STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.

2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

1 General
151/GNRL-1/A/C-001 1 0 General notes for Civil Works 1452 / 28.07.09 2378 / 16.09.10 649 / 24.09.10
151/GNRL-1/A/C-003 Survey Layout & detail topographical survey of proposed conveyor at Dipka
1 0 Main CHP 1974 / 05.09.09 2378 / 16.09.10 649 / 24.09.10

151/GNRL-1/A/C-003 / 1 1 0 Detail topographical survey of proposed inpit conveyor 4219 / 24.03.11


2 Truck Receiving Station-1
151/TRS1-1/A/C-011 1 0 GA of Retaining wall for Truck Receiving Station-1 3341 / 17.12.11
1 do 3467 / 04.12.12 3172 / 12.01.13 1374 / 17.01.13
2 0 RC detail of Retaining wall for Truck Receiving Station-1 3341 / 17.12.11
1 do 3467 / 04.12.12 3172 / 12.01.13 1374 / 17.01.13
3 0 GA of Ground floor plan for Truck Receiving Station-1 3341 / 17.12.11
1 do 3467 / 04.12.12 3172 / 12.01.13 1374 / 17.01.13
4 0 Profile of Earthwork formation for Truck Receiving Station-1 3341 / 17.12.11
1 do 3467 / 04.12.12 3172 / 12.01.13 1374 / 17.01.13
5 0 RC detail & BBS of of Retaining wall for Truck Receiving Station-1 717 / 21.05.12
6 0 do 717 / 21.05.12
7 0 do 717 / 21.05.12
8 0 do 717 / 21.05.12
9 0 do 717 / 21.05.12

3 Truck Receiving Station-2


151/TRS2-1/A/C-015 1 0 GA of Retaining wall for Truck Receiving Station-2 3798 / 24.12.12 3522 / 12.02.13 703 / 14.02.13
RC derail of platform, beams and columns for Truck Receiving Station-2 3522 / 12.02.13 703 / 14.02.13
2 0 3798 / 24.12.12

3 0 RC detail of Retaining wall for Truck Receiving Station-2 3798 / 24.12.12 3522 / 12.02.13 703 / 14.02.13
4 0 Profile of Earthwork formation for Truck Receiving Station-2 3798 / 24.12.12 3522 / 12.02.13 703 / 14.02.13
151/SKSL/TRS2/SK-003 1 0 Truck Receiving Station: TRS-2A. Modofication of beam : PB-2 4741 / 03.0314
Truck Receiving Station: TRS-2A. Modofication of beam : PB-1, PB-2, PB-3 & PB- 24 / 01.04.14 4 / 01.04.14
2 4 5042 / 25.03.14

Document -- -- Revised design of beam mkd. PB-2 at R.L. 194.7m 4741 / 03.0314
Checking of section at connection point of wall and beam mkd. PB-1 to PB-4 at 24 / 01.04.14 4 / 01.04.14
2 R.L. 194.7m for truck receiving station TRS-2 5042 / 25.03.14

10 Conveyor C1 & C2
151/COC1-1/A/C-046 1 0 Foundation layout of trestles & tower for conveyor no C1 & C2 2934 / 19.11.11 3295 / 09.12.11 1095 / 23.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12
151/COC1-1/A/C-047 1 0 GA & R.C Details of Trestle & Tower foundations for conveyor C1 & C2 2934 / 19.11.11 3295 / 09.12.11 1095 / 23.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12

12 Conveyor C3 & C4
151/COC3-1/A/C-050 1 0 Foundation layout of trestles & tower for conveyor no C3 & C4 3060 / 30.11.11 3301 / 09.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12
151/COC3-1/A/C-051 1 0 GA & R.C Details of Trestle 7 tower foundations for conveyor C3 & C4 3060 / 30.11.11 3301 / 09.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12

14 Conveyor C5 & C6
151/COC5-1/A/C-054 1 0 Foundations layout of trestles & tower for conveyor no C5 & C6 3001 / 24.11.11 3285 / 08.12.11 1094 / 23.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12
151/COC5-1/A/C-055 1 0 GA & R.C Details of Trestle & Tower foundations for conveyor C5 & C6 3001 / 24.11.11 3285 / 08.12.11 1094 / 23.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12

16 Conveyor C7 & C8
151/COC7-1/A/C-058 1 0 Foundation layout of trestles & tower for conveyor C7 & C8 3131 / 06.12.11 3331 / 13.12.11
1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12
151/COC7-1/A/C-059 GA & R.C Details of Trestle & Tower foundation foundations for conveyor
1 0 C7 & C8 3131 / 06.12.11 3331 / 13.12.11

1 do 3226 / 19.11.12 2829 / 10.12.12 H-576 / 14.12.12

18 Conveyor P1,Q1,R1
151/COP1, Q1, R1-1/A/C-062 1 0 Layout of foundations for conveyor no P1,Q1,R1 128 / 12.04.10
1 of 2 1 do 2458 / 29.09.11
2 do 2782 / 08.11.11 2948 / 17.11.11 2392 / 01.12.11
2 of 2 0 do 2458 / 29.09.11 2948 / 17.11.11 82 / 23.04.12

151/COP1-1/A/C-063 1 of 3 0 GA & R.C Details of Trestle foundation for conveyor P1,Q1,R1 128 / 12.04.10
1 of 7 1 do 2782 / 08.11.11 2948 / 17.11.11 2392 / 01.12.11
2 of 3 0 do 128 / 12.04.10
2 of 7 1 do 2782 / 08.11.11 2948 / 17.11.11 2392 / 01.12.11
3 of 3 0 do 128 / 12.04.10

1 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

3 of 7 1 do 2782 / 08.11.11 2948 / 17.11.11 2392 / 01.12.11


4 of 7 0 do 2458 / 29.09.11
1 do 2782 / 08.11.11 2948 / 17.11.11 82 / 23.04.12
5 of 7 0 do 2458 / 29.09.11
1 do 2782 / 08.11.11 2948 / 17.11.11 82 / 23.04.12
6 of 7 0 do 2458 / 29.09.11
1 do 2782 / 08.11.11 2948 / 17.11.11 82 / 23.04.12
7 of 7 0 do 2458 / 29.09.11
1 do 2782 / 08.11.11 2948 / 17.11.11 82 / 23.04.12
8 0 Ga & RC details of ground floor slab for conveyor P1,Q1,R1 3783 / 24.01.12 H - 25 / 12.04.12
151/DH/P1, Q1, R1-1/A/C-150 GA & RC details of foundation of Drive house for conveyor nos P1, Q1, R1
1 of 6 0 1372 / 09.07.11

1 do 2266 / 13.09.11 2277 / 19.09.11 994 / 22.09.11


2 of 6 0 do 1372 / 09.07.11
1 do 2266 / 13.09.11 2277 / 19.09.11 994 / 22.09.11
3 of 6 0 do 1372 / 09.07.11
1 do 2266 / 13.09.11 2277 / 19.09.11 994 / 22.09.11
4 of 6 0 do 1372 / 09.07.11
1 do 2266 / 13.09.11 2277 / 19.09.11 994 / 22.09.11
5 of 6 0 do 1372 / 09.07.11
1 do 2266 / 13.09.11 2277 / 19.09.11 994 / 22.09.11
6 of 6 0 do 1372 / 09.07.11
1 do 2266 / 13.09.11 2277 / 19.09.11 994 / 22.09.11
GA & RC details of equipment foundations & ground floor slab of Drive house
7 0 for conveyor nos P1, Q1, R1 839 / 28.05.12 765 / 05.06.12 H -161 / 19.06.12

8 0 do 839 / 28.05.12 765 / 05.06.12 H -161 / 19.06.12


9 GA & R C details of foundation of HGTU for conveyors P1, Q1 & R1 1350 / 03.07.12 1259 / 20.07.12 515 / 20.07.12

2 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

19 Conveyor P2,Q2,R2
151/COP2-1/A/C-064 1 0 Foundation layout of trestles & towers for conveyor P2,Q2,R2 2711 / 01.11.11 2981 / 21.11.11 1199/07.12.12
1 do 56 / 22.03.13 4047/26.03.13
151/COP2-1/A/C-065 GA & R.C Details of Trestle & tower foundations for conveyor P2,Q2,R2
1 0 2711 / 01.11.11 2981 / 21.11.11 1199/07.12.12

1 do 56 / 22.03.13
2 0 do 2711 / 01.11.11 2981 / 21.11.11 1199/07.12.12
1 do 56 / 22.03.13 4047/26.03.13
3 0 do 2711 / 01.11.11 2981 / 21.11.11 1199/07.12.12
1 do 56 / 22.03.13 4047/26.03.13
4 0 do 2711 / 01.11.11 2981 / 21.11.11 1199/07.12.12
1 do 56 / 22.03.13 4047/26.03.13
5 0 GA & RC details of ground floor slab for conveyor P2,Q2,R2 4030 / 11.02.12
1 do 841 / 28.05.12
2 do 4649 / 23.02.13 142 / 11.04.13 1722 / 15.04.13
6 2 do 4649 / 23.02.13 142 / 11.04.13 1722 / 15.04.13
GA & RC details of foundation of tail pulley frames for conveyor nos P2, Q2, R2
7 0 4649 / 23.02.13 142 / 11.04.13 1722 / 15.04.13

151/DH/P2,Q2,R2-1/A/C-151 GA & RC details of foundation of Drive House for conveyor nos P2, Q2,R2
1 of 6 0 4030 / 11.02.12

1 do 3995 / 08.01.13 3178/15.01.13 1383/19.01.13


2 do 0020 / 03.04.13 168/15.04.13 858 / 17.04.13
2 of 6 0 do 4030 / 11.02.12
1 do 3995 / 08.01.13 3178/15.01.13 1383/19.01.13
2 do 0020 / 03.04.13 168/15.04.13 858 / 17.04.13
3 of 6 0 do 4030 / 11.02.12
1 do 3995 / 08.01.13 3178/15.01.13 1383/19.01.13
2 do 0020 / 03.04.13 168/15.04.13 858 / 17.04.13
4 of 6 0 do 4030 / 11.02.12
1 do 3995 / 08.01.13 3178/15.01.13 1383/19.01.13
2 do 0020 / 03.04.13 168/15.04.13 858 / 17.04.13
5 of 6 0 do 4030 / 11.02.12
1 do 3995 / 08.01.13 3178/15.01.13 1383/19.01.13
2 do 0020 / 03.04.13 168/15.04.13 858 / 17.04.13
6 of 6 0 do 4030 / 11.02.12
1 do 3995 / 08.01.13 3178/15.01.13 1383/19.01.13
GA & RC details of equipment foundations & ground floor slab of Drive House
7 0 for conveyor nos P2, Q2,R2 143 / 12.04.12 3388/01.02.13 671 / 01.02.13

8 0 do 143 / 12.04.12 3388/01.02.13 671 / 01.02.13


9 0 GA & R C details of foundation of HGTU for conveyors P2, Q2 & R2 1350 / 03.07.12 2943 / 20.12.12 H- 613 / 07.01.13

3 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

21 Conveyor B1,B2,B3
151/COB1, B2, B3 -1/A/C-068 1 0 Layout of foundations for conveyor no B1,B2,B3 3699 / 18.02.10 4251 / 19.02.11 698 / 18.03.11
151/COB1, B2, B3 -1/A/C-069 1 of 3 0 GA & R.C Details of foundation for conveyor B1,B2,B3 3699 / 18.02.10 4251 / 19.02.11 698 / 18.03.11
2 of 3 0 3699 / 18.02.10 4251 / 19.02.11 698 / 18.03.11
3 of 3 0 3699 / 18.02.10 4251 / 19.02.11 698 / 18.03.11
151/ DH / B1, B2, B3 -1/A/C-043 1 0 Layout of foundations of Drive house for conveyor no B1,B2,B3 4001/ 13.03.10
1 do 1500 / 16.07.11 1584 / 22.07.11 944 / 04.08.11
151/ DH / B1, B2, B3 -1/A/C-043 2 1 GA & R.C Details of foundation of Drive house for conveyor B1,B2,B3 1500 / 16.07.11 1584 / 22.07.11 944 / 04.08.11
151/ DH / B1, B2, B3 -1/A/C-043 3 1 do 1500 / 16.07.11 1584 / 22.07.11 944 / 04.08.11
151/ DH / B1, B2, B3 -1/A/C-043 4 1 do 1500 / 16.07.11 1584 / 22.07.11 944 / 04.08.11
151/ DH / B1, B2, B3 -1/A/C-043 GA & R C details of equipment foundations and ground floor slab of drive
5 0 house for conveyors B1, B2 & B3 4091/ 16.02.12 4745 / 29.03.12 H - 75 / 08.05.12

151/ DH / B1, B2, B3 -1/A/C-043 6 0 GA & RC details of foundation of HGTU for Conveyors B1, B2 & B3. 1219/ 22.06.12 1174 / 04.07.12 204 / 07.07.12

Conveyor B4,B5
151/ HGTU / B4, B5 -1/A/C-152 1 0 GA & R C details of foundation of HGTU for conveyors B4, B5 4343 / 01.02.13 3448/05.02.13 680 / 06.02.13
GA & R C details of foundations for sand pits of HGTU for conveyors B4, B5
2 0 4343 / 01.02.13 3448/05.02.13 680 / 06.02.13

GA & R C details of sheave fixing pedestal foundation of HGTU for conveyors


3 0 B4, B5 4343 / 01.02.13 3448/05.02.13 680 / 06.02.13

Conveyor B6,B7
151/ HGTU / B6, B7 -1/A/C-153 1 of 2 0 GA & R C details of foundation of HGTU for conveyors B6, B7 4485 / 11.02.13 3708 / 26.02.13 1497 / 02.03.13
GA & R C details of foundations for sand pits of HGTU for conveyors B6, B7
2 of 2 0 4485 / 11.02.13 3708 / 26.02.13 1497 / 02.03.13

22 Conveyor B8,B9
151/COB8, B9 -1/A/C-070 1 0 Layout of foundations for conveyor no B8,B9 2734 / 23.11.09
0/1 do 1990 / 27.09.10 2576 / 01.10.10 710 / 11.10.10
151/COB8, B9-0/A/C-071 1 0 GA & R.C Details of Trestle foundation for conveyor B8,B9 2734 / 23.11.09
1 do 1990 / 27.09.10 2576 / 01.10.10 710 / 11.10.10
151/COB8, B9-0/A/C-071 Layout plan, sections & RCCdetails of Ground floor for conveyor
2 0 B8 / B9 867 / 06.06.11 997 / 10.06.11 849 / 16.06.11

151/DH B8, B9-1/A/C-074 1 0 GA & RC detail of foundation of drive house for Conveyors B8, B9. 3274 / 09.01.10
1 do 1162 / 25.06.11 1334 / 05.07.11 897 / 09.07.11
151/DH B8, B9-1/A/C-075 1 of 2 0 do 3274 / 09.01.10
1 do 1162 / 25.06.11 1334 / 05.07.11 897 / 09.07.11
151/DH B8, B9-2/A/C-075 2 of 2 0 do 3274 / 09.01.10
1 do 1162 / 25.06.11 1334 / 05.07.11 897 / 09.07.11
151/DH B8, B9-1/A/C-075 GA & RC details of equipment foundations & ground floor slab of drive house
3 0 for Conveyors B8, B9. 4159 / 21.02.12 4745 / 29.03.12 H - 75 / 08.05.12

151/DH B8, B9-1/A/C-075 4 GA & RC details of foundation of HGTU for Conveyors B8 & B9. 1219/ 22.06.12 1174 / 04.07.12 204 / 07.07.12
23 Conveyor B10, B11
151/COB10 -1/A/C-072 1 0 Layout of foundations for conveyor no B10, B11 2812 / 30.11.09 4251 / 19.02.11 698 / 18.03.11
151/COB10-1/A/C-073 1 0 GA & R.C Details of Trestle foundation for conveyor B10, B11 2812 / 30.11.09 4251 / 19.02.11 698 / 18.03.11
Layout plan, sections & RCCdetails of Ground floor for conveyor B10 / B11
2 0 1017 / 16.06.11 1225 / 24.06.11 H - 862 / 27.06.11

151/DH B10, B11-1/A/C-078 1 0 GA & RC detail of foundation of drive house for Conveyors B10, B11. 3714 / 19.02.10
1 do 1531 / 19.07.11 1585 / 22.07.11 935 / 30.07.11
151/DH B10, B11-1/A/C-079 1 0 RCC detail of Grade beams of Drive house for Conveyor B10 & B11 3714 / 19.02.10
1 do 1531 / 19.07.11 1585 / 22.07.11 935 / 30.07.11
RCC detail of Columns & Footings of Drive house for Conveyor B10 & B11
2 0 3714 / 19.02.10

1 do 1531 / 19.07.11 1585 / 22.07.11 935 / 30.07.11


GA & RC details of equipment foundations & ground floor slab of drive house
3 0 for conveyor B10 / B11 4354 / 07.03.12 4745 / 29.03.12 H - 75 / 08.05.12

4 0 GA & RC detail of foundations for HGTU for conveyors B10 / B11 2757 / 10.10.12 2348 / 16.10.12 1033 / 31.10.12

24 Conveyor B12, B13


151/COB12, 13 -1/A/C-076 1 of 2 0 Layout of foundations for conveyor no B12, B13 3060/ 19.12.09
0/1 do 1990 / 27.09.10 2576 / 01.10.10 710 / 11.10.10
2 of 2 0 3060/ 19.12.09
0/1 do 1990 / 27.09.10 2576 / 01.10.10 710 / 11.10.10
151/COB12, 13-1/A/C-077 1 0 GA & R.C Details of Trestle foundation for conveyor B12, B13 3060/ 19.12.09 2576 / 01.10.10 710 / 11.10.10
Layout plan, sections & RCCdetails of Ground floor for conveyor B12 / B13
2 0 902 / 09.06.11 1078 / 17.06.11 H - 859 / 22.06.11

3 0 do 902 / 09.06.11 1078 / 17.06.11 H - 859 / 22.06.11


151/DH B12, B13-1/A/C-044 1 0 GA & RC detail of foundation of drive house for Conveyors B12, B13. 3886 / 04.03.10
1 do 1102 / 22.06.11 1263 / 29.06.11 889 / 06.07.11
151/DH B12, B13-1/A/C-045 1 0 GA & RC detail of foundation of drive house for Conveyors B12, B13. 3886 / 04.03.10

4 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

1 do 1102 / 22.06.11 1263 / 29.06.11 889 / 06.07.11


2 0 do 3886 / 04.03.10
1 do 1102 / 22.06.11 1263 / 29.06.11 889 / 06.07.11
GA & R C details of equipment foundations and ground floor slab of drive
3 0 house for conveyors B12 & B13 4091/ 16.02.12 4745 / 29.03.12 H - 75 / 08.05.12

4 0 GA & R C details of foundation of HGTU for conveyors B12 & B13 1350 / 03.07.12 1259 / 20.07.12 515 / 20.07.12
GA & R C detail of sheave fixing pedestal for HGTU for conveyor B12 & B13
5 0 2757 / 10.10.12 1033 / 31.10.12

6 0 GA & R C detail of sand pit for HGTU for conveyor B12 & B13 2755 / 10.10.12 2348 / 16.10.12 1033 / 31.10.12
25 Transfer House-1
151/TRH1-1/A/C-080 1 0 GA & R.C Details of foundations for Transfer House-1 4461/ 15.03.12
1 of 5 1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
2 do 5052 / 25.03.13 886 / 13.05.13 925 / 14.05.13
2 0 do 4461/ 15.03.12
2 of 5 1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
3 0 do 4461/ 15.03.12
3 of 5 1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
4 of 5 0 do 4461/ 15.03.12 2912 / 17.12.12 H -584 / 20.12.12
1 do 4649 / 23.02.13 886 / 13.05.13 925 / 14.05.13
5 of 5 0 do 4461/ 15.03.12 2912 / 17.12.12 H -584 / 20.12.12
1 do 4649 / 23.02.13 886 / 13.05.13 925 / 14.05.13
26 Transfer House-2
151/TRH2-1/A/C-081 1 of 3 0 GA & R.C Details of foundations for Transfer House-2 2601 / 19.10.11 3098 / 26.11.11 1072 / 08.12.11
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
2 of 3 0 do 2601 / 19.10.11 3098 / 26.11.11 1072 / 08.12.11
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
3 of 3 0 do 2601 / 19.10.11 3098 / 26.11.11 1072 / 08.12.11

27 Transfer House-3
151/TRH3-1/A/C-082 1 of 3 0 GA & R.C Details of foundations for Transfer House-3 4190/ 23.02.12
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
2 of 3 0 do 4190/ 23.02.12
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
3 of 3 0 do 4190/ 23.02.12
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
28 Transfer House-4
151/TRH4-1/A/C-083 1 of 3 0 GA & R.C Details of foundations for Transfer House-4 2733 / 03.11.11 3098 / 26.11.11 1072 / 08.12.11
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
2 of 3 0 do 2733 / 03.11.11 3098 / 26.11.11 1072 / 08.12.11
1 do 3257 / 20.11.12 2912 / 17.12.12 H -584 / 20.12.12
3 of 3 0 do 2733 / 03.11.11 3098 / 26.11.11 1072 / 08.12.11

31 Transfer House-7
151/TRH7-1/A/C-086 1 0 GA & Details of foundation for Transfer House- TRH - 7 4344/ 06.03.12 2830 / 10.12.12 H-573 / 12.12.12
2 0 Layout and details of tie beams for Transfer House-7 TRH - 7 4344/ 06.03.12 3229 / 17.01.13
1 do 4090/ 11.01.13 651 / 25.01.13
3 0 Floor plans and misc. details for Transfer House-TRH - 7 4344/ 06.03.12
1 do 4090/ 11.01.13 3229 / 17.01.13 651 / 25.01.13

2 do Through IC at site on
04.02.13
Monorail fixing arrangement for floor at (+) 250.200 m for Transfer House-TRH
4 0 -7 4344/ 06.03.12

1 do 4090/ 11.01.13 3229 / 17.01.13 651 / 25.01.13

2 do Through IC at site on
04.02.13
5 0 RC details of beams & stair for Transfer House-TRH - 7 4344/ 06.03.12
1 do 4090/ 11.01.13 3229 / 17.01.13 651 / 25.01.13
Through IC at site on
2 do 04.02.13

32 Transfer House-8
151/TRH8-1/A/C-087 1 of 4 0 GA & R.C Details of foundations for Transfer House - TH - 8 268 / 23.04.10
1 do 3609 / 07.01.12 3796 / 13.01.12 1155 / 23.01.12
2 of 4 0 do 268 / 23.04.10
1 do 3609 / 07.01.12 3796 / 13.01.12 1155 / 23.01.12
3 of 4 0 do 268 / 23.04.10
1 do 3609 / 07.01.12 3796 / 13.01.12 1155 / 23.01.12
4 of 4 0 do 268 / 23.04.10
1 do 3609 / 07.01.12 3796 / 13.01.12 1155 / 23.01.12

33 Transfer House-9

5 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

151/TRH9-1/A/C-088 1 of 4 0 GA & R.C Details of foundations for Transfer House-9 1576 / 20.08.10 473 / 09.05.11 H - 797 / 11.05.11
2 of 4 0 do 1576 / 20.08.10 473 / 09.05.11 H - 797 / 11.05.11
3 of 4 0 do 1576 / 20.08.10 473 / 09.05.11 H - 797 / 11.05.11
4 of 4 0 do 1576 / 20.08.10 473 / 09.05.11 H - 797 / 11.05.11
34 Transfer House-10
151/TRH10-1/A/C-089 1 of 3 0 GA & R.C Details of foundations for Transfer House-10 3384/ 19.01.10
1 do 1102 / 22.06.11 1262 / 29.06.11 890 / 06.07.11
2 of 3 0 do 3384/ 19.01.10
1 do 1102 / 22.06.11 1262 / 29.06.11 890 / 06.07.11
151/TRH10-2/A/C-089 3 of 3 0 do 3384/ 19.01.10
1 do 1102 / 22.06.11 1262 / 29.06.11 890 / 06.07.11
35 Transfer House-11
151/TRH11-1/A/C-090 1 of 3 0 GA & R.C Details of foundations for Transfer House-11 2493 / 31.10.09
1 do 1102 / 22.06.11 1262 / 29.06.11 890 / 06.07.11
2 do 094 / 09.04.12 H - 68 / 04.05.12
2 of 3 0 do 2493 / 31.10.09
1 do 1102 / 22.06.11 1262 / 29.06.11 890 / 06.07.11
2 do 094 / 09.04.12 H - 68 / 04.05.12
151/TRH11-2/A/C-090 3 of 3 0 do 2493 / 31.10.09
1 do 1102 / 22.06.11 1262 / 29.06.11 890 / 06.07.11
2 do 094 / 09.04.12 H - 68 / 04.05.12
36 Bunker 1
151/BNK1-1/A/C-091 1 of 6 0 GA and Sections of Foundations for RCC overhead Bunker-1 2679 / 17.11.09 2729 / 19.10.10 749 / 28.10.10
GA plan at RL(+) 326.200 M & (+) 330.500 M level for RCC overhead Bunker-1
2 of 6 0 2679 / 17.11.09 2729 / 19.10.10 749 / 28.10.10

GA plan at RL(+) 334.500 M & (+) 340.000 M level for RCC overhead Bunker-1
3 of 6 0 2679 / 17.11.09 2729 / 19.10.10 749 / 28.10.10

4 of 6 0 GA plan at RL(+) 346.500 M for RCC overhead Bunker-1 2679 / 17.11.09 2729 / 19.10.10 749 / 28.10.10
1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
2 do 3725/ 18.01.12 4028 / 01.02.12 1201 / 21.02.12
3 do 1263/ 26.06.12 1501 / 10.08.12 H - 302 / 17.08.12
5 of 6 0 Longitudinal Sectional elevations for RCC overhead Bunker-1 2679 / 17.11.09 2729 / 19.10.10 749 / 28.10.10
6 of 6 0 Cross Sectional elevation for RCC overhead Bunker-1 2679 / 17.11.09 2729 / 19.10.10 749 / 28.10.10
1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
2 do 010 / 02.04.12
151/BNK1-1/A/C-092 1 of 4 0 RCC detail of footings for RCC overhead Bunker-1. 3425/ 22.01.10 2729 / 19.10.10 749 / 28.10.10
2 of 4 0 BBS and RCC detail of footings for RCC overhead Bunker -1. 3425/ 22.01.10 2729 / 19.10.10 749 / 28.10.10
3 of 4 0 RCC detail of column for RCC overhead Bunker -1. 3425/ 22.01.10 2729 / 19.10.10 749 / 28.10.10
4 of 4 0 BBS and RCC detail of column for RCC overhead Bunker-1 3425/ 22.01.10 2729 / 19.10.10 749 / 28.10.10
5 0 RCC detail of beam at EL (+) 326.20 m for RCC overhead Bunker 1 2752/ 26.11.10 3454 / 16.12.10 1091 / 13.01.11
6 0 RCC detail of beam at EL (+) 330.50 m for RCC overhead Bunker 1 2752/ 26.11.10 3454 / 16.12.10 1091 / 13.01.11
7 0 RCC detail of slab at EL (+) 334.50 m for RCC overhead Bunker 1 3299 / 08.01.11 452 / 06.05.11 798 / 12.05.11
8 0 RCC detail of beam at EL (+) 334.50 m for RCC overhead Bunker 1 3299 / 08.01.11 452 / 06.05.11 798 / 12.05.11
RCC detail of Hopper wall near expansion joint for RCC overhead Bunker 1
9 0 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11

10 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11


11 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
12 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
13 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
14 0 RCC detail of Hopper wall for RCC overhead Bunker 1 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
15 0 do 4022 / 08.03.11
1 do 332 / 28.04.11 452 / 06.05.11 798 / 12.05.11
16 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
17 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
18 0 do 4022 / 08.03.11 452 / 06.05.11 798 / 12.05.11
19 0 RCC detail of vertical wall for RCC overhead Bunker 1 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
20 0 BBS of vertical wall for RCC overhead Bunker 1 162 / 14.04.11
1 do 332 / 28.04.11 452 / 06.05.11 798 / 12.05.11
21 0 RCC detail of Beam at EL (+) 339.75 M for RCC overhead Bunker 1 654 / 21.05.11
1 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
RCC detail of Beam & slab at EL (+) 339.75 M for RCC overhead Bunker 1
22 0 654 / 21.05.11

1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11


23 0 RC plan of roof slab at (+) 346.500 of RCC overhead Bunker 1 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
RC sections & details of roof slab at (+) 346.500 of RCC overhead Bunker 1
24 0 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11

1 do 3725/ 18.01.12 4028 / 01.02.12 1201 / 21.02.12


25 0 RC details of roof beam at (+) 346.500 of RCC overhead Bunker 1 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
26 0 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
27 0 do 1399 / 11.07.11

6 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

1 do 2514 / 10.10.11 2584 / 17.10.11 1030 / 27.10.11


28 0 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
29 0 GA & detail of liner plate for RCC overhead Bunker 1 1017 / 16.06.11 1416 / 11.07.11 930 / 28.07.11
1 do 010 / 02.04.12 019 / 09.04.12

7 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

30 0 do 1017 / 16.06.11 1416 / 11.07.11 930 / 28.07.11


1 do 010 / 02.04.12 019 / 09.04.12
31 0 do 1017 / 16.06.11 1416 / 11.07.11 930 / 28.07.11
1 do 010 / 02.04.12 019 / 09.04.12
32 0 do 1017 / 16.06.11 1416 / 11.07.11 930 / 28.07.11
1 do 010 / 02.04.12 019 / 09.04.12
151/BNK1-0/A/c-092 33 0 GA & RC detail of ground floor for RCC overhead Bunker 1 4564 / 26.03.12 674 / 28.05.11 H - 136 / 07.06.12
34 0 do 4564 / 26.03.12 674 / 28.05.11 H - 136 / 07.06.12
37 Bunker 2
151/BNK2-1/A/C-093 1 of 6 0 GA and sections of foundations for RCC overhead Bunker-2 3166 / 31.12.09 2729 / 19.10.10 749 / 28.10.10
GA plan at RL (+) 326.200m & (+) 330.500m level for RCC Overhead Bunker-2.
2 of 6 0 3166 / 31.12.09 2729 / 19.10.10 749 / 28.10.10

GA plan at RL (+) 334.500m & (+) 340.000m level for RCC Overhead Bunker-2.
3 of 6 0 3166 / 31.12.09 2729 / 19.10.10 749 / 28.10.10

4 of 6 0 GA plan at RL (+) 346.500m for RCC Overhead Bunker -2. 3166 / 31.12.09 2729 / 19.10.10 749 / 28.10.10
1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
2 do 3725/ 18.01.12 4028 / 01.02.12 1201 / 21.02.12
3 do 1263/ 26.06.12 1501 / 10.08.12 H - 302 / 17.08.12
5 of 6 0 Longitudinal sectional elevations for RCC Overhead Bunker -2 3166 / 31.12.09 2729 / 19.10.10 749 / 28.10.10
6 of 6 0 Cross sectional elevation for RCC Overhead Bunker-2 3166 / 31.12.09 2729 / 19.10.10 749 / 28.10.10
1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
151/BNK2-1/A/C-094 1 of 4 0 RCC detail of footings for RCC overhead Bunker-2. 1908 / 21.09.10 2756 / 20.10.10 750 / 28.10.10
2 of 4 0 BBS and RCC detail of footings for RCC overhead Bunker -2. 1908 / 21.09.10 2756 / 20.10.10 750 / 28.10.10
3 of 4 0 RCC detail of column for RCC overhead Bunker -2. 1908 / 21.09.10 2756 / 20.10.10 750 / 28.10.10
4 of 4 0 BBS and RCC detail of column for RCC overhead Bunker-2 1908 / 21.09.10 2756 / 20.10.10 750 / 28.10.10
5 0 RCC detail of beam at EL (+) 326.20 m for RCC overhead Bunker 2 3139 / 24.12.10 3710 / 10.01.11
1 3902 / 26.02.11 4677 / 29.03.11 707 / 29.03.11
6 0 RCC detail of beam at EL (+) 330.50 m for RCC overhead Bunker 2 3139 / 24.12.10 3710 / 10.01.11 656 / 16.02.11
7 0 RCC detail of slab at EL (+) 334.50 m for RCC overhead Bunker 2 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
8 0 RCC detail of beam at EL (+) 334.50 m for RCC overhead Bunker 2 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
RCC detail of Hopper wall near expansion joint for RCC overhead Bunker 2
9 0 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11

10 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11


11 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
12 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
13 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
14 0 RCC detail of Hopper wall for RCC overhead Bunker 2 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
15 0 do 162 / 14.04.11
1 do 332 / 28.04.11 452 / 06.05.11 798 / 12.05.11
16 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
17 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
18 0 do 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
19 0 RCC detail of vertical wall for RCC overhead Bunker 2 162 / 14.04.11 452 / 06.05.11 798 / 12.05.11
20 0 BBS of vertical wall for RCC overhead Bunker 2 162 / 14.04.11
1 do 332 / 28.04.11 452 / 06.05.11 798 / 12.05.11
21 0 RCC detail of Beam at EL (+) 339.75 M for RCC overhead Bunker 2 654 / 21.05.11
1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
RCC detail of Beam & slab at EL (+) 339.75 M for RCC overhead Bunker 2
22 0 654 / 21.05.11

1 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11


23 0 RC plan of roof slab at (+) 346.500 of RCC overhead Bunker 2 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
RC sections & details of roof slab at (+) 346.500 of RCC overhead Bunker 2
24 0 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11

1 do 3725/ 18.01.12 4028 / 01.02.12 1201 / 21.02.12


25 0 RC details of roof beam at (+) 346.500 of RCC overhead Bunker 2 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
26 0 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
27 0 do 1399 / 11.07.11
1 do 2514 / 10.10.11 2584 / 17.10.11 1030 / 27.10.11
28 0 do 1399 / 11.07.11 2235 / 15.09.11 995 / 23.09.11
GA & detail of liner plate for RCC overhead Bunker 1overhead Bunker 2
29 0 1399 / 11.07.11 1498 / 15.07.11 925 / 26.07.11

30 0 do 1399 / 11.07.11 1498 / 15.07.11 925 / 26.07.11


31 0 do 1399 / 11.07.11 1498 / 15.07.11 925 / 26.07.11
32 0 do 1399 / 11.07.11 1498 / 15.07.11 925 / 26.07.11
33 0 GA & RC detail of ground floor for RCC overhead Bunker 2 1034 / 11.06.12 1171 / 04.07.11 203 / 07.07.12
34 0 do 1034 / 11.06.12 1171 / 04.07.11 203 / 07.07.12

38 Truck Loading Station - I


151/TLS1-1/A/C-095 1 0 RC GA and detail of foundations for truck loading Station-1 2964 / 11.12.09 4654 / 28.03.11 H - 733 / 09.04.11
2 0 RC GA and detail of floor slab plan for truck loading Station-1 2656 / 04.10.12 2926 / 19.12.12 H - 586 / 21.12.12
39 Truck Loading Station -2

8 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

151/TLS2-1/A/C-097 1 0 RC GA and detail of foundations for truck loading Station-2 3096 / 23.12.09 4654 / 28.03.11 H - 733 / 09.04.11
2 0 RC GA and detail of floor slab plan for truck loading Station-2 2656 / 04.10.12 2926 / 19.12.12 H - 586 / 21.12.12
40 3.3 KV Substation - I
151/SS31-1/A/C-099 1 0 GA plans,elevations & sections of 3.3 KV Substation -I 2156 / 24.09.09
1 do 3122/ 28.12.09
2 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11
3 do 3959/ 07.02.12 4166 / 13.02.12 H -1277/31.03.12
151/SS31-1/A/C-100 Layout & R.C.C. detail of foundations, columns, beams & slabs for Substation-I
1 0 (3.3 KV) 3122/ 28.12.09

1 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11


41 3.3 KV Substation - II
151/SS32-1/A/C-104 1 0 GA plans,elevations & sections of 3.3 KV Substation -II 2156 / 24.09.09
1 do 3122/ 28.12.09
2 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11
3 do 3959/ 07.02.12 H -1277/31.03.12
151/SS32-1/A/C-105 Layout & R.C.C. detail of foundations, columns, tie beams for Substation-II (3.3
1 KV) 3122/ 28.12.09

1 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11


151/SS32-1/A/C-106 1 0 R.C.C. detail of slab & roof beams for Substation-II (3.3 KV) 3122/ 28.12.09
1 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11
42 3.3 KV Substation - III
151/SS33-1/A/C-109 1 0 GA plans,elevations & sections of 3.3 KV Substation -III 2156 / 24.09.09
1 do 3122/ 28.12.09
2 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11

3 do 3959/ 07.02.12 4166 / 13.02.12 H - 1277 / 31.03.12

151/SS33-1/A/C-110 Layout & R.C.C. detail of foundations, columns, tie beams for Substation-III (3.3
1 0 KV) 3122/ 28.12.09

1 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11


151/SS33-1/A/C-111 1 0 R.C.C. detail of slab & roof beams for Substation-III (3.3 KV) 3122/ 28.12.09
1 do Verbal discussion 606 / 18.05.11 H - 818 / 23.05.11
43 3.3 KV Substation - IV
151/SS34-1/A/C-114 1 0 GA plans,elevations & sections of 3.3 KV Substation -IV 2156 / 24.09.09
1 do 3122/ 28.12.09
2 do 1094 / 22.06.11 1443 / 11.07.11 924 / 26.07.11

3 do 3959/ 07.02.12 4166 / 13.02.12 H - 1277 / 31.03.12

151/SS34-1/A/C-115 Layout & R.C.C. detail of foundations, columns for Substation-IV (3.3 KV)
1 0 3122/ 28.12.09

1 do 1094 / 22.06.11 1443 / 11.07.11 924 / 26.07.11


151/SS34-1/A/C-116 1 0 R.C.C. details of tie beams & stair case for Substation-IV (3.3 KV) 3122/ 28.12.09
1 do 1094 / 22.06.11 1443 / 11.07.11 924 / 26.07.11
151/SS34-1/A/C-117 R.C.C. details of slab, beams at lev 5.100 M & lev 8.600 M for Substation-IV (3.3
1 0 KV) 3122/ 28.12.09

1 do 1094 / 22.06.11 1443 / 11.07.11 924 / 26.07.11


44 6.6 KV Substation - I
151/SS61-1/A/C-119 1 0 GA plans,elevations & sections of 6.6 KV Substation -I 2156 / 24.09.09
1 do 3626 / 15.02.10
2 do 1094 / 22.06.11 1499 / 15.07.11 856 / 25.07.11
3 do 225/19.04.12
4 do 019/09.08.12
4 do 1039/01.11.12 3036 / 31.12.12 H - 612 / 07.01.13
151/SS61-1/A/C-120 Layout & RCC detail of foundation,columns & tie beams for 6.6 KV Substation-I
1 0 3626 / 15.02.10

1 do 1094 / 22.06.11 1499 / 15.07.11 856 / 25.07.11


2 do 225/19.04.12
3 do 4253/24.01.13 3520/11/12.02.13 1409/15.02.13

151/SS61-1/A/C-121 1 0 RCC detail of slab at EL (+) 5.100 M for 6.6 KV Substation-I 3626 / 15.02.10
1 do 1094 / 22.06.11 1499 / 15.07.11 856 / 25.07.11
45 6.6 KV Substation - II
151/SS62-1/A/C-124 1 0 GA plans,elevations & sections of 6.6 KV Substation -II 2156 / 24.09.09
1 do 3626 / 15.02.10
3690 / 13.01.12
2 do
4237 / 29.02.12
3 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

151/SS62-1/A/C-125 Layout & RCC detail of foundation,columns & tie beams for 6.6 KV Substation-II
1 0 3626 / 15.02.10

1 do 4237 / 29.02.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

9 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

151/SS62-1/A/C-126 1 0 RCC detail of tie beams for 6.6 KV Substation-II 3626 / 15.02.10
1 do 4237 / 29.02.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

151/SS62-1/A/C-127 1 0 RCC details of Slab,beams at different levels of 6.6 KV Substation-II 3626 / 15.02.10
1 do 4237 / 29.02.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

46 6.6 KV Substation - III


151/SS63-1/A/C-129 1 0 GA plans,elevations & sections of 6.6 KV Substation -III 2156 / 24.09.09
1 do 001 / 01.04.11
2 do 3690 / 13.01.12
3 do 3373 / 27.11.12 3450 / 05.02.13 681 / 06.02.13

151/SS63-1/A/C-130 Layout & RCC detail of foundation,columns & tie beams for 6.6 KV Substation-
1 0 III 001 / 01.04.11

1 do 3690 / 13.01.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

151/SS63-1/A/C-131 1 0 RCC detail of tie beams for 6.6 KV Substation-III 001 / 01.04.11
1 do 3690 / 13.01.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

151/SS63-1/A/C-132 1 0 RCC details of Slab,beams at different levels of 6.6 KV Substation-III 001 / 01.04.11
1 do 3690 / 13.01.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

47 6.6 KV Substation - IV
151/SS64-1/A/C-134 1 0 GA plans,elevations & sections of 6.6 KV Substation -IV 2156 / 24.09.09
1 do 001 / 01.04.11
2 do 3690 / 13.01.12
3 do 3373 / 27.11.12 3450 / 05.02.13 681 / 06.02.13

151/SS64-1/A/C-135 Layout & RCC detail of foundation,columns & tie beams for 6.6 KV Substation-
1 0 IV 001 / 01.04.11

1 do 3690 / 13.01.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

151/SS64-1/A/C-136 1 0 RCC detail of tie beams for 6.6 KV Substation-IV 001 / 01.04.11
1 do 3690 / 13.01.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

151/SS64-1/A/C-137 1 0 RCC details of Slab,beams at different levels of 6.6 KV Substation-IV 001 / 01.04.11
1 do 3690 / 13.01.12
2 do 4293/29.01.13 3450 / 05.02.13 681 / 06.02.13

48 Pump House 1
151/PMP1-1/A/C-139 1 0 G A - Plans, Elevations, Sections & details of Pump House 1 2140 / 03.09.11
1 do 1468 / 19.07.13 1546 / 23.07.13
151/PMP1-1/A/C-140 1 0 RCC details of tie beam, roof beam and slab of Pump House 1 2140 / 03.09.11
1 do 1468 / 19.07.13 1546 / 23.07.13
49 Pump House 2
151/PMP2-1/A/C-141 G A - Plans, Elevations, Sections & RCC details of foundation and column for
1 0 Pump House 2 4025 / 08.03.11

1 do 1468 / 19.07.13 1546 / 23.07.13


2 0 RCC detail of Roof beam and roof slab of Pump House 2 1036 / 17.06.11
1 do 1468 / 19.07.13 1546 / 23.07.13
50 Reservoir 1
151/REV1-1/A/C-143 1 of 1 0 General Arrangement for Reservoir 1 (400 cum capacity) 2676 / 22.11.10
151/REV1-1/A/C-144 1 of 2 0 RC detail of Reservoir1 ( 400 cum capacity) 2676 / 22.11.10
2 of 2 0 do 2676 / 22.11.10
51 Reservoir 2
151/REV2-1/A/C-145 1 of 1 0 General Arrangement for Reservoir 2 (1000 cum capacity) 2736 / 25.11.10
151/REV2-1/A/C-146 1 of 4 0 RC detail of Reservoir2 (1000 cum capacity) 2736 / 25.11.10
2 of 4 0 do 2736 / 25.11.10
3 of 4 0 do 2736 / 25.11.10
4 of 4 0 do 2736 / 25.11.10
52 Road & Drain
151/ROAD - DRAIN -0/A/C-147 1 0 Layout & Detail of Road and Drain 2752 / 05.11.11
151/ROAD - DRAIN -1/A/C-147/1 1 0 do ( for surface area) 48 / 03.01.12 3657 / 05.01.12 1125 / 10.01.12

10 of 245
STATUS OF CIVIL DRAWINGS FOR DIPKA MAIN CHPAS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. approval from Dwg. approval


from SECL to SKSL
Sl. No. Drawing No Sheet No Rev Description SKSL vide letter no & CMPDI to SECL vide
date to SECL/CMPDI letter no & date vide letter no &
date

1 4166 / 13.02.12 1198 / 13.02.12


151/ROAD - DRAIN -1/A/C-147/2 1 0 Layout & Detail of Road and Drain for in pit area 4524 / 13.02.13
1 do 5027 / 22.03.13 142 / 11.04.13 1722 / 15.04.13

53 Boundary Wall
151/WALL-1/A/C-149 Layout & Detail of Boundary Wall / Fencing
1 0 2982 / 23.11.11 3585 / 30.12.11 H -1265 / 20.03.12

11 of 245
APPROVAL STATUS OF CIVIL DOCUMENTS FOR DIPKA MAIN CHP AS ON 04.08.2011

Date of submission by Date of approval Date of approval


Sl. Document No Sheet No Rev Description SKSL vide letter no & from CMPDI to SECL from SECL to SKSL
No. date to CMPDI vide letter no & date vide letter no & date

