ANNUAL REVIEW OF PERFORMANCE GOALS

Performance Period: 2022-23


Name C.Mathu Manager Mr.R.Arthanari
Employee Id TSD 110 Designation Deputy Manager - Operations
Designation Engineer
Grade L6
Department Quality Assurance
Division TSD Reviewer Mr.K.V.Santhosh
Location Banglore Designation VP- Operations

Level of
Actual achievement for Achievement of Previous Percentage of KRA
Performance Objective Performance Measure performance for the Documents Enclosed Weightage Self Feedback Manager Feedback Exemplary Achievement Weighted KRA Score
current year Year Achievement
rating of 5

These are defined


Manager to write in a
These specify how you will based on the Please briefly detail your thoughts on your appraisee's progress
These are critical and quantifiable outputs of a The target (numeric) The actual achievemen tof Please list below the Please briefly detail your thoughts on progress against your performance objectives. score basis the actual
measure the achievement of the The actual criticality and effort against his performance objectives. Please type "Yes"if the Its weighted average
job contributing to Essae and your success. for the Performance previous financial year documents enclosed to In case there are any factors that are hindering or inhibiting your performance please document them. achievement on this
Performance Objectives. achievement(numerical) for required for a Please also suggest areas that need focused effort for the remainder Performance is to be score of the KRA
(Please select no more than 6-8 Performance measure in the (numerical) for the substantiate your actual Performance
(Please list the data source e.g. the performance measure particular of the performance cycle. rated as "9" as per PPS achievement
Objectives.) adjoining column performance measure. achievement What's working well? What could be better? Objective.
monthly report) performance What's working well? What could be better?
objective.

Reduce Zero Hour Incoming Inspection for important materials also during sample inspection only done.so to be develop
% of Sales 1 25% Fixture or gauge inspection to avoid further flash reports. 0
Flash Reports

Reduce Warrenty
Period compliants in Nos/100 7 25% All electronics equipments are site level enviroment condttionlly must to be test at same condition factroy
Installations also to avoid the warrenty compliants. 0
IWT,AWS,TIM & RIM

Reduce Delivery
Delays In Percentage 4% 25% Special machine acceries stock to be maintained avoid loading time and reduce the delivery delays. 0

` 0

TO BE FILLED BY THE SUPERVISOR KRA SCORE 0.00

Training Topic/s (If required) -


Overall Rating: 0.00 0.00