Project:

Calculation Sheet BLOK TAMBAHAN PUSAT KHIDMAT AGENSI


ANTIDADAH KEBANGSAAN
(PKAADK) DAERAH JASIN, MELAKA (FASA II)

Title: Step (1) : Determine overland flow time of Design by: VNA
concentration (minutes) Date: 02/03/2012
REF. CALCULATION REMARK

MSMA DESIGN FOR SEDIMENT BASIN


2000
All procedures and calculations were carried out using Urban Stormwater Management
Manual for Malaysia (Manual Saliran Mesra Alam Malaysia - MSMAM)

Design Criteria:

The proposed development requires 1 no. of silt trap and the design data as follows:

Table 14.2 Length of Overland flow Lo = 12.50 m Lo


2
Area Catchment A= 2,722 m 0.272 ha A
Manning of Overland n= 0.01 n
Average Slope %, S= 0.20 % S
Construction Period = 2 years
Design Storm ARI = 3 months

1/3
Eq.14.1 Overland flow time to = 107.n.Lo
1/2
time of concentration S
= 5.55 mins to

Design Criteria:
Length of Overland flow Ld = 12.50 m Ld
Velocity v= 1.00 m/s (minimum) v

Drain time td = Ld
v
= 12.50 seconds
= 0.21 mins td

Time of Concentration tc = to + td
= 5.76 mins
Use tc = 15.00 mins tc

*or else tc to be assume manually by user

Confidential 25/5/2022 Silt Trap (1)1 of 2


Project:
Calculation Sheet BLOK TAMBAHAN PUSAT KHIDMAT AGENSI
ANTIDADAH KEBANGSAAN
(PKAADK) DAERAH JASIN, MELAKA (FASA II)

Title: Step (1) : Determine overland flow time of Design by: VNA
concentration (minutes) Date: 02/03/2012
REF. CALCULATION REMARK

MSMA DETERMINE OF RAINFALL INTENSITY, I


2000
For ARI of R years
Eq.13.2;
Vol. 4 LOCATION: Jasin, Melaka

Table 13.A1 ARI (Year) a b c d


2 3.7091 1.1622 -0.3289 0.0176
10 4.993 0.4661 -0.174 0.0069

Minor System (ARI = 2years)


Major System (ARI = 10years)

Eq.13.4; t (min) 30 40 50 55 60

2 years ln (t) 3.401 3.689 3.912 4.007 4.094


In [2It] 4.550 4.404 4.276 4.217 4.162
[2It](mm/hr) 94.603 81.792 71.944 67.851 64.198
Pt (mm) = 47.302 54.528 59.954 62.197 64.198
10 years ln (t) 3.401 3.689 3.912 4.007 4.094
In [10It] 4.837 4.691 4.567 4.511 4.458
[10It](mm/hr) 126.081 108.961 96.217 90.979 86.322
Pt (mm) = 63.041 72.641 80.181 83.398 86.322

tc < 30 minutes, therefore use Eq. 13.3 with Table & figure 13.3
Eq.13.3;

Eq.13.4; t (min) 10 15 20 30
2 years Fd 1.28 0.80 0.47 0
Pd (mm) 25.7 33.8 39.4 47.3
Id (mm/hr) 154.04 135.14 118.08 94.60
10 years Fd 1.28 0.80 0.47 0
Pd (mm) 33.2 44.4 52.1 63.0
Id (mm/hr) 199.44 177.66 156.29 126.08

Appendix 14.A for 2 years ARI C = 0.333 ( category 7)


14-24 Q2 = 0.03 m3/s

for 10 years ARI C = 0.419 ( category 7)


Q10 = 0.06 m3/s

Confidential 25/5/2022 Silt Trap (1)2 of 2