1 General
151/GNRL-D/A/C-01 - 0 Design Criteria for Civil & Structural work 1452 / 28.07.09 671 / 01.10.10
2 Conveyor P1,Q1,R1
151/CON P1, Q1, R1 - D/A/C - 031 - 0 Design of foundations for conveyor P 1, Q 1, R 1 ( B / W 1600 mm) 128 / 12.04.10
1 2458 / 29.09.11 2948 / 17.11.11
151/DH - P1, Q1, R1 - D-C - 150 - 0 Design of foundations for drive house of conveyor P 1, Q 1, R 1 ( B / W 1600 mm) 1372 / 09.07.11
151/DH - P1, Q1, R1 - D-C - 150 Design of equipment foundations for drive house of conveyor P 1, Q 1, R 1
(Part - B) - 0 839 / 28.05.12

151/DH - P1, Q1, R1 - D-C - 150 RCC Design of foundations for HGTU of conveyor P 1, Q 1, R 1
(Part - C) - 0 1350 / 03.07.12

3 Conveyor B1,B2,B3
151 / CONV B1, B2, B3 -D/A/C-027 - 0 Design of Trestle foundations for conveyor B 1, B 2, B 3 (belt width - 1600) 3699 / 18.02.10 4251 / 19.02.11
151 / DH B1, B2, B3 -D/A/C-028 - 0 Design of foundations for drive house of conveyor B 1, B 2, B 3 4001 / 13.03.10
1 do 1500 / 16.07.11
151 / DH B1, B2, B3 -D-C-028 (Part - B) - 0 RCC Design of foundations for HGTU of conveyor B 1, B 2, B 3 1219/ 22.06.12
4 Conveyor B8,B9
151 / CON B 08, B 09 - D/A/C - 022 - 0 Design of Trestle foundations for conveyor B 8, B 9 (belt width - 1600) 2734 / 23.11.09 706 / 11.10.10
151 / CON B 08, B 09 - D/A/C - 025 - 0 Design of foundations for drive house of conveyor B 8, B 9 3274 / 09.01.10
1 do 1162 / 25.06.11 334 / 05.07.11
151 / DH- B8, B9 - D-C / 025 (Part B) - 0 Design of equipment foundations for drive house of conveyor B 8, B 9 4159 / 21.02.12

5 Conveyor B10, B11


151 / CON B10 - D/A/C - 021 - 0 Design of Trestle foundations for conveyor B 10, B 11 (belt width - 1200) 2812 / 30.11.09 4251 / 19.02.11
151 / DH B10, B11 - D/A/C - 24 - 0 Design of foundations for drive house of conveyor B 10, B 11 3714 / 19.02.10
151 / DH B10, B11 - D-C - 24 (Part - B) - 0 4354 / 07.03.12
151 / DH B10, 11 - 0 RCC design of foundations for HGTU of conveyor B10/B11 2757 / 10.10.12
6 Conveyor B12, B13
151 / CON B12, 13 - D/A/C - 023 - 0 Design of Trestle foundations for conveyor B 10, B 11 (belt width - 1600) 3060 / 19.12.09 706 / 11.10.10
151 / DH B12, 13 - D/A/C - 026 - 0 Design of foundations for drive house of conveyor B 12, B 13 3886 / 04.03.10
1 do 1102 / 22.06.11 1263 / 29.06.11
151 / DH B12, 13 - D-C - 026 (Part - B) - 0 RCC Design of foundations for HGTU of conveyor B12/B13 1350 / 03.07.12
151 / DH B12, 13 - 0 RCC Design of sheave foundations for HGTU of conveyor B12/B13 2757 / 10.10.12

Transfer House-7
151 / TRH8 - D-C / 14 - 0 Design of foundations for Transfer house TRH - 7 4344/ 06.03.12 3229 / 11.01.13

7 Transfer House-8
151 / TRH8 - D/A/C - 15 - 0 Design of foundations for Transfer house TRH - 8 268 / 23.04.10 3796 / 13.01.12

Page 12 of 245
APPROVAL STATUS OF CIVIL DOCUMENTS FOR DIPKA MAIN CHP AS ON 04.08.2011

8 Transfer House-9 -
151 / TRH9 - D/A/C - 16 0 Design of foundations for Transfer house TRH - 9 1576 / 20.08.10 473 / 09.05.11
9 Transfer House-11
151/ TRH11 - D/A/C -018 - 0 Design of foundation for Transfer house TRH - 11 2493 / 31.10.09
1 do 1102 / 22.06.11 1262 / 29.06.11
2 do 094 / 09.04.12

10 Bunker 1
151 / BNK1 - D/A/C - 06 - 0 Design of RCC overhead Bunker 1 2679 / 17.11.09 757 / 28.10.10
1 do 1399 / 11.07.11 2235 / 15.09.11
151 / BNK1 - D/A/C - 06A - 0 Design of Hopper plate & vertical wall of RCC overhead Bunker 1 4022 / 08.03.11
151 / BNK1 - D/C - 06 (Part - B) - 0 Design of Tail pulley & Stair foundation for RCC overhead Bunker 1 4564 / 26.03.12

Bunker 2
151 / BNK2 - D/C - 07 (Part - B) - 0 Design of Tail pulley & Stair foundation for RCC overhead Bunker 2 1034 / 11.06.12

11 Truck Loading Station - I


151 / TLS1-D/A/C - 019 - 0 Foundation design of Truck loading station TLS 1 2694 / 11.12. 09 4654 / 28.03.11
12 3.3 KV Substation - I
151 / SS31 - D/A/C - 51 - 0 Design of Substation I (3.3 KV) 3122 / 28.12. 09 606 / 18.05.11
13 3.3 KV Substation - II
151 / SS32 - D/A/C - 52 Design of Substation II (3.3 KV) 3122 / 28.12. 09 606 / 18.05.11
14 3.3 KV Substation - III
151 / SS33 - D/A/C - 53 - 0 Design of Substation III (3.3 KV) 3122 / 28.12. 09 606 / 18.05.11
15 3.3 KV Substation - IV
151 / SS34 - D/A/C - 54 - 0 Design of Substation IV (3.3 KV) 3122 / 28.12. 09 1443 / 11.07.11
16 6.6 KV Substation - I
151 / SS61 - D/A/C - 55 - 0 Design of Substation I (6.6 KV) 3626 / 15.02. 10 1499 / 15.07.11
17 6.6 KV Substation - II
151 / SS62 - D/A/C - 56 - 0 Design of Substation II (6.6 KV) 3626 / 15.02. 10
1 do 4237 / 29.02.12
18 Pump House 2
151 / PMP 2 - D/A/C - 62 - 0 Design of Pump House 2 4025 / 08.03. 11
19 6.6 KV Substation - III
151 / SS63 - D/A/C - 57 - 0 Design of Substation III (6.6 KV) 001 / 01.04.11
1 do 3690 / 13.01.12
20 6.6 KV Substation - IV
151 / SS64 - D/A/C - 58 - 0 Design of Substation IV (6.6 KV) 001 / 01.04.11
1 do 3690 / 13.01.12
21 Pump House 1
151 / PMP 1 - D/A/C - 61 - 0 Design of Pump House 1 2140 / 03.09. 11
22 Transfer House-2

Page 13 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

1 General
151/GNRL-1/A/S-001 0 General notes for Structural Works 1452 / 28.07.09 1 1
151/GNRL-1/A/S-003 Arrangement of steel work for 18.0m span for single Conveyor gallery belt
0 width 1600 mm 2131 / 22.09.09

1 do 3151 / 24.12.10 1 1
151/GNRL-1/A/S-004 Arrangement of steel work for 18.0m span for double Conveyor gallery belt
0 width 1600 mm 2131 / 22.09.09

1 do 1990 / 27.09.10 1 1
151/GNRL-1/A/S-005 Arrangement of steel work for 18.0m span for single Conveyor gallery belt
0 width 1200 mm 2131 / 22.09.09

1 do 3151 / 24.12.10 1 1
2 Truck Receiving Station-1
151/TRS1-1/A/S-011 Structural GA of Feeder supporting platforms for Truck Receiving Station 1
1 0 2706 / 01.11.11 1 1

1 do 39/04.04.13
2 0 Structural GA of Receiving Hopper for Truck Receiving Station 1 3188 / 08.12.11 1
1 do 3376 / 27.11.12
2 do 39/04.04.13
3 Truck Receiving Station-2
151/TRS2-1/A/S-015 Structural GA of Feeder supporting platforms for Truck Receiving Station 2
1 0 3784 / 24.01.12 1 1

1 do 39/04.04.13
2 0 Structural GA of Receiving Hopper for Truck Receiving Station 2 3278 / 13.12.11 1
1 do 3376 / 27.11.12
2 do 39/04.04.13
10 Conveyor C1 & C2
151/COC1-1/A/S-046 General Arrangement & marking of Gallery Girders & Trestles for conv no C1 &
1 0 C2 (1200 mm belt width) 2234 / 12.09.11 1 1

1 do 3226 / 19.11.12
151/COC1-1/A/S-047 Structural General Arrangement of Conveyor Gallery mkd G1 & G2 for conv no
1 0 C1 & C2 (1200 mm belt width) 2234 / 12.09.11

1 do 2705 / 01.11.11 1 1
2 do 3226 / 19.11.12
Structural General Arrangement of Conveyor Gallery mkd G3 & Trestles for
2 0 conv no C1 & C2 (1200 mm belt width) 2234 / 12.09.11

1 do 2705 / 01.11.11 1
2 do 3226 / 19.11.12

151/COC1-1/A/S-048 GA of Trestle
151/COC1-1/A/S-049 Arrangement & Details of cross over & Trestle
12 Conveyor C3 & C4
151/COC3-1/A/S-054 General arrangement & markings of gallery girders & trestles for conveyor no
1 0 C3 & C4 (1200 mm belt width) 2923 / 18.11.11 1 1

1 do 3226 / 19.11.12
151/COC3-1/A/S-055 Structural General Arrangement of Conveyor Gallery mkd G1 & G2 for conv no
1 0 C3 & C4 (1200 mm belt width) 2923 / 18.11.11 1 1

1 do 3226 / 19.11.12
Structural General Arrangement of Conveyor Gallery mkd G3 , G4 & tower for
2 0 conv no C3 & C4 (1200 mm belt width) 2923 / 18.11.11 1

1 do 3226 / 19.11.12

151/COC3-1/A/S-056 Structural General Arrangement of trestles & VGTU for conveyor no C3 & C4
1 0 (1200 mm belt width) 2923 / 18.11.11 1 1

1 do 3226 / 19.11.12
151/COC3-1/A/S-057
14 Conveyor C5 & C6
151/COC5-1/A/S-062 General Arrangement & markings of gallery girders & trestles for conveyor no
1 0 C5 & C6 (1200 mm belt width) 2435 / 27.09.11 1 1

1 do 3226 / 19.11.12
151/COC5-1/A/S-063 Structural General Arrangement of Gallery Girder mkd G1 & G2 for conveyor no
1 0 C5 & C6 (1200 mm belt width) 2435 / 27.09.11

1 do 3003 / 24.11.11 1 1
2 do 3226 / 19.11.12

Page 14 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

Structural General Arrangement of Gallery Girder mkd G3 & G4 for conveyor no


2 0 C5 & C6 (1200 mm belt width) 2435 / 27.09.11

1 do 3003 / 24.11.11 1
2 do 3226 / 19.11.12

151/COC5-1/A/S-064 Structural General Arrangement of Trestle for conveyor no C5 & C6 (1200 mm


1 0 belt width) 2435 / 27.09.11

1 do 3003 / 24.11.11 1 1
2 do 3226 / 19.11.12

151/COC5-1/A/S-065 Arrangement & Details of cross over & Trestle


16 Conveyor C7 & C8
151/COC7, C8-1/A/S-070 General Arrangement & Markings of Gallery Girders & Trestles for conveyor
1 0 no C7 & C8. 2993 / 24.11.11 1 1

1 do 3226 / 19.11.12
151/COC7, C8 -1/A/S-071 Structural General Arrangement of Gallery Girder mkd G1 & G2 for conveyor no
1 0 C7 & C8 (1200 mm belt width) 2993 / 24.11.11 1 1

0 do 3226 / 19.11.12
Structural General Arrangement of Gallery Girder mkd G3 & G4 for conveyor no
2 0 C7 & C8 (1200 mm belt width) 2993 / 24.11.11 1

1 do 3226 / 19.11.12
Structural General Arrangement & markings of gallery girder mkd G5 &
3 0 trestles for conveyor no C7 & C8 (1200 mm belt width) 2993 / 24.11.11 1

1 do 3226 / 19.11.12

151/COC7, C8 -1/A/S-072 Structural General Arrangement of VGTU for conveyor no C7 & C8 (1200 mm
1 0 belt width) 2993 / 24.11.11 1 1

1 do 3226 / 19.11.12

151/COC7-1/A/S-073 Arrangement & Details of cross over & Trestle


18 Conveyor P1,Q1,R1
151/COP1, Q1, R1-1/A/S-078 Structural GA & Marking of Gallery Girders & Trestles for conveyor no P1, Q1 &
1 0 R1 (1600 mm belt width) 3738 / 22.02.10

1 do 1800 / 08.08.11 1 1
Foundation load data for conveyor no P1, Q1 & R1 (1600 mm belt width)
2 0 3738 / 22.02.10

1 do 1800 / 08.08.11 1
Structural GA & Marking of Gallery Girders & Trestles for conveyor no P1, Q1 &
3 0 R1 (1600 mm belt width) 1800 / 08.08.11 1

Foundation load data (extension portion)for conveyor no P1, Q1 & R1 (1600


4 0 mm belt width) 1800 / 08.08.11 1

151/COP1, Q1, R1-1/A/S-079 Structural General Arrangement of conveyor gallery girder mkd G1, G2, G3 &
1 0 G5 3738 / 22.02.10

1 do 2905 / 08.12.10 1 1
do 2 0 Structural General Arrangement of conveyor gallery girder mkd G4 3738 / 22.02.10
1 do 2905 / 08.12.10 1
do Structural General Arrangement of conveyor gallery girder mkd G6 & G7
3 0 3738 / 22.02.10

1 do 2905 / 08.12.10 1
do Structural General Arrangement of conveyor gallery Girder mkd G8 & G9
4 0 3738 / 22.02.10

1 do 2905 / 08.12.10 1
do Structural General Arrangement of conveyor gallery Girder mkd G10 & G11
5 0 3738 / 22.02.10

1 do 2905 / 08.12.10 1
do Structural General Arrangement of conveyor gallery Girder mkd G12 & ground
6 0 portal 3738 / 22.02.10

1 do 2905 / 08.12.10 1
do 7 0 Structural General Arrangement of conveyor gallery Girder mkd G13 1800 / 08.08.11 1
1 2705 / 01.11.11
do 8 0 Structural General Arrangement of conveyor gallery Girder mkd G14 1800 / 08.08.11 1
1 2705 / 01.11.11
do 9 0 Structural General Arrangement of conveyor gallery Girder mkd G15 1800 / 08.08.11 1
1 2705 / 01.11.11

Page 15 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

do 10 0 Structural General Arrangement of conveyor gallery Girder mkd G16 1800 / 08.08.11 1
1 2705 / 01.11.11
151/CO P1, Q1, R1-1/A/S-080 1 0 Structural General Arrangement of Trestle mkd TR- 1 to TR- 4 3741 / 22.02.10 1 1
do 2 0 Structural General Arrangement of Trestle mkd TR- 5 to TR- 7 3741 / 22.02.10 1
do 3 0 Structural General Arrangement of Trestle mkd TR- 8 to TR- 10 3741 / 22.02.10 1
do 4 0 Structural General Arrangement of Tower 3741 / 22.02.10 1
do 5 0 Structural General Arrangement of Trestle mkd TR- 11 to TR- 14 1800 / 08.08.11 1
1 2705 / 01.11.11
do 6 0 Structural General Arrangement of Tower TW 2 1800 / 08.08.11 1
151/DH/CO P1, Q1, R1-1/A/S-81 Structural General Arrangement - Plans of Drive house for conveyors P1 Q1 R1
1 0 668 / 23.05.11 1 1

do 2 0 do 668 / 23.05.11 1
do Structural General Arrangement - Elevations of Drive house for conveyors P1
3 0 Q1 R1 668 / 23.05.11 1

do 4 0 do 668 / 23.05.11 1
do 5 0 do 668 / 23.05.11 1
do 6 0 do 668 / 23.05.11 1
151/DH/CO P1, Q1, R1-0/A/S-131 Structural General Arrangement - Plans of Drive house for conveyors P1 Q1 R1
1 1 1824 / 10.08.11

do 1 1 do 1914 / 17.08.11
do Structural General Arrangement - Elevations of Drive house for conveyors P1
4 1 Q1 R1 1914 / 17.08.11

do 5 1 do 1914 / 17.08.11
do Structural General Arrangement of Take up Tower for conveyors P1 Q1 R1
7 1047 / 12.06.12 1

19 Conveyor P2,Q2,R2
151/COP2, Q2, R2 -1/A/S-082 Structural GA & Markings of Gallery Girders & Trestles for conveyor no
1 0 P2,Q2,R2 2122 / 02.09.11 1 1

2 0 Foundation load data for conveyor no P2,Q2,R2 2122 / 02.09.11 1


151/COP2, Q2, R2-1/A/S-083 Structural General Arrangement of Conveyor Gallery mkd G 1 & G 2 for
1 0 conveyor no P2,Q2,R2 2122 / 02.09.11

1 2753 / 05.11.11 1 1
Structural General Arrangement of Conveyor Gallery mkd G 3 & G 4 for
2 0 conveyor no P2,Q2,R2 2122 / 02.09.11

1 2753 / 05.11.11 1
Structural General Arrangement of Conveyor Gallery mkd G 5 & G 6 for
3 0 conveyor no P2,Q2,R2 2122 / 02.09.11

1 2753 / 05.11.11 1
Structural General Arrangement of Conveyor Gallery mkd G 7 & G 8 for
4 0 conveyor no P2,Q2,R2 2122 / 02.09.11

1 2753 / 05.11.11 1
Structural General Arrangement of Conveyor Gallery mkd G9 , G 10 & G 11 for
5 0 conveyor no P2,Q2,R2 2122 / 02.09.11

1 2753 / 05.11.11 1
Structural General Arrangement of Conveyor Gallery mkd G 12 & G 12A for
6 0 conveyor no P2,Q2,R2 2122 / 02.09.11 1

1 2753 / 05.11.11 1
7 0 do 2122 / 02.09.11
1 2753 / 05.11.11 1
151/COP2, Q2, R2-1/A/S-084 Structural General Arrangement of trestle mkd TR1 to TR5 for conveyor no
1 0 P2,Q2,R2 2122 / 02.09.11 1 1

Structural General Arrangement of trestle mkd TR6 to TR9 for conveyor no


2 0 P2,Q2,R2 2122 / 02.09.11 1

Structural General Arrangement of trestle mkd TR10 to TR12 for conveyor


3 0 no P2,Q2,R2 2122 / 02.09.11 1

Structural General Arrangement of tower mkd TW1 for conveyor no


4 0 P2,Q2,R2 2122 / 02.09.11 1

Structural General Arrangement of tower mkd TW2 for conveyor no


5 0 P2,Q2,R2 2122 / 02.09.11 1

151/DH/COP2, Q2, R2-0/A/S-132 Structural General Arrangement - Plans of Drive House for conveyor no
1 0 P2,Q2,R2 3462 / 27.12.11 1 1

2 0 do 3462 / 27.12.11 1

Page 16 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

Structural General Arrangement - Elevationss of Drive House for conveyor no


3 0 P2,Q2,R2 3462 / 27.12.11 1

4 0 do 3462 / 27.12.11 1
5 0 do 3462 / 27.12.11 1
6 0 do 3462 / 27.12.11 1
1 do 4034 / 11.02.12
Structural General Arrangement of Take up tower for conveyor no P2,Q2,R2
7 0 880 / 30.05.12 1

Page 17 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

21 Conveyor B1,B2,B3
151/COB 1,2,3-0/A/S-90 Structural General Arrangement & Marking of Gallery Girders &Trestles for
1 0 Conv No. B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09 1 1

do 2 0 Foundation load data for Conv no. B1, B2, B3. 3082 / 22.12.09 1
151/COB 1,2,3-1/A/S-91 Structural General Arrangement of Conveyor gallery Mkd G-1 & G-2 for
1 0 Conv no. B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09

1 do 2719 / 24.11.10 1 1
do Structural General Arrangement of Conveyor gallery Mkd G-3 & G-4 for
2 0 Conv no. B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09

1 do 2719 / 24.11.10 1
do Structural General Arrangement of Conveyor gallery Mkd G-5, G-6, G-6x, G-7
3 0 & G-7x for Conv no. B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09

1 do 2719 / 24.11.10 1
do Structural General Arrangement of Conveyor gallery Mkd G-8, G-9 & G-10
4 0 for Conv no. B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09

1 do 2719 / 24.11.10 1

151/COB 1,2,3-1/A/S-92 Structural General Arrangement of trestle (Mkd Tr-1 to Tr-5) for Conv no. B1,
1 0 B2 & B3 (1600 mm Belt width) 3082 / 22.12.09 1 1

151/COB 1,2,3-1/A/S-92 Structural General Arrangement of trestle (Mkd Tr-6 to Tr-10) for Conv no.
2 0 B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09 1

151/COB 1,2,3-1/A/S-92 Structural General Arrangement of trestle (Mkd Tr-11, Tr-12 & Tr-13) for Conv
3 0 no. B1, B2 & B3 (1600 mm Belt width) 3082 / 22.12.09 1

151/COB 1,2,3-1/A/S-092 4 0 Structural GA of tower (TW-1) for Conv no. B1, B2 & B3 3082 / 22.12.09 1

151/DH/COB 1,2,3 -0/A/S-093 1 0 Structural GA - Plan of Drive House for conveyors B1, B2, B3 3571 / 10.02.10
1 1500 / 16.07.11 1 1
do Structural GA - Plans & Elevations of Drive House for conveyors B1, B2, B3
2 0 3571 / 10.02.10

do 1 do 1500 / 16.07.11 1
do 3 0 Structural GA - Elevations of Drive House for conveyors B1, B2, B3 3571 / 10.02.10
do 1 do 1500 / 16.07.11 1
do Structural General Arrangement of Take up tower for conveyor no B1 / B2 / B3
4 0 662 / 18.05.12 1

Conveyor B4,B5
151/COB4,B5 -1/A/S-133 Structural General Arrangement of Conveyor gallery for Conv no. B4 / B5
1 0 (Tripper conveyor 1600 mm belt width) 3806 / 25.01.12 1 1

151/COB4,B5 -1/A/S-135 Structural General Arrangement of Take up tower of HGTU for Conv no. B4 /
1 0 B5 4343 / 01.02.13 1 1

Conveyor B6,B7
151/COB6,B7 -1/A/S-134 Structural General Arrangement of Conveyor gallery for Conv no. B6 / B7
1 0 (Tripper conveyor 1600 mm belt width) 380 / 28.04.12 1 1

151/COB6,B7 -1/A/S-136 Structural General Arrangement of Take up tower of HGTU for Conv no. B6 / B7
1 0 4485 / 11.02.13 1 1

22 Conveyor B8,B9
151/COB8,9 -0/A/S-094 General Arrangement & Marking of Gallery Girders &Trestles for Conv No. B8/
1 0 B9(1600mm belt width) 2679 / 17.11.09

0/1 do 1990 / 27.09.10 1 1


151/COB8,9-1/A/S-095 Structural General Arrangement of Conveyor gallery Mkd G1 for Conv no. B8 /
1 0 B9 (1600 mm belt width) 2679 / 17.11.09

1 do 1990 / 27.09.10 1 1
151/COB8,9-1/A/S-095 Structural General Arrangement of Conveyor gallery Mkd G2 & G3 for Conv no.
2 0 B8 / B9 (1600 mm belt width) 2679 / 17.11.09

1 do 1990 / 27.09.10 1
151/COB8,9-1/A/S-095 Structural General Arrangement of Conveyor gallery Mkd G4 for Conv no. B8 /
3 0 B9 (1600 mm belt width) 2679 / 17.11.09

1 do 1990 / 27.09.10 1
151/COB08,09 -1/A/S-096 1 0 Structural GA trestle for Conv no. B8 - B9 2679 / 17.11.09 1 1
151/COB08,09 -2/A/S-096 2 0 Structural GA of Cross over for Conv no. B8 - B9 2679 / 17.11.09 1

Page 18 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

151/DH/COB8, 9-0/A/S-097 Structural General Arrangement – Plans for drive house for Conveyors B8, B9
1 0 3001 / 15.12.09

Page 19 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

1 do 1162 / 25.06.11 1 1
151/DH/COB8, 9-0/A/S-097 Structural General Arrangement– Elevations for drive house for Conveyors B8,
2 0 B9 3001 / 15.12.09

1 do 1162 / 25.06.11 1
151/DH/COB8, 9-1/A/S-097 Structural General Arrangement of Conveyor gallery for Conv no. B8 / B9
3 0 662 / 18.05.12 1

23 Conveyor B10, B11


151/COB10,11-0/A/S-098 General Arrangement & Marking of Gallery Girders &Trestles for Conv No. B10
1 0 & B11 (1200 mm belt width) 2473 / 30.10.09 1 1

151/COB10,11-1/A/S-099 Structural General Arrangement of conveyor gallery Mkd G1 & G2 for Conv No.
1 0 B10 & B11 (1200 mm belt width) 2473 / 30.10.09

1 do 2587 / 12.11.10 1 1
151/COB10,11-1/A/S-099 Structural General Arrangement of conveyor gallery Mkd G3,G4 & G5 for Conv
2 0 No. B10 & B11 (1200 mm belt width) 2473 / 30.10.09

1 do 2587 / 12.11.10 1
151/COB10,11-1/A/S-099 Structural General Arrangement of conveyor gallery Mkd G6 for Conv No. B10
3 0 & B11 (1200 mm belt width) 2473 / 30.10.09

1 do 2587 / 12.11.10 1
151/COB10,11-1/A/S-099 Structural General Arrangement of conveyor gallery Mkd G7 for Conv No. B10
4 0 & B11 (1200 mm belt width) 2473 / 30.10.09

1 do 2587 / 12.11.10 1
151/COB10,11-1/A/S-100 Structural General Arrangement of trestle Mkd TR-1, TR-2, TR-3 & ground
1 0 portal Mkd GP-2 for Conv no. B10 & B11(1200 mm belt width) 2473 / 30.10.09 1 1

151/COB10,11-1/A/S-100 Structural General Arrangement of trestle Mkd TR-4, TR-5 & TR-6 for Conv no.
2 0 B10 & B11(1200 mm belt width) 2473 / 30.10.09 1

151/DH/COB10, 11-0/A/S-101 Structural General Arrangement- Plans of Drive house for Conveyors B10 / B11
1 0 2607 / 11.11.09 1 1

Structural General Arrangement- Elevations of Drive house for Conveyors B10 /


2 0 B11 2607 / 11.11.09 1

Structural General Arrangement of Take up tower for Conveyors B10 / B11


3 0 1494 / 16.07.12 1

24 Conveyor B12, B13


151/COB12, 13-0/A/S-107 General Arrangement & Marking of Gallery Girders & Trestles for Conv no.
1 0 B12 / B13 (1600 mm belt width) 2734 / 23.11.09

1 do 1990 / 27.09.10 1 1
151/COB12, 13-1/A/S-108 Structural General Arrangement of Conveyor Gallery Mkd G1 for Conv no. B12 /
1 0 B13 (1600 mm belt width) 2734 / 23.11.09

1 do 1990 / 27.09.10 1 1
151/COB12, 13-1/A/S-108 Structural General Arrangement of Conveyor Gallery Mkd G-2, G-3, G-3X & G-4
2 0 for Conv no. B12 / B13 (1600 mm belt width) 2734 / 23.11.09

1 do 1990 / 27.09.10 1
151/COB12, 13-1/A/S-109 1 0 Structural GA Trestle for Conv no. B12 -B13 2734 / 23.11.09 1 1
151/COB12, 13-2/A/S-109 2 0 Structural GA of Cross over for Conv no. B12 - B13. 2734 / 23.11.09 1
151/DH/COB12, 13-0/A/S-110 Structural general Arrangement – Plans of drive house for Conveyors B12, B13.
1 0 3256 / 07.01.10 1 1

Structural general Arrangement – Elevation of drive house for Conveyors B12,


2 0 B13. 3256 / 07.01.10 03.06.11

1 do 1102 / 22.06.11 1
Structural general Arrangement of conveyor gallery for Conveyors B12, B13.
3 0 1256 / 25.06.12 1

25 Transfer House-1
151/TRH1-1/A/S-116 1 0 Structural General Arrangement plan for Transfer House TRH 1 4182 / 23.02.12 1 1
1 do 3257 / 20.11.12
2 0 Structural General Arrangement elevatioin for Transfer House TRH 1 4182 / 23.02.12 1
1 do 3257 / 20.11.12
3 0 do 4182 / 23.02.12 1
1 do 3257 / 20.11.12
4 0 Structural General Arrangement sheeting for Transfer House TRH 1 4182 / 23.02.12 1
1 do 3257 / 20.11.12

26 Transfer House-2
151/TRH2-1/A/S-117 1 0 Structural General Arrangements - plan for Transfer House TRH 2 2435 / 27.09.11 1 1
1 do 3257 / 20.11.12
2 0 Structural General Arrangements - elevation for Transfer House TRH 2 2435 / 27.09.11 1

Page 20 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

1 do 3257 / 20.11.12
3 0 Structural General Arrangements - sheeting for Transfer House TRH 2 2435 / 27.09.11 1
1 do 3257 / 20.11.12

27 Transfer House-3
151/TRH3-1/A/S-118 1 0 Structural General Arrangements - plan for Transfer House TRH 3 4026 / 11.02.12 1 1
1 do 3257 / 20.11.12
2 0 Structural General Arrangements - elevation for Transfer House TRH 3 4026 / 11.02.12 1
1 do 3257 / 20.11.12
3 0 do 4026 / 11.02.12 1
1 do 3257 / 20.11.12
4 0 Structural General Arrangements - sheeting for Transfer House TRH 3 4026 / 11.02.12 1
1 do 3257 / 20.11.12

28 Transfer House-4
151/TRH4-0/A/S-119 1 0 Structural General Arrangements - Plan for Transfer House TRH 4 2474 / 30.09.11 1 1
1 do 3257 / 20.11.12
2 0 Structural General Arrangements - Elevation for Transfer House TRH 4 2474 / 30.09.11 1
1 do 3257 / 20.11.12
3 0 Structural General Arrangements - Sheeting for Transfer House TRH 4 2474 / 30.09.11 1
1 do 3257 / 20.11.12

31 Transfer House-7
151/TRH7-1/A/C-086 Structural General Arrangements(Eaves level & Rafter level) for Transfer House
6 0 TRH - 7 4344/ 06.03.12 1 1

Structural General Arrangements(Elevations) for Transfer House TRH - 7


7 0 4344/ 06.03.12 1

1 do 4090/ 11.01.13
Structural General Arrangements(Sheeting on line 1, 5 & 6) for Transfer House
8 0 TRH - 7 4344/ 06.03.12 1

Structural General Arrangements(Sheeting on line A & D) for Transfer House


9 0 TRH - 7 4344/ 06.03.12 1

32 Transfer House-8
151/TRH8-1/A/S-123 1 0 Structural General Arrangements - Floor plan of Transfer House TH 8 3638 / 16.02.10
1 do 2432 / 27.09.11 1 1
2 do 3250 / 13.12.11
2 0 Structural General Arrangements - Elevation of Transfer House TH 8 3638 / 16.02.10 1
1 do 3250 / 13.12.11
33 Transfer House-9
151/TRH9-0/A/S-124 Structural General Arrangements of Transfer House TH 9 : elevation on line 1, 2
1 0 &3 4175 / 26.03.10 1 1

do Structural General Arrangements of Transfer House TH 9 : elevation on line 4, 5


2 0 &6 4175 / 26.03.10 1

do Structural General Arrangements of Transfer House TH 9 : elevation on line 7, 8


3 0 &9 4175 / 26.03.10 1

do Structural General Arrangements of Transfer House TH 9 : elevation on line A &


4 0 B 4175 / 26.03.10 1

do Structural General Arrangements of Transfer House TH 9 : elevation on line C &


5 0 D 4175 / 26.03.10 1

do Structural General Arrangements of Transfer House TH 9 : elevation on line E


6 0 & staircase 4175 / 26.03.10 1

do Structural General Arrangements of Transfer House TH 9 : sheeting


7 0 arrangement on line 1 & A 4175 / 26.03.10 1

1 do 2590 / 28.09.12
do Structural General Arrangements of Transfer House TH 9 : sheeting
8 0 arrangement on line E & 9 4175 / 26.03.10 1

1 do 2590 / 28.09.12
do Structural General Arrangements of Transfer House TH 9 : floor plan at RL (+)
9 0 349.800 4175 / 26.03.10 1

151/TRH9-1/A/S-124 Structural General Arrangements of Transfer House TH 9 : floor plan at RL (+)


10 0 346.500 4175 / 26.03.10 1

do Structural General Arrangements of Transfer House TH 9 : floor plan at RL (+)


11 0 330.000 4175 / 26.03.10 1

Page 21 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented


Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL
No. No
date to SECL/CMPDI vide letter no & date

do Structural General Arrangements of Transfer House TH 9 : plan at tie level


12 0 4175 / 26.03.10 1

34 Transfer House-10
151/TRH10-0/A/S-125 1 0 Structural GA (Elevation & Base plates) for transfer house TH-10 2634 / 13.11.09 03.06.11
1 do 1102 / 22.06.11 1 1
151/TRH10-1/A/S-125 2 0 do 2634 / 13.11.09 03.06.11
1 do 1102 / 22.06.11 1
35 Transfer House-11
151/TRH11-0/A/S-126 1 0 Structural GA ( Elevation & Base plates) for Transfer House TH-11 2256 / 09.10.09 03.06.11
1 do 1102 / 22.06.11 1 1
151/TRH11-1/A/S-126 2 0 Structural GA (Floor & Tie plan) for Transfer House TH-11 2256 / 09.10.09 03.06.11
1 do 1102 / 22.06.11 1
36 Bunker 1
151/BNK1-0/A/S-127 1 0 Structural GA of Elevation, tie & rafter plan for shed over Bunker-1 2131 / 22.09.09 1 1
2 0 Structural GA of Elevation for shed over Bunker-1 2131 / 22.09.09 1
3 0 Structural GA of Elevation & staircase for shed over Bunker-1 2131 / 22.09.09 1
4 0 Structural GA & Load data for shed over Bunker -1 2131 / 22.09.09 1
Structural General Arrangement of vibro feeder supporting platform for RCC
5 0 overhead Bunker-1 4475 / 16.03.12 1

37 Bunker 2
151/BNK2-0/A/S-128 1 0 Structural GA of Elevation, tie & rafter plan for shed over Bunker-2 2634 / 13.11.09 1 1
2 0 Structural GA of Elevation for shed over Bunker-2 2634 / 13.11.09 1
3 0 Elevation of line 2, 2A, 3 to 11 & staircase for shed over Bunker-2 2634 / 13.11.09 1
4 0 Structural GA & load data for shed over Bunker2 2634 / 13.11.09 1
Structural General Arrangement of vibro feeder supporting platform for RCC
5 0 overhead Bunker-2 1357 / 04.07.12 1

38 Truck Loading Station - I


151/TLS1-1/A/S-129 1 of 7 0 Structural G.A. of truck loading Station -1 elevation on Row– A and B. 2912 / 08.12.09 1 1
151/TLS1-1/A/S-129 Structural G.A. of truck loading Station -1 view on Line– 01, 02, 03, 04, 05 .
2 of 7 0 2912 / 08.12.09 1

151/TLS1-1/A/S-129 Structural G.A. of truck loading Station -1 floor plan at RL(+) 330.500 M, (+)
3 of 7 0 340.450 M, (+) 343.200 M (T.O.S.) 2912 / 08.12.09 1

151/TLS1-1/A/S-129 Structural G.A. of truck loading Station -1 elevation on line– 1A and tie & rafter
4 of 7 0 plan. 2912 / 08.12.09 1

151/TLS1-1/A/S-129 5 of 7 0 Structural G.A. of truck loading Station -1 detail of staircase. 2912 / 08.12.09 1
151/TLS1-1/A/S-129 6 of 7 0 Structural G.A. of truck loading Station -1 detail of bunker. 2912 / 08.12.09 1
151/TLS1-1/A/S-129 Structural G.A. of truck loading Station -1 bunker connection details and detail
7 of 7 0 of Col base plate. 2912 / 08.12.09 1

39 Truck Loading Station -2


151/TLS2-1/A/S-130 1 of 7 0 Structural G.A. of truck loading Station -2 elevation on Row -A and B. 3096 / 23.12.09 1 1
151/TLS2-1/A/S-130 Structural G.A. of truck loading Station -2 view on line 01, 02, 03, 04, 05.
2 of 7 0 3096 / 23.12.09 1

151/TLS2-1/A/S-130 Structural G.A. of truck loading Station -2 floor plan at Rl (+) 330.500 M, (+)
3 of 7 0 340.450 M, (+) 343.200 M (T.O.S) 3096 / 23.12.09 1

151/TLS2-1/A/S-130 Structural G.A. of truck loading Station -2 elevation on line -1A and tie & rafter
4 of 7 0 plan 3096 / 23.12.09 1

151/TLS2-1/A/S-130 5 of 7 0 Structural G.A. of truck loading Station -2 detail of staircase. 3096 / 23.12.09 1
151/TLS2-1/A/S-130 6 of 7 0 Structural G.A. of truck loading Station -2 detail of Bunker. 3096 / 23.12.09 1
151/TLS2-1/A/S-130 Structural G.A. of truck loading Station -2 Bunker connectrion details and detail
7 of 7 0 of Col base plate. 3096 / 23.12.09 1

Page 22 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

2378 / 16.09.10 1 1 649 / 24.09.010 1 1 8 days 424 days

3571 / 29.12.10 1 1 1089 / 13.01.11 1 1 15 days 478 days

2576 / 01.10.10 1 1 710 / 11.10.10 1 1 10 days 384 days

3571 / 29.12.10 1 1 1089 / 13.01.11 1 1 15 days 478 days

106 / 08.04.13 1 1 829 / 09.04.13 1 1

106 / 08.04.13 1 829 / 09.04.13 1

106 / 08.04.13 1 1 829 / 09.04.13 1 1

106 / 08.04.13 1 829 / 09.04.13 1

2780 / 04.11.11 1 1 1056 / 22.11.11 1 1 18 days 70 days

2829 / 10.12.12 1 H-576 / 14.12.12 1

2780 / 04.11.11 1 1 1056 / 22.11.11 1 1 18 days 70 days


2829 / 10.12.12 H-576 / 14.12.12

2780 / 04.11.11 1056 / 22.11.11 18 days 70 days


2829 / 10.12.12 1 H-576 / 14.12.12 1

3158 / 30.11.11 1 1

2829 / 10.12.12 H-576 / 14.12.12 1 1

3158 / 30.11.11 1 1

2829 / 10.12.12 H-576 / 14.12.12 1 1

3158 / 30.11.11

2829 / 10.12.12 1 H-576 / 14.12.12 1 1

3158 / 30.11.11

2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

3218 / 03.12.11 1075 / 12.12.11 9 days 76 days

2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

3218 / 03.12.11 1075 / 12.12.11 9 days 76 days


2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

Page 23 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

3218 / 03.12.11 1075 / 12.12.11 9 days 76 days


2829 / 10.12.12 1 H-576 / 14.12.12 1

3218 / 03.12.11 1075 / 12.12.11 9 days 76 days


2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

3285 / 08.12.11

2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

3285 / 08.12.11

2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

3285 / 08.12.11

2829 / 10.12.12 1 H-576 / 14.12.12 1

3285 / 08.12.11

2829 / 10.12.12 1 H-576 / 14.12.12 1

3285 / 08.12.11

2829 / 10.12.12 1 1 H-576 / 14.12.12 1 1

3573 / 30.12.10 1101 / 17.01.11 19 days 329 days

2789 / 04.11.11 1 1 1046 / 12.11.11 1 1 8 days 96 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

329 days
3573 / 30.12.10 1 1 1101 / 17.01.11 1 1 19 days

329 days
3573 / 30.12.10 1 1101 / 17.01.11 1 19 days

329 days
3573 / 30.12.10 1 1101 / 17.01.11 1 19 days

329 days
3573 / 30.12.10 1 1101 / 17.01.11 1 19 days

329 days
3573 / 30.12.10 1 1101 / 17.01.11 1 19 days

329 days
3573 / 30.12.10 1 1101 / 17.01.11 1 19 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

Page 24 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days


4332 / 25.02.11 1 1 H - 764 / 21.04.11 1 1 55 days 423 days
4332 / 25.02.11 1 H - 764 / 21.04.11 1 55 days 423 days
4332 / 25.02.11 1 H - 764 / 21.04.11 1 55 days 423 days
4332 / 25.02.11 1 H - 764 / 21.04.11 1 55 days 423 days

2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days


2789 / 04.11.11 1 1046 / 12.11.11 1 8 days 96 days

1978 / 23.08.11 1 1 965 / 02.09.11 1 1 9 days 102 days

1978 / 23.08.11 1 965 / 02.09.11 1 9 days 102 days

1978 / 23.08.11 1 965 / 02.09.11 1 9 days 102 days

1978 / 23.08.11 1 965 / 02.09.11 1 9 days 102 days


1978 / 23.08.11 1 965 / 02.09.11 1 9 days 102 days
1978 / 23.08.11 1 965 / 02.09.11 1 9 days 102 days

1978 / 23.08.11 965 / 02.09.11 9 days 102 days

1978 / 23.08.11 965 / 02.09.11 9 days 102 days

1115 / 30.06.12 H - 200 / 06.07.12

2814 / 08.11.11 1 1 1051 / 17.11.11 1 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1 1051 / 17.11.11 1 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1 1051 / 17.11.11 1 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

2814 / 08.11.11 1 1051 / 17.11.11 1 9 days 76 days

3663 / 05.01.12 1 1 H- 605 / 03.01.13 1 1

3663 / 05.01.12 1 H- 605 / 03.01.13 1

Page 25 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

3663 / 05.01.12 1 H- 605 / 03.01.13 1

3663 / 05.01.12 1 H- 605 / 03.01.13 1


3663 / 05.01.12 1 H- 605 / 03.01.13 1
3663 / 05.01.12
1 H- 605 / 03.01.13 1

2943 / 20.12.12 1 H- 613 / 07.01.13 1

Page 26 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

3404 / 13.12.10 1 1 485 / 12.01.11 1 1 30 days 385 days

4251 / 19.02.11 1 698 / 18.03.11 1 27 days 451 days

385 days
3404 / 13.12.10 1 1 485 / 12.01.11 1 1 30 days

385 days
3404 / 13.12.10 1 485 / 12.01.11 1 30 days

385 days
3404 / 13.12.10 1 485 / 12.01.11 1 30 days

385 days
3404 / 13.12.10 1 485 / 12.01.11 1 30 days

3513 / 22.12.10 1 1 H - 734 / 09.04.11 1 1 108 days 473 days

3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days 473 days

3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days 473 days

3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days 473 days

1650 / 26.07.11 1 1 956 / 26.08.11 1 1 31 days 562 days

1650 / 26.07.11 1 956 / 26.08.11 1 31 days 562 days

1650 / 26.07.11 1 956 / 26.08.11 1 31 days 562 days

713 / 31.05.12 1 H -148 / 11.06.12 1

1 1 H -59 / 28.04.12 1 1

3448 / 05.02.13 1 1 680 / 06.02.13

1 1 H -76 / 08.05.12 1 1

3708 / 26.02.13 1 1 1497 / 02.03.13 1 1

328 days
2576 / 01.10.10 1 1 710 / 11.10.10 1 1 10 days

328 days
2576 / 01.10.10 1 1 710 / 11.10.10 1 1 10 days

328 days
2576 / 01.10.10 1 710 / 11.10.10 1 10 days

2576 / 01.10.10 1 710 / 11.10.10 1 10 days 328 days


2576 / 01.10.10 1 1 710 / 11.10.10 1 1 10 days 328 days
2576 / 01.10.10 1 710 / 11.10.10 1 10 days 328 days

Page 27 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

587 days

Page 28 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL
587 days
1295 / 02.07.11 1 1 919 / 25.07.11 1 1 23 days

