This document is a letter from the Manager (Finance) of Koderma Thermal Power Station returning an unpassed bill to the Senior Engineer (Mechanical) - Operations. The bill was returned for the following reasons: [1] The required Contractor Performance Evaluation Report was not submitted; [2] A certificate confirming nothing is outstanding against the contractor was not included as it was a final bill; [3] The required NOC from HR was not furnished; [4] The Contractor Performance Evaluation Report was not provided; [5] A copy of the agreement was not included; and [6] Documents certifying EPF and ESI compliance for the month of June 2022, signed by HR, were not
This document is a letter from the Manager (Finance) of Koderma Thermal Power Station returning an unpassed bill to the Senior Engineer (Mechanical) - Operations. The bill was returned for the following reasons: [1] The required Contractor Performance Evaluation Report was not submitted; [2] A certificate confirming nothing is outstanding against the contractor was not included as it was a final bill; [3] The required NOC from HR was not furnished; [4] The Contractor Performance Evaluation Report was not provided; [5] A copy of the agreement was not included; and [6] Documents certifying EPF and ESI compliance for the month of June 2022, signed by HR, were not
This document is a letter from the Manager (Finance) of Koderma Thermal Power Station returning an unpassed bill to the Senior Engineer (Mechanical) - Operations. The bill was returned for the following reasons: [1] The required Contractor Performance Evaluation Report was not submitted; [2] A certificate confirming nothing is outstanding against the contractor was not included as it was a final bill; [3] The required NOC from HR was not furnished; [4] The Contractor Performance Evaluation Report was not provided; [5] A copy of the agreement was not included; and [6] Documents certifying EPF and ESI compliance for the month of June 2022, signed by HR, were not
KODERMA THERMAL POWER STATION BANJHEDIH, DISTT. - KODERMA
No: KT/FO/22/ 2gG Dtd. 13-09-2022
To, TheSE (Mech.)- Operation KTPS, DVVC 1411 e 2 Sub- Bill no. 10 dtd. 20.06.22 of M/s Tools Sales to cogljanea Center MANAgnctnn) Ref.-1. IBR no. 8941 Cofiauce Jeeumeds aloval 2. W.O. no. W&S/00003 dtd. 5.04.22 The the" COrhnconon hA, Lean dne Please refer above subjected bill, is returned poime rply t{lo herewith unpassed due to following reasons: 1. Conhoto tomace evapia epo shmihed'. 1. Contractor Performance Evaluation Report has not been submitted with the bill. 2 Cehchon asardlaho 2. As it is final bill hence certificate regarding wokug otslodiug "nothing outstanding against the contractor" is required on the body of the bill. Noc Sbmi4hecd 3. As it is final bill hence NOC (issued by HR)is 3 require. SubieA otraeter Agree no 4. Contractor Performance Evaluation Report has val | N 0 2.hae, not been furnished with the bill. A 5. Copy of the Agreement is require in term of clause 12 of the work order. eoupllaure FpF&EST 6. 6. As per certification in the pass order, work has been executed on 15.06.22 but EPF & ESI Jne 22 SusiHecl compliance document (certified by HR) for the month of Jun 22 has not been furnished with the e fion pekioof bill. 7 wov K Lecdy haem ondoned on H 7. Work execution period (Start date & completion date) has not been mentioned on the body of the bill from your end. The same is require in term of clause 7 of the work order and to co-relate with 0G.1-202
the Contractor Performance Evaluation Report
and EPF & ESI compliance document (signed by SE(M), oh HR). The same may plz be resubmitted after due needful.
NEA Memo To ECs No. 2015-036 - Guidelines in The Preparation of Accounting of Funds (AOF) and Identification of Allowable Charges Against Contingency Funds For Subsidy Funded Projects