587 days
1295 / 02.07.11 1 919 / 25.07.11 1 23 days

713 / 31.05.12 1 H -148 / 11.06.12 1

4129 / 11.02.11 1 1 H -743 / 12.04.11 1 1 61 days 164 days

3709 / 10.01.11 1 1 H - 722 / 04.04.11 1 1 84 days 520 days

3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days 520 days

3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days 520 days

3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days 520 days

4129 / 11.02.11 1 1 H -743 / 12.04.11 1 1 61 days 164 days

4129 / 11.02.11 1 H -743 / 12.04.11 1 61 days 164 days

1272 / 30.06.11 1 1 932 / 30.07.11 1 1 30 days 687 days

1272 / 30.06.11 1 932 / 30.07.11 1 30 days 687 days

1 H -273 / 01.08.12 1

322 days
2576 / 01.10.10 1 1 710 / 11.10.10 1 1 11 days

322 days
2576 / 01.10.10 1 1 710 / 11.10.10 1 1 11 days

322 days
2576 / 01.10.10 1 710 / 11.10.10 1 11 days
2576 / 01.10.10 1 1 710 / 11.10.10 1 1 11 days 322 days
2576 / 01.10.10 1 710 / 11.10.10 1 11 days 322 days

1236 / 27.06.11 1 1 H - 908 / 21.07.11 1 1 24 days 560 days

1236 / 27.06.11 1 1769 / 04.07.11 1 7 days 560 days

1173 / 04.07.12 1 H - 202 / 07.07.12 1

2925 / 19.12.12 1 1 H - 585 / 21.12.12 1 1

2925 / 19.12.12 1 H - 585 / 21.12.12 1

2925 / 19.12.12 1 H - 585 / 21.12.12 1

2925 / 19.12.12 1 H - 585 / 21.12.12 1

3044 / 23.11.11 1069 / 03.12.11 67 days


2925 / 19.12.12 1 1 H - 585 / 21.12.12 1 1
3044 / 23.11.11 1069 / 03.12.11 67 days

Page 29 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

2925 / 19.12.12 1 H - 585 / 21.12.12 1


3044 / 23.11.11 1069 / 03.12.11 67 days
2925 / 19.12.12 1 H - 585 / 21.12.12 1

2925 / 19.12.12 1 1 H - 585 / 21.12.12 1 1

2925 / 19.12.12 1 H - 585 / 21.12.12 1

2925 / 19.12.12 1 H - 585 / 21.12.12 1

2925 / 19.12.12 1 H - 585 / 21.12.12 1

3044 / 23.11.11 1069 / 03.12.11 64 days


2925 / 19.12.12 1 1 H - 585 / 21.12.12 1 1
3044 / 23.11.11 1069 / 03.12.11 64 days
2925 / 19.12.12 1 H - 585 / 21.12.12 1
3044 / 23.11.11 1069 / 03.12.11 64 days
2925 / 19.12.12 1 H - 585 / 21.12.12 1

3229 / 17.01.13 1 1 651 / 25.01.13 1 1

3229 / 17.01.13 1 651 / 25.01.13 1

3229 / 17.01.13 1 651 / 25.01.13 1

3229 / 17.01.13 1 651 / 25.01.13 1

3385 / 17.12.11 1 1 H -1090 / 20.12.11 1 1 3 days

3385 / 17.12.11 1 H -1090 / 20.12.11 1 3 days

414 / 04.05.11 1 1 H -792 / 10.05.11 1 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

Page 30 of 245
STATUS OF STRUCTURAL GA DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

MAIN CHP
OALFIELDS LIMITED

Dwg. approval from Dwg. approval from Time taken by SECL Time taken by SECL
CMPDI to SECL vide SECL to SKSL vide after receipt of after submission of Remarks
approval from
letter no & date letter no & date CMPDI drawing by SKSL

414 / 04.05.11 1 H -792 / 10.05.11 1 6 days 410 days

1335 / 05.07.11 1 1 934 / 30.07.11 1 1 25 days 624 days

1335 / 05.07.11 1 934 / 30.07.11 1 25 days 624 days

1335 / 05.07.11 1 1 934 / 30.07.11 1 1 25 days 659 days

1335 / 05.07.11 1 934 / 30.07.11 1 25 days 659 days

718 / 24.05.11 1 1 H -843 / 07.06.11 1 1 14 days 623 days


718 / 24.05.11 1 H -843 / 07.06.11 1 14 days 623 days
718 / 24.05.11 1 H -843 / 07.06.11 1 14 days 623 days
718 / 24.05.11 1 H -843 / 07.06.11 1 14 days 623 days

4475 / 16.03.12 1 H -33 / 17.04.12 1

718 / 24.05.11 1 1 H -843 / 07.06.11 1 1 14 days 623 days


718 / 24.05.11 1 H -843 / 07.06.11 1 14 days 623 days
718 / 24.05.11 1 H -843 / 07.06.11 1 14 days 623 days
718 / 24.05.11 1 H -843 / 07.06.11 1 14 days 623 days

H -230 / 19.07.12 1

4654 / 28.03.11 1 1 H -752 / 15.04.11 1 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days


4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 1 H -752 / 15.04.11 1 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days


4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

4654 / 28.03.11 1 H -752 / 15.04.11 1 18 days 494 days

Page 31 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

dwg sht dwg sht dwg sht dwg sht


1 Truck Receiving Station-1
151/TRS1-1/B/S-011 Detail of Hopper girder, Hopper plate & top vertical plate for Truck Receiving
1 0 Station 1 3189 / 08.12.11 1 1

1 do 342 / 26.04.13 396 / 30.04.13 1 1 894 / 04.05.13


2 0 do 3189 / 08.12.11 1
1 do 342 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13
Detail of Receiving , Hopper plate & liner plate for Truck Receiving Station 1
3 0 3189 / 08.12.11 1

1 do 342 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13


4 0 do 3189 / 08.12.11 1
1 do 342 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13
Marking of platform, chqd pl (Feeder supporting platforms) for Truck Receiving
5 0 Station 1 4911 / 13.03.13 1

1 do 342 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13


Details of platforms (Feeder supporting platforms) for Truck Receiving Station 1
6 0 4911 / 13.03.13 1

1 do 342 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13


Details of chqd pl, bracing & ladder (Feeder supporting platforms) for Truck
7 0 Receiving Station 1 4911 / 13.03.13 1

1 do 342 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13

2 Truck Receiving Station-2


151/TRS2-1/B/S-015 Detail of Hopper girder, Hopper plate & top vertical plate for Truck Receiving
1 0 Station 2 3279 / 13.12.11 1 1

1 do 343 / 26.04.13 396 / 30.04.13 1 1 894 / 04.05.13 1 1


2 0 do 3279 / 13.12.11 1
1 do 343 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13 1
Detail of Receiving , Hopper plate & liner plate for Truck Receiving Station 2
3 0 3279 / 13.12.11 1

1 do 343 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13 1


4 0 do 3279 / 13.12.11 1
1 do 343 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13 1
Marking of feeder supporting platforms & detail of platforms for Truck
5 0 Receiving Station 2 4152 / 21.02.12 1

1 do 343 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13 1


Detail of platform beam & bracing (feeder supporting platforms) for Truck
6 0 Receiving Station 2 4152 / 21.02.12 1

1 do 343 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13 1

32 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

Detail of chequered plate, bracing & ladder (feeder supporting platforms) for
7 0 Truck Receiving Station 2 4152 / 21.02.12 1

1 do 343 / 26.04.13 396 / 30.04.13 1 894 / 04.05.13 1

9 Conveyor C1 & C2
151/COC1, C2- 1/B/S-047 General arrangement & marking of gallery girders & trestles for conveyor no C1
1 0 & C2 3862 / 31.01.12 1 1 4134 / 10.02.12 1 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1 1


Detail of vertical girder mkd G1 / VG 1, 1X & top chord bracing for conveyor no
2 0 C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1

Detail of vertical girder mkd VG2 / VG 1, 1X & top chord bracing for conveyor
3 0 no C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1

Detail of vertical girder mkd G3 / VG 1, 1X & top chord bracing for conveyor no
4 0 C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1

Detail of vertical girder mkd VG 1, 1X & top chord bracing & side runner for
5 0 conveyor no C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1

6 0 Detail of truss, purlin & portal (for G1 to G3) for conveyor no C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1
7 0 Detail of tower & trestle for conveyor no C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1
1 do 4535 / 14.02.13 H- 717/22.02.13 1
Detail of portal frame (for gallery girder mkd G1, 2 & 3) for conveyor no C1 &
8 0 C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1

Detail of cross beam, walkway- runner & trestle (for G1 to G3) for conveyor no
9 0 C1 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1


Detail of chqd pl, handrail & ridge tie bracing (for G1 to G3) for conveyor no C1
10 0 & C2 3862 / 31.01.12 1 4134 / 10.02.12 1 H- 749/06.03.13 1

11 Conveyor C3 & C4
151/COC3, C4- 1/B/S-055 General arrangement & marking of gallery girders & trestles for conveyor no C3
1 0 & C4 3788 / 24.01.12 1 1 4027 / 01.02.12 1 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1 1


Detail of vertical girder mkd G1 / VG 1, 1X & top chord bracing for conveyor no
2 0 C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

Detail of vertical girder mkd G2 / VG 1, 1X & top chord bracing for conveyor no
3 0 C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

Detail of vertical girder mkd G3 / VG 1, 1X & top chord bracing for conveyor no
4 0 C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

Detail of vertical girder mkd G4 / VG 1, 1X & top chord bracing for conveyor no
5 0 C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

6 0 Detail of top chord & bottom chord bracing for conveyor no C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

33 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

7 0 Detail of truss, purlin & portal (for G1 to G4) for conveyor no C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1
8 0 Detail of tower & trestle for conveyor no C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1
1 do 4535 / 14.02.13 H- 717/22.02.13 1
Detail of portal frame (for gallery girder mkd G1, 2 & 3) for conveyor no C3 &
9 0 C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

Detail of cross beam, walkway- runner & trestle (for G1 to G4) for conveyor no
10 0 C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1


Detail of chqd pl, handrail & ridge tie bracing (for G1 to G4) for conveyor no C3
11 0 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1 H- 749/06.03.13 1

151/COC3, C4- 1/B/S-056 1 0 Marking of trestles & VGTU for conveyor no C3 & C4 3788 / 24.01.12 1 1 4027 / 01.02.12 1 1
1 do 4535 / 14.02.13 H- 717/22.02.13 1 1
Detail of column mkd A3, A3X & A4, A4X (for VGTU) for conveyor no C3 & C4
2 0 3788 / 24.01.12 1 4027 / 01.02.12 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1


Detail of column mkd B3, B3X & B4, B4X (for VGTU) for conveyor no C3 & C4
3 0 3788 / 24.01.12 1 4027 / 01.02.12 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1


Detail of column bracing, post & floor beam (for VGTU) for conveyor no C3 & C4
4 0 3788 / 24.01.12 1 4027 / 01.02.12 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1


5 0 Detail of floor beam (for VGTU) for conveyor no C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1
1 do 4535 / 14.02.13 H- 717/22.02.13 1
Detail of floor beam, floor bracing, tie beam, tie bracing, monorail, monorail
6 0 bracing, ladder, diaph pl, sag rod & elevation beam (for VGTU) for conveyor no 3788 / 24.01.12 1 4027 / 01.02.12 1
C3 & C4

1 do 4535 / 14.02.13 H- 717/22.02.13 1


7 0 Detail of ladder, chqd pl & handrail (for VGTU) for conveyor no C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1
1 do 4535 / 14.02.13 H- 717/22.02.13 1
Detail of fhandrail, side runner, purlin, truss, false frame & elevation beam (for
8 0 VGTU) for conveyor no C3 & C4 3788 / 24.01.12 1 4027 / 01.02.12 1

1 do 4535 / 14.02.13 H- 717/22.02.13 1

13 Conveyor C5 C6
151/COC5, C6- 1/B/S-063 General Arrangement & marking of gallery girders & trestles for conveyor no C5
1 0 & C6 4120 / 18.02.12 1 1

1 do 4535 / 14.02.13 3672/22.02.13 1 1 H-722/25.02.13 1 1

34 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

Detail of vertical girder & top chord bracing ( Gallery girder mkd G1) for
2 0 conveyor no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

Detail of vertical girder & top chord bracing ( Gallery girder mkd G2) for
3 0 conveyor no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

Detail of vertical girder & walkway runner ( Gallery girder mkd G3) for conveyor
4 0 no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

Detail of vertical girder & walkway runner ( Gallery girder mkd G4) for conveyor
5 0 no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

Detail of truss , rafter bracing, sag rod & diaphram plate ( Gallery girder mkd
6 0 G1 to G4) for conveyor no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

Detail of vertical girder mkd VG 1 / 1X , cross beam & bottom chord bracing
7 0 ( Gallery girder mkd G1 to G4) for conveyor no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

Detail of bottom chord bracing , runner & purlin ( Gallery girder mkd G1 to G4)
8 0 for conveyor no C5 & C6 4120 / 18.02.12 1 3672/22.02.13 1 H-722/25.02.13 1

9 0 Detail of tower & trestle for conveyor no C5 & C6 4120 / 18.02.12 1


1 do 4535 / 14.02.13 3672/22.02.13 1 H-722/25.02.13 1
10 0 Detail of trestle mkd TR 1, TR 2 & TR 3 for conveyor no C5 & C6 4120 / 18.02.12 1
1 do 4535 / 14.02.13 3672/22.02.13 1 H-722/25.02.13 1
Detail of portal frame mkd PF-1, PF-2, PF-3 & PF-4 ( Gallery girder mkd G1 & Through IC at site on
11 0 G2) for conveyor no C5 & C6 1
826 /04.02.13
Detail of portal frame mkd PF-5, PF-6, PF-7, PF-8 & PF-9 ( Gallery girder mkd Through IC at site on
12 0 G2, G3 & G4) for conveyor no C5 & C6 1
826 /04.02.13

13 0 Through IC at site on 1
000 /25.04.13

15 Conveyor C7 & C8
151/COC7, C8- 1/B/S-071 General Arrangement & marking of gallery girders & trestles for conveyor no C7
1 0 & C8 4120 / 18.02.12 1 1

1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1 1


Detail of vertical girder & top chord bracing ( Gallery girder mkd G1) for
2 0 conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

Detail of vertical girder & top chord bracing ( Gallery girder mkd G2) for
3 0 conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

Detail of vertical girder & walkway runner ( Gallery girder mkd G3) for conveyor
4 0 no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

Detail of vertical girder & walkway runner ( Gallery girder mkd G4) for conveyor
5 0 no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

6 0 Detail of vertical girder & truss for conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

35 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

Detail of vertical girder mkd VG 1 / 1X , cross beam & bottom chord bracing
7 0 ( Gallery girder mkd G1 to G5) for conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

Detail of bottom chord bracing , runner & purlin ( Gallery girder mkd G1 to G5)
8 0 for conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

9 0 Detail of tower & trestle for conveyor no C7 & C8 4120 / 18.02.12 1 1


1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1
10 0 Detail of trestle mkd TR 1, TR 2 & TR 3 for conveyor no C7 & C8 4120 / 18.02.12 1
1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1
Detail of portal frame mkd PF 1, PF 2, PF 3 & PF 4 ( Gallery girder mkd G1 & G2)
11 0 for conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

Detail of portal frame mkd PF 5, PF 6, PF 7, PF 8 & PF 9 ( Gallery girder mkd G2,


12 0 3 & 4) for conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

Detail of chequered plate & handrail ( Gallery girder mkd G1 to G5) for
13 0 conveyor no C7 & C8 4120 / 18.02.12 1 3672/22.02.13 H-722/25.02.13 1

151/COC7, C8- 1/B/S-072 1 0 Marking of VGTU & trestle for conveyor no C7 & C8 4120 / 18.02.12 1 1
1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1 1
Detail of column mkd A3, A3X & A4, A4X ( for VGTU) for conveyor no C7 & C8
2 0 4120 / 18.02.12 1

1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1


Detail of column mkd B3, B3X & B4, B4X ( for VGTU) for conveyor no C7 & C8
3 0 4120 / 18.02.12 1

1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1


Detail of column bracing, post & floor beam ( for VGTU) for conveyor no C7 &
4 0 C8 4120 / 18.02.12 1

1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1


5 0 Detail of floor beam ( for VGTU) for conveyor no C7 & C8 4120 / 18.02.12 1
1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1
Detail of floor beam, floor bracing, tie beam, tie bracing, monorail, monorail
6 0 bracing, ladder, diaph pl, sag rod & elevation beam ( for VGTU) for conveyor no 4120 / 18.02.12 1
C7 & C8

1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1


7 0 Detail of ladder, chqd pl & handrail ( for VGTU) for conveyor no C7 & C8 4120 / 18.02.12 1
1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1
Detail of hand rail, side runner, purlin, truss, false frame & elevation beam ( for
8 0 VGTU) for conveyor no C7 & C8 4120 / 18.02.12 1

1 do 4535 / 14.02.13 3672/22.02.13 H-722/25.02.13 1

17 Conveyor P1,Q1,R1

36 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/COP1, Q1, R1- 0/B/S-079 1 0 Marking of gallery girders & trestles for conv no P1, Q1, R1 856 / 19.06.10
1 do 3311 / 10.01.11 1 1 3948 / 29.01.11 1 1 H -719/ 02.04.11 1 1 63 days
151/COP1, Q1, R1-1/B/S-079 Detail of vertical girder VG 1 & 1X for gallery girder G1, G2 & G3 for conv no P1,
2 0 Q1, R1 856 / 19.06.10 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days

do Detail of top & bottom chord brcg, cross beam, sag rod for gallery girder G1, G2
3 0 & G3 for vertical girder VG 1 & 1X for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of truss, diph pl, runner, purlin & chqd for gallery girder G1, G2 & G3 for
4 0 conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 3948 / 29.01.11 1 63 days


2 do 1825 / 10.08.11 1 955 / 20.08.11 1
do Detail of portal frame, walkway runner & rafter brcg for gallery girder G1, G2 &
5 0 G3 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 3948 / 29.01.11 1 63 days


2 do 1825 / 10.08.11 1 955 / 20.08.11 1
do Detail of top & bottom chord brcg, cross beam, rafter brcg. & portal frame for
6 0 gallery girder G4 for vertical girder VG 1 & 1X for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


Detail of truss, purlin, walkway runner & chqd for gallery girder G4 for conv no
7 0 P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 3948 / 29.01.11 1


2 do 1825 / 10.08.11 1 955 / 20.08.11 1
do Detail of top & bottom chord brcg, cross beam, rafter brcg. & portal frame for
8 0 gallery girder G5 for vertical girder VG 1 & 1X for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of truss, purlin, walkway runner & chqd for gallery girder G5 for conv no
9 0 P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of vertical girder VG 1 & 1X for gallery girder G6 for conv no P1, Q1, R1
10 0 856 / 19.06.10 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days

do Detail of truss, diph pl, runner, purlin, walkway runner, sag rod & chqd for
11 0 gallery girder G6 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 3948 / 29.01.11 1


2 do 1825 / 10.08.11 1 955 / 20.08.11 1
do Detail of vertical girder VG 1 & 1X for gallery girder G7 for conv no P1, Q1, R1
12 0 856 / 19.06.10 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days

37 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of truss, cross beam, top & bottom chord brcg for gallery girder G7 for
13 0 vertical girder VG 1 & 1X for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of portal frame, diph pl, rafter brcg, runner, purlin, walkway runner &
14 0 chqd for gallery girder G7 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of vertical girder VG 1 & 1X for gallery girder G8 for conv no P1, Q1, R1
15 0 856 / 19.06.10 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days

do Detail of top & bottom chord brcg, side runner, rafter brcg. & cross beam for
16 0 gallery girder G8 for vertical girder VG 1 & 1X for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of portal frame, truss, purlin, walkway runner & chqd for gallery girder
17 0 G8 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


151/COP1, Q1, R1- 0/B/S-079 Detail of top & bottom chord brcg, rafter brcg., cross beam & portal frame for
18 0 gallery girder G9 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


151/COP1, Q1, R1-1/B/S-079 Detail of truss, purlin, walkway runner & chqd for gallery girder G9 for conv no
19 0 P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


151/COP1, Q1, R1- 0/B/S-079 Detail of top & bottom chord brcg, rafter brcg., cross beam & portal frame for
20 0 gallery girder G10 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


151/COP1, Q1, R1-1/B/S-079 Detail of truss, purlin, handrail, walkway runner & chqd for gallery girder G10
21 0 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


151/COP1, Q1, R1- 0/B/S-079 Detail of top & bottom chord brcg, rafter brcg., cross beam & portal frame for
22 0 gallery girder G11 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


151/COP1, Q1, R1-1/B/S-079 Detail of truss, purlin, handrail, walkway runner & chqd for gallery girder G11
23 0 for conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do Detail of vertical girder VG 1 & 1X for gallery girder G12 for conv no P1, Q1,
24 0 R1 856 / 19.06.10 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days

do Detail of truss, cross beam, top & bottom chord brcg for gallery girder G12 for
25 0 conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days

38 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of portal frame, diph pl, runner, purlin & chqd for gallery girder G12 for
26 0 conv no P1, Q1, R1 856 / 19.06.10

1 do 3311 / 10.01.11 1 3948 / 29.01.11 1 H -719/ 02.04.11 1 63 days


do 27 0 Marking of gallery girders & trestles for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
do 28 0 Marking of gallery girders for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
do Detail of vertical gallery girder (for gallery girder mkd P1, Q1, R1 / G-13) for
29 0 conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of portal, top chord brcg & side runner (for gallery girder mkd P1, Q1,
30 0 R1 / G-13) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of truss, purlin, walkway runner & cross beams (for gallery girder mkd P1,
31 0 Q1, R1 / G-13) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of chqd pl, handrail, rafter brcg, bottom chord brcg, diaph pl & sag rod
32 0 (for gallery girder mkd P1, Q1, R1 / G-13) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of vertical girder, truss, side runner, rafter, ridge tie & bottom chord
33 0 brcg (for gallery girder mkd P1, Q1, R1 / G-14) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of purlin, portal frame, walkway runner, chqd pl & cross beam (for
34 0 gallery girder mkd P1, Q1, R1 / G-14) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of vertical girder, truss, side runner, rafter, ridge tie & bottom chord
35 0 brcg (for gallery girder mkd P1, Q1, R1 / G-15) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of purlin, portal frame, walkway runner, chqd pl & cross beam (for
36 0 gallery girder mkd P1, Q1, R1 / G-15) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of vertical girder & diaph pl (for gallery girder mkd P1, Q1, R1 / G-16) for
37 0 conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of portal, top chord brcg , rafter brcg & side runner (for gallery girder
38 0 mkd P1, Q1, R1 / G-16) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of truss, cross beams, purlin, walkway runner, sag rod & chqd pl (for
39 0 gallery girder mkd P1, Q1, R1 / G-16) for conv no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

151/COP1, Q1, R1- 0/B/S-080 1 0 Details of trestle mkd. TR 1 to TR 3 for conveyor no P1, Q1, R1 947 / 26.06.10 1 1 4332 / 25.02.11 1 1 H - 764 / 21.04.11 1 1 56 days
do 2 0 Details of trestle mkd. TR 4 & TR 5 for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days
151/COP1, Q1, R1- 1/B/S-080 3 0 Details of trestle mkd. TR 6 for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days
151/COP1, Q1, R1- 0/B/S-080 4 0 Details of trestle mkd. TR 7 for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days
do 5 0 Details of trestle mkd. TR 8 for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days
151/COP1, Q1, R1- 1/B/S-080 6 0 Details of trestle mkd. TR 9 for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days
do 7 0 Details of trestle mkd. TR 10 for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days
do Marking of column, column bracing, inclined beam, truss, platform, tie beam,
8 0 tie bracing & beam for tower TW 1for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days

do 9 0 Detail of column for tower TW 1for conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days

39 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Marking of column bracing, inclined beam for tower TW 1 for conveyor no P1,
10 0 Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days

do Detail of truss, cross over platform, tie bracing & beam for tower TW 1 for
11 0 conveyor no P1, Q1, R1 947 / 26.06.10 1 4332 / 25.02.11 1 H - 764 / 21.04.11 1 56 days

do Marking of column, column brcg, inclined beam, truss, platform, tie beam, tie
12 0 bracing & beam (for tower TW - 2) for conveyor no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do 13 0 Detail of column (for tower TW - 2) for conveyor no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
do Detail of column bracing & beam (for tower TW - 2) for conveyor no P1, Q1, R1
14 0 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of tie beam & truss (for tower TW - 2) for conveyor no P1, Q1, R1
15 0 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do Detail of cross over platform & chqd. pl (for tower TW - 2) for conveyor no P1,
16 0 Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1

do 17 0 Detail of trestle mkd P1, Q1, R1 / TR - 11 for conveyor no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
do 18 0 Detail of trestle mkd P1, Q1, R1 / TR - 12 for conveyor no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
do 19 0 Detail of trestle mkd P1, Q1, R1 / TR - 13 for conveyor no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
do 20 0 Detail of trestle mkd P1, Q1, R1 / TR - 14 for conveyor no P1, Q1, R1 2734 / 03.11.11 1 2872 / 14.11.11 1 1064 / 26.11.11 1
151/DH/COP1,Q1 ,R1 -1/B/S-131 Marking of floor plan & tie plan of Drive house for conveyor P1 / Q1 / R1
1 0 2264 / 13.09.11 1 1 2265 / 13.09.11 2509 / 10.10.11 1 1 1026 / 18.10.11 1 1 8 days

Marking of roof plan & column elevation of Drive house for conveyor P1 / Q1 /
2 R1 2264 / 13.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

3 Marking of column elevation of Drive house for conveyor P1 / Q1 / R1 2264 / 13.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
4 do 2264 / 13.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
5 do 2264 / 13.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
151/DH/COP1,Q1 ,R1 -1/B/S-131 6 0 Detail of column mkd A / 06 of drive house for conveyors P1, Q1, R1 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days
do 7 0 Detail of column mkd A / 07 of drive house for conveyors P1, Q1, R1 1507 / 18.07.11
1 do 1936 / 18.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days
do 8 0 Detail of column mkd A / 08 of drive house for conveyors P1, Q1, R1 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days
do Detail of column mkd A / 09 to A/11 & E/09, E/10 of drive house for conveyors
9 0 P1, Q1, R1 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd B / 01 & C/04 of drive house for conveyors P1, Q1, R1
10 0 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd B / 02 & C/05 of drive house for conveyors P1, Q1, R1
11 0 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd B / 03 & E/11, J/11 of drive house for conveyors P1, Q1,
12 0 R1 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd C/01 & L/01 of drive house for conveyors P1, Q1, R1
13 0 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

40 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of column mkd C/02 & L/02 of drive house for conveyors P1, Q1, R1
14 0 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd C/03 & L/03 of drive house for conveyors P1, Q1, R1
15 0 1507 / 18.07.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of floor beams at RL (+) 327.600 (TOS) of drive house for conveyors P1,
16 0 Q1, R1 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days

do 17 0 do 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days


do 18 0 do 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do 19 0 do 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of floor beams at RL (+) 332.300 (TOS) of drive house for conveyors P1,
20 0 Q1, R1 1507 / 18.07.11

1 do 1936 / 18.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days


do 21 0 do 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do 22 0 Detail of truss & rafter brcg of drive house for conveyors P1, Q1, R1 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of truss, false rafter & sag rod of drive house for conveyors P1, Q1, R1
23 0 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days

do 24 0 Detail of truss & rafter brcg of drive house for conveyors P1, Q1, R1 1507 / 18.07.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of column mkd C/06, L/06 & J/09 of drive house for conveyors P1, Q1,
25 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days
R1
do Detail of column mkd G / 01 & G /06 of drive house for conveyors P1, Q1, R1
26 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd G / 07 & G /08 of drive house for conveyors P1, Q1, R1
27 0 1782 / 05.08.11

1 do 1936 / 18.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days


do Detail of column mkd M / 01 & L /04 of drive house for conveyors P1, Q1, R1
28 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd M / 02 & L /05 of drive house for conveyors P1, Q1, R1
29 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd M / 03 & J /10 of drive house for conveyors P1, Q1, R1
30 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd N / 06 & N /09 of drive house for conveyors P1, Q1, R1
31 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of column mkd N / 07 & N /10 of drive house for conveyors P1, Q1, R1
32 0 1782 / 05.08.11

1 do 1936 / 18.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days


do Detail of column mkd N / 08 & N /11 of drive house for conveyors P1, Q1, R1
33 0 1782 / 05.08.11 1 2157 / 07.09.11 1 978 / 13.09.11 1 6 days

do Detail of floor beams at RL (+) 327.600 (TOS) of drive house for conveyors P1,
34 0 1782 / 05.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
Q1, R1

41 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 35 0 do 1782 / 05.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days


do 36 0 do 1782 / 05.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of floor beams at RL (+) 327.600 (TOS) & Floor brcg of drive house for
37 0 1782 / 05.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
conveyors P1, Q1, R1
do Detail of floor beams at RL (+) 332.300 (TOS) of drive house for conveyors P1,
38 0 1782 / 05.08.11
Q1, R1
1 do 1936 / 18.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of floor beams at RL (+) 332.300 (TOS) of drive house for conveyors P1,
39 0 1782 / 05.08.11
Q1, R1
1 do 1936 / 18.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of truss mkd T 5, T5X, T10, T11 & T11X of drive house for conveyors
40 0 1782 / 05.08.11
P1, Q1, R1
1 do 1936 / 18.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
do Detail of truss , false rafter, purlin & rafter brcg of drive house for conveyors
41 0 1782 / 05.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
P1, Q1, R1
do Detail of truss , rafter brcg , purlin & sag rod of drive house for conveyors P1,
42 0 1782 / 05.08.11 1 2301 / 20.09.11 1 1007 / 29.09.11 1 9 days
Q1, R1
do Detail of column mkd B/06, M/06, K/06, F/06, H/06, D/06, K/03, D/03, F/03,
H/03 & S beam mkd 01/SB-3, 03/SB-1, 06/SB-1, 08/SB-1, 03/SB-3, 01/SB-2,
43 0 03/SB-2, 03/SB-2X of drive house for conveyors P1, Q1, R1 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of column mkd K/01, D/01, F/01, H/01, K/08, D/08, F/08, H/08, M/08,
B/08 & Beam mkd M/B-1, N/B-1, N/B-6, M/B-2, N/B-2, M/B-4, N/B-4, M/B-3
44 0 & N/B-3of drive house for conveyors P1, Q1, R1 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Monorail & Floor bracing at RL (+) 327.600 (TOS) of drive house
45 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
for conveyors P1, Q1, R1
do 46 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do 47 0 Detail of Cloumn bracing of drive house for conveyors P1, Q1, R1 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do 48 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do 49 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do 50 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do Detail of Cloumn bracing & beams of drive house for conveyors P1, Q1, R1
51 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Cloumn bracing & post of drive house for conveyors P1, Q1, R1
52 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Laced side runner on line - A, B, C, L of drive house for conveyors


53 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
P1, Q1, R1

42 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of Laced & side runner of drive house for conveyors P1, Q1, R1
54 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Side runner & sag rod of drive house for conveyors P1, Q1, R1
55 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Floor beam & cross over at RL (+) 332.300 of drive house for
56 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
conveyors P1, Q1, R1
do Detail of Floor beam at RL (+) 332.300 of drive house for conveyors P1, Q1,
57 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
R1
do 58 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do Detail of Column bracing on line - L of drive house for conveyors P1, Q1, R1
59 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Column bracing on line - L , M & N of drive house for conveyors P1,
60 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
Q1, R1
do Detail of Column bracing on line - M & N of drive house for conveyors P1,
61 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
Q1, R1
do 62 0 Detail of Tie beam of drive house for conveyors P1, Q1, R1 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do 63 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do 64 0 do 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days
do Detail of Monorail & Tie bracing of drive house for conveyors P1, Q1, R1
65 0 2442 / 28.09.11 1 2509 / 10.10.11 1 1026 / 18.10.11 1 8 days

do Detail of Chqd plate at 332.300 (TOS) of Drive house for conveyor P1,Q1,R1
66 0 20/09.08.12 1 1602 / 11.08.12 1 681 / 16.08.12 1

do Detail of Chqd plate & Handrail at 332.300 (TOS) of Drive house for conveyor
67 0 20/09.08.12 1 1602 / 11.08.12 1 681 / 16.08.12 1
P1,Q1,R1
do 69 0 Marking of take up tower of HGTU for conveyor P1,Q1,R1 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
do Detail of column mkd P/2, Q/2, R/2, S/2 & P/1 of HGTU for conveyor
70 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
P1,Q1,R1
do Detail of column mkd Q/1, R/1, S/1 & column bracing of HGTU for conveyor
71 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
P1,Q1,R1
do 72 0 Detail of column bracing of HGTU for conveyor P1,Q1,R1 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
do Detail of floor beams at RL 323.800 M (TOS) of HGTU for conveyor
73 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
P1,Q1,R1
do 74 0 do 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
do Detail of chqd. pl & hand rail at RL 323.800 M (TOS) & RL 328.300 M (TOS)
75 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
of HGTU for conveyor P1,Q1,R1
do Detail of floor beam at RL 328.300 M (TOS) of HGTU for conveyor P1,Q1,R1
76 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1

do Detail of floor beams, floor bracing at RL 328.300 M (TOS) of HGTU for


77 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1
conveyor P1,Q1,R1

43 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of ladder mkd LD - 1 & LD - 2 of HGTU for conveyor P1,Q1,R1


78 0 0136 / 10.04.13 1 372 / 27.04.13 1 891 / 03.05.13 1

18 Conveyor P2,Q2,R2
151/COP2, 2 R2- 0/B/S-083 1 0 Marking of gallery girders & trestles for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 1 3429 / 20.12.11 1 1 H-563/10.12.12 1 1
151/COP2, 2 R2- 1/B/S-083 Detail of vertical girder & walkway runner (for gallery girder mkd G - 1) for
2 0 conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of poral, top chord bracing, tie bracing, side runner & ridge bracing (for
3 0 gallery girder mkd G - 1) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of truss, purlin, cross beams, sag rod, diaph pl, bottom chord bracing &
4 0 rafter bracing (for gallery girder mkd G - 1) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder , top & bottom chord bracing, rafter brcg, cross beams
5 0 & portal frame (for gallery girder mkd G - 2) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of truss, purlin, hand rail, walkway runner & chqd. pl (for gallery girder
6 0 mkd G - 2) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

151/COP2, 2 R2- 0/B/S-083 Detail of vertical girder , top & bottom chord bracing, rafter brcg, cross beams
7 0 & portal frame (for gallery girder mkd G - 3) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

151/COP2, 2 R2- 1/B/S-083 Detail of truss, purlin, hand rail, walkway runner & chqd. pl (for gallery girder
8 0 mkd G - 3) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

151/COP2, 2 R2- 0/B/S-083 Detail of vertical girder , top & bottom chord bracing, rafter brcg, cross beams
9 0 & portal frame (for gallery girder mkd G - 4) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

151/COP2, 2 R2- 1/B/S-083 Detail of truss, purlin, hand rail, walkway runner & chqd. pl (for gallery girder
10 0 mkd G - 4) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder mkd G5/VG- 1, 1X (for gallery girder mkd G - 5) for
11 0 conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of top chord bracing, bottom chord bracing, side runner, rafter brcg &
12 0 cross beams (for gallery girder mkd G - 5) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of portal frame, truss, purlin, walkway runner & chqd. pl (for gallery
13 0 girder mkd G - 5) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder mkd G6/VG- 1, 1X (for gallery girder mkd G - 6) for
14 0 conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of truss, cross beams , top & bottom chord bracing (for gallery girder
15 0 mkd G - 6) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

44 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of portal frame, diaph pl, rafter brcg, runner, purlin, walkway runner &
16 0 chqd. pl (for gallery girder mkd G - 6) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder mkd G7/VG- 1, 1X (for gallery girder mkd G - 7) for
17 0 conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of portal frame, truss, purlin, walkway runner & chqd. pl (for gallery
18 0 girder mkd G - 7) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of top chord bracing, bottom chord bracing, side runner, rafter brcg &
19 0 cross beams (for gallery girder mkd G - 7) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder mkd G8/VG- 1, 1X (for gallery girder mkd G - 8) for
20 0 conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of truss, cross beams , top & bottom chord bracing (for gallery girder
21 0 mkd G - 8) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of portal frame, diaph pl, rafter brcg, runner, purlin, walkway runner &
22 0 chqd. pl (for gallery girder mkd G - 8) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

151/COP2, 2 R2- 0/B/S-083 Detail of vertical girder , top & bottom chord bracing, rafter brcg, cross beams
23 0 & portal frame (for gallery girder mkd G - 9) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

151/COP2, 2 R2- 1/B/S-083 Detail of truss, purlin, hand rail, walkway runner & chqd. pl (for gallery girder
24 0 mkd G - 9) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder , top chord bracing, rafter brcg, & handrail (for gallery
25 0 girder mkd G - 10) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of truss, diaph pl, runner, purlin, walkway runner, sag rod & chqd. pl (for
26 0 gallery girder mkd G - 10) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder , diaph pl, rafter & top chord bracing (for gallery girder
27 0 mkd G - 11) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of truss, purlin, bottom chord bracing,side runner, sag rod, cross beam &
28 0 handrail (for gallery girder mkd G - 11) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of portal, walkway runner, diaph pl, chqd. Pl, top chord bracing (for
29 0 gallery girder mkd G - 11) for conveyor no P2, Q2, & R2 3145 / 07.12.11 1 3429 / 20.12.11 1 H-563/10.12.12 1

do Detail of vertical girder , bracing, & cross beam (for gallery girder mkd G - 12,
30 0 12A & 13, 13A) for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1

do Detail of gallery girder , top & bottom chord bracing, (for gallery girder mkd G -
31 0 13 & 13A) for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1

do Detail of vertical girder , top & bottom chord bracing, purlins (for gallery girder
32 0 mkd G -14, 14A) for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1

45 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of truss (for gallery girder mkd G - 12, 12A , 13, 13A & 14, 14A) for
33 0 conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1

do Detail of portal (for gallery girder mkd G - 12, 12A , 13, 13A & 14, 14A) for
34 0 conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1

do Detail of chqd. Pl & hand rail (for gallery girder mkd G - 12, 12A , 13, 13A & 14,
35 0 14A) for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1

151/COP2, 2 R2- 1/B/S-084 1 0 Detail of trestle mkd TR- 1 for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 1 3538 / 26.12.11 1 1 1
do 2 0 Detail of trestle mkd TR- 2 for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1
do 3 0 Detail of trestle mkd TR- 3 for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1
do 4 0 Detail of trestle mkd TR- 4 & 5 for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1
do 5 0 Detail of trestle mkd TR- 1 for conveyor no P2, Q2, & R2 3328 / 16.12.11 1 3538 / 26.12.11 1
do 6 0 Detail of trestle mkd TR- 6 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 7 0 Detail of trestle bracing for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 8 0 Detail of trestle mkd TR- 7 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 9 0 Detail of trestle mkd TR- 8 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do Detail of trestle bracing & beam mkd TR - 8for conveyor no P2, Q2, & R2
10 0 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

do 11 0 Detail of trestle mkd TR- 9 & TR - 10 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 12 0 do 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 13 0 Detail of trestle mkd TR - 10 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 14 0 Detail of trestle mkd TR- 11 & TR - 12 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 15 0 do 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 16 0 do 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
151/COP2, 2 R2- 0/B/S-084 17 0 Marking of tower 1 & tower 2 for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
151/COP2, 2 R2- 1/B/S-084 18 0 Detail of column (for tower mkd TW 1) for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do Detail of column , column bracing & cross over (for tower mkd TW 1) for
19 0 conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

do Detail of beam & tie beam (for tower mkd TW 1) for conveyor no P2, Q2, & R2
20 0 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

do Detail of truss, purlin, rafter brcg, false rafter, laced side runner (for tower
21 0 mkd TW-1 & TW- 2) for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

do Detail of chqd. pl, handrail, floor brcg & tie bracing (for tower mkd TW-1 &
22 0 TW- 2) for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

do 23 0 Detail of column (for tower mkd TW 2) for conveyor no P2, Q2, & R2 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do 24 0 do 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1
do Detail of column bracing (for tower mkd TW 2) for conveyor no P2, Q2, & R2
25 0 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

do Detail of beam & tie beam (for tower mkd TW 2) for conveyor no P2, Q2, & R2
26 0 3151 / 07.12.11 1 2735 / 29.11.12 1 H - 571 / 12.12.12 1

46 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/DH/COP2,Q2 ,R2 -1/B/S-132 Structural marking of floor plan & tie plan of Drive House for conveyor
1 0 P2,Q2,R2. 037 / 04.04.12 1 1 2735 / 29.11.12 1 1 H - 605 / 03.01.13 1 1

do Structural marking of roof plan, column elevation & column of Drive House for
2 0 conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do Structural marking of column elevation of Drive House for conveyor P2,Q2,R2.


3 0 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do Structural marking of elevations of Drive House for conveyor P2,Q2,R2.


4 0 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do 5 0 do 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1


do 6 0 Details of column mkd A/06 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 7 0 Details of column mkd A/07 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 8 0 Details of column mkd A/08 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do Details of column mkd A/09, A/10, A/11 & post mkd N/P-2 & N/P-3 of Drive
9 0 House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do 10 0 Details of column mkd N/06 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 11 0 Details of column mkd N/07 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do Details of column mkd N/09, N/10, N/11 & post mkd N/P-1 & N/P-1X of Drive
12 0 House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do 13 0 Details of column mkd N/08 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do Details of column mkd E/09, E/10, E/11, J/09, J/10, J/11, B/06 & M/06 of Drive
14 0 House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do Details of column mkd C/06, F/06, H/06, K/06 & D/06 of Drive House for
15 0 conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do Details of column mkd G/06, B/08, M/08, K/08, F/08, H/08 & D/08 of Drive
16 0 House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1

do 17 0 Details of column mkd G/07 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 18 0 Details of column mkd G/08 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 19 0 Details of column mkd L/06 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 20 0 Details of column mkd B/01 of Drive House for conveyor P2,Q2,R2. 037 / 04.04.12 1 2735 / 29.11.12 1 H - 605 / 03.01.13 1
do 21 0 Details of column mkd B/02 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 22 0 Details of column mkd B/03 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do Details of column mkd C/01 & C/04 of Drive House for conveyor P2,Q2,R2.
23 0 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1

do Details of column mkd K/01, D/01, F/01, H/01, K/03, D/03, F/03, H/03 & beam
24 0 mkd M/B-1, N/B-1, N/B-6, M/B-2, N/B-2, M/B-4, N/B-4, M/B-3, N/B-3, B/B-2, 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
N/B-5 of Drive House for conveyor P2,Q2,R2.

do 25 0 Details of column mkd C/03 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1

47 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Details of column mkd C/02 & C/05 of Drive House for conveyor P2,Q2,R2.
26 0 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1

do Details of column mkd G/01 & L/04 of Drive House for conveyor P2,Q2,R2.
27 0 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1

do Details of column mkd L/01 & L/05 of Drive House for conveyor P2,Q2,R2.
28 0 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1

do 29 0 Details of column mkd L/02 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 30 0 Details of column mkd L/03 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 31 0 Details of column mkd M/01 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 32 0 Details of column mkd M/02 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 33 0 Details of column mkd M/03 of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 34 0 Details of column bracing of Drive House for conveyor P2,Q2,R2. 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 35 0 do 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 36 0 do 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 37 0 do 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 38 0 do 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 39 0 do 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 40 0 do 086 / 07.04.12 1 2916 / 17.12.12 1 H - 605 / 03.01.13 1
do 41 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 42 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 43 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 44 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 45 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 46 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 47 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of floor beams at RL (+) 242.100 of Drive House for conveyor P2,Q2,R2.
48 0 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 49 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1


do 50 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 51 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 52 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 53 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 54 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of floor beams at RL (+) 242.100 & floor bracings of Drive House for
55 0 conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do Detail of monorail & floor bracings at RL (+) 242.100 of Drive House for
56 0 conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 57 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

48 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of floor beams at RL (+) 250.300 of Drive House for conveyor P2,Q2,R2.
58 0 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 59 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1


do 60 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 61 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of floor beam & cross over at RL (+) 250.300 of Drive House for conveyor
62 0 P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do Detail of floor beams at RL (+) 250.300 of Drive House for conveyor P2,Q2,R2.
63 0 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 64 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1


do 65 0 Detail of tie beam of Drive House for conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 66 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 67 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of monorail & tie bracings of Drive House for conveyor P2,Q2,R2.
68 0 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do Detail of laced side runner on line - A, B, C, L, N & M of Drive House for


69 0 conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 70 0 Detail of laced & side runner of Drive House for conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 71 0 Detail of side runner & sag rod of Drive House for conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do 72 0 Detail of truss & rafter bracings of Drive House for conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of truss , false rafter & sag rod of Drive House for conveyor P2,Q2,R2.
73 0 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 74 0 Detail of truss & rafter bracings of Drive House for conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of truss mkd T-4, T-4X, T-10, T-11 & T-11X of Drive House for conveyor
75 0 P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do Detail of truss , false rafter, purlin & rafter bracings of Drive House for
76 0 conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do Detail of truss , rafter bracing, purlin & sag rod of Drive House for conveyor
77 0 P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do Detail of chqd plate at RL (+) 250.300 of Drive House for conveyor P2,Q2,R2.
78 0 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 79 0 do 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1


do 80 0 Detail of chqd plate & handrail of Drive House for conveyor P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1
do Detail of laced side runner, side runner & post of Drive House for conveyor
81 0 P2,Q2,R2. 115 / 10.04.12 1 2932 / 24.12.12 1 H - 605 / 03.01.13 1

do 82 0 Marking of take up tower of HGTU for conveyor P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1
do 83 0 Detail of column of HGTU for conveyor P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1
do 84 0 Detail of column bracing of HGTU for conveyor P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1

49 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of ladder, column bracings & bracket of HGTU for conveyor P2,Q2,R2
85 0 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1

do 86 0 Detail of floor beam at RL (+) 240.800 m of HGTU for conveyor P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1
do Detail of floor beams & floor bracings at RL (+) 240.800 m of HGTU for conveyor
87 0 P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1

do 88 0 Detail of floor beam at RL (+) 237.300 m of HGTU for conveyor P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1
do 89 0 do 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1
do Detail of chqd pl & handrail at RL (+) 237.300 m of HGTU for conveyor
90 0 P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1

do Detail of chqd pl & handrail at RL (+) 240.800 m of HGTU for conveyor


91 0 P2,Q2,R2 307 / 24.04.13 1 415 / 02.05.13 1 895 / 04.05.13 1

20 Conveyor B1,B2,B3
151/COB 1,2,3-0/B/S-91 Marking of gallery girders & trestles for conveyor no B1, B2, B3
1 0 620 / 26.05.10

1 do 2862 / 06.12.10 1 1
151/COB 1,2,3-1/B/S-91 Detail of vertical girder mkd. VG - 1, 1X for gallery girder B1, B2, B3 / G1
2 0 620 / 26.05.10 1 3404 / 13.12.10 1 1 485 / 12.01.11 1 1 30 days

do Detail of portal frame, truss, purlin, walkway runner & chqd pl for gallery girder
3 0 B1, B2, B3 / G1 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of top chord brcg, bottom chord brcg, side runner, sag rod, rafter brcg &
4 0 cross beams for gallery girder B1, B2, B3 / G1 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of gallery girder top & bottom chord brcg & cross beams for gallery
5 0 girder B1, B2, B3 / G2 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of portal frame, truss, diaph pl, rafter brcg, runner, purlin, walkway
6 0 runner, sag rod, handrail & chqd pl for gallery girder B1, B2, B3 / G2 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of vertical girder, top chord & bottom chord brcg for gallery girder B1,
7 0 B2, B3 / G3 620 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

do Detail of portal frame, truss, diaph pl & chqd pl for gallery girder B1, B2, B3 /
8 0 G3 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of side runner, purlin, walkway runner, handrail, sag rod & cross beam
9 0 for gallery girder B1, B2, B3 / G3 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

50 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of vertical girder mkd. VG - 1, 1X, top chord brcg, bottom chord brcg &
10 0 cross beams for gallery girder B1, B2, B3 / G4 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of portal frame, truss, diaph pl, top chord brcg, bottom chord brcg,
11 0 runner, purlin, walkway runner.sag rod, handrail & chqd pl for gallery girder B1, 620 / 26.05.10
B2, B3 / G4

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of vertical girder mkd. VG - 1, 1X, top chord brcg, bottom chord brcg &
12 0 cross beams for gallery girder B1, B2, B3 / G5 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of portal frame, truss, diaph pl, rafter brcg, runner, purlin, walkway
13 0 runner.sag rod, handrail & chqd pl for gallery girder B1, B2, B3 / G5 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of vertical girder mkd. VG - 1, 1X for gallery girder B1, B2, B3 / G6 & 6X
14 0 620 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

do Detail of portal frame, truss, purlin, walkway runner & chqd pl for gallery girder
15 0 B1, B2, B3 / G6 & 6X 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of top chord brcg, bottom chord brcg, side runner, sag rod, rafter brcg &
16 0 cross beams for gallery girder B1, B2, B3 / G6 & 6X 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of vertical girder, bottom chord brcg & rafter brcg for gallery girder B1,
17 0 B2, B3 / G7 620 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

do Detail of portal frame, truss, diaph pl & chqd pl for gallery girder B1, B2, B3 /
18 0 G7 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of side runner, purlin, walkway runner, handrail, sag rod, top chord brcg
19 0 & cross beam for gallery girder B1, B2, B3 / G7 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do 20 0 Detail of vertical girder for gallery girder B1, B2, B3 / G8, G9 & G10 620 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days
do Detail of vertical girder, top chord & bottom chord brcg, rafter brcg, sag rod,
21 0 cross beam & diaph pl for gallery girder B1, B2, B3 / G8, G9 & G10 620 / 26.05.10

1 do 2862 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of portal frame, truss, side runner & chqd pl for gallery girder B1, B2, B3 /
22 0 G8, G9 & G10 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

51 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of side runner, purlin, walkway runner & handrail for gallery girder B1,
23 0 B2, B3 / G8, G9 & G10 620 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

do Detail of vertical girder, bottom chord brcg & rafter brcg for gallery girder B1,
24 0 B2, B3 / G7A 620 / 26.05.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

do Detail of portal frame, truss, diaph pl & chqd pl for gallery girder B1, B2, B3 /
25 0 G7A 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days


do Detail of side runner, purlin, walkway runner, handrail, sag rod, top chord brcg
26 0 & cross beam for gallery girder B1, B2, B3 / G7A 620 / 26.05.10

1 do 2862 / 06.12.10 1 3404 / 13.12.10 1 485 / 12.01.11 1 30 days

151/COB 1,2,3-1/B/S-92 1 0 Detail of trestle mkd. TR - 1 & TR - 2 for B1, B2, B3 626 / 27.05.10 1 1 3513 / 22.12.10 1 1 H - 734 / 09.04.11 1 1 108 days
151/COB 1,2,3-0/B/S-92 2 0 Detail of trestle mkd. TR - 3, TR - 4 & TR - 5 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
do 3 0 Detail of trestle mkd. TR - 6 & TR - 7 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
151/COB 1,2,3-1/B/S-92 4 0 Detail of trestle mkd. TR - 8 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
151/COB 1,2,3-0/B/S-92 5 0 Detail of trestle mkd. TR - 9 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
do 6 0 Detail of trestle mkd. TR - 10 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
do 7 0 Detail of trestle mkd. TR - 11 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
do 8 0 Detail of trestle mkd. TR - 12 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
do 9 0 Detail of trestle mkd. TR - 13 for B1, B2, B3 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
151/COB 1,2,3-1/B/S-92 10 0 Structural GA of tower 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
151/COB 1,2,3-1/B/S-92 Detail of column mkd A1, A2, A3, A4 & B1, B2, B3, B4 for tower mkd. TW - 1
11 0 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days

151/COB 1,2,3-1/B/S-92 12 0 Detail of beam & column bracing for tower mkd. TW - 1 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days
151/COB 1,2,3-1/B/S-92 Structural detail of cross over platform, truss & tie beam for tower mkd. TW - 1
13 0 626 / 27.05.10 1 3513 / 22.12.10 1 H - 734 / 09.04.11 1 108 days

151/DH/COB 1,2,3-1/B/S-93 Marking of floor plan, tie plan & rafter plan of drive house for conveyors B1, B2,
1 0 B3 700 / 03.06.10 1 1 1650 / 26.07.11 1 1 956 / 26.08.11 1 1 31 days

do Marking of column, column brcg & side runner of drive house for conveyors B1,
2 0 B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Marking of column brcg & side runner of drive house for conveyors B1, B2, B3
3 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of column mkd. K4 & A2 of drive house for conveyors B1, B2, B3
4 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do 5 0 Detail of column mkd. A4 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 6 0 Detail of column mkd. K5 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 7 0 Detail of column mkd. A 5 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 8 0 Detail of column mkd. K 3 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

52 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 9 0 Detail of column mkd. A 3 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 10 0 Detail of column mkd. D1 & D 3 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 11 0 Detail of column mkd. D 2 & D 4 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 12 0 Detail of column mkd. D 5 & G 2 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 13 0 Detail of column mkd. G 5 & K 2 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do Detail of column mkd. G 1, K 1 & A 1 of drive house for conveyors B1, B2, B3
14 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of column mkd. J 5, H 5, F 5, E 5, C 5 & B 5 of drive house for conveyors


15 0 B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of column mkd. J 3, H 3, F 3, E 8, C 3 & B 3 of drive house for conveyors


16 0 B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of column brcg on line K & G of drive house for conveyors B1, B2, B3
17 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of column brcg on line A & K of drive house for conveyors B1, B2, B3
18 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of column brcg on line A , D & 5 of drive house for conveyors B1, B2, B3
19 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do 20 0 Detail of column brcg on line 1 & 5 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do Detail of column brcg on line 1, 2, 4 & 5 of drive house for conveyors B1, B2,
21 0 B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do 22 0 Detail of column brcg on line 3 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 23 0 Detail of tie beam at RL (+) 331.500 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 24 0 do 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 25 0 Detail of tie beam at RL (+) 331.500 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 26 0 do 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do Detail of monorail at RL (+) 330.500 & (+) 345.500 & tie brcg, monorail brcg of
27 0 drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do Detail of inclined floor beam from RL (+) 336.771 to RL (+) 338.598 of drive
28 0 house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do 29 0 do 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days


do 30 0 do 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 31 0 do 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 32 0 Detail of tie beam at RL (+) 346.350 of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do Detail of tie beam & bracing at RL (+) 346.350 of drive house for conveyors B1,
33 0 B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

do 34 0 Detail of truss of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do 35 0 do 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
151/DH/COB 1,2,3-0/B/S-93 Detail of truss & cross over platform of drive house for conveyors B1, B2, B3
36 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

53 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/DH/COB 1,2,3-1/B/S-93 37 0 Detail of laced & side runner of drive house for conveyors B1, B2, B3 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days
do Detail of laced & side runner & sag rod of drive house for conveyors B1, B2, B3
38 0 700 / 03.06.10 1 1650 / 26.07.11 1 956 / 26.08.11 1 31 days

Detail of chqd plate & hand rail of drive house for conveyors B1, B2, B3
39 0 4152 / 21.02.12 1 1 H - 69 / 04.05.12 1

40 0 do 4152 / 21.02.12 1 1 H - 69 / 04.05.12 1

151/DH/COB 1,2,3-1/B/S-94 1 0 Marking of take up towerconveyor no B1/B2/B3 - HGTU 2443 / 29.09.12 1 1 2206/03.10.12 1 1 H - 414 / 16.10.12 1 1
Detail of column mkd P/1, S/1, P/2, S/2 & Q/1 - HGTU for conveyors B1/B2/B3
2 0 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

3 0 Detail of column & column bracing - HGTU for conveyors B1/B2/B3 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
4 0 Detail of column bracing & ladder - HGTU for conveyors B1/B2/B3 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
5 0 Detail of floor beam at RL 327.300 M - HGTU for conveyors B1/B2/B3 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
6 0 do 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
Detail of chqd. Pl & handrail at RL 327.300 m & RL 330.300 m - HGTU for
7 0 conveyors B1/B2/B3 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

8 0 Detail of floor beam at RL 330.300 M - HGTU for conveyors B1/B2/B3 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
Detail of floor beams & floor bracings at RL 330.300 M - HGTU for conveyors
9 0 B1/B2/B3 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

Conveyor B4,B5
151/CO B 4, B5-1/B/S-133 1 0 Marking of conveyor gallery girder for conveyor no B4 / B5 648 / 17.05.12 1 1 657 / 26.05.12 1 1 H - 135 / 07.06.12 1 1
2 0 Detail of vertical girder mkd VG -1 & VG - 1X for conveyor no B4 / B5 648 / 17.05.12 1 657 / 26.05.12 1 H - 135 / 07.06.12 1
Detail of vertical girder top chord bracing & runner for conveyor no B4 / B5
3 0 648 / 17.05.12 1 657 / 26.05.12 1 H - 135 / 07.06.12 1

4 0 Detail of cross beams & walkway runner for conveyor no B4 / B5 648 / 17.05.12 1 657 / 26.05.12 1 H - 135 / 07.06.12 1
Detail of cross beams , chqd pl & bottom chord bracing for conveyor no B4 / B5
5 0 648 / 17.05.12 1 657 / 26.05.12 1 H - 135 / 07.06.12 1

Detail of truss , diaph pl , sag rod, purlin & rafter bracing for conveyor no B4 /
6 0 B5 648 / 17.05.12 1 657 / 26.05.12 1 H - 135 / 07.06.12 1

151/HGTU B 4, B5-1/B/S-135 1 0 Marking of Take up tower for conveyors B4 & B5 4766 / 04.03.13 1 1 3838 / 08/11.03.13 1 1 H - 772 / 13.03.13 1 1
Detail of column mkd P/1, P/2,Q/1,R/1 & R/2 of HGTU for conveyors B4 & B5
2 0 4766 / 04.03.13 1 3838 / 08/11.03.13 1 H - 772 / 13.03.13 1

3 0 Detail of column mkd Q/2 & bracing of HGTU for conveyors B4 & B5 4766 / 04.03.13 1 3838 / 08/11.03.13 1 H - 772 / 13.03.13 1
Detail of floor beam & floor bracing at RL (+) 329,250 M of HGTU for conveyors
4 0 B4 & B5 4766 / 04.03.13 1 3838 / 08/11.03.13 1 H - 772 / 13.03.13 1

5 0 Detail of chqd. plate at RL (+) 329,250 M of HGTU for conveyors B4 & B5 4766 / 04.03.13 1 3838 / 08/11.03.13 1 H - 772 / 13.03.13 1

54 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

Detail of floor beams & floor bracing at RL (+) 332,350 M of HGTU for conveyors
6 0 B4 & B5 4766 / 04.03.13 1 3838 / 08/11.03.13 1 H - 772 / 13.03.13 1

Detail of chqd. Plate, handrail, ladder & support beam of HGTU for conveyors
7 0 B4 & B5 4766 / 04.03.13 1 3838 / 08/11.03.13 1 H - 772 / 13.03.13 1

Conveyor B6,B7
151/CO B 6, B7-1/B/S-134 1 0 Marking of conveyor gallery girder for conveyor no B6 / B7 811 / 25.05.12 1 1 681 / 29.05.12 1 1 H - 137 / 07.06.12 1 1
2 0 Detail of vertical girder mkd VG - 1 & VG - 1X for conveyor no B6 / B7 811 / 25.05.12 1 681 / 29.05.12 1 H - 137 / 07.06.12 1
3 0 Detail of top chord bracing & runner for conveyor no B6 / B7 811 / 25.05.12 1 681 / 29.05.12 1 H - 137 / 07.06.12 1
4 0 Detail of cross beams & walkway runner for conveyor no B6 / B7 811 / 25.05.12 1 681 / 29.05.12 1 H - 137 / 07.06.12 1
Detail of cross beams, chqd plate & bottom chord bracing for conveyor no B6 /
5 0 B7 811 / 25.05.12 1 681 / 29.05.12 1 H - 137 / 07.06.12 1

Detail of truss, diaph plate, sag rod, purlin & rafter bracing for conveyor no B6 /
6 0 B7 811 / 25.05.12 1 681 / 29.05.12 1 H - 137 / 07.06.12 1

151/HGTU B 6, B7-1/B/S-136 1 0 Marking of Take up tower for conveyors B6 & B7 4828 / 06.03.13 1 1 H - 774 / 19.03.13 1 1
Detail of column mkd P/1, P/2,Q/1,R/1 & R/2 of HGTU for conveyors B6 & B7
2 0 4828 / 06.03.13 1 H - 774 / 19.03.13 1

3 0 Detail of column mkd Q/2 & bracing of HGTU for conveyors B6 & B7 4828 / 06.03.13 1 H - 774 / 19.03.13 1
Detail of floor beam & floor bracing at RL (+) 329,250 M of HGTU for conveyors
4 0 B6 & B7 4828 / 06.03.13 1 H - 774 / 19.03.13 1

5 0 Detail of chqd. plate at RL (+) 329,250 M of HGTU for conveyors B6 & B7 4828 / 06.03.13 1 H - 774 / 19.03.13 1
Detail of floor beams & floor bracing at RL (+) 332,350 M of HGTU for conveyors
6 0 B6 & B7 4828 / 06.03.13 1 H - 774 / 19.03.13 1

Detail of chqd. Plate, handrail, ladder & support beam of HGTU for conveyors
7 0 B6 & B7 4828 / 06.03.13 1 H - 774 / 19.03.13 1

21 Conveyor B8,B9
151/CO B 8, 9-0/B/S-095 1 0 Marking of Gallery girder, Ground portal, Trestle & Cross over 3675 / 17.02.10 1 1 2857 / 27.10.10 1 1 801 / 04.11.10 1 1 8 days
do 2 0 Detail of vertical girder mkd. G2/VG - 1, 1X & top chord brcg. 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 3 0 Detail of portal frame, rafter brcg. & side runner for gallery girder G2 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G2
4 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do 5 0 Detail of cross beam & bottom chord brcg for gallery girder G2 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 6 0 Detail of chqd pl, handrail & walkway runner for gallery girder G2 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 7 0 Detail of vertical girder mkd. G4/VG - 1, 1X & top chord brcg. 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 8 0 Detail of portal frame, rafter brcg. & side runner for gallery girder G4 3675 / 17.02.10

55 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G4
9 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do 10 0 Detail of cross beam & bottom chord brcg for gallery girder G4 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 11 0 Detail of chqd pl, handrail & walkway runner for gallery girder G4 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 12 0 Detail of vertical girder mkd. G3/VG - 1, 1X & top chord brcg. 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 13 0 Detail of portal frame, rafter brcg. & side runner for gallery girder G3 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G3
14 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do 15 0 Detail of cross beam & bottom chord brcg for gallery girder G3 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 16 0 Detail of chqd pl, handrail & walkway runner for gallery girder G3 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 17 0 Detail of vertical girder mkd. G1/VG - 1, 1X & top chord brcg. 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 18 0 Detail of portal frame, rafter brcg. & side runner for gallery girder G1 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 19 0 do 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 20 0 Detail of cross beam & bottom chord brcg for gallery girder G1 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G1
21 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do 22 0 Detail of chqd pl, handrail & walkway runner for gallery girder G1 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
151/CO B 8, 9-0/B/S-096 1 0 Detail of trestle mkd. TR - 2 & TR - 3 3675 / 17.02.10 1 1 2885 / 28.10.10 1 1 811 / 10.11.10 1 1 13 days
do 2 0 Detail of trestle mkd. TR - 1, TR - 4 & TR - 5 3675 / 17.02.10 1 2885 / 28.10.10 1 811 / 10.11.10 1 13 days
do 3 0 Detail of portal, beam, bracings, staircase & chqd pl for cross over 3675 / 17.02.10 1 2885 / 28.10.10 1 811 / 10.11.10 1 13 days
151/ DH/COB8, 9-1/B/S-097 1 0 Structural marking plan for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1 1295 / 02.07.11 1 1 919 / 25.07.11 1 1 23 days
151/ DH/COB8, 9 - 0/B/S-097 2 0 Structural marking elevations for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
151/ DH/COB8, 9-1/B/S-097 3 0 Detail of column mkd A1 & A2 for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 4 0 Detail of column mkd A3, A4 & A5 for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 5 0 Detail of column mkd E1 & E2 for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 6 0 Detail of column mkd E3, E4 & E5 for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do Detail of column & side post mkd C1, C3, SP3, SP2 for Drive house for conveyor
7 0 B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do Detail of column & side post mkd C4, C5, SP1, SP5, SP 5A, SP6, SP4 & SP4X for
8 0 Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do 9 0 Detail of bracings & tie beam for Drive house for conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

56 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of tie beams at RL (+) 329.935 (T.O.S) for Drive house for conveyor B8, B9
10 0 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do 11 0 do 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days


do 12 0 do 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do Detail of floor beams at RL (+) 332.400 (T.O.S) for Drive house for conveyor B8,
13 0 B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do 14 0 do 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days


do 15 0 do 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do Detail of floor beams at RL (+) 332.400 (T.O.S) & handrail for Drive house for
16 0 conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do Detail of tie beams at RL (+) 338.210 (T.O.S) for Drive house for conveyor B8, B9
17 0 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do Detail of tie beams at RL (+) 338.210 (T.O.S) & bracings for Drive house for
18 0 conveyor B8, B9 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do 19 0 Detail of monorail & portal frame 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 20 0 Detail of truss & false frame 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 21 0 Detail of runner, purlin & rafter bracing 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 22 0 Detail of runner, sag rod & diaph pl 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 23 0 Detail of column bracings 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 24 0 do 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do 25 0 Detail of false frame, false rafter & laced runner 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days
do Detail of tie beams at RL (+) 329.935 (T.O.S) for Drive house for conveyor B8, B9
26 0 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

do 27 0 Detail of chqd pl at RL (+) 332.406 (T.O.CH.PL) 3675 / 17.02.10 1 1295 / 02.07.11 1 919 / 25.07.11 1 23 days

151/ DH/COB8, 9-1/B/S-098 1 0 Marking of HGTU for conveyor no B8 & B9 2443 / 29.09.12 1 1 2206/03.10.12 1 1 H - 414 / 16.10.12 1 1
2 0 Detail of column mkd P/1, P/2, Q/1 & Q/2 - HGTU for conveyors B8 & B9 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
3 0 Detail of column mkd R/1 & R/2 - HGTU for conveyors B8 & B9 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
4 0 Detail of column brcg & ladder - HGTU for conveyors B8 & B9 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
5 0 Detail of floor plan at RL 327.350 m - HGTU for conveyors B8 & B9 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
Detail of chqd pl & handrail at RL 327.350 m - HGTU for conveyors B8 & B9
6 0 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

Detail of floor beam & floor bracing at RL 329.850 m - HGTU for conveyors B8
7 0 & B9 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

Detail of chqd pl & floor bracing at RL 329.850 m - HGTU for conveyors B8 &
8 0 B9 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

22 Conveyor B10, B11


151/CO B10, 11-0/B/S-099 1 0 Marking of Gallery girder, Ground portal, Trestle & Cross over 3675 / 17.02.10

57 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

1 do 2732 / 25.11.10 1 1 3709 / 10.01.11 1 1 H - 722 / 04.04.11 1 1 84 days


do Detail of vertical girder, top & bottom chord brcg & cross beams for gallery
2 0 girder G2 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of portal frame, truss, diaph pl, rafter brcg, runner, purlin, walkway
3 0 runner, sag rod, handrrail & chqd pl for gallery girder G2 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of vertical girder, top & bottom chord brcg & cross beams for gallery
4 0 girder G3 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of portal frame, truss, diaph pl, rafter brcg, runner, purlin, walkway
5 0 runner, sag rod, handrrail & chqd pl for gallery girder G3 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of vertical girder, top & bottom chord brcg & cross beams for gallery
6 0 girder G4 3675 / 17.02.10 1 3709 / 10.01.11 1 H - 812 / 17.05.11 1 127 days

do 7 0 Detail of portal frame, truss, rafter brcg for gallery girder G4 3675 / 17.02.10
1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days
do Detail of diaph pl, rafter brcg, runner, top chord brcg, purlin, walkway runner,
8 0 sag rod, handrrail & chqd pl for gallery girder G4 3675 / 17.02.10 1 3709 / 10.01.11 1 H - 812 / 17.05.11 1 127 days

do 9 0 Detail of vertical girder & top chord brcg. for gallery girder G5 3675 / 17.02.10 1 3709 / 10.01.11 1 H - 812 / 17.05.11 1 127 days
do Detail of portal frame, truss, diaph pl, rafter brcg, runner, purlin, walkway
10 0 runner, sag rod, handrrail & chqd pl for gallery girder G5 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of rafter brcg, top & bottom chord brcg, cross walkway runner & chqd pl
11 0 for gallery girder G5 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do 12 0 Detail of vertical girder & top chord brcg. for gallery girder G6 3675 / 17.02.10 1 3709 / 10.01.11 1 H - 812 / 17.05.11 1 127 days
do Detail of portal frame, truss, diaph pl, cross beam & handrrail for gallery girder
13 0 G6 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of diaph pl, runner, top chord brcg, purlin, walkway runner, sag rod &
14 0 chqd pl for gallery girder G6 3675 / 17.02.10 1 3709 / 10.01.11 1 H - 812 / 17.05.11 1 127 days

do Detail of vertical girder, purlin, side runner & handrail for gallery girder G7
15 0 3675 / 17.02.10 1 3709 / 10.01.11 1 H - 812 / 17.05.11 1 127 days

do Detail of rafter brcg, runner, top & bottom chord brcg, cross beams, diaph pl &
16 0 sag rod for gallery girder G7 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of portal frame, truss, walkway runner & chqd pl for gallery girder G7
17 0 3675 / 17.02.10

58 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of vertical girder, top chord brcg & cross beams for gallery girder G1
18 0 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do Detail of truss, diaph pl, bottom chord brcg, rafter brcg, runner, purlin, walkway
19 0 runner, sag rod, handrrail & chqd pl for gallery girder G1 3675 / 17.02.10

1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days


do 20 0 Detail of portal frame & staircase for gallery girder G1 3675 / 17.02.10
1 do 2732 / 25.11.10 1 3709 / 10.01.11 1 H - 722 / 04.04.11 1 84 days
151/CO B10, 11-0/B/S-100 1 0 Detail of trestle mkd. TR - 6 3675 / 17.02.10 1 1 4129 / 11.02.11 1 1 803 / 13.05.11 1 1 90 days
do 2 0 Detail of trestle mkd. TR - 7 3675 / 17.02.10 1 4129 / 11.02.11 1 803 / 13.05.11 1 90 days
do 3 0 Detail of trestle mkd. TR - 1 & TR - 4 3675 / 17.02.10 1 4129 / 11.02.11 1 803 / 13.05.11 1 90 days
do 4 0 Detail of trestle mkd. TR - 5 3675 / 17.02.10 1 4129 / 11.02.11 1 803 / 13.05.11 1 90 days
do 5 0 Detail of trestle mkd. TR - 5 3675 / 17.02.10 1 4129 / 11.02.11 1 803 / 13.05.11 1 90 days
do 6 0 Detail of trestle mkd. TR - 2 3675 / 17.02.10 1 4129 / 11.02.11 1 803 / 13.05.11 1 90 days
do 7 0 Detail of trestle mkd. TR - 3 & ground portal GP 2 3675 / 17.02.10 1 4129 / 11.02.11 1 803 / 13.05.11 1 90 days
151/DH/CO B10, 11-1/B/S-101 1 0 Marking of column, col brcg, post & runner 3675 / 17.02.10 1 1 1272 / 30.06.11 1 1 932 / 30.07.11 1 1 30 days
do 2 0 Marking plan of floor beam, tie & rafter 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 3 0 Detail of column mkd A2 & A3 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 4 0 Detail of column mkd A1 & A5 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 5 0 Detail of column mkd F2 & F3 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 6 0 Detail of column mkd F1 & F5 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 7 0 Detail of column mkd A4 & C1 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 8 0 Detail of column mkd F4 & C2 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 9 0 Detail of column mkd C3 & C5 for Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do Detail of column mkd B3, D3 & E3 for Drive house for conveyor B10, B11
10 0 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do Detail of column mkd B5, D5 & E5 for Drive house for conveyor B10, B11
11 0 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do Detail of column brcg on line 3 & 5 for Drive house for conveyor B10, B11
12 0 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do Detail of column brcg on line 5 & on row A for Drive house for conveyor B10,
13 0 B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do Detail of column brcg on row A & F for Drive house for conveyor B10, B11
14 0 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do Detail of column brcg on row A, F & on line 1 for Drive house for conveyor B10,
15 0 B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do Detail of floor beams at RL (+) 331.925 (T.O.S) for Drive house for conveyor
16 0 B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

59 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 17 0 do 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days


do 18 0 do 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do Detail of monorail, bracing at RL (+) 331.925 (T.O.S) & cross over platform for
19 0 Drive house for conveyor B10, B11 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days

do 20 0 Detail of inclined beam from RL (+) 336.023 to (+) 338.307 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 21 0 do 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 22 0 do 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 23 0 Detail of inclined floor beam & brcgs 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 24 0 Detail of tie beam at RL (+) 343.960 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 25 0 Detail of tie beam, monorail & bracing at RL (+) 343.960 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 26 0 Detail of side runners 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 27 0 Detail of side runners & sag rod 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 28 0 Detail of truss, purlin & rafter brcings 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 29 0 Detail of truss, purlin & rafter brcings 3675 / 17.02.10 1 1272 / 30.06.11 1 932 / 30.07.11 1 30 days
do 30 Detail of chqd pl & handrail 3788 / 24.01.12 1 4027 / 01.02.12 1

151/DH/CO B10, 11-1/B/S-102 1 0 Marking of take up tower - HGTU for conveyor no B10 & B11 2443 / 29.09.12 1 1 2246/03.10.12 1 1 H - 413 / 16.10.12 1 1
1 do 2642 / 03.10.12 2246/03.10.12 1 H - 413 / 16.10.12 1
Detail of column mkd P/1, P/2, R/1, R/2 & Q/1 - HGTU for conveyors B10 & B11
2 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1

3 Detail of column & column bracing - HGTU for conveyors B10 & B11 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1
Detail of column bracing & floor beam at EL 329.800 m - HGTU for conveyors
4 B10 & B11 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1

5 Detail of floor beam & floor bracing - HGTU for conveyors B10 & B11 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1
Detail of floor beam & floor bracing at RL (+) 337.000 m - HGTU for conveyors
6 B10 & B11 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1

7 Detail of ladder & support beam - HGTU for conveyors B10 & B11 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1
8 Detail of chqd. pl & handrail - HGTU for conveyors B10 & B11 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1
Detail of chqd. pl & handrail at EL 337.000 m - HGTU for conveyors B10 & B11
9 2443 / 29.09.12 1 2246/03.10.12 1 H - 413 / 16.10.12 1

23 Conveyor B12, B13


151/COB12, 13-0/B/S-108 1 0 Marking of Gallery girder, Ground portal, Trestle & Cross over 3675 / 17.02.10 1 1 2857 / 27.10.10 1 1 801 / 04.11.10 1 1 8 days
151/COB12, 13-1/B/S-108 2 0 Detail of vertical girder mkd. G2 / VG - 1, 1X & top chord brcg. 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 3 0 Detail of portal frame, rafter brcg & side runner for gallery girder G2 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G2
4 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days

60 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 5 0 Detail of cross beam & bottom chord brcg for gallery girder G2 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 6 0 Detail of chqd pl, handrail & walkway runner for gallery girder G2 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 7 0 Detail of vertical girder mkd G 3 / VG - 1, 1X & G 3X / VG - 1, 1X 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of portal frame, rafter brcg & side runner for gallery girder G3 & 3X
8 0 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days

do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G3 & 3X
9 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do 10 0 Detail of cross beam & bottom chord brcg for gallery girder G3 & 3X 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 11 0 Detail of chqd pl, handrail & walkway runner for gallery girder G3 & 3X 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 12 0 Detail of vertical girder mkd. G1 / VG - 1, 1X 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 13 0 Detail of portal frame, rafter brcg & side runner for gallery girder G1 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 14 0 do 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do 15 0 Detail of cross beam, top & bottom chord brcg for gallery girder G1 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of truss, purlin, diaph pl, ridge, tie brcg, sag rod for gallery girder G1
16 0 3675 / 17.02.10

1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days


do 17 0 Detail of chqd pl, handrail & walkway runner for gallery girder G1 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of vertical girder, top chord brcg, sag rod & diaph pl for gallery girder G4
18 0 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days

do 19 0 Detail of portal frame & cross beam for gallery girder G4 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
do Detail of top & bottom chord brcg, rafter brcg, chqd pl, side runner, purlin,
20 0 walkway runner & handrail for gallery girder G4 3675 / 17.02.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days

do 21 0 Detail of truss, walkway runner & ridge, tie brcg for gallery girder G4 3675 / 17.02.10
1 do 2114 / 09.10.10 1 2857 / 27.10.10 1 801 / 04.11.10 1 8 days
151/COB12, 13-1/B/S-109 1 0 Detail of trestle mkd. TR - 2 & TR - 3 3675 / 17.02.10 1 1 2885 / 28.10.10 1 1 811 / 10.11.10 1 1 8 days
do 2 0 Detail of trestle mkd. TR - 1, TR - 4, TR - 5, TR - 6 & TR - 7 3675 / 17.02.10 1 2885 / 28.10.10 1 811 / 10.11.10 1 8 days
do 3 0 Detail of portal, beam, brcg, staircase & chqd pl for cross over 3675 / 17.02.10 1 2885 / 28.10.10 1 811 / 10.11.10 1 8 days
151/DH/CO B12, 13-0/B/S-110 1 0 Structural marking of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1 1236 / 27.06.11 1 1 1769 / 04.07.11 1 1 7 days
do 2 0 do 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
151/DH/CO B12, 13-1/B/S-110 3 0 Detail of column mkd E- 1, E- 2 of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do 4 0 Detail of column mkd E- 3, A- 1 of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do 5 0 Detail of column mkd A- 2, A- 3 of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do 6 0 Detail of column mkd C- 1, C- 2 of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

61 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of column mkd C- 3, laced side runner & sag rod of Drive house for
7 0 conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of column mkd C- 4, C- 5, C- 6, E- 4, E- 5 & E- 6 of Drive house for


8 0 conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of column & gable post mkd A- 4, A- 5, A- 6,GP-1, 1X , GP- 2, 2X & GP- 3,
9 0 3X of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of side post, tie beam, false frame, portal frame of Drive house for
10 0 conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do 11 0 Detail of column bracing of Drive house for conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do 12 0 do 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do Detail of tie beams at RL (+) 329.910 (T.O.S) of Drive house for conveyor B12,
13 0 B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do 14 0 do 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days


do 15 0 do 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do Detail of tie beams at RL (+) 329.910 (T.O.S) & tie bracings of Drive house for
16 0 conveyor B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of monorail mkd 1/MR- 1 & 3/MR- 1 of Drive house for conveyor B12,
17 0 B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of floor beams at RL (+) 332.400 (T.O.S) of Drive house for conveyor
18 0 B12, B13 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do 19 0 do 3985 / 11.03.10 1 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days


do 20 0 do 3985 / 11.03.10 1 2804 / 07.05.11 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do Detail of floor beams at RL (+) 332.406 (T.O.CH.PL) of Drive house for conveyor
21 0 B12, B13 3985 / 11.03.10 1 2804 / 07.05.11 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of tie beams at RL (+) 338.075 (T.O.S) of Drive house for conveyor B12,
22 0 B13 3985 / 11.03.10 1 2804 / 07.05.11 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do 23 0 Detail of truss & tie beams of Drive house for conveyor B12, B13 3985 / 11.03.10 1 2804 / 07.05.11 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days
do Detail of runner, sag rod & diaph pl of Drive house for conveyor B12, B13
24 0 3985 / 11.03.10 1 2804 / 07.05.11 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

do Detail of runner, purlin & rafter bracing of Drive house for conveyor B12, B13
25 0 3985 / 11.03.10 1 2804 / 07.05.11 1236 / 27.06.11 1 1769 / 04.07.11 1 7 days

151/DH/CO B12, 13-1/B/S-111 1 0 Marking of take up tower - HGTU for conveyor no B12 & B13 2443 / 29.09.12 1 1 2206/03.10.12 1 1 H - 414 / 16.10.12 1 1
Detail of column bracing & support beam - HGTU for conveyors B11 & B13
2 0 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

Detail of column bracing bracket & column mkd P/1 & P/2 - HGTU for
3 0 conveyors B11 & B13 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

Detail of column mkd Q/1 , Q/2 , R/1 & R/2 - HGTU for conveyors B11 & B13
4 0 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

62 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

Detail of floor beams at RL (+) 328.600 m - HGTU for conveyors B11 & B13
5 0 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

Detail of floor bracings, chqd. pl & ladder - HGTU for conveyors B11 & B13
6 0 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

7 0 Detail of chqd. pl & handrail - HGTU for conveyors B11 & B13 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1
Detail of floor beams & floor bracings at RL (+) 332.350 m - HGTU for
8 0 conveyors B11 & B13 2443 / 29.09.12 1 2206/03.10.12 1 H - 414 / 16.10.12 1

151/CON-GUT- 2/B/S-112 1 0 Structural general arrangement & detail of gutter 2581 / 01.10.12 1 1

24 Transfer House-1
151/TRH2-0/B/S-116 1 0 Structural marking - Plan for Transfer House TRH - 1 342 / 26.04.12 1 1
1 do 308 / 24.04.13 395 / 30.04.13 1 1 892 / 03.05.13 1 1
do 2 0 Structural marking - Elevation for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
151/TRH2-1/B/S-116 Structural marking for Sheeting arrangement for Transfer House TRH - 1
3 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do 4 0 Detail of column mkd D- 04 & tie beam for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 5 0 Detail of columns mkd A- 01 & A- 02 for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of column mkd B- 01 & post mkd C/P-1, D/P-1 for Transfer House TRH - 1
6 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of column mkd B- 02 & post mkd 01/P-1 for Transfer House TRH - 1
7 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of column mkd B- 03 & post mkd 01/P-2, 2X for Transfer House TRH - 1
8 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of column mkd B- 04 & post mkd 01/P-3 for Transfer House TRH - 1
9 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of column mkd C- 01 & post mkd B/P-1 & 2, D/P 2 for Transfer House
10 0 TRH - 1 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do 11 0 Detail of columns mkd C- 02 & C- 03 for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1

63 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of column mkd C- 04 & post mkd 02/P-1 for Transfer House TRH - 1
12 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of column mkd D- 01 & post mkd 02/P-2 for Transfer House TRH - 1
13 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do 14 0 Detail of columns mkd D- 02 & D- 03 for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 15 0 Detail of column bracing on line A & 04 for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do 16 0 Detail of column bracing on line B, 03 & 04 for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of column bracing on line B, C, D, 01 & 02 for Transfer House TRH - 1
17 0 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1

do 18 0 Detail of column bracing on line B, C & D for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of column bracing on line 01, 02, C & D for Transfer House TRH - 1
19 0 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1

do 20 0 Detail of column bracing on line 02 & D for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do 21 0 Detail of column bracings & false frame for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do 22 0 Detail of floor beams at RL 201.250 m for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 23 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of floor beams & floor bracings at RL 201.250 m for Transfer House TRH
24 0 -1 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of chqd plate & handrail at RL 201.250 m for Transfer House TRH - 1
25 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do 26 0 Detail of floor beams at RL 204.500 m for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 27 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 28 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 29 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 30 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of chqd plate & handrail at RL 204.500 m for Transfer House TRH - 1
31 0 342 / 26.04.12 1

64 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do 32 0 Detail of tie beam at RL 210.375 m for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 33 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 34 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 35 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 36 0 do 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of monorail beam & column bracings for Transfer House TRH - 1
37 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do Detail of truss, lean to truss, false rafter, purlin, laced purlin, diaphram plate &
38 0 ridge bracing for Transfer House TRH - 1 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


do 39 0 Detail of stair case & handrail for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 40 0 Detail of stair case, handrail & tie beam for Transfer House TRH - 1 342 / 26.04.12 1
1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1
do 41 0 Detail of side runner for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do 42 0 Detail of side runner & tie bracing for Transfer House TRH - 1 342 / 26.04.12 1 395 / 30.04.13 1 892 / 03.05.13 1
do Detail of lean to truss, rafter bracings & runner for Transfer House TRH - 1
43 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


151/TRH2-2/B/S-116 Detail of column, beam, laced purlin & side runner for Transfer House TRH - 1
44 0 342 / 26.04.12 1

1 do 308 / 24.04.13 395 / 30.04.13 1 892 / 03.05.13 1


25 Transfer House-2
151/TRH2-0/B/S-117 1 0 Structural marking arrangement (plan) for Transfer house TRH 2 3127 / 06.12.11 1 1
1 do 3731 / 18.01.12 3930 / 24.01.12 1 1
2 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 2 0 Structural marking arrangement (elevation) for Transfer house TRH 2 3127 / 06.12.11 1
1 do 3731 / 18.01.12 3930 / 24.01.12 1
2 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH2-1/B/S-117 3 0 Structural marking arrangement (runner) for Transfer house TRH 2 3127 / 06.12.11 1
1 do 3731 / 18.01.12 3930 / 24.01.12 1
2 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13

65 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/TRH2-0/B/S-117 Detail of column & side post mkd A - 01, A-03, SP-6 for Transfer house TRH 2
4 0 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do Detail of column & side post mkd B- 02, B-04, SP-1, SP-7 for Transfer house TRH
5 0 2 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do Detail of column & side post mkd B- 01, B-03, SP-4, SP-5 for Transfer house TRH
6 0 2 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 1972 / 08.06.13


do Detail of column mkd A-02, A-04, & side post mkd SP-2, 2X, SP-3, 3X for
7 0 Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do 8 0 Detail of column mkd C-01, C-02, C-03 for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH2-1/B/S-117 9 0 Detail of column bracings for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH2-0/B/S-117 10 0 do 3127 / 06.12.11 1
1 do 3731 / 18.01.12 3930 / 24.01.12 1
2 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 11 0 Detail of tie beams for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 12 0 do 3127 / 06.12.11 1
1 do 3731 / 18.01.12 3930 / 24.01.12 1
2 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do Detail of floor beams at RL (+) 204.500 m (TOS) for Transfer house TRH 2
13 0 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do 14 0 do 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do Detail of floor beam & floor bracings at RL (+) 204.500 m (TOS) & tie bracings
15 0 for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do 16 0 Detail of tie beams for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 17 0 do 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 18 0 do 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13

66 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of truss, lean to, false rafter, louvre bracket, purlin, rafter brcg, louvre
19 0 runner, diaph. Plate, sag rod for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do 20 0 Detail of side runner and sag rod for Transfer house TRH 2 3127 / 06.12.11 1
1 do 3731 / 18.01.12 3930 / 24.01.12 1
2 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 21 0 Detail of stair and handrail for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 22 0 Detail of chqd plate and handrail for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do Detail of monorail mkd MR-01 & monorail support MST -1 for Transfer house
23 0 TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1

1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


151/TRH2-1/B/S-117 24 0 Detail of stair for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH2-0/B/S-117 25 0 Detail of column bracings for Transfer house TRH 2 3127 / 06.12.11 1 3930 / 24.01.12 1
1 do 718 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
26 Transfer House-3
151/TRH3-0/B/S-118 1 0 Structural marking plan for Transfer house TRH3 003 / 02.04.12 1 1
1 do 311 / 24.04.13 387 / 30.04.13 1 1 890 / 03.05.13 1 1
do 2 0 Structural marking elevation for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
151/TRH3-1/B/S-118 3 0 Structural marking for sheeting for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 4 0 Detail of column mkd D- 04 & tie beam for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 5 0 Detail of column mkd A- 01 & A- 02 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do Detail of column mkd B- 01 & posts mkd C/P-1, D/P-1 for Transfer house TRH3
6 0 003 / 02.04.12 1

1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1


do 7 0 Detail of column mkd B- 02 & post mkd I/P-1 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do Detail of column mkd B- 03 & post mkd 2/P-2, 2X for Transfer house TRH3
8 0 003 / 02.04.12 1

1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1


do 9 0 Detail of column mkd B- 04 & post mkd 1/P-3 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1

67 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of column mkd C- 01 & posts mkd B/P-1 & 2, D/P-2 for Transfer house
10 0 TRH3 003 / 02.04.12 1

1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1


do 11 0 Detail of column mkd C- 02 & C- 03 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 12 0 Detail of column mkd C- 04 & post mkd 2/P-1 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 13 0 Detail of column mkd D-01 & post mkd 2/P-2 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 14 0 Detail of column mkd D- 02 & D- 03 for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 15 0 Detail of column bracings on line A & 04 for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do 16 0 Detail of column bracings on line B, 03 & 04 for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do Detail of column bracings on line B, C, D, 01 & 02 for Transfer house TRH3
17 0 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1

do 18 0 Detail of column bracings on line B, C & D for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do 19 0 Detail of column bracings on line 01, 02, C & D for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do 20 0 Detail of column bracings on line 02 & D for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do 21 0 Detail of column bracings & false frame for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do 22 0 Detail of floor beams at RL 201.250 m for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 23 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do Detail of floor beams & bracings at RL 201.250 m for Transfer house TRH3
24 0 003 / 02.04.12 1

1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1


do 25 0 Detail of chqd. pl & handrail at RL 201.250 m for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 26 0 Detail of floor beams at RL 204.500 m for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 27 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 28 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 29 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 30 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 31 0 Detail of chqd. pl & handrail at RL 204.500 m for Transfer house TRH3 003 / 02.04.12 1

68 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1


do 32 0 Detail of tie beams at RL 210.375 m for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 33 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 34 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 35 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 36 0 do 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 37 0 Detail of monorail & column bracings for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do Detail of truss, lean to truss, false rafter, purlin, laced purlin, diaph plate & ridge
38 0 bracing at RL 201.250 m for Transfer house TRH3 003 / 02.04.12 1

1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1


do 39 0 Detail of stair case & handrail for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 40 0 Detail of stair case , handrail & tie beam for Transfer house TRH3 003 / 02.04.12 1
1 do 311 / 24.04.13 387 / 30.04.13 1 890 / 03.05.13 1
do 41 0 Detail of side runner for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do 42 0 Detail of side runner & tie bracing for Transfer house TRH3 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1
do Detail of rafter bracing , laced side runner & sag rod for Transfer house TRH3
43 0 003 / 02.04.12 1 387 / 30.04.13 1 890 / 03.05.13 1

27 Transfer House-4
151/TRH4-0/B/S-119 1 0 Structural marking arrangement (plan) for Transfer house TRH 4 3607 / 07.01.12 1 1 3949 / 25.01.12 1 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 2 0 Structural marking arrangement (elevation) for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH4-1/B/S-119 3 0 Structural marking arrangement - runner for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH4-0/B/S-119 4 0 Detail of column & side post for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 5 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 6 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 7 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13

69 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 8 0 Detail of column for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH4-1/B/S-119 9 0 Detail of column bracings for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH4-0/B/S-119 10 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 11 0 Detail of tie beams for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 12 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 13 0 Detail of floor beams at RL (+) 204.500 M (TOS)for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 14 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do Detail of floor beam & floor bracings at RL (+) 204.500 M (TOS) & tie bracings
15 0 for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1

1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do 16 0 Detail of tie beams for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 17 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 18 0 do 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do Detail of truss, lean to false rafter, louvre bracket, purlin, rafter brcg, louvre
19 0 runner, diaph plate, sag rod for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1

1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13


do 20 0 Detail of side runner and sag rod for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 21 0 Detail of stair and hand rail for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 22 0 Detail of chquered plate and hand rail for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
do 23 0 Detail of monorail beam for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH4-1/B/S-119 24 0 Detail of stair for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
151/TRH4-0/B/S-119 25 0 Detail of column bracings for Transfer house TRH 4 3607 / 07.01.12 1 3949 / 25.01.12 1
1 do 719 / 28.05.13 920 / 06.06.13 1972 / 08.06.13
30 Transfer House-7

70 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/TRH7-1/B/S-086 Marking of elevation on line 5, bottom chord level of roof truss, floor at (+)
1 0 250.200 m level & rafter level for transfer House TRH - 7 3904 / 01.01.13 1 1 3230 / 17.01.13 1 1 1312 / 28.01.13 1 1

Marking of elevation on line 1 & row A & C and sheeting on line A, C & D for
2 0 transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

Marking of elevation on line 2, 3, 4, 6 & row D and sheeting on line 1, 5 & 6 for
3 0 transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

4 0 Details of column mkd A/1, A/2, A/3 & D/1 for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
5 0 Details of column mkd A/4, D/2, D/3 & D/4 for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
6 0 Details of column mkd D/5, C/5, B/1 & C/1 for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
7 0 Details of column mkd A/6, B/6 & C/6 for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
8 0 Details of column bracing for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
Details of tie beam, bottom chord level of roof truss at level (+) 255.782 m for
9 0 transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

10 0 do 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1


Details of monorail & tie bracing bottom chord level of roof truss at level (+)
11 0 255.782 m for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

12 0 Details of louvre & side runner for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
13 0 Details of louvre & side runner for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
14 0 do 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
15 0 Details of louvre & side runner for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
16 0 Details of monorail at level (+) 248.780 m for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
17 0 Details of truss mkd T-2, T-3 & T-4 for transfer House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1
Details of truss mkd T-1, ridge tie bracing, purlin & laced purlin for transfer
18 0 House TRH - 7 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

Details of truss mkd T-5, rafter bracing & false rafter for transfer House TRH - 7
19 0 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

Details of truss mkd T-6, purlin & laced purlin for transfer House TRH - 7
20 0 3904 / 01.01.13 1 3230 / 17.01.13 1 1312 / 28.01.13 1

31 Transfer House-8
151/TRH8-1/B/S-123 1 0 Marking of column, floor plan & rafter plan for Transfer House TH 8 1507 / 13.08.10 1 1 2804 / 07.05.11
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1 1160 / 03.02.12 1 1
do 2 0 Marking of column bracing & runner for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 3 0 Detail of column mkd A / 05 & B / 05 for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 4 0 Detail of column mkd A / 04 for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 5 0 Detail of column mkd A / 02, A / 03 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 6 0 Detail of column mkd A / 03 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 7 0 Detail of column mkd C / 01 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 8 0 Detail of column mkd C / 04 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1

71 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 9 0 Detail of column mkd C / 02, C / 03 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 10 0 Detail of column mkd B / 02, B / 03 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 11 0 Detail of column mkd B / 01 & col brcg for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 12 0 Detail of column mkd B / 04 for Transfer House TH 8 1507 / 13.08.10 1 2804 / 07.05.11 3871 / 20.01.12 1 1160 / 03.02.12 1
do 13 0 Detail of column bracing for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 14 0 do 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 15 0 do 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 16 0 Detail of floor beam at RL (+) 332.400 for Transfer House TH 8 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do 17 0 do 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do 18 0 do 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do 19 0 do 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do 20 0 do 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do Detail of floor beam, bracing at RL (+) 332.400 for Transfer House TH 8
21 0 1507 / 13.08.10 1

1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1


do 22 0 Detail of floor beam at RL (+) 327.400 for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 23 0 Detail of floor beam at RL (+) 327.400 for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 24 0 do 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 25 0 Detail of tie beam at RL (+) 338.400 for Transfer House TH 8 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do 26 0 do 1507 / 13.08.10 1
1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1
do Detail of monorail, tie beam & bracing at RL (+) 328.400 for Transfer House TH
27 0 8 1507 / 13.08.10 1

1 do 3608 / 07.01.12 3871 / 20.01.12 1 1160 / 03.02.12 1


do 28 0 Detail of column bracing & post for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 29 0 Detail of column bracing & beam for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 30 0 Detail of laced & side runner for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 31 0 Detail of laced , side runner & sag rod for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 32 0 Detail of staircase mkd ST 1, ST 2 & ST 3 for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do 33 0 Detail of staircase mkd ST 4 & ST 5 for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1
do Detail of truss, rafter bracing, purlin & sag rod for Transfer House TH 8
34 0 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1

do 35 0 Detail of post, beam, purlin & false frame for Transfer House TH 8 1507 / 13.08.10 1 3871 / 20.01.12 1 1160 / 03.02.12 1

72 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of chqd plate & handrail at RL (+) 327.400 m for Transfer House TH 8
36 0 919 / 02.06.12 1

do 37 0 Detail of chqd plate at RL (+) 332.400 m for Transfer House TH 8 919 / 02.06.12 1

32 Transfer House-9
151/TRH9-1/B/S-124 Marking elevation on line 1, 2, 3, 4, 5, 6 , rafter plan & base plan for transfer
1 0 house TRH 9 1637 / 25.08.10 1 1 777 / 27.05.11 1 1 H - 840 / 04.06.11 1 1 8 days

do Marking elevation on line A to E , 7, 8, 9 & stair for transfer house TRH 9


2 0 1637 / 25.08.10 1 777 / 27.05.11 1 H - 840 / 04.06.11 1 8 days

do 3 0 Floor plan at RL (+) 330.000 M (T.O.S) for transfer house TRH 9 1637 / 25.08.10 1 777 / 27.05.11 1 H - 840 / 04.06.11 1 8 days
do 4 0 Floor plan at RL (+) 346.500 M (T.O.S) for transfer house TRH 9 1637 / 25.08.10 1 777 / 27.05.11 1 H - 840 / 04.06.11 1 8 days
do 5 0 Floor plan at RL (+) 349.800 M (T.O.S) for transfer house TRH 9 1637 / 25.08.10 1 777 / 27.05.11 1 H - 840 / 04.06.11 1 8 days
do 6 0 Floor plan at RL (+) 359.072 M (T.O.S) for transfer house TRH 9 1637 / 25.08.10 1 777 / 27.05.11 1 H - 840 / 04.06.11 1 8 days
do 7 0 Detail of handrail for transfer house TRH 9 1637 / 25.08.10 1 607 / 18.05.11 1 H - 845 / 08.06.11 1 21 days
151/TRH9-0/B/S-124 8 0 Detail of column & side post mkd E - 01, SP - 1 for transfer house TRH 9 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days
do 9 0 Detail of column & side post mkd A - 01, SP - 2 & 3 for transfer house TRH 9 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days
do 10 0 Detail of column mkd D - 01, B - 01 for transfer house TRH 9 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days
do Detail of column & side post mkd C - 01, SP - 4, 6 & 7 for transfer house TRH 9
11 0 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days

do Detail of column & side post mkd E - 02, SP - 8 for transfer house TRH 9
12 0 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days

do Detail of column & side post mkd A - 02, SP - 9 for transfer house TRH 9
13 0 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days

do 14 0 Detail of column mkd D - 02, B - 02 for transfer house TRH 9 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days
do Detail of column & side post mkd C - 02, SP - 10 for transfer house TRH 9
15 0 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days

do 16 0 Detail of column mkd E - 03 for transfer house TRH 9 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days
do 17 0 Detail of column mkd A - 03 for transfer house TRH 9 1637 / 25.08.10 1 499 / 10.05.11 1 H - 806 / 14.05.11 1 4 days
do 18 0 Detail of column mkd D - 03, B - 03 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 19 0 Detail of column mkd C - 03, C - 04 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 20 0 Detail of column mkd E - 09 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 21 0 Detail of column mkd A - 09 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 22 0 Detail of column mkd D - 09, B - 09 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do Detail of column & side post mkd C - 09, SP - 5 & 11 for transfer house TRH 9
23 0 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days

do 24 0 Detail of column mkd E - 08 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 25 0 Detail of column mkd A - 08 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 26 0 Detail of column mkd D - 08, B - 08 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days
do 27 0 Detail of column mkd C - 08, C - 07 for transfer house TRH 9 1637 / 25.08.10 1 514 / 11.05.11 1 H - 809 / 16.05.11 1 5 days

73 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 28 0 Detail of column mkd E - 07 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 29 0 Detail of column mkd A - 07 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 30 0 Detail of column mkd D - 07, B - 07 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 31 0 Detail of column mkd E - 06 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 32 0 Detail of column mkd A - 06 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 33 0 Detail of column mkd D - 06, B - 06 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 34 0 Detail of column mkd D - 04, B - 04 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 35 0 Detail of column mkd E - 04 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 36 0 Detail of column mkd A - 04 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 37 0 Detail of column mkd E - 05 for transfer house TRH 9 1637 / 25.08.10 1 516 / 12.05.11 1 H - 808 / 16.05.11 1 4 days
do 38 0 Detail of column mkd D - 05, B - 05 for transfer house TRH 9 1637 / 25.08.10 1 519 / 12.05.11 1 H - 810 / 16.05.11 1 4 days
do 39 0 Detail of column mkd C - 05, C - 06 for transfer house TRH 9 1637 / 25.08.10 1 519 / 12.05.11 1 H - 810 / 16.05.11 1 4 days
do 40 0 Detail of column mkd A - 05 for transfer house TRH 9 1637 / 25.08.10 1 519 / 12.05.11 1 H - 810 / 16.05.11 1 4 days
151/TRH9-1/B/S-124 41 0 Detail of floor beam at RL (+) 330.00 for transfer house TRH 9 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 42 0 do 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 43 0 do 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 44 0 do 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 45 0 do 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 46 0 do 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 47 0 do 1644 / 25.08.10 1 519 / 12.05.11 1 H - 819 / 24.05.11 1 12 days
do 48 0 do 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
do 49 0 do 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
do Detail of floor beam & floor bracings at RL (+) 330.00 for transfer house TRH 9
50 0 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days

do 51 0 Detail of floor bracings at RL (+) 330.00 for transfer house TRH 9 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
do 52 0 Detail of laced gable & side runner for transfer house TRH 9 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
do Detail of gable & side louvre runner, gable runner for transfer house TRH 9
53 0 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days

do 54 0 Detail of side runner & rafter bracing for transfer house TRH 9 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
do 55 0 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
do Detail of gable/side louvre bkt. & sag rod & truss for transfer house TRH 9
56 0 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days

do 57 0 Detail of purlin, rafter bracing & false rafter for transfer house TRH 9 1644 / 25.08.10 1 520 / 12.05.11 1 H - 826 / 25.05.11 1 13 days
151/TRH9-0/B/S-124 58 0 Detail of column bracings for transfer house TRH 9 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 59 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 60 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 61 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 62 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 63 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days

74 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 64 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days


151/TRH9-1/B/S-124 65 0 Detail of floor beam at RL (+) 346.50 for transfer house TRH 9 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 66 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 67 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 68 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 69 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 70 0 do 1644 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.11 1 4 days
do 71 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 72 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 73 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 74 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 75 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 76 0 Detail of floor bracings at RL (+) 346.50 for transfer house TRH 9 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
151/TRH9-0/B/S-124 Detail of chqd plate mkd TH-9/1/CP-1 at RL (+) 330.00 for transfer house TRH 9
77 0 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days

151/TRH9-1/B/S-124 78 0 Detail of floor beam at RL (+) 349.80 for transfer house TRH 9 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 79 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 80 0 do 1644 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 81 0 do 1645 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 82 0 do 1645 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 83 0 do 1645 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 84 0 do 1645 / 25.08.10 1 738 / 25.05.11 1 H - 836 / 01.06.11 1 7 days
do 85 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 837 / 02.06.11 1 7 days
do 86 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 837 / 02.06.11 1 7 days
do 87 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 837 / 02.06.11 1 7 days
do 88 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 837 / 02.06.11 1 7 days
do 89 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 837 / 02.06.11 1 7 days
do 90 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 837 / 02.06.11 1 7 days
do 91 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days
do 92 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days
do 93 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days
do 94 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days
do 95 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days
do Detail of chqd plate mkd TH-9/2/CP-1 at RL (+) 346.50 for transfer house TRH 9
96 0 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days

do 97 0 Detail of column bracings for transfer house TRH 9 1645 / 25.08.10 1 708 / 23.05.11 1 H - 830 / 27.05.13 1 4 days
do 98 0 Detail of floor bracings at RL (+) 349.80 for transfer house TRH 9 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days
do 99 0 do 1645 / 25.08.10 1 762 / 26.05.11 1 H - 839 / 03.06.11 1 8 days

75 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Detail of chqd plate mkd TH-9/3/CP-1 at RL (+) 359.072 for transfer house TRH
100 0 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days

do 101 0 do 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days


do 102 0 Detail of monorail at RL (+) 348.79 for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 103 0 Detail of tie beams at RL (+) 359.072 for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 104 0 do 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 105 0 do 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 106 0 do 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 107 0 do 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 108 0 do 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 109 0 Detail of tie bracings at RL (+) 359.072 for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 110 0 Detail of tie beams at RL (+) 359.072 for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do 111 0 Detail of monorail at RL (+) 358.00 for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days
do Detail of stair supporting beams, conveyor supoorting beams & side post for
112 0 transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days

do Detail of stair mkd ST 1, 2, 3, 3X, 4, 5 & handrail mkd HR 1, 1A, 2, 2A, 3, 3A, 3X,
113 0 3AX, 4, 4A, 5, 5A for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days

do Detail of stair mkd ST 1, 2, 3, 3X, 4, 5 & handrail mkd HR 1, 1A, 2, 2A, 3, 3A, 3X,
114 0 3AX, 4, 4A, 5, 5A for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days

do 115 0 Detail of handrail for transfer house TRH 9 1645 / 25.08.10 1 776 / 27.05.11 1 H - 845 / 08.06.11 1 12 days

33 Transfer House-10
151/TRH10-0/B/S-125 Marking of elevation on row A,B,C,d on line 1,2,3,4 floor, tie & rafter plan &
1 0 staircase for Transfer house TH 10 1259 / 23.07.10

1 1240 / 30.06.11 1 1 1471 / 14.07.11 1 1 933 / 30.07.11 1 1 16 days


151/TRH10-1/B/S-125 2 0 Detail of column mkd D1 & D3 for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 3 0 Detail of column mkd B1 & B3 for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 4 0 Detail of column mkd C1 & C3 for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 5 0 Detail of column mkd D4, C4, A1 & A3 for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 6 0 Detail of column mkd A2, B2, C2 & D2 for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 7 0 Detail of floor beam at RL (+) 329.400 m for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 8 0 Detail of floor beam at RL (+) 329.400 m for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do Detail of floor beam at RL (+) 329.400 m & RL (+) 332.400 m for Transfer house
9 0 TH 10 1259 / 23.07.10

1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days

76 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 10 0 Detail of floor beam at RL (+) 332.400 m for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 11 0 Detail of floor beam at RL (+) 332.400 m for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 12 0 Detail of floor beam at RL (+) 332.400 m for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 13 0 Detail of column bracing on line 1, 3 & 4 for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 14 0 Detail of column bracing on line A, B & C for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 15 0 Detail of purlin, sag rod & column brcing for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do Detail of tie beam & tie bracing at RL (+) 338.275 m for Transfer house TH 10
16 0 1259 / 23.07.10

1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days


do Detail of tie beam & tie bracing at RL (+) 338.275 m for Transfer house TH 10
17 0 1259 / 23.07.10

1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days


do Detail of tie beam , tie bracing & monorail at RL (+) 338.275 m for Transfer
18 0 house TH 10 1259 / 23.07.10

1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days


do 19 0 Detail of truss & false rafter for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 20 0 Detail of staircase mkd ST1 & ST 2 for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do Detail of staircase mkd ST 3, ST 4 & handrail mkd HR 5, HR 6, HR 7 for Transfer
21 0 house TH 10 1259 / 23.07.10

1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days


do 22 0 Detail of runners for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 23 0 Detail of runners for Transfer house TH 10 1259 / 23.07.10
1 1240 / 30.06.11 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do 24 0 Detail of tie beam , post & sag rod for Transfer house TH 10 1259 / 23.07.10 1 1471 / 14.07.11 1 933 / 30.07.11 1 16 days
do Detail of chqd pl & handrail at RL (+) 332.400 m for Transfer house TH 10
25 0 3788 / 24.01.12 1 4027 / 01.02.12 1 H-749 / 06.03.13 1

do Detail of chqd pl & handrail at RL (+) 329.400 m for Transfer house TH 10


26 0 3788 / 24.01.12 1 4027 / 01.02.12 1 H-749 / 06.03.13 1

34 Transfer House-11
151/TRH11-0/B/S-126 Marking of elevation on row A, B, C, D on line 1, 2, 3, 4 floor, tie & rafter plan &
1 0 staircase 3675 / 17.02.10

1 1240 / 30.06.11 1 1 1487 / 15.07.11 1 1 943 / 04.08.11 1 1 20 days

77 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/TRH11-1/B/S-126 2 0 Detail of column mkd D 1 & D 3 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 3 0 Detail of column mkd B 1 & B 3 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 4 0 Detail of column mkd C 1 & C 3 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 5 0 Detail of column mkd D 4, C 4, A 1 & A 4 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 6 0 Detail of column mkd A 2, B 2, C 2 & D 2 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 7 0 Detail of floor beams at RL (+) 329.400 m 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 8 0 do 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 9 0 Detail of floor beams at RL (+) 329.400 m & RL (+) 332.400 m 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 10 0 Detail of floor beams at RL (+) 332.400 m 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 11 0 do 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 12 0 do 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 13 0 Detail of column brcg on line 1, 2 & 4 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 14 0 Detail of column brcg on line A, B & C 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 15 0 Detail of purlin, sag rod & column brcg 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 16 0 Detail of tie beam & tie brcgs at RL (+) 338.275 m 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 17 0 do 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 18 0 Detail of tie beam & tie brcgs and monorail at RL (+) 338.275 m 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 19 0 Detail of truss & false frame 3675 / 17.02.10

78 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days


do 20 0 Detail of staircase mkd ST- 1 & ST- 2 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 21 0 Detail of staircase mkd ST- 3 & ST- 4 and handrail mkd HR- 5, HR- 7 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 22 0 Detail of runners 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 23 0 do 3675 / 17.02.10
1 1240 / 30.06.11 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do 24 0 Detail of beam, post & sag rod 3675 / 17.02.10 1 1487 / 15.07.11 1 943 / 04.08.11 1 20 days
do Detail of chqd pl & handrail at RL (+) 332.400 m for Transfer house TH 11
25 0 3788 / 24.01.12 1 4027 / 01.02.12 1 H-749 / 06.03.13 1

do Detail of chqd pl & handrail at RL (+) 329.400 m for Transfer house TH 11


26 0 3788 / 24.01.12 1 4027 / 01.02.12 1 H-749 / 06.03.13 1

35 Bunker 1
151/BNK1-0/B/S-127 1 0 Marking of elevation on row a', c", tie & rafter plan 3675 / 17.02.10 1 1 1251 / 28.06.11 1 1 H - 895 / 09.07.11 1 1 11 days
151/BNK1-0/B/S-127 Marking of elevation on line 1 A 1, on row A 2, A1 rafter plan, runner &
2 0 staircase 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days

151/BNK1-1/B/S-127 3 0 Detail of column mkd 1 A1 & 1 A2 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 4 0 Detail of column mkd 1A - A1 & 1A - A2 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 5 0 Detail of column bracings 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 6 0 Detail of column bracing, lean to truss, lean to purlin, lean to rafter 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 7 0 Detail of staircase mkd ST- 1 & ST- 2 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 8 0 Detail of staircase mkd ST- 3 & ST- 4 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 9 0 Detail of staircase mkd ST- 5, handrail mkd HR- 6 & beam mkd B3 to B6 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 10 0 Detail of portal mkd PF- 1 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 11 0 Detail of portal mkd PF- 2, 3 & 4 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 12 0 Detail of portal mkd PF- 5, 7 & 7X 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 13 0 Detail of portal mkd PF- 6 & 6X 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 14 0 Detail of purlin & portal bracing 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 15 0 Detail of tie beam 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 16 0 Detail of runner 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do 17 0 Detail of monorail, post & louver 3675 / 17.02.10 1 1251 / 28.06.11 1 H - 895 / 09.07.11 1 11 days
do Detail of platform mkd VSP - 1/1 & VSP - 1/2 vibro feeder supporting platform
18 0 for for RCC overhead Bunker - 1 648 / 17.05.12 1 713 / 31.05.12 1 H -148 / 11.06.12 1

do Detail of platform mkd VSP - 1/3, 4, 5 & 6, bracing & chqd pl vibro feeder
19 0 supporting platform for for RCC overhead Bunker - 1 648 / 17.05.12 1 713 / 31.05.12 1 H -148 / 11.06.12 1

36 Bunker 2
151/BNK2-0/B/S-128 1 0 Marking of elevation & plan for shed over bunker 2 947 / 26.06.10 1 1 1251 / 28.06.11 1 1 891 / 06.07.11 1 1 8 days
do 2 0 Marking for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days

79 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

151/BNK2-1/B/S-128 3 0 Detail of column mkd 1 A 1 & 1 A2 for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 4 0 Detail of column mkd 1 A 1 & 1 A2 for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 5 0 Detail of column bracing for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do Detail of column bracing, lean to truss, lean to purlin, lean to rafter for shed
6 0 over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days

do 7 0 Detail of staircase mkd ST 1 & ST 2 for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 8 0 Detail of staircase mkd ST 3 & ST 4 for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do Detail of staircase mkd ST 5, HR 6 & beam mkd B 3 to B 6 for shed over bunker
9 0 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days

do 10 0 Detail of portal mkd PF 1 for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 11 0 Detail of portal mkd PF 2, 3 & 4 for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 12 0 Detail of portal mkd PF 5, 7 & 7X for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 13 0 Detail of portal mkd PF 6 & 6X for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 14 0 Detail of purlin & portal bracing for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 15 0 Detail of tie beam for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 16 0 Detail of runner for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do 17 0 Detail of monorail, post & louvre for shed over bunker 2 947 / 26.06.10 1 1251 / 28.06.11 1 891 / 06.07.11 1 8 days
do Detail of platform mkd VSP - 1/1 & VSP - 1/2 vibro feeder supporting platform
18 0 for for RCC overhead Bunker - 2 1276 / 27.06.12 1 H -230 / 19.07.12 1

do Detail of platform mkd VSP - 1/3, 4, 5 & 6, bracing & chqd pl vibro feeder
19 0 supporting platform for for RCC overhead Bunker - 2 1 H -230 / 19.07.12 1

37 Truck Loading Station - I


151/TLS1-1/B/S-129 1 0 Structural detail & Marking elevation on row A and B 4080 / 18.03.10 1 1 172 / 18.04.11 1 1 H - 772 / 02.05.11 1 1 15 days
do 2 0 Structural detail & Marking elevation on line 1, 2, 3, 4 & 5 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do Structural detail & Marking plan at RL (+) 330.500 M (T.O.S), (+) 340.450 M
3 0 (T.O.S), (+) 343.200 M (T.O.S) & staircase 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail & Marking elevation on line 1A and tie, rafter plan & lean to
4 0 rafter 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do 5 0 Detail of column mkd. B - 1 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do 6 0 Detail of column mkd. A - 1 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do 7 0 Detail of column mkd. B - 2 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do 8 0 Detail of column mkd. A - 2 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do 9 0 Detail of column mkd. B - 3 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do 10 0 Detail of column mkd. A - 3 4080 / 18.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days
do 11 0 Detail of column mkd. B - 4 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 12 0 Detail of column mkd. A - 4 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 13 0 Detail of column mkd. B - 5 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 14 0 Detail of column mkd. A - 5 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

80 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do 15 0 Detail of column mkd. B - 1A 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 16 0 Detail of column mkd. A - 1A 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 17 0 Detail of column bracing on line 1A & 1 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 18 0 Detail of column bracing on line 2, 3, 4 & 5 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 19 0 Detail of column bracing on line 5, A & B 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 20 0 Detail of column bracing on line A & B 4080 / 18.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days
do 21 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 22 0 Detail of beam, post etc. 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 23 0 Detail of floor beam at (+) 330.500 M 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 24 0 Detail of floor beam & floor bracing at (+) 330.500 M 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 25 0 Detail of floor beam at (+) 340.450 M 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 26 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 27 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 28 0 Detail of floor beam at (+) 343.200 M 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 29 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 30 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 775 / 05.05.11 1 18 days
do 31 0 Detail of tie beam at (+) 349.185 M 4080 / 18.03.10 1 172 / 18.04.11 1 H - 780 / 05.05.11 1 18 days
do 32 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 780 / 05.05.11 1 18 days
do 33 0 Detail of tie beam at (+) 349.185 M & monorail 4080 / 18.03.10 1 172 / 18.04.11 1 H - 780 / 05.05.11 1 18 days
do 34 0 Detail of truss, rafter brcg, purlin & lean to truss 4080 / 18.03.10 1 172 / 18.04.11 1 H - 780 / 05.05.11 1 18 days
do 35 0 Detail of runner 4080 / 18.03.10 1 172 / 18.04.11 1 H - 780 / 05.05.11 1 18 days
do 36 0 Detail of inclined beam from RL (+) 336.023 to (+) 338.307 M 4080 / 18.03.10 1 172 / 18.04.11 1 H - 781 / 05.05.11 1 18 days
do 37 0 Detail of staircase mkd. ST - 1 & ST - 2 4080 / 18.03.10 1 172 / 18.04.11 1 H - 781 / 05.05.11 1 18 days
do 38 0 Detail of staircase mkd. ST - 3 & ST - 4 4080 / 18.03.10 1 172 / 18.04.11 1 H - 781 / 05.05.11 1 18 days
do 39 0 Detail of staircase mkd. ST - 5 & ST - 6 4080 / 18.03.10 1 172 / 18.04.11 1 H - 781 / 05.05.11 1 18 days
do 40 0 Detail of bunker girder mkd. BG - 1 4080 / 18.03.10 1 172 / 18.04.11 1 H - 781 / 05.05.11 1 18 days
do 41 0 Detail of bunker girder mkd. BG - 2 4080 / 18.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days
do 42 0 Detail of top vertical wall on bunker girder 4080 / 18.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days
do 43 0 Detail of hopper and liner plate of vertical wall. 4080 / 18.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days
do 44 0 do 4080 / 18.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days
do 45 0 Detail of liner plate on hopper. 4080 / 18.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days
do Detail of chqd plate, handrail at RL (+) 330.500 M (TOS) & at RL (+) 340.450 M
46 0 (TOS) for Truck Loading Station - 1 4580 / 26.03.11 1 H - 62 / 30.04.12 1

do Detail of chqd plate & handrail at RL (+) 343.200 M (TOS) for Truck Loading
47 0 Station - 1 4580 / 26.03.11 1 H - 62 / 30.04.12 1

do 48 0 Detail of section & bill of material for Truck Loading Station - 1 4580 / 26.03.11 1 H - 62 / 30.04.12 1

38 Truck Loading Station -2

81 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

Structural detail of Truck Loading Station 2 marking elevation on row A and B


151/TLS2-1/ B /S-130 1 0 4132 / 23.03.10 1 1 172 / 18.04.11 1 1 H - 772 / 02.05.11 1 1 15 days

do Structural detail of Truck Loading Station 2 marking elevation on line 1, 2, 3, 4,


2 0 5 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 marking plan at RL (+) 330.500, (+)
3 0 340.450, (+) 343.200 & stair case 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 marking elevation on line 1A and tie,
4 0 rafter plan & lean to rafter. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. B 1


5 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. A 1


6 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. B 2


7 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. A 2


8 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. B 3


9 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. A 3


10 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 772 / 02.05.11 1 15 days

do Structural detail of Truck Loading Station 2 detail of column mkd. B 4


11 0 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column mkd. A 4


12 0 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column mkd. B 5


13 0 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column mkd. A 5


14 0 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column mkd. B 1A


15 0 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column mkd. A 1A


16 0 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column bracing on line 1A


17 0 &1 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column bracing on line 2, 3,


18 0 4&5 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do Structural detail of Truck Loading Station 2 detail of column bracing on line 5, A


19 0 &B 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

82 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Structural detail of Truck Loading Station 2 detail of column bracing on line A &
20 0 B 4132 / 23.03.10 1 172 / 18.04.11 1 776 / 04.05.11 1 17 days

do 21 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days


do 22 0 Structural detail of Truck Loading Station 2 detail of beam, post etc. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days
do Structural detail of Truck Loading Station 2 detail of floor beam at RL (+)
23 0 330.500. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days

do Structural detail of Truck Loading Station 2 detail of floor beam & floor bracing
24 0 at RL (+) 330.500. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days

do Structural detail of Truck Loading Station 2 detail of floor beam at RL (+)


25 0 340.450. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days

do 26 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days


do 27 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days
do Structural detail of Truck Loading Station 2 detail of floor beam at RL (+)
28 0 343.200. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days

do 29 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days


do 30 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 777 / 05.05.11 1 18 days
do Structural detail of Truck Loading Station 2 detail of tie beam at RL (+) 349.185.
31 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do 32 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days


do Structural detail of Truck Loading Station 2 detail of tie beam at RL (+)
33 0 349.185.& monorail. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do Structural detail of Truck Loading Station 2 detail of truss, rafter bracing, purlin
34 0 & lean to truss. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do 35 0 Structural detail of Truck Loading Station 2 detail of runner. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days
do Structural detail of Truck Loading Station 2 detail of inclined beam from RL (+)
36 0 336.023.to RL (+) 338.307. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do Structural detail of Truck Loading Station 2 detail of staircase mkd. ST 1 & ST 2.


37 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do Structural detail of Truck Loading Station 2 detail of staircase mkd. ST 3 & ST 4.


38 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do Structural detail of Truck Loading Station 2 detail of staircase mkd. ST 5 & ST 6.


39 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days

do 40 0 Structural detail of Truck Loading Station 2 detail of bunker girder mkd. BG 1. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 782 / 06.05.11 1 19 days
do 41 0 Structural detail of Truck Loading Station 2 detail of bunker girder mkd. BG 2. 4132 / 23.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days
do Structural detail of Truck Loading Station 2 detail of top vertical wall on bunker
42 0 girder . 4132 / 23.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days

do Structural detail of Truck Loading Station 2 detail of hopper and liner plate of
43 0 vertical wall . 4132 / 23.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days

do 44 0 do 4132 / 23.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days

83 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Dwg. Submission by Dwg. commented Dwg. approval from Dwg. approval Time taken by SECL
Sl. Drawing No Sheet Rev Description SKSL vide letter no & from CMPDI to SKSL CMPDI to SECL vide from SECL to SKSL after receipt of
No. No vide letter no & approval from
date to SECL/CMPDI vide letter no & date letter no & date
date CMPDI

do Structural detail of Truck Loading Station 2 detail of iner plate on hopper .


45 0 4132 / 23.03.10 1 172 / 18.04.11 1 H - 779 / 05.05.11 1 18 days

84 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

85 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

86 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

87 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

88 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

89 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

90 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

287 days

91 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

287 days

300 days
300 days
300 days
300 days
300 days
300 days
300 days

300 days

300 days

92 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

300 days

300 days

35 days

35 days

35 days
35 days
35 days
57 days

57 days
57 days

57 days

57 days

57 days

57 days

57 days

93 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

57 days

57 days

73 days

73 days
73 days
73 days

73 days
73 days
73 days

73 days

73 days

39 days

39 days

39 days

39 days

39 days

39 days

39 days

39 days

39 days

55 days

94 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

55 days
55 days

55 days

55 days

55 days

55 days

55 days

55 days

20 days

20 days

20 days

20 days
20 days
20 days
20 days
20 days

20 days

20 days

20 days

95 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

20 days

20 days

20 days

20 days

20 days

20 days

20 days

20 days

20 days
20 days
20 days

20 days

96 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

97 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

98 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

99 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

100 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

101 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

102 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

103 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

231 days

104 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

231 days

231 days

231 days

231 days

317 days
317 days
317 days
317 days
317 days
317 days
317 days
317 days
317 days
317 days

317 days

317 days

317 days

449 days

449 days

449 days

449 days

449 days
449 days
449 days
449 days

105 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

449 days
449 days
449 days
449 days
449 days

449 days

449 days

449 days

449 days

449 days

449 days

449 days

449 days

449 days
449 days
449 days
449 days
449 days

449 days

449 days

449 days
449 days
449 days
449 days

449 days

449 days
449 days

449 days

106 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

449 days

449 days

107 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

260 days
260 days

260 days

260 days
260 days
260 days
260 days

108 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

260 days

260 days
260 days
260 days
260 days

260 days

260 days
260 days
260 days
260 days

260 days

260 days
260 days

260 days
260 days
265 days
265 days
265 days
523 days
523 days
523 days
523 days
523 days
523 days

523 days

523 days

523 days

109 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

523 days

523 days
523 days

523 days

523 days
523 days

523 days

523 days

523 days

523 days
523 days
523 days
523 days
523 days
523 days
523 days

523 days

523 days

411 days

110 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

411 days

411 days

411 days

411 days

411 days

454 days

411 days

454 days

454 days

411 days

411 days

454 days

411 days

454 days

454 days

411 days

411 days

111 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL
411 days

411 days

411 days

411 days

450 days
450 days
450 days
450 days
450 days
450 days
450 days
528 days
528 days
528 days
528 days
528 days
528 days
528 days
528 days
528 days

528 days

528 days

528 days

528 days

528 days

528 days

528 days

112 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

528 days
528 days

528 days

528 days
528 days
528 days
528 days
528 days
528 days
528 days
528 days
528 days
528 days

260 days
260 days

260 days

260 days

113 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

260 days
260 days
260 days

260 days

260 days

260 days
260 days
260 days

260 days

260 days

260 days

260 days

260 days

260 days

260 days

260 days

260 days

260 days
260 days
260 days
480 days
480 days
480 days
480 days
480 days
480 days

114 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

480 days

480 days

480 days

480 days

480 days
480 days

480 days

480 days
480 days

480 days

480 days

480 days

480 days
480 days

480 days

480 days

480 days

480 days

480 days

115 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

116 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

117 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

118 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

119 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

120 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

121 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

122 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

123 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

124 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

125 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

283 days

283 days

283 days
283 days
283 days
283 days
287 days
262 days
262 days
262 days

262 days

262 days

262 days

262 days

262 days

262 days
262 days
264 days
264 days
264 days
264 days
264 days

264 days

264 days
264 days
264 days
264 days

126 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

264 days
264 days
264 days
264 days
264 days
264 days
264 days
264 days
264 days
264 days
264 days
264 days
264 days
272 days
272 days
272 days
272 days
272 days
272 days
272 days
273 days
273 days

273 days

273 days
273 days

273 days

273 days
273 days

273 days

273 days
275 days
275 days
275 days
275 days
275 days
275 days

127 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

275 days
275 days
275 days
275 days
275 days
275 days
275 days
281 days
281 days
281 days
281 days
281 days
281 days

281 days

281 days
281 days
281 days
281 days
281 days
281 days
281 days
282 days
282 days
282 days
282 days
282 days
282 days
283 days
283 days
283 days
283 days
283 days

283 days

283 days
283 days
283 days

128 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

287 days

287 days
287 days
287 days
287 days
287 days
287 days
287 days
287 days
287 days
287 days
287 days

287 days

287 days

287 days

287 days

372 days
372 days

372 days

372 days

372 days

372 days
372 days
372 days

372 days

129 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

372 days

372 days

372 days
372 days

372 days

372 days

372 days

372 days

372 days

372 days
372 days

372 days

372 days

372 days
372 days

533 days

130 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

533 days

533 days

533 days

533 days

533 days
533 days
533 days

533 days
533 days

533 days

533 days
533 days

533 days

533 days

533 days

533 days

533 days

131 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

533 days
533 days

533 days

533 days

533 days
533 days

507 days

507 days

507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days
507 days

375 days
375 days

132 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

375 days
375 days
375 days

375 days

375 days
375 days

375 days

375 days
375 days
375 days
375 days
375 days
375 days
375 days
375 days

410 days
410 days

410 days

410 days

410 days
410 days
410 days
410 days
410 days
410 days
412 days
412 days
412 days
412 days

133 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

412 days
412 days
412 days
412 days
412 days
412 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days
413 days

134 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

410 days

410 days

410 days

410 days

410 days

410 days

410 days

410 days

410 days

410 days

412 days

412 days

412 days

412 days

412 days

412 days

412 days

412 days

412 days

135 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

412 days

413 days
413 days

413 days

413 days

413 days

413 days
413 days

413 days

413 days
413 days

414 days

414 days

414 days

414 days

414 days

414 days

414 days

414 days

414 days

414 days
413 days

413 days

413 days

413 days

136 of 245
STATUS OF STRUCTURAL FABRICATION DRAWINGS FOR DIPKA MAIN CHP ( AS ON 27.11.2012 )

Time taken by SECL


after submission of
drawing by SKSL

413 days

137 of 245
APPROVAL STATUS OF STRUCTURAL FABRICATION DOCUMENTS FOR DIPKA MAIN CHP ( AS ON 04.08.2011 )

Date of submission by Date of approval Date of approval


Sl. Document No Sheet Rev Description SKSL vide letter no & from CMPDI to SECL from SECL to SKSL
No. No date to CMPDI vide letter no & date vide letter no & date

1 General
151/GNRL-D/A/S - 03 Structural design of standard gallery 18.0 M span for single conveyor ( B / W 1600 mm)
- 0 2131 / 22.09.09

1 3902 / 26.02.11
151/GNRL-D/A/S - 04 Structural design of standard gallery 18.0 M span for double conveyor ( B / W 1600 mm)
- 0 2131 / 22.09.09

151/GNRL-D/A/S - 05 Structural design of standard gallery 18.0 M span for single conveyor ( B / W 1200 mm)
- 0 2131 / 22.09.09

151/GNRL-D/A/S - 03A - 0 Structural design of gallery 30.0 M span for single conveyor ( B / W 1600 mm) 3738 / 22.02.10
2 Conveyor P1,Q1,R1
151 / CONV P1, Q1, R1-D/A/S - 29 - 0 Structural design of trestles for conveyor P 1, Q 1, R 1 ( Belt width - 1600 mm) 3741 / 22. 02.10 4251 / 19.02.11
Structural design of trestles for conveyor P 1, Q 1, R 1 ( part - II) 1800 / 08.08.11 2789 / 04.11.11
151 / DH P1, Q1, R1-D/A/S - 30 Structural design of drive house for conveyor P 1, Q 1, R 1 668 / 23.05.11
151 / DH P1, Q1, R1-D-S /30 (Part-B) Structural design of HGTU for drive house for conveyor P 1, Q 1, R 1
- 0 1047 / 12.06.12

3 Conveyor B1,B2,B3
151 / CON B 1, B2, B3 - D/A/S-27 - 0 Structural design of trestles for conveyor B 1, B 2, B3 ( Belt width - 1600) 3082 / 22.12.09 3513 / 22.12.10
151 / DH B 1, B2, B3 - D/A/S-28 - 0 Structural design of drive house for conveyor B 1, B 2, B3 3571 / 10.02.10 1650 / 26.07.11
151 / DH B 1, B2, B3 - D/A/S-28 Structural design of HGTU for conveyor B1 / B2 / B3
(Part - B) - 0 662 / 18.05.12

4 Conveyor B8,B9
151/ CON B 08 - B 09 - D/A/S - 022 Structural design of trestles for conveyor B 8, B 9 ( Belt width - 1600)
- 0 2679 / 17.11.09

151 / DH - B 08, B 09 -D/A/S - 025 - 0 Structural design of drive house for conveyor B 8, B 9 3001 / 15.12.09
1 do 1162 / 25.06.11
151 / DH - B 08, B 09 -D/A/S - 025 Structural design of HGTU for conveyor B 8, B 9
(Part - B) - 0 662 / 18.05.12

5 Conveyor B10, B11


151/CON B10 - B11 - D/A/S -021 Structural design of gallery & trestles for conveyor B 10 - B 11 (belt width - 1200)
- 0 2473 / 30.10.09

151 / DH B10 - B11 - D-S -024 - 0 Structural design of drive house for conveyor B 10 - B 11 2607 / 11.11.09
151 / DH B10 - B11 - D-S -024 (Part Structural design of HGTU for conveyor B10 / B11
- B) - 0 1494 / 16.07.12

6 Conveyor B12, B13


151 / CON B12, 13 - D/A/S - 023 - 0 Structural design of trestles for conveyor B 12, B 13 ( Belt width - 1600) 2734 / 23.11.09
151 / CON B12, 13 - D/A/S - 026 - 0 Structural design of drive house for conveyor B 12, B 13 3256 / 07.01.10
151 / CON B12, 13 - D-S - 026 (Part- Structural design of HGTU for conveyor B 12, B 13
B) - 0 1256 / 25.06.12

7 Transfer House-8
151 / TRH8 - D/A/S - 15 - 0 Structural design of Transfer house TRH 8 3638 / 16.02.10 3385 / 17.12.11
8 Transfer House-9
151 / TRH9 - D/A/S - 16 - 0 Structural design of Transfer house TRH 9 4175 / 26.03.10 414 / 04.05.11
9 Transfer House-11

Page 138 of 245


APPROVAL STATUS OF STRUCTURAL FABRICATION DOCUMENTS FOR DIPKA MAIN CHP ( AS ON 04.08.2011 )

151/TRH11 - D - S -18 - - Structural design of Transfer house TRH 11 2256 / 09.10.09


10 Bunker 1
151/BNK1 - D/A/S - 06 - 0 Structural design of shed over Bunker 1 & stair block 2131 / 22.09.09
151/BNK1 - D/S - 06 (Part - B) - 0 Structural design of Vibro feeder supporting platform Bunker 1 4475 / 16.03.12
11 Truck Loading Station - I
151 / TLS1 - D/A/S -19 - 0 Structural design of Truck loading station TLS 1 2912 / 08.12.09 4654 / 28.03.11
12 Conveyor P2,Q2,R2

Page 139 of 245


STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

A System Layout Drawing dwg sht dwg sht


Flow Diagram

1 151/MTFD-0/A/M-001 1 of 1 0 Flow diagram of basic system layout 2517/ 04.11.09


1 of 1 0 do 3566/ 10.02.10
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 990 / 15.06.11 1 1
do (clarrification) 2448 / 01.10.11
Plot Plan

2 151/CHPP-0/A/M-002 1 of 1 0 Plot plan of basic system layout 2534/ 05.11.09


1 do 3566/ 10.02.10
2 do 1613/ 23.08.10
1 of 2 3 do 4185 / 22.03.11
4 do 990 / 15.06.11 1 1
do (clarrification) 2448 / 01.10.11
5 Plot plan of basic system layout 2146 / 04.09.12
2 of 2 3 do 4185 / 22.03.11
4 do 990 / 15.06.11 1
do (clarrification) 2448 / 01.10.11
5 Plot plan of basic system layout 2146 / 04.09.12

Conveyor B12 / B13

3 151/CONV-0/A/M-003 1 of 3 0 Sectional elevation of belt Conveyor nos B12 & B13 along with RCC overhead 2517/ 04.11.09
bunker -1 & transfer house TH11 of basic system layout

1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 3600 / 01.02.11 1 1
2 of 3 0 do 2517/ 04.11.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 3600 / 01.02.11 1
3 of 3 0 do 2517/ 04.11.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

Conveyor B8 / B9

Sectional elevation of belt conveyor nos B8 & B9 alongwith RCC overhead


4 151/CONV-0/A/M-004 1 of 2 0 2132/ 22.09.09
Bunker 2 & transfer house TH10.
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 3600 / 01.02.11 1 1
2 of 2 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 3600 / 01.02.11 1
Conveyor B10 / B11 & B22 / B23

Sectional elevation of belt conveyor nos B10, B11, B22 & B23 alongwith
5 151/CONV-0/A/M-005 1 of 2 0 truck loading Station 1 & 2. 2132/ 22.09.09

1 do 822 / 15.06.10

140 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

2 do 1613/ 23.08.10 1 1
2 of 2 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

Conveyor B4 / B5 & B6 / B7

Sectional elevation of belt Conveyor nos B4, B5, B6 & B7 along with RCC
6 151/CONV-0/A/M-006 1 of 4 0 2132/ 22.09.09
overhead bunker -1 & 2 & transfer house TH9
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1 1
2 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
3 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
4 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

Conveyor B1 / B2 / B3

Sectional elevation of belt Conveyor nos B1, B2 & B3 along with transfer
7 151/CONV-0/A/M/007 1 of 2 0 houses TH8 & TH9 for basic system layout 2620 / 12.11.09

1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1 1
2 of 2 0 do 2620 / 12.11.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

Conveyor P1 / Q1 / R1

8 151/CONV-0/A/M/008 1 of 3 0 Sectional Elevation of belt Conveyors nos. P1, Q1 & R1 along with Transfer 3447/ 27.01.10
Houses TH7 & TH8
1 do 4163/ 18.03.11
2 do 990 / 15.06.11 1 1
2 of 3 0 do 3447/ 27.01.10
1 do 4163/ 18.03.11
2 do 990 / 15.06.11 1
3 of 3 0 do 3447/ 27.01.10
1 do 4163/ 18.03.11
2 do 990 / 15.06.11 1

Conveyor P2 / Q2 / R2

Sectional Elevation of Belt Conveyor nos. P2, Q2 & R2 along with transfer
10 151/CONV-0/A/M/010 1 of 3 0 3418 / 22.01.10
houses TH1/TH2/TH3/TH 4 & TH7
1 do 4163/ 18.03.11
2 do 990 / 15.06.11 1 1
3 do 2146 / 04.09.12
2 of 3 0 do 3418 / 22.01.10
1 do 4163/ 18.03.11
2 do 990 / 15.06.11 1
3 do 2146 / 04.09.12

141 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

3 of 3 0 do 3418 / 22.01.10
1 do 4163/ 18.03.11
2 do 990 / 15.06.11 1
Conveyor C1 to C8

Sectional elevation of belt Conveyor nos. C1, C2, C3 , C4, C5, C6, C7 & C8
12 151/CONV-0/A/M-012 1 of 4 0 along with truck receiving hopper Station -1 & 2 and transfer houses TH1/ 3237 / 06.01.10
TH2/TH3 / TH4.

B GA Drawing
Conveyor B12 / B13

33 151/CON-B12/B13-0/A/M-041 1 of 6 0 Mechanical GA & load data of conveyor nos. B12 & B13. 3170 / 31.12.09
1 2120 / 11.10.10 1 1
2 of 6 0 do 3170 / 31.12.09
1 2120 / 11.10.10 1
3 of 6 0 do 3170 / 31.12.09
1 2120 / 11.10.10 1
4 of 6 0 do 3170 / 31.12.09
1 do 2120 / 11.10.10
2 do 2683 / 22.11.10 1
5 of 6 0 do 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1
6 of 6 0 do 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1

38 151/CON-B12/B13-0/A/M-049 1 of 1 0 Mechanical GA & load data of drive house for Conveyor nos B12 & B13 2620 / 12.11.09

1 do 1613/ 23.08.10 1 1
1 of 2 2 do 261 / 21.04.12
2 of 2 2 do 261 / 21.04.12
47 151/CHUT-0/A/M-069 1 of 2 0 GA of discharge chute of Conveyor nos. B12 & B13. 3418/ 22.01.10 1 1
2 of 2 0 do 3418/ 22.01.10 1

Conveyor B8 / B9

31 151/CON-B8/B9-0/A/M-039 1 of 5 0 Mechanical GA & load data of belt conveyor nos. B8 & B9. 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1 1
2 of 5 0 do 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1
3 of 5 0 do 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1
4 of 5 0 do 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1
5 of 5 0 do 3170 / 31.12.09
1 2120 / 11.10.10
2 2577/ 12.11.10 1
36 151/CON-B8/B9-0/A/M-047 1 of 1 0 Mechanical GA & load data of drive house for Conveyor nos B8 & B9 2620 / 12.11.09
1 do 1613/ 23.08.10 1 1

142 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 of 2 2 do 261 / 21.04.12
2 of 2 2 do 261 / 21.04.12
45 151/CHUT-0/A/M-067 1 of 1 0 GA of discharge chute of Conveyor nos. B8 & B9. 3418/ 22.01.10 1 1

Conveyor B10 / B11 & B22 / B23

32 151/CON-B10/B11-0/A/M-040 1 of 5 0 Mech GA & load data of Conv nos B10 & B11 3146 / 30.12.09
1 do 2301 / 21.10.10 1 1
2 of 5 0 do 3146 / 30.12.09
1 do 2301 / 21.10.10 1
3 of 5 0 do 3146 / 30.12.09
1 do 2301 / 21.10.10 1
4 of 5 0 do 3146 / 30.12.09
1 do 2301 / 21.10.10 1
5 of 5 0 do 3146 / 30.12.09
1 do 2301 / 21.10.10 1

37 151/CON-B10/B11-0/A/M-048 1 of 1 0 Mechanical GA & load data of drive house for Conveyor nos B10 & B11 2620 / 12.11.09

1 do 1613/ 23.08.10 1 1
1 of 2 2 do 1278/ 27.06.12
2 of 2 2 do 1278/ 27.06.12 1

46 151/CHUT-0/A/M-068 1 of 1 0 GA of discharge chute of Conveyor nos. B10 & B11 3418/ 22.01.10 1 1
Conveyor B22 / B23

151/CON-B22/B23-0/A/M-042 1 of 1 0 Mechanical GA & load data of reversible Conv. nos B22 & B23. 3211 / 05.01.10 1 1

48 151/CHUT-0/A/M-070 1 of 2 0 GA of discharge chute of Conveyor nos. B22 & B23. 3418/ 22.01.10 1 1
2 of 2 0 do 3418/ 22.01.10 1
Conveyor B4 / B5 & B6 / B7

28 151/CON-B4/B5-0/A/M-037 1 of 3 0 Mechanical GA & load data of conveyor nos B4 / B5 (with travelling tripper). 3170 / 31.12.09

1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1 1
3 do 1278/ 27.06.12
2 of 3 0 do 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1
3 do 1278/ 27.06.12
3 of 3 0 do 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1
3 do 1278/ 27.06.12

30 151/CON-B6/B7-0/A/M-038 1 of 3 0 Mechanical GA & load data of conveyor nos. B6 / B7 (with travelling tripper). 3170 / 31.12.09

1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1 1
3 do 1278/ 27.06.12
2 of 3 0 do 3170 / 31.12.09
1 do 822 / 15.06.10

143 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

2 do 1918/ 22.09.10 1
3 do 1278/ 27.06.12
3 of 3 0 do 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1
3 do 1278/ 27.06.12
GA of chute feeding conveyor nos B4, B5. B6 & B7 from tripper conveyor
151/CHUT-0/A/M-066 1 of 1 0 3062 / 30.11.11 1 1
nos B1, B2 & B3
do (Clarification / Compliance) 511 / 08.05.12

Conveyor B1 / B2 / B3

27 151/CON-B1/B2/B3-0/A/M-036 1 of 4 0 Mechanical GA & load data of belt conveyor nos. B1, B2 & B3. 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1 1
2 of 4 0 do 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1
3 of 4 0 do 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1
4 of 4 0 do 3170 / 31.12.09
1 do 822 / 15.06.10
2 do 1918/ 22.09.10 1

35 151/CON-B1/B2/B3-0/A/M-046 1 of 1 0 Mechanical GA & load data of drive house for Conveyor nos B1,B2 & B3 3146 / 30.12.09 1 1

1 of 2 2 do 261 / 21.04.12
2 of 2 2 do 261 / 21.04.12
Conveyor P1 / Q1 / R1

151/CON-P1/Q1/R1-0/A/M-035 1 of 7 2 Mechanical GA & load data of Belt conveyor nos P1, Q1, R1 2357/ 19.09.11 1 1
2 of 7 2 do 2357/ 19.09.11 1
3 of 7 2 do 2357/ 19.09.11 1
4 of 7 2 do 2357/ 19.09.11 1
5 of 7 2 do 2357/ 19.09.11 1
6 of 7 2 do 2357/ 19.09.11 1
7 of 7 2 do 2357/ 19.09.11 1
Clarification sent for drawing no M -035 - 02 810 / 25.05.12

26 151/CON-P1/Q1/R1-0/A/M-045 1 of 2 0 Mechanical GA & load data of Drive house for conveyor nos P1, Q1, R1 3752/ 23.02.10

1 do 2578/ 12.11.10
2 do 778/ 31.05.11 1 1
2 do 261 / 21.04.12
2 of 2 2 do 3752/ 23.02.10
1 do 2578/ 12.11.10 1
2 do 778/ 31.05.11
2 do 261 / 21.04.12

44 151/CHUT-0/A/M-065 1 of 1 0 GA of Discharge chute of inpit conveyor nos P1. Q1 & R1 Feeding conveyor 2896 / 07.12.10 1 1
nos B1, B2, B3
1 do 786/ 24.05.12
2 do 1258/ 25.06.12

Clarrification 09.11.12

144 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

Conveyor P2 / Q2 / R2

151/CON-P2, Q2, R2-0/A/M-043 1 of 2 0 Mechanical GA & load data of Drive house for Conv. nos P2, Q2 & R2 3062 / 30.11.11 1 1

1 do 261 / 21.04.12
2 do 3429 / 01.12.12
2 of 2 0 do 3062 / 30.11.11 1
1 do 261 / 21.04.12
2 do 3429 / 01.12.12

151/CHUT-0/A/M-063 1 of 1 0 GA of Discharge chute of inpit conveyor nos P2. Q2 & R2 Feeding conveyor 3062 / 30.11.11 1 1
nos P1, Q1, R1
151/CON-P2, Q2, R2-0/A/M-084 1 of 7 0 Mechanical GA & load data of Belt conveyor for Conv. nos P2, Q2 & R2 3156 / 07.12.11 1 1
1 do 3429 / 01.12.12
2 of 7 0 do 3156 / 07.12.11 1
1 do 3429 / 01.12.12
3 of 7 0 do 3156 / 07.12.11 1
1 do 3429 / 01.12.12
4 of 7 0 do 3156 / 07.12.11 1
1 do 3429 / 01.12.12
5 of 7 0 do 3156 / 07.12.11 1
1 do 3429 / 01.12.12
6 of 7 0 do 3156 / 07.12.11 1
1 do 3429 / 01.12.12
7 of 7 0 do 3156 / 07.12.11 1
1 do 3429 / 01.12.12
Conveyor C1 to C8

151/CON C1/C2 - 0/A/M / 031 1 of 3 0 Mechanical GA & load data of conveyor nos C1 & C2 2072/ 29.08.11 1 1
1 do 3356/ 27.11.12
2 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12
3 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12

151/CON C3/C4 - 0/A/M / 032 1 of 3 0 Mechanical GA & load data of conveyor nos C3 & C4 2072/ 29.08.11 1 1
1 do 3356/ 27.11.12
2 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12
3 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12

151/CON C5/C6 - 0/A/M / 033 1 of 3 0 Mechanical GA & load data of conveyor nos C5 & C6 2072/ 29.08.11 1 1
1 do 3356/ 27.11.12
2 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12
3 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12

151/CON C7/C8 - 0/A/M / 034 1 of 3 0 Mechanical GA & load data of conveyor nos C7 & C8 2072/ 29.08.11 1 1
1 do 3356/ 27.11.12
2 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12

145 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

3 of 3 0 do 2072/ 29.08.11 1
1 do 3356/ 27.11.12

42 151/CHUT-0/A/M-061 1 of 2 0 GA of Discharge chute of inpit conveyor nos C1. C2, C3 & C4 3622 / 15.02.10
2 of 2 0 do 3622 / 15.02.10
1 of 1 1 do 3429 / 01.12.12 1 1

43 151/CHUT-0/A/M-062 1 of 2 0 GA of Discharge chute of inpit conveyor nos C5. C6, C7 & C8 3622 / 15.02.10
2 of 2 0 do 3622 / 15.02.10
1 of 1 1 do 3429 / 01.12.12 1 1

Truck Receiving Station 1

151/TRST 1-0/A/M-021 1 of 2 0 Mechanical GA & Load data of Truck Receiving Station 1 2235 / 12.09.11 1 1
1 do 3266 / 20.11.12

146 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

2 of 2 0 do 2235 / 12.09.11 1
1 do 3266 / 20.11.12

Truck Receiving Station 2

151/TRST 2 -0/A/M-083 1 of 2 0 Mechanical GA & Load data of Truck Receiving Station 2 2235 / 12.09.11 1 1
1 do 3266 / 20.11.12
2 of 2 0 do 2235 / 12.09.11 1
1 do 3266 / 20.11.12

Transfer House 1

13 151/TRH1-0/A/M-022 1 of 1 0 Mechanical GA & Load data of Transfer house TH 1 3622 / 15.02.10


1 of 2 1 do 1880 / 13.08.11 1 1
2 do 3266 / 20.11.12
2 of 2 1 do 1880 / 13.08.11 1
2 do 3266 / 20.11.12

Transfer House 2

14 151/TRH2-0/A/M-023 1 of 1 0 Mechanical GA & Load data of Transfer house TH 2 3622 / 15.02.10


1 of 2 1 do 1880 / 13.08.11 1 1
2 do 3266 / 20.11.12
2 of 2 1 do 1880 / 13.08.11 1
2 do 3266 / 20.11.12

Transfer House 3

15 151/TRH3-0/A/M-081 1 of 1 0 Mechanical GA & Load data of Transfer house TH 3 3622 / 15.02.10


1 of 2 1 do 1880 / 13.08.11 1 1
2 do 3266 / 20.11.12
2 of 2 1 do 1880 / 13.08.11 1
2 do 3266 / 20.11.12

Transfer House 4

16 151/TRH4-0/A/M-082 1 of 1 0 Mechanical GA & Load data of Transfer house TH 4 3622 / 15.02.10


1 of 2 1 do 1880 / 13.08.11 1 1
2 do 3266 / 20.11.12
2 of 2 1 do 1880 / 13.08.11 1
17 151/TRH5-0/A/M-083 1 of 1 0 Mechanical GA & Load data of Transfer house TH 5 3622 / 15.02.10
18 151/TRH6-0/A/M-084 1 of 1 0 Mechanical GA & Load data of Transfer house TH 6 3622 / 15.02.10
2 do 3266 / 20.11.12

Transfer House 7

151/TRH7-0/A/M-024 1 of 2 0 Mechanical GA & Load data of Transfer house TH 7 3062 / 30.11.11 1 1


2 of 2 0 do 3062 / 30.11.11 1

Transfer House 8

19 151/TRH8-0/A/M-025 1 of 2 0 Mechanical GA & Load Data of Transfer House TH-8 3482/ 30.01.10
1 do 2577/ 12.11.10
2 do 2276/ 14.09.11 1 1
Clarrification 941/04.06.12
2 of 2 0 do 3482/ 30.01.10

147 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 do 2577/ 12.11.10
2 do 2276/ 14.09.11 1
Clarrification 941/04.06.12

Transfer House 9

20 151/TRH9-0/A/M-026 1 of 3 0 Mechanical GA & load data of transfer house TH9 2620 / 12.11.09 1 1
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
2 of 3 0 do 2620 / 12.11.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
3 of 3 0 do 2620 / 12.11.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

Transfer House 10

21 151/TR10-0/A/M-027 1 of 1 0 Mechanical GA & load data of transfer house TH10 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1 1

Transfer House 11

22 151/TR11-0/A/M-028 1 of 1 0 Mechanical GA & load data of transfer house TH11 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1 1

Bunker 1

23 151/BNK 1-0/A/M-029 1 of 4 0 Mechanical GA & load data of RCC overhead Bunker-1 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1 1
2 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
3 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 2047/ 01.10.10 1
4 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 2047/ 01.10.10 1

50 151/CHUT-0/A/M-072 1 of 1 0 GA of discharge chute for RCC Overhead Surge Bunker -1feeding B12 & B13 3622 / 15.02.10
(through vibrating feeders VF 25 to VF 44)
1 do 3450 / 20.01.11 1 1

Bunker 2

24 151/BNK 2-0/A/M-030 1 of 4 0 Mechanical GA & load data of RCC overhead Bunker-2 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1 1
2 of 4 0 do 2132/ 22.09.09

148 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
3 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1
4 of 4 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 1

51 151/CHUT-0/A/M-073 1 of 1 0 GA of discharge chute for RCC Overhead Surge Bunker -2 feeding B 8 & B 9 3622 / 15.02.10
(through vibrating feeders VF 45 to VF 60)
1 do 3450 / 20.01.11 1 1
GA of discharge chute for RCC Overhead Surge Bunker -2 feeding B 10 & B
52 151/CHUT-0/A/M-074 1 of 1 0 11 (through vibrating feeders VF 61 to VF 64) 3622 / 15.02.10

1 do 3450 / 20.01.11 1 1

Truck Loading Station 1

39 151/TLS1-0/A/M-050 1 of 2 0 Mechanical GA & load data of Truck loading Station-1 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 2047 / 01.10.10 1 1
2 of 2 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

Truck Loading Station 2

41 151/TLS2-0/A/M-051 1 of 2 0 Mechanical GA & load data of Truck loading Station-2 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10
3 do 2047 / 01.10.10 1 1
2 of 2 0 do 2132/ 22.09.09
1 do 822 / 15.06.10
2 do 1613/ 23.08.10 1

53 151/CHUT-0/A/M-075 1 of 1 0 GA of discharge chute of Truck loading hoppers feeding trucks (through 3622 / 15.02.10 1 1
vibrating feeders at TLS 1 & 2)

Truck Receiving Hopper


GA of discharge chute of truck receiving hoppers feeding conv nos C1 to C8
49 151/CHUT-0/A/M-071 1 of 2 0 (throughy vibrating feeder). 3622 / 15.02.10 1 1

1 do 3700 / 15.12.12
2 of 2 0 do 3622 / 15.02.10 1
1 do 3700 / 15.12.12
C Auxiliary System & GA Drawing
Fire Fighting
54 151/FIRE-1/A/M-013 1 0 P & I diagram for Fire Fighting system - hydrant 3391 / 15.01.11 1 1
1 do 3035 / 29.11.11
do (Clarrification / Compliance) 4401 / 10.03.12
2 P & I diagram for Fire Fighting system - hydrant 3371 / 27.11.12
3 do 4246 / 24.01.13

149 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

55 151/FIRE-1/A/M-014 1 0 Layout plan for Fire Fighting system - hydrant 3391 / 15.01.11 1 1
1 do 3035 / 29.11.11
do (Clarrification / Compliance) 4401 / 10.03.12
2 do 3371 / 27.11.12

2 0 Layout of hydrant system along with RCC overhead Bunker 1 & Transfer 3391 / 15.01.11 1
house TH - 11
1 do 3035 / 29.11.11
do (Clarrification / Compliance) 4401 / 10.03.12

2 Layout of hydrant system along with RCC overhead Bunker 1 & TLS 1 & 2. – 4246 / 24.01.13
Basic System Layout

3 0 Layout of hydrant system along with RCC overhead Bunker 2 & Transfer 3391 / 15.01.11 1
house TH - 10
1 do 3035 / 29.11.11
do (Clarrification / Compliance) 4401 / 10.03.12
Layout of hydrant system along with RCC overhead Bunker 2 & Transfer
2 House TH 10/ TH11 - Basic System Layout. 4246 / 24.01.13

Layout of hydrant system conveyor nos B 10, B 11, B 22 & B 23 along with
4 0 Truck loading station 1 & 2 3391 / 15.01.11 1

1 Layout of hydrant system along with Truck receiving hopper station 1 & 3035 / 29.11.11
transfer house TH9
do (Clarrification / Compliance) 4401 / 10.03.12

2 Layout of hydrant system along with Conveyor B1/B2/B3 & Transfer House 4246 / 24.01.13
TH9 - Basic System Layout.
Layout of hydrant system along with Conveyor B1, B2 & B3 & Transfer
5 0 house TH - 8 / TH - 9 3391 / 15.01.11 1

Layout of hydrant system Conveyor P1, Q1 & R1 along with Transfer house
1 3035 / 29.11.11
TH - 8
do (Clarrification / Compliance) 4401 / 10.03.12
Layout of hydrant system conveyor nos P1,Q1, & R1 along with Transfer
2 4246 / 24.01.13
house TH 8- Basic System Layout.

6 0 Layout of hydrant system conveyor nos P1,Q1, & R1 along with Transfer 3391 / 15.01.11 1
house TH 8
1 Layout of hydrant system along with Transfer house TH 7 3035 / 29.11.11
do (Clarrification / Compliance) 4401 / 10.03.12

2 Layout of hydrant system conveyor nos P2, Q2 & R2 along with Transfer 4246 / 24.01.13
house TH 7- Basic System Layout.

7 0 Layout of hydrant system along with Transfer houses TH - 1 / TH - 2 / TH - 3 3391 / 15.01.11 1


& TH - 7
Layout of hydrant system conveyor nos B 10, B 11, B 22 & B 23 along with
1 Truck loading station 1 & 2 3035 / 29.11.11

do (Clarrification / Compliance) 4401 / 10.03.12

2 Layout of hydrant system along with Truck Receiving Hopper station 1 & 4246 / 24.01.13
Transfer houses TH1/ TH2 - Basic System Layout.

8 0 Layout of hydrant system along with Truck receiving hopper & Transfer 3391 / 15.01.11 1
houses TH - 4 / TH - 5 / TH - 6
Layout of hydrant system along with Truck receiving hopper station 1 &
1 transfer house TH1 / TH2 3035 / 29.11.11

do (Clarrification / Compliance) 4401 / 10.03.12

2 Layout of hydrant system along with Truck Receiving Hopper station 2 & 4246 / 24.01.13
Transfer houses TH3/ TH4 - Basic System Layout.
Layout of hydrant system along with Truck receiving hopper & Transfer
9 0 3391 / 15.01.11 1
houses TH - 1 / TH - 2 / TH - 3

1 Layout of hydrant system along with Truck receiving hopper station 2 & 3035 / 29.11.11
transfer house TH3 / TH4
do (Clarrification / Compliance) 4401 / 10.03.12
Riser details of Transfer houses TH1/TH2/TH3/TH4/TH7/TH9 & Truck
2 Loading Station 1 & 2 for Fire fighting system - Hydrant 4246 / 24.01.13

Riser details of Transfer houses TH - 1 / TH - 2 / TH - 3 / TH - 4 / TH - 5 & TH -


10 0 6 for Fire fighting system - hydrant 3391 / 15.01.11 1

150 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 Riser details of Transfer houses TH - 1 / TH - 2 / TH - 3 / TH - 4 / TH - 7 / TH - 3035 / 29.11.11


9 & loading station 1 , 2 for Fire Fighting System - Hydrant
do (Clarrification / Compliance) 4401 / 10.03.12

11 0 Riser details of Transfer houses TH - 7 / TH - 9 & Truck loading station 1, 2 for 3391 / 15.01.11 1
Fire fighting system - hydrant
Clarrification sent for all above drawing 852 / 29.05.12
58 151/FFTG-1/A/M-015 1 of 2 0 SLD for Sub station, substation I, II, III, IV (3.3 kv) for Fire alarm system 3407 / 17.01.11

do ( Clarification ) 602 / 17.05.11


do ( Clarification ) 1423 / 12.07.11 1 1

2 of 2 0 SLD for Sub station, substation I, II, III, IV (6.6 kv) for Fire alarm system 3407 / 17.01.11

do ( Clarification ) 602 / 17.05.11


do ( Clarification ) 1423 / 12.07.11 1
Dust Suppression
56 151/DUST-1/A/M-016 1 of 2 0 P & I diagram for PH - 2 near TH 7 for Dust suppression system 3394 / 15.01.11 1 1
1 do 3088 / 02.12.11
do ( Clarification ) 889 / 31.05.12
1 do 3371 / 27.11.12
2 do 840 / 04.06.13
2 of 2 0 P & I diagram for PH - 1 near Bunker for Dust suppression system 3394 / 15.01.11 1
1 do 3088 / 02.12.11
do ( Clarification ) 889 / 31.05.12
1 do 3371 / 27.11.12
2 do 840 / 04.06.13

57 151/DUST-1/A/M-017 1 0 Layout plan for Dust suppression system 3394 / 15.01.11 1 1


1 do 3088 / 02.12.11
2 do 3371 / 27.11.12
Layout of Dust suppression along with RCC overhead Bunker 1 & Transfer
2 0 house TH - 11 3394 / 15.01.11 1

1 Layout of Dust suppression in RCC overhead Bunker 1 3088 / 02.12.11


Layout of Dust suppression along with RCC overhead Bunker 2 & Transfer
3 0 house TH - 10 3394 / 15.01.11 1

1 Layout of Dust suppression in RCC overhead Bunker 2 3088 / 02.12.11


Layout of Dust suppression system conveyor nos B 10, B 11, B 22 & B 23
4 0 along with Truck loading station 1 & 2 3394 / 15.01.11 1

1 do 3088 / 02.12.11
Layout of Dust suppression system along with Conveyor B1, B2 & B3 &
5 0 Transfer house TH - 9 3394 / 15.01.11 1

1 do 3088 / 02.12.11

6 0 Layout of Dust suppression system conveyor nos P1, Q1, R1 along with 3394 / 15.01.11 1
Transfer house TH - 8
1 Layout of Dust suppression along with Transfer house TH - 7 3088 / 02.12.11
Layout of Dust suppression system along with Truck receiving hopper &
7 0 3394 / 15.01.11 1
Transfer houses TH - 4 / TH - 5 / TH - 6
1 do 3088 / 02.12.11
do ( Clarification ) 889 / 31.05.12
Layout of Dust suppression system along with Truck receiving hopper &
8 0 3394 / 15.01.11 1
Transfer houses TH - 3 / TH - 4
1 do 3088 / 02.12.11

9 0 Layout of Dust suppression system along with Truck receiving hopper & 3394 / 15.01.11 1
Transfer houses TH - 1 / TH - 2
1 do 3088 / 02.12.11
Layout of Dust suppression system along with RCC overhead Bunker 2 &
10 0 Transfer house TH 10 3394 / 15.01.11 1

151 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 do 3088 / 02.12.11
Layout of Dust suppression system along with RCC overhead Bunker 1 &
11 1 Transfer house TH 11 3088 / 02.12.11 1

Clarrification sent for all above drawing 889 / 31.05.12


Plant cleaning & Water supply
system
59 151/ PLANT - WS -1/A/M-018 1 0 P & I diagram for Plant cleaning & Drinking water system 3408 / 17.01.11 1 1
1 do 3118 / 05.12.11
2 do 3371 / 27.11.12

60 151/ PLANT - WS -1/A/M-019 1 of 1 0 General layout for Plant cleaning & Drinking water system 3408 / 17.01.11 1 1
1 do 3118 / 05.12.11
Clarrification sent for all above drawing 893 / 31.05.12
2 General layout for Plant cleaning & Drinking water system 3371 / 27.11.12

D Fabrication Drawing
Conveyor P1 / Q1 / R1

Fabrication details of discharge chute of conveyor nos P1, Q1 & R1 feeding


151/CHUT-1/B/M- 104 1 of 3 0 conveyor nos B1, B2, B3 3461 / 21.01.11 1 1

2 of 3 0 do 3461 / 21.01.11 1
3 of 3 0 do 3461 / 21.01.11 1

151/STR - 1/B/M- 117 7 of 13 0 Marking & fabrication detail of non standard stringer & short post for conv 2770 / 07.11.11 1 1
no P1, Q1 & R1
8 of 13 0 do 2770 / 07.11.11 1
9 of 13 0 do 2770 / 07.11.11 1
10 of 13 0 do 2770 / 07.11.11 1
11 of 13 0 do 2770 / 07.11.11 1
12 of 13 0 do 2770 / 07.11.11 1
13 of 13 0 do 2770 / 07.11.11 1
1 do 2960 / 21.11.11
151/ FRM - 1/B/M- 129 1 0 Fabrication detail of Head pulley frame for conv no P1,Q1,R1 1299 / 29.06.12 1 1

151/ FRM - 1/B/M- 140A 1 of 1 0 Fabrication detail of Tail pulley & Bend pulley frames for conv no P1 2770 / 07.11.11 1 1

151/ FRM - 1/B/M- 140B 1 of 1 0 Fabrication detail of Tail pulley & Bend pulley frames for conv no Q1 2770 / 07.11.11 1 1

151/ FRM - 1/B/M- 140C 1 of 1 0 Fabrication detail of Tail pulley & Bend pulley frames for conv no R1 2770 / 07.11.11 1 1

151/ FRM - 1/B/M- 162 1 0 Fabrication detail of Drive base frame for conv no P1, Q1, & R1 3061 / 30.11.11 1 1
Fabrication detail of Drive Pulley supporting frame for conv no P1, Q1 &
151/ FRM - 1/B/M- 151 1 0 3485 / 28.12.11 1 1
R1

151/ TTSF - 1/B/M- 144 1 of 1 0 Fabrication detail of Take up trolley supporting frame for conveyor nos 246 / 20.04.12
P1 ,Q1 & R1
151/ TUP - 1/B/M- 187 1 of 2 0 Arrangement & detail of Take up for conveyor nos P1 ,Q1 & R1 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
151/ MG - 1/B/M- 196 1 0 Fabrication detail of Tail pulley guard for conv no P1 ,Q1 & R1 1299 / 29.06.12 1 1
Conveyor P2 / Q2 / R2

151/ FRM - 1/B/M- 163 1 0 Fabrication detail of Drive base frame for conv no P2, Q2, & R2 3061 / 30.11.11 1 1
Fabrication detail of discharge chute of in pit conveyor no P2, Q2 & R2
151/CHUT-P2, Q2, R2 -1/B/M- 102 1 of 4 0 feeding conveyor nos P1, Q1 & R1 3299 / 14.12.11 1 1

2 of 4 0 do 3299 / 14.12.11 1
3 of 4 0 do 3299 / 14.12.11 1
4 of 4 0 do 3299 / 14.12.11 1

152 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

151/STR - 1/B/M- 118 1 of 15 1 Marking & fabrication detail of non standard stringer & short post for conv 3667 / 13.12.12 1 1
no P2, Q2 & R2
2 of 15 1 do 3667 / 13.12.12 1
3 of 15 1 do 3667 / 13.12.12 1
4 of 15 1 do 3667 / 13.12.12 1
5 of 15 1 do 3667 / 13.12.12 1
6 of 15 1 do 3667 / 13.12.12 1
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 118 7 of 15 0 no P2, Q2 & R2 3551 / 03.01.12 1

1 do 3667 / 13.12.12 1
8 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
9 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
10 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
11 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
12 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
13 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
14 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
15 of 15 0 do 3551 / 03.01.12 1
1 do 3667 / 13.12.12 1
151/ FRM - 1/B/M- 130 1 0 Fabrication detail of Head pulley frame for conv no P2,Q2,R2 1299 / 29.06.12 1 1
Fabrication detail of Tail pulley, Upper L/T Bend pulley & H/T Bend pulley
151/ FRM - 1/B/M- 141 1 of 1 0 frames for conv no P2,Q2,R2 1 1

Fabrication detail of Drive Pulley supporting frame for conv no P2, Q2 &
151/ FRM - 1/B/M- 152 1 0 3551 / 03.01.12
R2

151/ TTSF - 1/B/M- 146 1 of 1 0 Fabrication detail of Take up trolley supporting frame for conveyor nos 246 / 20.04.12
P2 ,Q2 & R2
151/ TUP - 1/B/M- 188 1 of 2 0 Arrangement & detail of Take up for conveyor nos P2 ,Q2 & R2 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
151/ MG - 1/B/M- 197 1 0 Fabrication detail of Tail pulley guard for conv no P2 ,Q2 & R2 1299 / 29.06.12 1 1
Conveyor B8 / B9

151/CHUT-1/B/M- 106 1 of 5 0 Fabrication detail of discharge chute of conveyor no B8 & B9 2809 / 01.12.10 1 1
2 of 5 0 do 2809 / 01.12.10 1
3 of 5 0 do 2809 / 01.12.10 1
4 of 5 0 do 2809 / 01.12.10 1
5 of 5 0 do 2809 / 01.12.10 1

Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 113 1 of 7 0 2141 / 03.09.11 1 1
no B8 & B9
2 of 7 0 do 2141 / 03.09.11 1
3 of 7 0 do 2141 / 03.09.11 1
4 of 7 0 do 2141 / 03.09.11 1
5 of 7 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
6 of 7 0 do 3240 / 03.01.11

153 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 do 2128 / 02.09.11 1
7 of 7 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
151/ FRM - 1/B/M- 125 1 0 Fabrication detail of Head pulley frame for conv no B8 & B9 2770 / 07.11.11 1 1

151/ FRM - 1/B/M- 136 1 of 2 0 Fabrication detail of Tail pulley & Bend pulley frames for conv no B8 & B9 2770 / 07.11.11 1 1

151/ FRM - 1/B/M- 147 1 0 Fabrication detail of Drive Pulley supporting frame for conv no B8 & B9 3485 / 28.12.11 1 1

151/ FRM - 1/B/M- 158 1 0 Fabrication detail of Drive Base frame for conv no B8 & B9 3485 / 28.12.11 1 1
Fabrication detail of Take up trolley supporting frame for conveyor nos
151/ TTSF - 1/B/M- 133 1 of 1 0 B8 ,B9 4121 / 18.02.12 1 1

151/ MG - 1/B/M- 193 1 0 Fabrication detail of Tail pulley guard for conveyor nos B8 & B9 246/ 20.04.12
151/ TUP - 1/B/M- 183 1 of 2 0 Arrangement & detail of Take up for conveyor nos B8 & B9 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
Conveyor B10 / B11

151/CHUT-1/B/M- 107 1 of 3 0 Fabrication detail of discharge chute of conveyor no B10 & B11 2809 / 01.12.10 1 1
2 of 3 0 do 2809 / 01.12.10 1
3 of 3 0 do 2809 / 01.12.10 1

Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 114 1 of 8 0 no B10 & B11 2141 / 03.09.11 1 1

2 of 8 0 do 2141 / 03.09.11 1
3 of 8 0 do 2141 / 03.09.11 1
4 of 8 0 do 2141 / 03.09.11 1
5 of 8 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
6 of 8 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
7 of 8 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
8 of 8 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1

151/ FRM - 1/B/M- 137 1 of 1 0 Fabrication detail of Tail pulley, upper L/T Bend pulley & H/T Bend pulley 2770 / 07.11.11 1 1
frames for conv no B10 & B11
151/ FRM - 1/B/M- 126 1 0 Fabrication detail of Head pulley frame for conv no B10 & B11 2960 / 21.11.11 1 1

151/ FRM - 1/B/M- 148 1 0 Fabrication detail of Drive Pulley supporting frame for conv no B10 & B11 3485 / 28.12.11 1 1

151/ FRM - 1/B/M- 159 1 0 Fabrication detail of Drive base frame for conv no B10 & B11 4121 / 18.02.12 1 1

151/ TTSF - 1/B/M- 135 1 of 1 0 Fabrication detail of Take up trolley supporting frame for conveyor nos 246 / 20.04.12
B10 ,B11
151/ MG - 1/B/M- 194 1 0 Fabrication detail of Tail pulley guard for conveyor nos B10 & B11 246/ 20.04.12
151/ TUP - 1/B/M- 184 1 of 2 0 Arrangement & detail of Take up for conveyor nos B10 & B11 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
Conveyor B12 / B13

151/CHUT-1/B/M- 108 1 of 4 0 Fabrication detail of discharge chute of conveyor no B12 & B13 2809 / 01.12.10 1 1
2 of 4 0 do 2809 / 01.12.10 1
3 of 4 0 do 2809 / 01.12.10 1
4 of 4 0 do 2809 / 01.12.10 1

Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 115 1 of 9 0 no B12 & B13 2141 / 03.09.11 1 1

2 of 9 0 do 2141 / 03.09.11 1
3 of 9 0 do 2141 / 03.09.11 1

154 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

4 of 9 0 do 2141 / 03.09.11 1
5 of 9 0 do 2141 / 03.09.11 1
6 of 9 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
7 of 9 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
8 of 9 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
9 of 9 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
Fabrication detail of Tail pulley, upper L/T Bend pulley & H/T Bend pulley
151/ FRM - 1/B/M- 138 1 of 1 0 frames for conv no B12 & B13 2770 / 07.11.11 1 1

151/ FRM - 1/B/M- 127 1 0 Fabrication detail of Head pulley frame for conv no B12 & B13 2960 / 21.11.11 1 1
151/ FRM - 1/B/M- 160 1 0 Fabrication detail ofDrive Base frame for conv no B12 & B13 3299 / 14.12.11 1 1
151/ FRM - 1/B/M- 149 1 0 Fabrication detail of Drive Pulley supporting frame for conv no B12 & B13 3485 / 28.12.11 1 1
Fabrication detail of Take up trolley supporting frame for conveyor nos
151/ TTSF - 1/B/M- 143 1 of 1 0 B12 ,B13 246 / 20.04.12

151/ MG - 1/B/M- 195 1 0 Fabrication detail of Tail pulley guard for conveyor nos B12 & B13 246/ 20.04.12
151/ TUP - 1/B/M- 185 1 of 2 0 Arrangement & detail of Take up for conveyor nos B12 & B13 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
Conveyor B22 / B23
Fabrication detail of discharge chute of conveyor no B22 & B23 at head end
151/CHUT-1/B/M- 109 1 of 6 2809 / 01.12.10 1 1

2 of 6 do 2809 / 01.12.10 1
3 of 6 do 2809 / 01.12.10 1
4 of 6 do 2809 / 01.12.10 1
5 of 6 do 2809 / 01.12.10 1
6 of 6 do 2809 / 01.12.10 1

151/STR - 1/B/M- 116 1 of 2 0 Marking & fabrication detail of non standard stringer & short post for conv 2141 / 03.09.11 1 1
no B22 & B23
2 of 2 0 do 3240 / 03.01.11
1 do 2128 / 02.09.11 1
151/ FRM - 1/B/M- 139 1 of 1 0 Fabrication detail of Tail pulley frame for conv no B22 & B23 2770 / 07.11.11 1 1
1 do 2960 / 21.11.11
151/ TUP - 1/B/M- 186 1 of 1 0 Arrangement of screw take up for conveyor B22 & B23 2770 / 07.11.11 1 1
151/ FRM - 1/B/M- 128 1 0 Fabrication detail of Head pulley frame for conv no B22 & B23 2960 / 21.11.11
151/ FRM - 1/B/M- 161 1 0 Fabrication detail of Drive base frame for conv no B22 & B23 4121 / 18.02.12 1 1
Conveyor C1 to C8

151/CHUT-1/B/M- 173 1 of 3 0 Fabrication details of discharge chutes from truck receiving hoppers to 3525 / 27.01.11 1 1
feeding conveyor nos C1 to C8
2 of 3 0 do 3525 / 27.01.11 1
3 of 3 0 do 3525 / 27.01.11 1

151/CHUT-1/B/M- 100 1 of 4 0 Fabrication detail of discharge chute of conveyor no C1, C2, C3 & C4 2141 / 03.09.11 1 1
1 do 3441 / 03.12.12
2 of 4 0 do 2141 / 03.09.11 1
1 do 3441 / 03.12.12
3 of 4 0 do 2141 / 03.09.11 1
1 do 3441 / 03.12.12
4 of 4 0 do 2141 / 03.09.11 1
1 do 3441 / 03.12.12

155 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

151/CHUT-1/B/M- 101 1 of 4 0 Fabrication detail of discharge chute of conveyor no C5, C6, C7 & C8 2141 / 03.09.11 1 1
1 do 3441 / 03.12.12
2 of 4 0 do 2141 / 03.09.11 1
1 do 3441 / 03.12.12
3 of 4 0 do 2141 / 03.09.11 1
1 do 3441 / 03.12.12
4 of 4 0 do 2141 / 03.09.11 1
1 do 3441 / 03.12.12
Fabrication detail of Head pulley frame for conv no C1, C2, C3, C4, C5, C6,
151/ FRM - 1/B/M- 131 1 of 1 0 C7 & C8 2770 / 07.11.11 1 1

Fabrication detail of Tail pulley & Bend pulley frame for conv no C1, C2,
151/ FRM - 1/B/M- 142 1 of 1 0 C3, C4, C5, C6, C7 & C8 2770 / 07.11.11 1 1

1 do 3441 / 03.12.12
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 119 1 of 5 1 no C1 & C2 3441 / 03.12.12 1

2 of 5 1 do 3441 / 03.12.12 1
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 119 3 of 5 0 no C1 & C2 2960 / 21.11.11 1 1

4 of 5 0 do 2960 / 21.11.11 1
5 of 5 0 do 2960 / 21.11.11 1
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 120 1 of 5 1 no C3 & C4 3441 / 03.12.12 1

2 of 5 1 do 3441 / 03.12.12 1

151/STR - 1/B/M- 120 3 of 5 0 Marking & fabrication detail of non standard stringer & short post for conv 2960 / 21.11.11 1 1
no C3 & C4
4 of 5 0 do 2960 / 21.11.11 1
5 of 5 0 do 2960 / 21.11.11 1

151/STR - 1/B/M- 121 1 of 5 1 Marking & fabrication detail of non standard stringer & short post for conv 3441 / 03.12.12 1
no C5 & C6
2 of 5 1 do 3441 / 03.12.12 1

151/STR - 1/B/M- 121 3 of 5 0 Marking & fabrication detail of non standard stringer & short post for conv 2960 / 21.11.11 1 1
no C5 & C6
4 of 5 0 do 2960 / 21.11.11 1
5 of 5 0 do 2960 / 21.11.11 1

151/FRM - 1/B/M- 131 1 of 1 0 Fabrication detail of Head pulley frame for conv no C1, C2, C3, C4,C5, C6, C7 2770 / 07.11.11 1 1
& C8
1 do 3441 / 03.12.12

151/STR - 1/B/M- 132 1 of 5 1 Marking & fabrication detail of non standard stringer & short post for conv 3441 / 03.12.12 1
no C7 & C8
2 of 5 1 do 3441 / 03.12.12 1

151/STR - 1/B/M- 132 3 of 5 0 Marking & fabrication detail of non standard stringer & short post for conv 2960 / 21.11.11 1 1
no C7 & C8
4 of 5 0 do 2960 / 21.11.11 1
5 of 5 0 do 2960 / 21.11.11 1
151/ FRM - 1/B/M- 165 1 0 Fabrication detail of Drive base frame for conv no C to C8 4121 / 18.02.12 1 1
1 do 3441 / 03.12.12

151/ TUP - 1/B/M- 189 1 of 2 0 Arrangement & detail of vertical gravity take up for conveyor nos C1 to C8 246 / 20.04.12

2 of 2 0 do 246 / 20.04.12
151/ MG - 1/B/M- 198 1 0 Fabrication detail of Tail pulley guard for conveyor nos C1 to C8 246/ 20.04.12
Bunker 1 1 1
Fabrication detail of discharge chute for RCC Overhead Bunker -1 & 2
151/CHUT-1/B/M- 171 1 of 3 0 3461 / 21.01.11 1
feeding conveyor nos B 8, B 9 ,B12 & B13
2 of 3 0 do 3461 / 21.01.11 1
3 of 3 0 do 3461 / 21.01.11

156 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 1
Fabrication detail of discharge chute for RCC Overhead Bunker - 2 feeding
151/CHUT-1/B/M- 172 1 of 3 0 conveyor nos B10 & B11 3461 / 21.01.11 1

2 of 3 0 do 3461 / 21.01.11 1
3 of 3 0 do 3461 / 21.01.11

Truck Loading Station 1 & 2 1 1


Fabrication details of discharge chute of Truck loading hoppers feeding
151/CHUT-1/B/M- 174 1 of 2 0 trucks (through vibrating feeders at TLS 1 & 2) 3525 / 27.01.11 1

2 of 2 0 do 3525 / 27.01.11
Conveyor B1 / B2 / B3 1 1
Fabrication detail of Tripper rail supporting structure for conveyor nos B1 /
151/STR - 1/B/M- 176 1 of 3 0 B2 / B3 4131 / 17.03.11 1

2 of 3 0 do 4131 / 17.03.11 1
3 of 3 0 do 4131 / 17.03.11
1 1
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 110 1 of 6 0 no B1, B2 & B3 2141 / 03.09.11 1

2 of 6 0 do 2141 / 03.09.11 1
3 of 6 0 do 2141 / 03.09.11 1
4 of 6 0 do 2141 / 03.09.11 1
5 of 6 0 do 2141 / 03.09.11 1
6 of 6 0 do 2141 / 03.09.11 1 1

151/ FRM - 1/B/M- 134 1 of 1 0 Fabrication detail of Tail pulley, upper L/T Bend pulley & H/T Bend pulley 2770 / 07.11.11 1
frames for conv no B1, B2 & B3
2 of 2 0 do 2770 / 07.11.11 1 1
151/ FRM - 1/B/M- 123 1 0 Fabrication detail of Head pulley frame for conv no B1, B2 & B3 2960 / 21.11.11 1 1
151/ FRM - 1/B/M- 156 1 0 Fabrication detail of Drive Base frame for conv no B1, B2 & B3 3299 / 14.12.11 1 1

151/ FRM - 1/B/M- 145 1 0 Fabrication detail of Drive Pulley supporting frame for conv no B1, B2 & B3 3485 / 28.12.11

1 1

151/ TTSF - 1/B/M- 103 1 of 1 0 Fabrication detail of Take up trolley supporting frame for conveyor nos B1 / 4121 / 18.02.12
B2 / B3
151/ MG - 1/B/M- 191 1 0 Fabrication detail of Tail pulley guard for conveyor nos B1 / B2 / B3 246/ 20.04.12
151/ TUP - 1/B/M- 181 1 of 1 0 Arrangement & detail of Take up for conveyor nos B1 / B2 / B3 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
Conveyor B6 / B7 1 1
Fabrication detail of Tripper rail supporting structure for conveyor nos B6 /
151/STR - 1/B/M- 178 1 of 4 0 B7 4210 / 23.03.11 1

2 of 4 0 do 4210 / 23.03.11 1
3 of 4 0 do 4210 / 23.03.11 1
4 of 4 0 do 4210 / 23.03.11
1 1
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 112 1 of 4 0 no B6 & B7 2141 / 03.09.11 1

2 of 4 0 do 2141 / 03.09.11 1
3 of 4 0 do 2141 / 03.09.11 1
4 of 4 0 do 2141 / 03.09.11
Conveyor B4 / B5 1 1
Fabrication detail of Tripper rail supporting structure for conveyor nos B4 /
151/STR - 1/B/M- 177 1 of 4 0 B5 002 / 01.04.11 1

2 of 4 0 do 002 / 01.04.11 1
3 of 4 0 do 002 / 01.04.11 1
4 of 4 0 do 002 / 01.04.11

157 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED
Dwg. Submission by
SKSL vide letter no &
Sl. Drawing No Sheet No Rev Description date to SECL/CMPDI ga fab
No.

1 1
Marking & fabrication detail of non standard stringer & short post for conv
151/STR - 1/B/M- 111 1 of 4 0 no B4 & B5 2420 / 26.09.11 1

2 of 4 0 do 2420 / 26.09.11 1
3 of 4 0 do 2420 / 26.09.11 1
4 of 4 0 do 2420 / 26.09.11 1 1
151/ FRM - 1/B/M- 124 1 0 Fabrication detail of Head pulley frame for conv no B4, B5, B6 & B7 2960 / 21.11.11 1 1
Marking & detail of chute feeding conveyor nos B4, B5, B6 & B7 from tripper
151/ CHUT - 1/B/M- 201 1 of 1 0 conveyor nos B1, B2, B3 3155 / 07.12.11 1 1

151/ FRM - 1/B/M- 157 1 0 Fabrication detail of Drive Base frame for conv no B4, B5, B6 & B7 4121 / 18.02.12

151/ TTSF - 1/B/M- 105 1 of 1 0 Fabrication detail of Take up trolley supporting frame for conv no B4, B5, 246 / 20.04.12
B6 & B7

151/ TUP - 1/B/M- 155 1 of 2 0 Fabrication detail of Sheave supporting frame for conv no B4, B5, B6 & B7 1299 / 29.06.12 1 1

2 of 2 0 do 1299 / 29.06.12 1
151/ TUP - 1/B/M- 182 1 of 2 0 Arrangement & detail of Take up for conveyor nos B4, B5, B6 & B7 1299 / 29.06.12 1 1
2 of 2 0 do 1299 / 29.06.12 1
151/ MG - 1/B/M- 192 1 0 Fabrication detail of Head pulley guard for conv no B4, B5, B6 & B7 1299 / 29.06.12 1 1
Fabrication Drawing of standard 1 1
stringer post
151/STR - 1/B/M- 122 1 of 2 0 Detail of standard stringer with short post & tie for 1200 mm & 1600 mm 2809 / 01.12.10 1
width belt conveyor.
2 do 3667 / 12.12.12
2 of 2 0 do 2809 / 01.12.10
2 do 3667 / 12.12.12

Fabrication Drawing for skirt 1 1


151/ SKT - 1/B/M- 150 1 of 3 0 Fabrication Detail of skirt for1600 mm belt width conveyors 3789 / 24.01.12 1
2 of 3 0 do 3789 / 24.01.12 1
3 of 3 0 do 3789 / 24.01.12
1 1
151/ SKT - 1/B/M- 151 1 of 3 0 Fabrication Detail of skirt for1200 mm belt width conveyors 4121 / 18.02.12 1
2 of 3 0 do 4121 / 18.02.12 1
3 of 3 0 do 4121 / 18.02.12

Fabrication Drawing for Inspection


Door
Fabrication Detail of Inspection Door with schedule size-(500X500, 500X400
151/ CHUT - 1/B/M- 179 1 of 1 0 & 400X300) 1299 / 29.06.12 1 1

Fabrication Drawing for Hood

151/ HOOD - 1/B/M- 153 1 of 1 0 Arrangement & detail of conveyor hood for 1600 B/W conveyor 2580 / 01.10.12 1 1
151/ HOOD - 1/B/M- 154 1 of 1 0 Arrangement & detail of conveyor hood for 1200 B/W conveyor 2580 / 01.10.12 1 1

158 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

dwg sht dwg sht dwg sht dwg sht dwg sht dwg sht

1705 / 13.09.10 614 / 17.09.10 4 days


2439 / 08.09.11 1 1 # H -985 / 16.09.11 1 1

1705 / 13.09.10 614 / 17.09.10 4 days

2439 / 08.09.11 1 1 H -985 / 16.09.11 1 1

2876 / 21.05.13 1984/10/11.06.13

2439 / 08.09.11 1 # H -985 / 16.09.11 1

2876 / 21.05.13 1984/10/11.06.13

1705 / 13.09.10 1 1 614 / 17.09.10 1 1 4 days


2885/03/04.06.13 970 / 07.06.13

1705 / 13.09.10 1 614 / 17.09.10 1 4 days


2885/03/04.06.13 970 / 07.06.13

1705 / 13.09.10 1 614 / 17.09.10 1 4 days

1705 / 13.09.10 1 1 614 / 17.09.10 1 1 4 days


2885/03/04.06.13 970 / 07.06.13

1705 / 13.09.10 1 614 / 17.09.10 1 4 days


2885/03/04.06.13 970 / 07.06.13

159 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

1705 / 13.09.10 1 1 614 / 17.09.10 1 1 4 days

1705 / 13.09.10 1 614 / 17.09.10 1 4 days

1705 / 13.09.10 1 1 614 / 17.09.10 1 1 4 days

1705 / 13.09.10 1 614 / 17.09.10 1 4 days

1705 / 13.09.10 1 614 / 17.09.10 1 4 days

1705 / 13.09.10 1 614 / 17.09.10 1 4 days

1747 / 23.09.10 1 1 670 / 01.10.10 1 1 8 days

1747 / 23.09.10 1 670 / 01.10.10 1 8 days

2036/ 18.01.11 1127/ 25.01.11 7 days

2884 / 31.05.13 969 / 07.06.13


2036/ 18.01.11 1127/ 25.01.11 7 days

2884 / 31.05.13 969 / 07.06.13


2036/ 18.01.11 1127/ 25.01.11 7 days

2884 / 31.05.13 969 / 07.06.13

1026/30.10.12

1026/30.10.12

160 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

1355 / 13.12.10 1 1 987 / 17.12.10. 1 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1747 / 23.09.10 670 / 01.10.10


2870 / 13.05.13 1 1 924 / 15.05.13 1 1
2870 / 13.05.13 1 924 / 15.05.13 1
2018/ 10.01.11 1 1 1128/ 25.01.11 1 1 15 days
2018/ 10.01.11 1 1128/ 25.01.11 1 15 days

1355 / 13.12.10 1 1 987 / 17.12.10. 1 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1747 / 23.09.10 670 / 01.10.10 8 days

161 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2870 / 13.05.13 1 1 924 / 15.05.13 1 1


2870 / 13.05.13 1 924 / 15.05.13 1
2018/ 10.01.11 1 1 1128/ 25.01.11 1 1 15 days

1355 / 13.12.10 1 1 987 / 17.12.10. 1 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1355 / 13.12.10 1 987 / 17.12.10. 1 4 days

1747 / 23.09.10 670 / 01.10.10 8 days


2870 / 13.05.13 1 1 924 / 15.05.13 1 1
2870 / 13.05.13 1 924 / 15.05.13 1

2018/ 10.01.11 1 1 1128/ 25.01.11 1 1 15 days

2981 / 03.11.10 1 1 840 / 18.11.10 1 1 15 days

2018/ 10.01.11 1 1 1128/ 25.01.11 1 1 15 days

1763 / 04.10.10 1 1 717 / 12.10.10 1 1 8 days


2013 / 11.06.13 997 / 17.06.13

1763 / 04.10.10 1 717 / 12.10.10 1 8 days


2013 / 11.06.13 997 / 17.06.13

1763 / 04.10.10 1 717 / 12.10.10 1 8 days


2013 / 11.06.13 997 / 17.06.13

1763 / 04.10.10 1 1 717 / 12.10.10 1 1 8 days


2013 / 11.06.13 997 / 17.06.13

162 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

1763 / 04.10.10 1 717 / 12.10.10 1 8 days


2013 / 11.06.13 997 / 17.06.13

1763 / 04.10.10 1 717 / 12.10.10 1 8 days


2013 / 11.06.13 997 / 17.06.13

2603 / 26.04.12 2898 / 24/25.06.13 1 1 1021 / 26.06.13 1 1

2612 / 14.05.12

1763 / 04.10.10 1 1 717 / 12.10.10 1 1 8 days

1763 / 04.10.10 1 717 / 12.10.10 1 8 days

1763 / 04.10.10 1 717 / 12.10.10 1 8 days

1763 / 04.10.10 1 717 / 12.10.10 1 8 days

2981 / 03.11.10 840 / 18.11.10 15 days

2870 / 13.05.13 1 1 924 / 15.05.13 1 1


2870 / 13.05.13 1 924 / 15.05.13 1

2613 / 14.05.12 2882 / 27.05.13 1 1 204 / 31.05.13


2613 / 14.05.12 2882 / 27.05.13 1 204 / 31.05.13
2613 / 14.05.12 2882 / 27.05.13 1 204 / 31.05.13
2613 / 14.05.12 2882 / 27.05.13 1 204 / 31.05.13
2613 / 14.05.12 2882 / 27.05.13 1 204 / 31.05.13
2613 / 14.05.12 2882 / 27.05.13 1 204 / 31.05.13
2613 / 14.05.12 2882 / 27.05.13 1 204 / 31.05.13

1355 / 13.12.10 987 / 17.12.10. 4 days

2870 / 13.05.13 1 1 924 / 15.05.13 1 1

1355 / 13.12.10 987 / 17.12.10. 4 days

2870 / 13.05.13 1 924 / 15.05.13 1

2616 / 10.05.12

2657 / 12.07.12
2695 / 31.10.12
2783/04-07.02.13 1 1 H - 694 / 11.02.13 1 1

163 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2870 / 13.06.13 1 1 924 / 15.05.13 1 1

2870 / 13.06.13 1 924 / 15.05.13 1

2898 / 24/25.06.13 1 1 1021 / 26.06.13 1 1

2786/14/15.02.13 1 1 1419 / 18.02.13 1 1

2786/14/15.02.13 1 1419 / 18.02.13 1

2786/14/15.02.13 1 1419 / 18.02.13 1

2786/14/15.02.13 1 1419 / 18.02.13 1

2786/14/15.02.13 1 1419 / 18.02.13 1

2786/14/15.02.13 1 1419 / 18.02.13 1

2786/14/15.02.13 1 1419 / 18.02.13 1

2772/ 30.01.13 1 1 H - 670 / 01.02.13 1 1

2772/ 30.01.13 1 H - 670 / 01.02.13 1

2772/ 30.01.13 1 H - 670 / 01.02.13 1

2772/ 30.01.13 1 1 H - 670 / 01.02.13 1 1

2772/ 30.01.13 1 H - 670 / 01.02.13 1

2772/ 30.01.13 1 H - 670 / 01.02.13 1

2772/ 30.01.13 1 1 H - 670 / 01.02.13 1 1

2772/ 30.01.13 1 H - 670 / 01.02.13 1

2772/ 30.01.13 1 1

2772/ 30.01.13 1 1 H - 670 / 01.02.13 1 1

2772/ 30.01.13 1 H - 670 / 01.02.13 1

164 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2772/ 30.01.13 1 H - 670 / 01.02.13 1

2858 / 12.04.13 1 1 860 / 17.04.13 1 1

2858 / 12.04.13 1 1 860 / 17.04.13 1 1

2744 / 21/26.12.12 1 1 H - 603 / 02.01.13 1 1

165 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2744 / 21/26.12.12 1 H - 603 / 02.01.13 1

2744 / 21/26.12.12 1 1 H - 603 / 02.01.13 1 1

2744 / 21/26.12.12 1 H - 603 / 02.01.13 1

2718 / 11.12.12 1 1 H - 572 / 12.12.12 1 1

2718 / 11.12.12 1 H - 572 / 12.12.12 1

2718 / 11.12.12 1 1 H - 572 / 12.12.12 1 1

2718 / 11.12.12 1 H - 572 / 12.12.12 1

2718 / 11.12.12 1 1 H - 572 / 12.12.12 1 1

2718 / 11.12.12 1 H - 572 / 12.12.12 1

2718 / 11.12.12 1 1 H - 572 / 12.12.12 1 1

CANCELED

2718 / 11.12.12 1 H - 572 / 12.12.12 1

2698 / 10.11.12 1 1 522 / 17.11.12 1 1


2698 / 10.11.12 1 522 / 17.11.12 1

2040 / 20.01.11 1126/ 25.01.11 5 days


2625/ 28.05.12 1 1
1040 / 03.07.13

166 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2040 / 20.01.11 1126/ 25.01.11 5 days


2625/ 28.05.12 1
1040 / 03.07.13

1747 / 23.09.10 1 1 670 / 01.10.10 1 1 8 days

1747 / 23.09.10 1 670 / 01.10.10 1 8 days

1747 / 23.09.10 1 670 / 01.10.10 1 8 days

1747 / 23.09.10 1 1 670 / 01.10.10 1 1 8 days

1747 / 23.09.10 1 1 670 / 01.10.10 1 1 8 days

2040 / 18.01.11 1 1 1126/ 25.01.11 1 1 7 days

2040 / 18.01.11 1 1126/ 25.01.11 1 7 days

2040 / 18.01.11 1 1126/ 25.01.11 1 7 days

2040 / 18.01.11 1 1126/ 25.01.11 1 7 days

2014 / 06.01.11

2245 / 07.04.11 1 1 H -745 / 13.04.11 1 1 6 days

2040 / 18.01.11 1 1 1126/ 25.01.11 1 1 7 days

167 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2040 / 18.01.11 1 1126/ 25.01.11 1 7 days

2040 / 18.01.11 1 1126/ 25.01.11 1 7 days

2040 / 18.01.11 1 1126/ 25.01.11 1 7 days

2014 / 06.01.11

2245 / 07.04.11 1 1 H -745 / 13.04.11 1 1 6 days

2014 / 06.01.11

2245 / 07.04.11 1 1 H -745 / 13.04.11 1 1 6 days

2981 / 03.11.10 1 1 840 / 18.11.10 1 1 15 days

2981 / 03.11.10 1 840 / 18.11.10 1 15 days

2981 / 03.11.10 1 1 840 / 18.11.10 1 1 15 days

2981 / 03.11.10 1 840 / 18.11.10 1 15 days

2216 / 26.03.11 1 1 H -712 / 31.03.11 1 1 5 days

2898 / 24/25.06.13 1 1 1021 / 26.06.13 1 1

2898 / 24/25.06.13 1 1021 / 26.06.13 1

2585 / 01.03.12
2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

168 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2585 / 01.03.12
2614 / 14.05.12

2585 / 01.03.12
2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12
2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12

2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12

2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12
2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12

2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12

2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

2585 / 01.03.12

2614 / 14.05.12

2871 / 13.05.13 H - 931 / 16.05.13

169 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2585 / 01.03.12

2614 / 14.05.12

2297 / 03.05.11

2382 / 25.06.11
Appvd 1 1 949 / 06.08.11 1 1

2297 / 03.05.11

2382 / 25.06.11
Appvd 1 1 949 / 06.08.11 1 1

2606 / 08.05.12

2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12

2926 / 09/11.07.13 1 1078 /15.07.13 1

2606 / 08.05.12
2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1 1078 /15.07.13 1 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1078 /15.07.13 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1078 /15.07.13 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1078 /15.07.13 1

170 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2606 / 08.05.12 2926 / 09/11.07.13 1 1078 /15.07.13 1

2606 / 08.05.12 2926 / 09/11.07.13 1 1078 /15.07.13 1

2641 / 16.06.12 2 13

2607 / 09.05.12
2903/27.06.13 1 1 1042 / 04.07.13 1 1

2607 / 09.05.12

2903/27.06.13 1 1 1042 / 04.07.13 1 1

171 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2215 / 26.03.11 1 1 H -713/ 31.03.11 1 1 5 days


2215 / 26.03.11 1 H -713/ 31.03.11 1 1
2215 / 26.03.11 1 H -713/ 31.03.11 1 1
2215 / 26.03.11 1 H -713/ 31.03.11 1 1
2215 / 26.03.11 1 H -713/ 31.03.11 1 1

2482/ 23.11.11 1 1 1070 / 05.12.11 1 1

2482/ 23.11.11 1 1070 / 05.12.11 1


2482/ 23.11.11 1 1070 / 05.12.11 1
2482/ 23.11.11 1 1070 / 05.12.11 1
2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1
2337 / 03.06.11

172 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2478/ 11.11.11 1 1060 / 22.11.11 1


2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1

2215 / 26.03.11 1 1 H -713/ 31.03.11 1 1 5 days


2215 / 26.03.11 1 H -713/ 31.03.11 1 1
2215 / 26.03.11 1 H -713/ 31.03.11 1 1

2482/ 23.11.11 1 1 1070 / 05.12.11 1 1

2482/ 23.11.11 1 1070 / 05.12.11 1


2482/ 23.11.11 1 1070 / 05.12.11 1
2482/ 23.11.11 1 1070 / 05.12.11 1
2337 / 03.06.11

2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1
2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1
2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1

2215 / 26.03.11 1 1 H -713/ 31.03.11 1 1 5 days


2215 / 26.03.11 1 H -713/ 31.03.11 1 1
2215 / 26.03.11 1 H -713/ 31.03.11 1 1
2215 / 26.03.11 1 H -713/ 31.03.11 1 1

2482/ 23.11.11 1 1 1070 / 05.12.11 1 1

2482/ 23.11.11 1 1070 / 05.12.11 1


2482/ 23.11.11 1 1070 / 05.12.11 1

173 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2482/ 23.11.11 1 1070 / 05.12.11 1


2482/ 23.11.11 1 1070 / 05.12.11 1
2337 / 03.06.11

2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1
2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1
2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1

2215 / 26.03.11 1 1 H -713/ 31.03.11 1 1 5 days

2215 / 26.03.11 1 H -713/ 31.03.11 1 5 days


2215 / 26.03.11 1 H -713/ 31.03.11 1 5 days
2215 / 26.03.11 1 H -713/ 31.03.11 1 5 days
2215 / 26.03.11 1 H -713/ 31.03.11 1 5 days
2215 / 26.03.11 1 H -713/ 31.03.11 1 5 days

2482/ 23.11.11 1 1 1070 / 05.12.11 1 1

2337 / 03.06.11
2478/ 11.11.11 1 1060 / 22.11.11 1

174 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

175 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2500 / 17.03.12 1 1 38 / 11.04.12 1 1

2500 / 17.03.12 1 38 / 11.04.12 1

2550/ 20.01.12 1 1 1169/ 06.02.12 1 1

2550/ 20.01.12 1 1169/ 06.02.12 1

2550/ 20.01.12 1 1169/ 06.02.12 1


2550/ 20.01.12 1 1169/ 06.02.12 1
2550/ 20.01.12 1 1169/ 06.02.12 1
2550/ 20.01.12 1 1169/ 06.02.12 1

176 of 245
STATUS OF MECHANICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

DIPKA MAIN CHP


EASTERN COALFIELDS LIMITED
Dwg. commented ga fab Dwg. approval from ga fab Dwg. approval from
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide Time taken by SECL
vide letter no & date letter no & date letter no & date ga fab after receipt of
approval from
CMPDI

2018/ 10.01.11 1 1 1128/ 25.01.11 1 1 15 days

2018/ 10.01.11 1 1128/ 25.01.11 1 15 days

177 of 245
APPROVAL STATUS OF MECHANICAL DOCUMENTS FOR DIPKA MAIN CHP (AS ON 04.08.11)

Date of submission by Date of approval


Sl. Sheet
Document No Rev Description SKSL vide letter no & from CMPDI to SECL
No. No. date to CMPDI vide letter no & date

1 151 / CONV / D/A/M - 01 - 0 Conveyor calculations 3069 / 21.12.09


151 / CAL / VOL _ TR. Loading Hopper /
2 01 - 0 Calculation of volume for Truck loading hoppers 3237 / 06.01.10

151 / CAL / VOL _ TR. Loading Hopper /


3 01 - 0 Calculation of volume for Truck receiving hoppers 3237 / 06.01.10

4 151 / CAL / VOL _ RCC Bunker / 01 - 0 Calculation of volume for RCC Overhead Surge Bunkers 3237 / 06.01.10
5 - 1 do 3408 / 21.01.10
151 / CAL / VOL _ TR. Loading Hopper /
6 02 - Calculation of volume for Truck loading hoppers 3408 / 21.01.10

151 / CAL / VOL _ TR. Receiving Hopper / - 0 Calculation of volume for Truck loading hoppers 3237 / 06.01.10
03
- 1 3408 / 21.01.10

Page 178 of 245


APPROVAL STATUS OF MECHANICAL DOCUMENTS FOR DIPKA MAIN CHP (AS ON 04.08.11)

Date of approval
from SECL to SKSL
vide letter no & date

491 / 13.08.10

491 / 13.08.10

Page 179 of 245


STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

1 151/SLHT-3/A/E-001 1 of 1 0 Single line diagram for 17 panel 3.3 KV switch board Substation near overhead bunkers (3.3 1524 / 31.07.09
KV S/S No.4)
do 1 do 2074 / 05.10.10 1 1

2 151/SLHT-3/A/E-002 1 of 1 0 Single line diagram for 10 panel 3.3 KV switch board Substation near drive house of Conv. 1524 / 31.07.09
B12/B13 (3.3 KV S/S No.2)
do 1 do 2074 / 05.10.10 1 1

3 151/SLHT-3/A/E-003 1 of 1 0 Single line diagram for 11 panel 3.3 KV switch board Substation near drive house of Conv. 1524 / 31.07.09
B1, B2, B3 (3.3 KV S/S No.1)
do 1 do 2074 / 05.10.10 1 1

4 151/SLHT-3/A/E-004 1 of 1 0 Single line diagram for 7 panel 3.3 KV switch board Substation at truck receiving station 1524 / 31.07.09
near tail end of Conv. B8, B9 (3.3 KV Substation No. 3)
do 1 do 2074 / 05.10.10 1 1
Single line diagram for 20 panel 6.6 KV switch board Substation at truck receiving station
5 151/SLHT-3/A/E-005 1 of 1 0 near tail end of Conv. P2, Q2, R2 (6.6 KV Substation No.2) 1524 / 31.07.09

do 1 do 2074 / 05.10.10 1 1
Single line diagram for 7 panel 6.6 KV switch board Substation at truck receiving station
6 151/SLHT-3/A/E-006 1 of 1 0 near tail end of Conv. P1, Q1, R1 (6.6 KV Substation No.3). 1524 / 31.07.09

do 1 do 2074 / 05.10.10 1 1

7 151/SLHT-3/A/E-007 1 of 1 0 Single line diagram for 6 panel 6.6 KV switch board Substation at truck receiving station 1524 / 31.07.09
near tail end of Conv. C7 & C8 (6.6 KV Substation No.4)
do 1 do 2074 / 05.10.10 1 1

8 151/SLHT-3/A/E-008 1 of 1 0 Single line diagram for 19 panel 6.6 KV switch board Substation near drive house of 1524 / 31.07.09
Conv.P1, Q1, R1 (6.6 KV Substation No.1)
do 1 do 2074 / 05.10.10 1 1

9 151/SLLT-3/A/E-009 1 of 1 0 415V Power Dist Board -I (PDB-I) Sub Stn near D/H of Conv B1, B2, B3 (3.3 KV S/S No.1) 2155 / 24.09.09

1 of 2 1 do 2255 / 13.10.10 1 1
2 of 2 1 do 2255 / 13.10.10 1

10 151/SLLT-3/A/E-010 1 of 1 0 415V Power Dist Board -II (PDB-II) Sub Stn near D/H of Conv B12/ B13 (3.3 KV S/S No.2) 2155 / 24.09.09

1 of 2 1 do 2255 / 13.10.10 1 1
2 of 2 1 do 2255 / 13.10.10 1

11 151/SLLT-3/A/E-011 1 of 1 0 415V Power Dist Board -III (PDB-III) Sub Stn near D/H of Conv B8/ B9 (3.3 KV S/S No.3) 2155 / 24.09.09

1 of 2 1 do 2255 / 13.10.10 1 1
2 of 2 1 do 2255 / 13.10.10 1

12 151/SLLT-3/A/E-012 1 of 4 0 415V Power Dist Board -IV (PDB-IV) Sub Stn near overhead Bunkers (3.3 KV S/S No.4) 2155 / 24.09.09

1 do 2255 / 13.10.10 1 1
2 of 4 0 do 2155 / 24.09.09
1 do 2255 / 13.10.10 1
3 of 4 0 do 2155 / 24.09.09
1 do 2255 / 13.10.10 1
4 of 4 1 do 2255 / 13.10.10
13 151/SLLT-3/A/E-013 1 of 2 0 415V Power Dist Board -V (PDB-V) at 6.6 KV S/S-1 2155 / 24.09.09 1
1 do 2255 / 13.10.10 1
2 of 2 0 do 2155 / 24.09.09
1 do 2255 / 13.10.10 1
14 151/SLLT-3/A/E-014 1 of 3 0 415V Power Dist Board-VI(PDB-VI)at 6.6 KV S/S No.2 2155 / 24.09.09
1 do 2255 / 13.10.10 1 1
2 of 3 0 do 2155 / 24.09.09
1 do 2255 / 13.10.10 1
3 of 3 1 do 2255 / 13.10.10 1
15 151/SLLT-3/A/E-015 1 of 2 0 415V Power Dist Board-VII(PDB-VII)at 6.6 KV S/S No.3 2155 / 24.09.09
1 do 2255 / 13.10.10 1 1
2 of 2 0 do 2155 / 24.09.09
1 do 2255 / 13.10.10 1
16 151/SLLT-3/A/E-016 1 of 2 0 415V Power Dist Board-VIII(PDB-VIII)at 6.6 KV S/S No.4 2155 / 24.09.09
1 do 2255 / 13.10.10 1 1
2 of 2 0 do 2155 / 24.09.09
1 do 2255 / 13.10.10 1

17 151/SLLT-3/A/E-017 1 of 1 0 Single line diagram of main lighting distribution board - II at substation Iii of 3.3 kv system 2773 / 29.11.10 1 1

1 do 2834 / 12.11.11

180 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

18 151/SLLT-3/A/E-018 1 of 1 0 Single line diagram of main lighting distribution board - III at substation II of 6.6 kv system 2773 / 29.11.10 1 1

2 do 2834 / 12.11.11

19 151/SLLT-3/A/E-019 1 of 1 0 Single line diagram of main lighting distribution board - IV at substation III of 6.6 kv system 2773 / 29.11.10 1 1

2 do 2834 / 12.11.11
Single line diagram of 415V Main Power Sub Dist. Board (PSDB-I, PSDB-II, PSDB-III, PSDB-IV)
20 151/SLLT-3/A/E-020 1 of 1 0 below overhead Bunker No.-I & II. 2779 / 26.11.09 1 1

21 151/SLLT-3/A/E-021 1 of 1 0 Single Line Diagram of 415V Main Power Sub Dist. Board (PSDB-V, PSDB-VI) Feeder floor of 2779 / 26.11.09 1 1
truck receiving hopper.

Single Line Diagram of 415V Main Power Sub Dist. Board (PSDB-VII, PSDB-VIII, PSDB-IX,
22 151/SLLT-3/A/E-022 1 of 1 0 PSDB-X PSDB-XI, PSDB-XII, PSDB-XIII, PSDB-XIV) near tail end of Conv. P2, Q2, R2 2779 / 26.11.09 1 1

1 do 55 /18.03.13

23 151/SLLT-3/A/E-023 1 of 1 0 Single line diagram of main lighting distribution board - I at substation Iv of 3.3 kv system 2773 / 29.11.10 1 1

1 do
2 do 2834 / 12.11.11

24 151/SLLT-3/A/E-024 1 of 1 0 Single line diagram of lighting distribution board - I at substation II of 3.3 kv system 2773 / 29.11.10 1 1

1 do 2834 / 12.11.11

25 151/SLLT-3/A/E-025 1 of 1 0 Single line diagram of lighting distribution board - II at substation I of 3.3 kv system 2773 / 29.11.10 1 1

1 do 2834 / 12.11.11

26 151/SLLT-3/A/E-026 1 of 1 0 Single line diagram of lighting distribution board - III at substation I of 6.6 kv system 2773 / 29.11.10 1 1

2 do 2834 / 12.11.11

27 151/SLLT-3/A/E-027 1 of 1 0 Single line diagram of lighting distribution board - IV at substation IV of 6.6 kv system 2773 / 29.11.10 1 1

2 do 2834 / 12.11.11
28 151/SLLT-3/A/E-028 1 of 17 0 Single line diagram of sub lighting distribution board SLDB 5 at SS I 3.3 kv system 3054 / 20.12.10
1 do 1934 / 18.08.11 1 1
Single line diagram of sub lighting distribution board SLDB 6, SLDB 7 at SS II, SS III 3.3 kv
2 of 17 0 3054 / 20.12.10
system
1 do 1934 / 18.08.11 1

3 of 17 0 Single line diagram of sub lighting distribution board SLDB 8 at SS IV 3.3 kv system 3054 / 20.12.10

1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 9, FP 1 for conv. B8, B9 3.3 kv
4 of 17 0 system 3054 / 20.12.10

1 do 1934 / 18.08.11 1

5 of 17 0 Single line diagram of sub lighting distribution board SLDB 10, SLDB 11, FP 1 for DH of conv. 3054 / 20.12.10
B8, B9, Lighting mast 3.3 kv system
1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 21, SLDB 12 for Bunker 2 &
6 of 17 0 outdoor area 3.3 kv system 3054 / 20.12.10

1 do 1934 / 18.08.11 1

7 of 17 0 Single line diagram of sub lighting distribution board SLDB 13, SLDB 14 at TH 9 3.3 kv 3054 / 20.12.10
system
1 do 1934 / 18.08.11 1

8 of 17 0 Single line diagram of sub lighting distribution board SLDB 15, SLDB 16 for conv. B10, B11 3054 / 20.12.10
3.3 kv system
1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 17, SLDB 18 for DH of conv. B10,
9 of 17 0 B11, Tripper gallery & B4, B5 3.3 kv system 3054 / 20.12.10

1 do 1934 / 18.08.11 1

10 of 17 0 Single line diagram of sub lighting distribution board SLDB 19, SLDB 20 for Bunker 1, 3054 / 20.12.10
Tripper gallery & B6, B7 3.3 kv system
1 do 1934 / 18.08.11 1

181 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

11 of 17 0 Single line diagram of sub lighting distribution board SLDB 22, SLDB 23 for lighting mast, 3054 / 20.12.10
outdoor area 3.3 kv system
1 do 1934 / 18.08.11 1

12 of 17 0 Single line diagram of sub lighting distribution board SLDB 34, SLDB 35 for conv. B12, B13 3054 / 20.12.10
& DH of conv. B12, B13 3.3 kv system
1 do 1934 / 18.08.11 1

13 of 17 0 Single line diagram of sub lighting distribution board SLDB 36, SLDB 37 at TH 11 3.3 kv 3054 / 20.12.10
system
1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 38, SLDB 39 for conv. B1, B2 3.3
14 of 17 0 3054 / 20.12.10
kv system
1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 40, SLDB 41 for conv. B3 & DH
15 of 17 0 3054 / 20.12.10
of conv. B1, B2, B3 3.3 kv system
1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 42, SLDB 56 for TH 8 & Truck
16 of 17 0 3054 / 20.12.10
loading station 3.3 kv system
1 do 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board FP 6, FP 7 for conv. B12, B13 3.3 kv
17 of 17 0 system 3054 / 20.12.10

1 do 1934 / 18.08.11 1
29 151/SLLT-3/A/E-029 1 of 16 1 Single line diagram of sub lighting distribution board SLDB 1 at SS I 6.6 kv system 1934 / 18.08.11 1 1
2 of 16 1 Single line diagram of sub lighting distribution board SLDB 2 at SS II 6.6 kv 1934 / 18.08.11 1
3 of 16 1 Single line diagram of sub lighting distribution board SLDB 3 at SS III 6.6 kv 1934 / 18.08.11 1
4 of 16 1 Single line diagram of sub lighting distribution board SLDB 4 at SS IV 6.6 kv 1934 / 18.08.11 1
Single line diagram of sub lighting distribution board SLDB 26, SLDB 27 for conv C1, C2, C3,
5 of 16 0 C4 & TH 1 6.6 kv system 1934 / 18.08.11 1

Single line diagram of sub lighting distribution board SLDB 24, SLDB 25 at TH 7 6.6 kv
6 of 16 1 system 1934 / 18.08.11 1

Single line diagram of sub lighting distribution board SLDB 2850, SLDB 29, SLDB 43 at TH 2,
7 of 16 1 TH 3 & conv P1 6.6 kv system 1934 / 18.08.11 1

Single line diagram of sub lighting distribution board FP 8 , FP 5 for conv P2, Q2, R2 6.6 kv
8 of 16 1 system 1934 / 18.08.11 1

Single line diagram of sub lighting distribution board SLDB 32, SLDB 53 for DH of conv P2,
9 of 16 1 Q2, R2 6.6 kv system 1934 / 18.08.11 1

10 of 16 1 Single line diagram of sub lighting distribution board SLDB 30, SLDB 55 for truck receiving 1934 / 18.08.11 1
station 1, 2 - 6.6 kv system

11 of 16 1 Single line diagram of sub lighting distribution board SLDB 44, SLDB 45 for conv Q1, R1 6.6 1934 / 18.08.11 1
kv system

12 of 16 1 Single line diagram of sub lighting distribution board SLDB 46, SLDB 47 for DH1, DH 2 of 1934 / 18.08.11 1
conv P1, Q1, R1 6.6 kv system

13 of 16 1 Single line diagram of sub lighting distribution board SLDB 48, SLDB 49 for conv. C5, C6, C7, 1934 / 18.08.11 1
C8 & TH 4 6.6 kv system
Single line diagram of sub lighting distribution board FP 4 , SLDB 31B for P1, Q1, R1 & R2 6.6
14 of 16 1 kv system 1934 / 18.08.11 1

15 of 16 1 Single line diagram of sub lighting distribution board FP 2 , FP3 for P1, Q1, R1 6.6 kv system 1934 / 18.08.11 1

15A of 16 0 Single line diagram of sub lighting distribution board SLDB 31, SLDB 31A for conv P2, Q2 1934 / 18.08.11 1
6.6 kv system
Single line diagram of sub lighting distribution board FP33 for outdoor area of 6.6 kv
16 of 16 0 system 1934 / 18.08.11 1

30 151/SLLT-3/A/E-044 1 of 9 0 Single line diagram of emergency sub lighting distribution board 6.6 kv for S/S I 3054 / 20.12.10 1 1
1 do 3479 / 28.12.11
2 of 9 0 Single line diagram of emergency sub lighting distribution board 6.6 kv for S/S II 3054 / 20.12.10 1
1 do 3479 / 28.12.11
3 of 9 0 Single line diagram of emergency sub lighting distribution board 6.6 kv for S/S III 3054 / 20.12.10 1
1 do 3479 / 28.12.11
4 of 9 0 Single line diagram of emergency sub lighting distribution board 6.6 kv for S/S IV 3054 / 20.12.10 1
1 do 3479 / 28.12.11
5 of 9 0 Single line diagram of emergency sub lighting distribution board 3.3 kv for S/S I 3054 / 20.12.10 1
1 do 3479 / 28.12.11
6 of 9 0 Single line diagram of emergency sub lighting distribution board 3.3 kv for S/S II 3054 / 20.12.10 1
1 do 3479 / 28.12.11
7 of 9 0 Single line diagram of emergency sub lighting distribution board 3.3 kv for S/S III 3054 / 20.12.10 1
1 do 3479 / 28.12.11

182 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

8 of 9 0 Single line diagram of emergency sub lighting distribution board 3.3 kv for S/S IV 3054 / 20.12.10 1
1 do 3479 / 28.12.11
9 of 9 0 Single line diagram of feeder piller for 3.3 kv & 6.6 kv for S/S II, S/S III & S/S IV 3054 / 20.12.10 1
1 do 3479 / 28.12.11

31 151/SLLT-3/A/E-158 1 of 1 0 Single line diagram of interlock circuit 2773 / 29.11.10 1 1


0 do 2834 / 12.11.11

32 151/CABL-1/A/E-039 1 of 1 0 Equipment & cable tray layout of Substation-I near drive house of Conv-B1, B2, B3 (3.3 KV 2155 / 24.09.09
S/S No-I)
1 do 2255 / 13.10.10
2 do 2451 / 29.09.11 1 1
Equipment & cable tray layout of Substation-II near drive house of Conv-B12, B13 (3.3 KV
33 151/CABL-1/A/E-040 1 of 1 0 S/S No-II) 2155 / 24.09.09

1 do 2255 / 13.10.10
2 do 2451 / 29.09.11 1 1
Equipment & cable tray layout of Substation-III near drive house of Conv-B8, B9 (3.3 KV S/S
34 151/CABL-1/A/E-041 1 of 1 0 No-III) 2155 / 24.09.09

1 do 2255 / 13.10.10
2 do 2451 / 29.09.11 1 1
Equipment & cable tray layout of Substation-IV near the overhead Bunker (3.3 KV S/S No-
35 151/CABL-1/A/E-042 1 of 1 0 IV) 2155 / 24.09.09

1 do 2255 / 13.10.10
2 do 2451 / 29.09.11 1 1
36 151/CABL-1/A/E-043 1 of 1 0 Equipment & Cable Tray layout of Conv. B1, B2, B3. 3376 / 18.01.10 1 1
1 do 4260 / 01.03.12
37 151/CABL-1/A/E-046 1 of 2 0 Equipment & Cable Tray layout of Conv. B8 & B9. 3376 / 18.01.10 1 1
1 do 4260 / 01.03.12
2 of 2 0 do 3376 / 18.01.10 1
1 do 4260 / 01.03.12
38 151/CABL-1/A/E-047 1 of 1 0 Equipment & Cable Tray Layout of B10 & B11 3457 / 28.01.10 1 1
39 151/CABL-1/A/E-048 1 of 2 0 Equipment & Cable Tray Layout of Convs. B12 & B13 3457 / 28.01.10 1 1
2 of 2 0 do 3457 / 28.01.10 1
40 151/CABL-1/A/E-049 1 of 1 0 Equipment & Cable Tray Layout of Transfer house TH 1 3744 / 22.02.10
1 do 951 / 13.06.11
1 do 4258 / 01.03.12
1 of 2 2 do 4052 / 10.01.13 1 1
2 of 2 2 do 4052 / 10.01.13 1

41 151/CABL-1/A/E-050 1 of 1 0 Equipment & Cable Tray Layout of Transfer house TH 2 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
1 do 4258 / 01.03.12
1 of 2 2 do 5106 / 29.03.13
2 of 2 2 do 5106 / 29.03.13

42 151/CABL-1/A/E-051 1 of 1 0 Equipment & Cable Tray Layout of Transfer house TH 3 3744 / 22.02.10
1 do 951 / 13.06.11
1 do 4258 / 01.03.12
1 of 2 2 do 4948 / 15.03.13 1 1
2 of 2 2 do 4948 / 15.03.12 1
4948 / 15.03.13

43 151/CABL-1/A/E-052 1 of 1 0 Equipment & Cable Tray Layout of Transfer house TH 4 3936 / 09.03.10 1 1

Equipment & Cable Trench Layout of outdoor area: Burried cable Trench layout for 3.3 kv
44 151/CABL-1/A/E-053 1 of 2 0 area 1169 / 20.06.12 1 1

1 do 2317 / 13.09.12

2 of 2 0 Equipment & Cable Trench Layout of outdoor area: Burried cable Trench layout for 6.6 kv 1169 / 20.06.12 1
area
1 do 2317 / 13.09.12

45 151/CABL-1/A/E-054 1 of 1 0 Equipment & cable tray layout of 6.6 KV Substation-I near drive house of Conv P1, Q1, R1. 2155 / 24.09.09

1 do 2255 / 13.10.10 1 1
2 do 2717 / 02.11.11

46 151/CABL-1/A/E-055 1 of 1 0 Equipment & cable tray layout of 6.6 KV Substation-II near tail end of Conv P1, Q1, R1. 2155 / 24.09.09

183 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

1 do 2255 / 13.10.10 1 1
2 do 2717 / 02.11.11

47 151/CABL-1/A/E-056 1 of 1 0 Equipment & cable tray layout of 6.6 KV Substation-III near tail end of Conv P2, Q2, R2. 2155 / 24.09.09

1 do 2255 / 13.10.10 1 1
2 do 2717 / 02.11.11

48 151/CABL-1/A/E-057 1 of 1 0 Equipment & cable tray layout of 6.6 KV Substation-IV near tail end of Conv C7, C8 2155 / 24.09.09

1 do 2255 / 13.10.10 1 1
2 do 2717 / 02.11.11

49 151/CABL-1/A/E-058 1 of 1 0 Equipment & cable tray layout of Conv P1, Q1, R1. 4502 / 12.02.13 1 1

50 151/CABL-1/A/E-059 1 of 1 0 Equipment & cable tray layout of Conv P2, Q2, R2. 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
1 of 2 1 do 4258 / 01.03.12
2 of 2 1 do 4258 / 01.03.12
1 of 1 2 do 4948 / 15.03.13

51 151/CABL-1/A/E-061 1 of 1 0 Equipment & cable tray layout of Conv C1/ C2/ C3/ C4 3824 / 26.02.10
1 do 2965 / 13.12.10 1 1
52 151/CABL-1/A/E-062 1 of 1 0 Equipment & cable tray layout of Conv C5/ C6/ C7/ C8 3824 / 26.02.10
1 do 2965 / 13.12.10 1 1

53 151/CABL-1/A/E-122 1 of 1 0 Equipment & Cable Tray Layout of TH-7 3430 / 01.12.12 1 1

54 151/CABL-1/A/E-138 1 of 1 0 Equipment & Cable Tray Layout of TH-8 3457 / 28.01.10 1 1

55 151/CABL-1/A/E-139 1 of 1 0 Equipment & Cable Tray Layout of TH-9. 3376 / 18.01.10 1 1


1 do 3034 / 02.11.12
56 151/CABL-1/A/E-140 1 of 1 0 Equipment & Cable Tray Layout of TH-10. 3376 / 18.01.10 1 1
1 do 3034 / 02.11.12
57 151/CABL-1/A/E-141 1 of 1 0 Equipment & Cable Tray Layout of TH-11 3457 / 28.01.10 1 1

58 151/CABL-1/A/E-142 1 of 1 0 Equipment & Cable Tray Layout of DH of Conv.12 & Conv.13. 3376 / 18.01.10 1 1
1 do 3034 / 02.11.12
59 151/CABL-1/A/E-143 1 of 1 0 Equipment & Cable Tray Layout of DH of Conv. B8 & Conv. B9. 3376 / 18.01.10 1 1
1 do 3034 / 02.11.12
60 151/CABL-1/A/E-144 1 of 1 0 Equipment & Cable Tray Layout of DH of Conv. B10 & Conv. B11. 3457 / 28.01.10 1 1

61 151/CABL-1/A/E-145 1 of 1 0 Equipment & Cable Tray Layout of Bunker-1 & Bunker -2. 3457 / 28.01.10 1 1

62 151/CABL-1/A/E-148 1 of 1 0 Equipment & Cable Tray Layout of DH of Conv. P2, Q2, R2. 3824 / 26.02.10
1 do 2965 / 13.12.10 1 1

63 151/CABL-1/A/E-155 1 of 1 0 Equipment & Cable Tray Layout of Drive house 1 of Conveyor P1, R1. 3936 / 09.03.10 1 1

64 151/CABL-1/A/E-156 1 of 1 0 Equipment & Cable Tray Layout of Drive house 2 of Conveyor Q1 3936 / 09.03.10 1 1

65 151/ELPN-1/A/E-064 1 of 1 0 Earthing & lightning protection layout of 3.3 KV for Substation -I near drive house of Conv - 3167 / 31.12.09
B1,B2 & B3
1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
3 do 1847 / 28.05.12
Earthing & lightning protection layout of 3.3 KV for Substation -II near drive house of Conv-
66 151/ELPN-1/A/E-065 1 of 1 0 B12 & B13 3167 / 31.12.09

1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
3 do 1847 / 28.05.12
Earthing & ligjtning protection layout of 3.3 KV for Substation -III near drive house of Conv
67 151/ELPN-1/A/E-066 1 of 1 0 - B8 B9 3167 / 31.12.09

1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
3 do 1847 / 28.05.12
Earthing & lightning protection layout of 3.3 KV for Substation -IV near the overhead
68 151/ELPN-1/A/E-067 1 of 1 0 Bunker. 3167 / 31.12.09

184 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
3 do 1847 / 28.05.12
69 151/ELPN-1/A/E-068 1 of 1 0 Earthing & lightning protection of Conv –B1, B2, B3 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
70 151/ELPN-1/A/E-071 1 of 2 0 Earthing & Lightning Protection Layout of Convs. B8 & B9 3457 / 28.01.10 1 1
1 do 3652 / 11.01.12
2 of 2 0 do 3457 / 28.01.10 1
1 do 3652 / 11.01.12
71 151/ELPN-1/A/E-072 1 of 1 0 Earthing & Lightning Protection Layout of B10 & B11 3457 / 28.01.10 1 1
1 do 3652 / 11.01.12
72 151/ELPN-1/A/E-073 1 of 2 0 Earthing & Lightning Protection Layout of Convs. B12 & B13 3457 / 28.01.10 1 1
1 do 3652 / 11.01.12
2 of 2 0 do 3457 / 28.01.10 1
1 do 3652 / 11.01.12
73 151/ELPN-1/A/E-074 1 of 1 0 Earthing & Lightning Protection Layout of Transfer house TH1 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
1 do 3652 / 11.01.12
74 151/ELPN-1/A/E-075 1 of 1 0 Earthing & Lightning Protection Layout of Transfer house TH2 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
1 do 3652 / 11.01.12
75 151/ELPN-1/A/E-076 1 of 1 0 Earthing & Lightning Protection Layout of Transfer house TH3 3774 / 24.02.10 1 1
1 do 991 / 15.06.11
1 do 3652 / 11.01.12
76 151/ELPN-1/A/E-077 1 of 1 0 Earthing & Lightning Protection Layout of Transfer house TH4 3824 / 26.02.10 1 1
1 do 3652 / 11.01.12
77 151/ELPN - 0/A/E-078 1 of 1 0 Earthing Layout of Outdoor area 3936 / 09.03.10
1 do 3194 / 29.12.10 1 1
2 do 2845 /14.11.11
3 do 3841 / 27.12.12
78 151/ELPN-1/A/E-079 1 of 3 0 Earthing & lightning protection of Conv –P1, Q1, R1 3824 / 26.02.10
1 do 2965 / 13.12.10
1 of 5 2 do 3723 / 18.01.12 1 1
2 of 3 0 do 3824 / 26.02.10
1 do 2965 / 13.12.10
2 of 5 2 do 3723 / 18.01.12 1
3 of 3 0 do 3824 / 26.02.10
1 do 2965 / 13.12.10
3 of 5 2 do 3723 / 18.01.12 1
4 of 5 2 do 3723 / 18.01.12 1
5 of 5 2 do 3723 / 18.01.12 1

Earthing & lightning protection layout of 6.6 KV for Substation -I near drive house of Conv -
79 151/ELPN-1/A/E-080 1 of 1 0 3167 / 31.12.09
P1,Q1,R1.
1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
Earthing & lightning protection layout of 6.6 KV for Substation -II near tail end of Conv -
80 151/ELPN-1/A/E-081 1 of 1 0 P1,Q1,R1. 3167 / 31.12.09

1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11

81 151/ELPN-1/A/E-082 1 of 1 0 Earthing & lightning protection layout of 6.6 KV for Substation -III near tail end of Conv- 3167 / 31.12.09
P2,Q2,R2.
1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
3 do 4186 / 18.01.13
Earthing & lightning protection layout of 6.6 KV for Substation -IV near tail end of Conv- C7,
82 151/ELPN-1/A/E-083 1 of 1 0 C8 3167 / 31.12.09

1 do 1053 / 20.06.11 1 1
2 do 2793 / 09.11.11
83 151/ELPN-1/A/E-084 1 of 1 0 Earthing & lightning protection layout of Conv- C1 / C2 / C3 / C4. 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
2 do 3930 / 04.02.12
3 do 3754 / 20.12.12
84 151/ELPN-1/A/E-086 1 of 1 0 Earthing & lightning protection layout of Conv- P2,Q2,R2. 3774 / 24.02.10

185 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

1 do 991 / 15.06.11 1 1
1 of 2 2 do 3930 / 04.02.12
3 do 3849 / 27.12.12
2 of 2 2 do 3930 / 04.02.12
3 do 3849 / 27.12.12
85 151/ELPN-1/A/E-087 1 of 1 0 Earthing & lightning protection layout of Conv- C5 / C6 / C7 / C8. 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
2 do 3930 / 04.02.12
3 do 3754 / 20.12.12
86 151/ELPN-1/A/E-116 1 of 1 0 Earthing & lightning protection layout of TH-8. 3159 / 31.12.09 1 1

1 do 3723 / 18.01.12

87 151/ELPN-1/A/E-117 1 of 1 0 Earthing & lightning protection layout of TH-9. 3159 / 31.12.09 1 1


1 do 3723 / 18.01.12
88 151/ELPN-1/A/E-118 1 of 1 0 Earthing & lightning protection layout of TH-10. 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
89 151/ELPN-1/A/E-119 1 of 1 0 Earthing & lightning protection layout of TH-11. 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
90 151/ELPN-1/A/E-131 1 of 1 0 Earthing & lightning protection layout of DH of Conv B8 & Conv B9 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
91 151/ELPN-1/A/E-132 1 of 1 0 Earthing & lightning protection layout of DH of Conv B10 & Conv B11 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
92 151/ELPN-1/A/E-133 1 of 1 0 Earthing & lightning protection layout of DH of Conv B12 & Conv B13 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
93 151/ELPN-1/A/E-134 1 of 1 0 Earthing & lightning protection of Bunker-1 & Bunker-2 3236 / 06.01.10
1 do 1022 / 16.06.11 1 1
2 do 2580 / 17.10.11
3 do 2835 / 12.11.11
94 151/ELPN-1/A/E-147 1 of 1 0 Earthing & lightning protection layout of DH of Conv P2,Q2,R2. 3774 / 24.02.10
1 do 991 / 15.06.11 1 1
2 do 3930 / 04.02.12
3 do 3849 / 27.12.12

95 151/ELPN-1/A/E-151 1 of 1 0 Earthing & lightning protection layout of Drive House 1 of Conv- P1,R1. 3936 / 09.03.10
1 do 3194 / 29.12.10 1 1
2 do 3723 / 18.01.12

96 151/ELPN-1/A/E-152 1 of 1 0 Earthing & lightning protection layout of drive house 2 of Conv- Q1 3936 / 09.03.10
1 do 3194 / 29.12.10 1 1
2 do 3723 / 18.01.12
97 151/ILLU-1/A/E-090 1 of 1 0 Illumination layout of 3.3 KV Substation -I near drive house of Conv- B1, B2 & B3. 3159 / 31.12.09 1 1
1 do 1479 / 14.07.12
98 151/ILLU-1/A/E-091 1 of 1 0 Illumination layout of 3.3 KV Substation -II near drive house of Conv- B12 & B13. 3159 / 31.12.09 1 1
1 do 1479 / 14.07.12
99 151/ILLU-1/A/E-092 1 of 1 0 Illumination layout of 3.3 KV Substation -III near drive house of Conv- B8 & B9. 3159 / 31.12.09 1 1
1 do 1479 / 14.07.12
100 151/ILLU-1/A/E-093 1 of 1 0 Illumination layout of 3.3 KV Substation -IV near the overhead Bunker. 3159 / 31.12.09 1 1
1 do 1479 / 14.07.12
2 do 2630 / 03.10.12
101 151/ILLU-1/A/E-094 1 of 1 0 Illumination layout of Conv B1, B2 , B3. 3159 / 31.12.09 1 1
1 do 4653 / 31.03.12
102 151/ILLU-1/A/E-097 1 of 2 0 Illumination layout of B8 & B9 3376 / 18.01.10 1 1
1 do 4587 / 27.03.12
2 of 2 0 do 3376 / 18.01.10 1
1 do 4587 / 27.03.12
103 151/ILLU-1/A/E-098 1 of 1 0 Illumination layout of Conv B10, B11. 3159 / 31.12.09 1 1

186 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

1 4653 / 31.03.12
104 151/ILLU-1/A/E-099 1 of 2 0 Illumination layout of B12 & B13. 3376 / 18.01.10 1 1
1 do 4587 / 27.03.12
2 of 2 0 do 3376 / 18.01.10 1
1 do 4587 / 27.03.12
105 151/ILLU-1/A/E-100 1 of 1 0 Illumination layout of Transfer house TH 1 3744 / 22.02.10
1 do 2875 / 07.12.10 1 1
2 do 951 / 13.06.11
3 do 3754 / 20.12.12
106 151/ILLU-1/A/E-101 1 of 1 0 Illumination layout of Transfer house TH 2 3744 / 22.02.10
1 do 2875 / 07.12.10 1 1
2 do 951 / 13.06.11
3 do 3754 / 20.12.12
107 151/ILLU-1/A/E-102 1 of 1 0 Illumination layout of Transfer house TH 3 3744 / 22.02.10
1 do 2875 / 07.12.10 1 1
2 do 951 / 13.06.11
3 do 3849 / 27.12.12
108 151/ILLU-1/A/E-103 1 of 1 0 Illumination layout of Transfer house TH 4 3936 / 09.03.10
1 do 2875 / 07.12.10 1 1
2 do 4653 / 31.03.12
109 151/ILLU-1/A/E-105 1 of 1 0 Illumination layout of 6.6 KV Substation-I near drive house of Conv P1, Q1, R1. 3159 / 31.12.09 1 1
1 do 4186 / 18.01.13
110 151/ILLU-1/A/E-106 1 of 1 0 Illumination layout of 6.6 KV Substation-II near tail end of Conv P1, Q1, R1. 3159 / 31.12.09 1 1
1 do 4186 / 18.01.13
111 151/ILLU-1/A/E-107 1 of 1 0 Illumination layout of 6.6 KV Substation -III near tail end of Conv P2, Q2, R2. 3159 / 31.12.09 1 1
1 do 4186 / 18.01.13
112 151/ILLU-1/A/E-108 1 of 1 0 Illumination layout of 6.6 KV Substation -IV near tail end of Conv C7, C8 3159 / 31.12.09 1 1
1 do 4186 / 18.01.13
113 151/ILLU-1/A/E-109 1 of 3 0 Illumination layout of Conv P1, Q1, R1. 3774 / 24.02.10
1 do 991 / 15.06.11
1 of 5 2 do 4653 / 31.03.12 1 1
2 of 3 0 do 3774 / 24.02.10
1 do 991 / 15.06.11
2 of 5 2 do 4653 / 31.03.12 1
3 of 3 0 do 3774 / 24.02.10
1 do 991 / 15.06.11
3 of 5 2 do 4653 / 31.03.12 1
4 of 5 0 do 4653 / 31.03.12 1
5 of 5 0 do 4653 / 31.03.12 1
114 151/ILLU-1/A/E-110 1 of 1 0 Illumination layout of Conveyor P2, Q2, R2. 3744 / 22.02.10
1 do 951 / 13.06.11
1 of 2 1 do 991 / 15.06.11 1 1
2 do 3872 / 29.12.12
2 of 2 1 do 991 / 15.06.11 1
2 do 3872 / 29.12.12

115 151/ILLU-1/A/E-112 1 of 1 0 Illumination layout of Conveyor C1 / C2 / C3 / C4. 3744 / 22.02.10 1 1


1 do 951 / 13.06.11
2 do 3849 / 27.12.12
116 151/ILLU-1/A/E-113 1 of 1 0 Illumination layout of Conveyor C5 / C6 / C7 / C8. 3744 / 22.02.10 1 1
1 do 951 / 13.06.11
2 do 3849 / 27.12.12
117 151/ILLU - 0/A/E-114 1 of 1 0 Illumination layout of Outdoor area 3936 / 09.03.10
1 do 3194 / 29.12.10
2 do 1421 / 12.07.11
1 of 3 3 do 1934 / 18.08.11 1 1
2 of 3 3 do 1934 / 18.08.11 1
3 of 3 3 do 1934 / 18.08.11 1

118 151/ILLU-1/A/E-115 1 of 1 0 Illumination layout of Bunker-1 & Bunker-2 3236 / 06.01.10


1 do 1022 / 16.06.11 1 1
2 do 4653 / 31.03.12

119 151/ILLU-1/A/E-125 1 0 Illumination layout of Transfer house TH 7 2878 / 07.02.10 1 1


1 1058 / 20.06.11
1 4900/12.03.13

187 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Dwg. Submission by SKSL


No. Drawing No Sheet No Rev Description vide letter no & date to
SECL/CMPDI

120 151/ILLU-1/A/E-127 1 of 1 0 Illumination layout of TH-8 3376 / 18.01.10 1 1


1 do 2875 / 07.12.10

121 151/ILLU-1/A/E-128 1 of 1 0 Illumination layout of TH-9 3376 / 18.01.10


1 do 2875 / 07.12.10 1 1

122 151/ILLU-1/A/E-129 1 of 1 0 Illumination layout of TH-11. 3282 / 09.01.10


1 do 1107 / 22.06.11 1 1

123 151/ILLU-1/A/E-130 1 of 1 0 Illumination layout of TH-10. 3282 / 09.01.10


1 do 1107 / 22.06.11 1 1

124 151/ILLU-1/A/E-135 1 of 1 0 Illumination layout of DH of Conv. B8 & Conv. B9. 3282 / 09.01.10
1 do 1107 / 22.06.11 1 1

125 151/ILLU-1/A/E-136 1 of 1 0 Illumination layout of DH of Conv. B10 & Conv. B11. 3282 / 09.01.10 1 1
1 do 1107 / 22.06.11

126 151/ILLU-1/A/E-137 1 of 1 0 Illumination layout of DH of Conv. B12 & Conv. B13. 3774 / 24.02.10 1 1
1 do 1107 / 22.06.11

188 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

1968 / 20.12.10 1 1 1217 / 14.02.11 1 1 56 days 563 days

505 days
1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days
1968 / 20.12.10 1 1211 / 11.02.11 1 53 days

505 days
1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days
1968 / 20.12.10 1 1211 / 11.02.11 1 53 days

505 days
1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days
1968 / 20.12.10 1 1211 / 11.02.11 1 53 days

505 days
1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days

1968 / 20.12.10 1 1211 / 11.02.11 1 53 days


505 days
1968 / 20.12.10 1 1211 / 11.02.11 1 53 days
1968 / 20.12.10 1 1211 / 11.02.11 1 53 days 121 days

1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days


505 days

1968 / 20.12.10 1 1211 / 11.02.11 1 53 days

1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days


505 days

1968 / 20.12.10 1 1211 / 11.02.11 1 53 days


1968 / 20.12.10 1 1211 / 11.02.11 1 53 days 121 days

1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days


505 days

1968 / 20.12.10 1 1211 / 11.02.11 1 53 days

1968 / 20.12.10 1 1 1211 / 11.02.11 1 1 53 days


505 days

1968 / 20.12.10 1 1211 / 11.02.11 1 53 days

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

189 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2765 / 29.01.13 1 1 666 / 31.01.13 1 1

2765 / 29.01.13 1 1 666 / 31.01.13 1 1

2765 /29.01.13

Approval not yet received


2811 / 21/22.03.13 1 1 801 / 26.03.13 1 1

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 378 days

2487 / 01.12.11 1 1 1078 / 12.12.11 1 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

Approval not yet received


2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

190 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED
Approval not yet received
Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 357 days


2487 / 01.12.11 1 1 1078 / 12.12.11 1 1 11 days 116 days
2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days
2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days
2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days Approval not yet received

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2487 / 01.12.11 1 1078 / 12.12.11 1 11 days 116 days

2616 / 16.05.12 1 1 217 / 24.05.12 1 1

2616 / 16.05.12 1 217 / 24.05.12 1

2616 / 16.05.12 1 217 / 24.05.12 1

2616 / 16.05.12 1 217 / 24.05.12 1

2616 / 16.05.12 1 217 / 24.05.12 1

2616 / 16.05.12 1 217 / 24.05.12 1

2616 / 16.05.12 1 217 / 24.05.12 1

191 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2616 / 16.05.12 1 217 / 24.05.12 1

2616 / 16.05.12 1 217 / 24.05.12 1

2489 / 01.12.11 1 1 1076 / 12.12.11 1 1 11 days 30 days

505 days
1968 / 20.12.10 1211 / 11.02.11 53 days
2540 / 30.12.11 1 1 1136 / 12.01.12 1 1

505 days
1968 / 20.12.10 1211 / 11.02.11 53 days
2540 / 30.12.11 1 1 1136 / 12.01.12 1 1

505 days
1968 / 20.12.10 1211 / 11.02.11 53 days
2540 / 30.12.11 1 1 1136 / 12.01.12 1 1

505 days
1968 / 20.12.10 1211 / 11.02.11 53 days
2540 / 30.12.11 1 1 1136 / 12.01.12 1 1
2335 / 03.06.11
2710 / 04.12.12 1 1 559 / 07.12.12 1 1
2335 / 03.06.11
2710 / 04.12.12 1 1 559 / 07.12.12 1 1
2335 / 03.06.11
2710 / 04.12.12 1 559 / 07.12.12 1
2706 / 04.12.12 1 1 558 / 07.12.12 1 1
2706 / 04.12.12 1 1 558 / 07.12.12 1 1
2706 / 04.12.12 1 558 / 07.12.12 1
2332 / 25.05.11

Approval not yet received


2716 / 10.12.12
2768 / 29.01.13 1 1 664 / 31.01.13 1 1
2768 / 29.01.13 1 664 / 31.01.13 1

2332 / 25.05.11

2716 / 10.12.12
2873 / 16.05.13 1 1 400 / 21.05.13 1 1
2873 / 16.05.13 1 400 / 21.05.13 1

2332 / 25.05.11

2716 / 10.12.12
2859 / 12.04.13 859 / 17.04.13
2859 / 12.04.13 859 / 17.04.13

1841 / 03.11.10 3302 / 03.12.10 1 1 1210 / 11.02.11 1 1 70 days 354 days

2659 / 14.07.12

2691 / 25.10.12 1 1 2704 / 01.12.12 1 1 556 / 07.12.12 1 1

2659 / 14.07.12

2691 / 25.10.12 1 2704 / 01.12.12 1 556 / 07.12.12 1

1968 / 20.12.10 1211 / 11.02.11 53 days 505 days


2530 / 23.12.11 1 1 1135 / 12.01.12 1 1

192 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

1968 / 20.12.10 1211 / 11.02.11 53 days 505 days


2530 / 23.12.11 1 1 1135 / 12.01.12 1 1

1968 / 20.12.10 1211 / 11.02.11 53 days 505 days


2530 / 23.12.11 1 1 1135 / 12.01.12 1 1

1968 / 20.12.10 1211 / 11.02.11 53 days 505 days


2530 / 23.12.11 1 1 1135 / 12.01.12 1 1

2802 / 11.03.13 1 1 H - 767 / 12.03.13

2332 / 25.05.11
2716 / 10.12.12

2859 / 12.04.13 859 / 17.04.13

1897 / 22.11.10
2711 / 06.12.12 1 1 H - 560 / 10.12.12 1 1
1897 / 22.11.10
2711 / 06.12.12 1 1 H - 560 / 10.12.12 1 1

2766 / 29.01.13 1 1 667 / 31.01.13 1 1

1 1 2721 / 11.12.12 1 1 H - 577 / 14.12.12 1 1

2335 / 03.06.11 1 1
2706 / 04.12.12 1 1 H - 557 / 07.12.12 1 1
2335 / 03.06.11 1 1
2706 / 04.12.12 1 1 H - 557 / 07.12.12 1 1
1 1 2721 / 11.12.12 1 1 H - 577 / 14.12.12 1 1 Approval not yet received

2335 / 03.06.11 1 1
2706 / 04.12.12 1 1 H - 557 / 07.12.12 1 1
2335 / 03.06.11 1 1
2706 / 04.12.12 1 1 H - 557 / 07.12.12 1 1
1 1 2721 / 11.12.12 1 1 H - 577 / 14.12.12 1 1

2739 / 21.12.12 1 1 H - 601 / 02.01.13 1 1

1897 / 22.11.10
2740 / 21.12.12 1 1 H - 600 / 02.01.13 1 1

3303 / 03.12.10 2803 / 11.03.13 1 1 H - 769 / 12.03.13

3303 / 03.12.10 2803 / 11.03.13 1 1 H - 769 / 12.03.13

2501 / 12.12.11
2634 / 08.06.12 1 1 309 / 13.06.12 1 1

2501 / 12.12.11
2634 / 08.06.12 1 1 309 / 13.06.12 1 1

2501 / 12.12.11
2634 / 08.06.12 1 1 309 / 13.06.12 1 1

193 of 245
Approval not yet received
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2501 / 12.12.11
2634 / 08.06.12 1 1 309 / 13.06.12 1 1
Approval not yet received
2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1

2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1

2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1

2628 / 04.06.12 1 H - 146 / 11.06.12 1

2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1

2628 / 04.06.12 1 H - 146 / 11.06.12 1


2332 / 25.05.11

2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1


2332 / 25.05.11

2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1


2328 / 24.05.11

2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1


1897 / 22.11.10
2628 / 04.06.12 1 1 H - 146 / 11.06.12 1 1
3303 / 03.12.10

2707 / 04.12.12 1 1
2767 / 29.01.13 1 1 665 / 31.01.13 1 1
1897 / 22.11.10

2582 / 25.02.12 1 1 H - 1272 / 29.03.12 1 1


1897 / 22.11.10

2582 / 25.02.12 1 H - 1272 / 29.03.12 1


1897 / 22.11.10

2582 / 25.02.12 1 H - 1272 / 29.03.12 1


2582 / 25.02.12 1 H - 1272 / 29.03.12 1
2582 / 25.02.12 1 H - 1272 / 29.03.12 1

2323 / 18.05.11

2633 / 07.06.12 1 1 H - 150 / 12.06.12 1 1

2323 / 18.05.11

2633 / 07.06.12 1 1 H - 150 / 12.06.12 1 1

2323 / 18.05.11

2801 / 11.03.13 H - 768 / 12.03.13

2323 / 18.05.11

2633 / 07.06.12 1 1 H - 150 / 12.06.12 1 1


2332 / 25.05.11

2716 / 10.12.12
2770 / 29.01.13 1 1 662 / 31.01.13 1 1
2328 / 24.05.11

194 of 245
Approval not yet received
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2716 / 10.12.12
2764 / 29.01.13 1 1 668 / 31.01.13 1 1
Approval not yet received
2716 / 10.12.12
2764 / 29.01.13 1 668 / 31.01.13 1
2332 / 25.05.11

2716 / 10.12.12
2770 / 29.01.13 1 1 662 / 31.01.13 1 1

2582 / 25.02.12 1 1 H - 1272 / 29.03.12 1 1

2582 / 25.02.12 1 1 H - 1272 / 29.03.12 1 1


2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1
2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1
2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1
2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1
2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1
2329 / 24.05.11
2416 / 05.08.11
2472 / 03.11.11
2490 / 12.12.11 1 1 2485 / 20.12.11 1 1
2328 / 24.05.11

2716 / 10.12.12
2764 / 29.01.13 1 1 668 / 31.01.13 1 1

3303 / 03.12.10

2582 / 25.02.12 1 1 H - 1272 / 29.03.12 1 1

3303 / 03.12.10

2582 / 25.02.12 1 1 H - 1272 / 29.03.12 1 1

2667 / 26.07.12 1 1 H - 272 / 01.08.12 1 1

2667 / 26.07.12 1 1 H - 272 / 01.08.12 1 1

2667 / 26.07.12 1 1 H - 272 / 01.08.12 1 1

2667 / 26.07.12
2709 / 04.12.12 1 1 H -555 / 07.12.12 1 1

2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1


2335 / 03.06.11
2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1
2335 / 03.06.11
Approval not yet received
2629 / 04.06.12 1 H - 145 / 11.06.12 1

195 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after ApprovalRemarks
not yet received
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1


2335 / 03.06.11
2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1
2335 / 03.06.11
2629 / 04.06.12 1 H - 145 / 11.06.12 1

2332 / 25.05.11
2716 / 10.12.12
2770 / 29.01.13 1 1 662 / 31.01.13 1 1

2332 / 25.05.11
2716 / 10.12.12
2770 / 29.01.13 1 1 662 / 31.01.13 1 1

2332 / 25.05.11
2716 / 10.12.12
2764 / 29.01.13 1 1 668 / 31.01.13 1 1
1841 / 03.11.10 3302 / 03.12.10 1 1 1210 / 11.02.11 1 1 73 days 339 days

2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1

2801 / 11.03.13 1 1 H - 768 / 12.03.13

2801 / 11.03.13 1 1 H - 768 / 12.03.13

2801 / 11.03.13 1 1 H - 768 / 12.03.13

2801 / 11.03.13 1 1 H - 768 / 12.03.13


2328 / 24.05.11

2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1


2328 / 24.05.11
Approval not yet received

2629 / 04.06.12 1 H - 145 / 11.06.12 1


2328 / 24.05.11

2629 / 04.06.12 1 H - 145 / 11.06.12 1


2629 / 04.06.12 1 H - 145 / 11.06.12 1
2629 / 04.06.12 1 H - 145 / 11.06.12 1
2332 / 25.05.11

2716 / 10.12.12
2769/29.01.13 1 1 663 / 31.01.13 1 1
2716 / 10.12.12
2769/29.01.13 1 663 / 31.01.13 1

2332 / 25.05.11
2716 / 10.12.12
Approval not yet received
2764 / 29.01.13 1 1 668 / 31.01.13 1 1
2332 / 25.05.11
2716 / 10.12.12
2764 / 29.01.13 1 1 668 / 31.01.13 1 1
3303 / 03.12.10

2409 / 26.07.11
2468 / 22.10.11 1 1 1034 / 02.11.11 1 1
2468 / 22.10.11 1 1034 / 02.11.11 1
2468 / 22.10.11 1 1034 / 02.11.11 1

2329 / 24.05.11

2629 / 04.06.12 1 1 H - 145 / 11.06.12 1 1

2812/21/22.03.13 1 1 802 / 26.03.13 1 1

196 of 245
STATUS OF ELECTRICAL DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

HP
ELDS LIMITED

Dwg. commented Dwg. approval from Dwg. approval from Time taken by SECL Time taken by
after receipt of SECL after
from CMPDI to SKSL CMPDI to SECL vide SECL to SKSL vide approval from submission of Remarks
vide letter no & date letter no & date letter no & date CMPDI drawing by SKSL

2502 / 13.12.11 1 1 1118 / 05.01.12 1 1

2502 / 13.12.11 1 1 1118 / 05.01.12 1 1

2504 / 15.12.11 1 1 1154 / 21.01.12 1 1

2504 / 15.12.11 1 1 1154 / 21.01.12 1 1

2322 / 18.05.11
2504 / 15.12.11 1 1 1154 / 21.01.12 1 1

2322 / 18.05.11
2504 / 15.12.11 1 1 1154 / 21.01.12 1 1

2505 / 15.12.11 1 1 2709 / 04.12.12 1 1 H - 561 / 10.12.12 1 1

197 of 245
APPROVAL STATUS OF ELECTRICAL DOCUMENTS FOR DIPKA MAIN CHP ( AS ON 04.08.2011 )

Date of submission by Dwg. commented Date of approval


Sl. Sheet
Document No Rev Description SKSL vide letter no & from CMPDI to SKSL from CMPDI to SECL
No. No. date to CMPDI vide letter no & date vide letter no & date

1 151 / ENGG - 4/A/E - 119 volm 1 0 Design calculation for 6.6 KV 2193 / 01.10.09
1 do 1652 / 26.08.10
2 151 / ENGG - 4/A/E - 120 volm 1 0 Design calculation for 3.3 KV 2193 / 01.10.09
1 do 1652 / 26.08.10
151 / ENGG - 4/A/E - 121 volm II 0 Design calculation for lighting 3.3 KV & 6.6 kv system
1 do 1813 / 09.08.11 2466 / 18.10.11
2 do 2693 / 31.10.11 2471 / 03.11.11
3 151 / ENGG - 4/A/E - 122 0 Electrical control philosophy for plant operation 2820 / 02.12.10
1 do 4218 / 24.03.11 95 / 09.04.11

Page 198 of 245


APPROVAL STATUS OF ELECTRICAL DOCUMENTS FOR DIPKA MAIN CHP ( AS ON 04.08.2011 )

Date of approval
from SECL to SKSL
vide letter no & date

1057 / 23.11.11

H -754 / 15.04.11

Page 199 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

dw
g sht
Belt M / s Phoenix Yule (P)
Ltd
Data Sheet (Annexure - A) 1 - Technical Data sheet (Steel cord belt) do 708 / 04.06.10
QAP NO : PYL/SKS/SCB/2010
1 0 QAP for Steel cord conveyor belt do 708 / 04.06.10
(Annexure - A)
Data Sheet (Annexure - A) 1 - Technical Data sheet (Nylon nylon belt) do 708 / 04.06.10
QAP NO : PYL/SKS/TCB/2010 1 0 QAP for Nylon nylon conveyor belt do 708 / 04.06.10
(Annexure - A)
Iddler TRF Limited
3 - 1023 - 675 1 of 1 2 Dimension sheet for Troughing Idler (with 2 0 forward tilt) do 2325 / 25.10.10
3 do do 2561 / 11.11.10 1 1
3 - 1023 - 676 1 of 1 2 Dimension sheet for Troughing training Idler do 2325 / 25.10.10
3 do do 2561 / 11.11.10 1 1
3 - 1023 - 677 1 of 1 2 Dimension sheet for Impact Idler do 2325 / 25.10.10
3 do do 2561 / 11.11.10
4 do do 2739 / 25.11.10 1 1
2 - 1023 - 678 1 of 1 1 Dimension sheet for V. P. Transition idler do 2325 / 25.10.10 1 1
3 - 1023 - 679 1 of 1 2 Dimension sheet for Flat return idler do 2325 / 25.10.10
3 do do 2561 / 11.11.10 1 1
3 - 1023 - 680 1 of 1 2 Dimension sheet for Return training Idler do 2325 / 25.10.10
3 do do 2561 / 11.11.10 1 1
3 - 1023 - 682 1 of 1 1 Pivot arrangement for Training Idler do 2325 / 25.10.10
1 do do 2561 / 11.11.10 1 1

0 - 7974 - 000 1 of 1 1 G A of Travelling tripper with two way discharge chute on conveyor no B4, B5, TRF Limited 2887 / 07.12.10
B6 & B7 1600 mm belt width
2 do do 3069 / 20.12.10 1 1

0 - 7978 - 000 1 of 1 0 G A of Travelling tripper with single way discharge chute on conveyor no B1, B2 do 2887 / 07.12.10
& B3 1600 mm belt width
1 do do 3069 / 20.12.10 1 1

152/CONV/TC-ID/IDLER/12 Test certificate & inspection document for Belt Conveyor Idlers / Rollers do 670 / 23.05.11

152/CONV/TC-ID/IDLER/15 Test certificate & inspection document for Belt Conveyor Idlers / Rollers do 1192 / 27.06.11

152/CONV/TC-ID/IDLER/16 Test certificate & inspection document for Belt Conveyor Idlers / Rollers do 1348 / 07.07.11

Fluid Coupling Fluidomat Limited


PR / D / 8066 1 of 1 0 G.A Drawing for Fluidomat Fluid Coupling Model : HFD - 6 do 3140 / 24.12.10 1 1
PR / D / 8067 1 of 1 0 G.A Drawing for Fluidomat Fluid Coupling Model : HFD - 8 do 3140 / 24.12.10 1 1
PR / D / 8068 1 of 1 0 G.A Drawing for Fluidomat Fluid Coupling Model : HFD - 8B do 3140 / 24.12.10 1 1
PR / D / 8069 1 of 1 0 G.A Drawing for Fluidomat Fluid Coupling Model : HFD - 10B do 3140 / 24.12.10 1 1
QAP No 652 1 of 2 0 Quality plan for HF / HFD types Fluid coupling do
2 of 2 0 do do
Data Sheet 7 shts 0 Technical data sheet for fluid coupling materials do

152/CONV/TC-ID/Fluid coupling/23 Test certificate & inspection document do

Elecon Engineering Co.


Vibratory Feeder
Ltd

M 15990 / 1 1 0 Mechanical Vibrating Feeder (size - 1600 mm X 2500 mm) Motor - V 24140 / 6 do 3181 / 28.12.10 1 1

152 / VF / TC - ID / 09 Test Certificates & Inspection documents do 013 / 02.04.11


Elecon Engineering Co.
152 / VF / TC - ID / 11 Test Certificates & Inspection documents Ltd 669 / 23.05.11

152 / VF / TC - ID / 14 Test Certificates & Inspection documents do 935 / 11.06.11


152 / VF / TC - ID / 17 Test Certificates & Inspection documents do 1534 / 19.07.11
Rack & Pinion Gate

UHT / SKS / RPG / GEN / 1000 - 1 A2 0 Mechanical GA of manually operated rack & pinion gate (RPG 25 to RPG 64) United Handling 3301 / 08.01.11 1 1
below overhead surge bunker 1 & 2 (opng. 1000 X 1200) Technocrats Pvt. Ltd

HMC / SKS / RPG / M - 01 1 of 1 0 Mechanical GA of manually operated rack & pinion gate (RPG 1 to RPG 24) Howrah Machinery 3645 / 03.02.11
below Truck receiving hoppers (opng. 1000 X 1200) Corporation
1 do do 4274 / 29.03.11 1 1

HMC / SKS / RPG / M - 02 1 of 1 0 Mechanical GA of manually operated rack & pinion gate (RPG 1 to RPG 24) do 3645 / 03.02.11
below Truck receiving hoppers (opng. 1200 X 1200)
1 do do 4274 / 29.03.11 1 1
Elecon Engineering Co.
Gear Box Ltd
8050372 1 0 Dimension sheet of KCN - 400 do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11
2 do do 1193 / 27.06.11 1 1
8050373 1 0 Dimension sheet of KBN - 280 do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11

Page 200 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

2 do do 1193 / 27.06.11 1 1
8050374 1 0 Dimension sheet of KCN - 280 do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11
2 do do 1193 / 27.06.11 1 1
8050375 1 0 Dimension sheet of KCN - 400 do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11
2 do do 1193 / 27.06.11 1 1
8050376 1 0 Dimension sheet of KCN - 200 do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11
2 do do 1193 / 27.06.11 1 1
8050385 1 0 Dimension sheet of KCN - 400 do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11
2 do do 1193 / 27.06.11 1 1
8050386 1 0 do do 3303 / 08.01.11
1 do do 4073 / 12.03.11 2310 / 09.05.11
2 do do 1193 / 27.06.11 1 1
R 105 - CBE - ET - STD - 002710 1 of 1 0 Dimension sheet drg of KCN - 450 for P1,Q1,R1 do 3303 / 08.01.11
A do do 4073 / 12.03.11 2310 / 09.05.11
A do ( Compliance Report ) do
B do do 1193 / 27.06.11 2401 / 14.07.11
C Dimension sheet drg of KCN - 450 do 1676 / 27.07.11 1 1 2452 / 22.09.11
D do do 2927 / 18.11.11
R 105 - CBE - ET - STD - 002810 1 of 1 0 do do 3303 / 08.01.11
A do do 4073 / 12.03.11 2310 / 09.05.11
A do ( Compliance Report ) do
B do do 1193 / 27.06.11 2401 / 14.07.11
C do do 1676 / 27.07.11 1 1 2452 / 22.09.11
D do do 2927 / 18.11.11
R 105 - CBE - ET - STD - 002910 1 of 1 0 do do 3303 / 08.01.11
A do do 4073 / 12.03.11 2310 / 09.05.11
A do ( Compliance Report ) do
B do do 1193 / 27.06.11 1 1 2401 / 14.07.11
C do do 1676 / 27.07.11 2452 / 22.09.11
D do do 2927 / 18.11.11

QP. QA. 16.00 1 of 1 0 Reference quality plan-01 for helical / spiral bevel / ju/custom built gear box do 3303 / 08.01.11

R 105 - CBE - ET - STD - 002510 1 of 1 0 Dimension sheet drg of KBN - 450 do 3341 / 12.01.11
A do do 4073 / 12.03.11 1 1 2310 / 09.05.11
A do ( Compliance Report ) do 2363 / 20.06.11
B do do 1193 / 27.06.11
R 105 - CBE - ET - STD - 002610 1 of 1 0 do do 3341 / 12.01.11
A do do 4073 / 12.03.11 2310 / 09.05.11
A do ( Compliance Report ) do 2363 / 20.06.11
B do do 1193 / 27.06.11 1 1
R 105 - CBE - ET - STD - 110090 1 of 1 0 Dimension sheet drg of KBN - 450 for P2,Q2,R2 do 2698 / 31.10.11 1 1
A do do 2927 / 18.11.11
R 105 - CBE - ET - STD - 110091 1 of 1 0 do do 2698 / 31.10.11 1 1
A do do 2927 / 18.11.11
R 105 - CBE - ET - STD - 110092 1 of 1 0 do do 2698 / 31.10.11 1 1
A do do 2927 / 18.11.11

1 of 2 &
QP / 31 2 of 2 0 Quality plan for Vibrating Feeder do 3347 / 12.01.11
8051263 1 of 1 0 Dimension sheet drg of KCN - 280 do 2787 / 08.11.11 1 1

Belt Weigher Prayas Engineering Ltd

BWPR - 1254.1 1 0 Material part list of of Belt weigher do 3554 / 28.01.11 1 1 2624 / 26.05.12
BWPR - 1254.5 1 0 Remote rate of flow meter ( 4 digit T.P.H) do 3554 / 28.01.11 1 1 2624 / 26.05.12
RPW - 2595.4 1 0 Speed sensor (ST - 101 C) do 3554 / 28.01.11 1 1 2624 / 26.05.12
GA & installation drawing of weigh scale ( Model : 100-14-4) 1600 mm belt
RPW - 2594.2 1 0 do 3554 / 28.01.11 1 1 2624 / 26.05.12
width
BWPR - 1254.3 0 Wiring diagram for belt weigher do 3554 / 28.01.11 1 1 2624 / 26.05.12
BWPR - 1254.4 0 Belt weigher panel do 3554 / 28.01.11 1 1 2624 / 26.05.12
BWPR - 1254.6 0 Remote totaliser (8 digit) do 3554 / 28.01.11 1 1 2624 / 26.05.12
BWPR - 1254.7 0 Remote chart recorder do 3554 / 28.01.11 1 1 2624 / 26.05.12
1 of 3
QP no : BW / SK SAMANTA / 01 to 3 of 0 Quality plan for belt scale (weigher) do 3554 / 28.01.11 2624 / 26.05.12
3
Clarrification 1903 / 14.03.12
Clarrification sent for all above drawing including QAP 892 / 31.05.12

Power Transformer Kirloskar Electric


Company Ltd
316E9210 1 of 1 1 General assembly of Transformer - 200 KVA - 3.3 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
316E9310 1 of 1 1 Rating & diagram plate - 200 KVA - 3.3 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1

Page 201 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

41644710 1 of 1 0 HV cable box assembly - heat shrinkable kit & boots 11000 V 400A do 3357 / 13.01.11 1 1
41644810 1 of 1 0 LV cable box assembly - 1.1KV upto 630A 3.5 core do 3357 / 13.01.11 1 1
41644910 1 of 1 0 Marshalling box wiring diagram - 200 KVA - 3.3 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
10 EB 007 1 1 Guaranteed Technical Particulars do 3357 / 13.01.11

316E9010 1 of 1 1 General assembly of Transformer - 200 KVA - 6.6 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
316E9110 1 of 1 1 Rating & diagram plate - 200 KVA - 6.6 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
41644710 1 of 1 0 HV cable box assembly - heat shrinkable kit & boots 11000 V 400A do 3357 / 13.01.11 1 1
41644810 1 of 1 0 LV cable box assembly - 1.1KV upto 630A 3.5 core do 3357 / 13.01.11 1 1
41645010 1 of 1 0 Marshalling box wiring diagram - 200 KVA - 6.6 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
10 EC 012 1 1 Guaranteed Technical Particulars do 3357 / 13.01.11

316L3410 1 of 1 1 General assembly of Transformer - 630 KVA - 6.6 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
316L3510 1 of 1 1 Rating & diagram plate - 630 KVA - 6600 / 433 V - Dyn 11 do 3357 / 13.01.11 1 1
41645210 1 of 1 0 Marshalling box wiring diagram - 630 KVA - 6.6 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
41645310 1 of 1 0 LV cable box assembly - 1.1KV - 1100 Amps do 3357 / 13.01.11 1 1
41645410 1 of 1 0 HV cable box assembly - heat shrinkable kit & boots 11000 V 400A do 3357 / 13.01.11 1 1
10 JC 030 1 1 Guaranteed Technical Particulars do 3357 / 13.01.11

316L2710 1 of 1 2 General assembly of Transformer - 1250 KVA - 3.3 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
316L2810 1 of 1 1 Rating & diagram plate - 1250 KVA - 3300 / 433 V - Dyn 11 do 3357 / 13.01.11 1 1
41600311 1 of 1 0 LV Busduct flange details - 10 MB 012 do 3357 / 13.01.11 1 1
41645110 1 of 1 0 Marshalling box wiring diagram - 1250 KVA - 3.3 / 0.433 KV - Dyn 11 do 3357 / 13.01.11 1 1
41645510 1 of 1 0 HV cable box assembly - 3.6 KV 250 Amps do 3357 / 13.01.11 1 1
10 MB 012 1 1 Guaranteed Technical Particulars do 3357 / 13.01.11

HT Switch gear Andrew Yule & Co. Ltd

3 - GA - 1579 A 1 of 5 0 3.3 KV 13.1 KA panel sw. board (11 panel) at SS - I do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 A 2 of 5 0 3.3 KV 13.1 KA 630 A indoor VCB panel (incoming panel) Andrew Yule & Co. Ltd 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 A 3 of 5 0 3.3 KV 13.1 KA 630 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 A 4 of 5 0 3.3 KV 13.1 KA 400 A indoor VC panel (motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 A 5 of 5 0 3.3 KV 13.1 KA 400 A indoor VC panel (spare motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - GA - 1579 D 1 of 7 0 3.3 KV 13.1 KA panel sw. board (17 panel) at SS - IV do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 D 2 of 7 0 3.3 KV 13.1 KA 800 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 D 3 of 7 0 3.3 KV 13.1 KA 800 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 DA 4 of 7 0 3.3 KV 13.1 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 DB 5 of 7 0 3.3 KV 13.1 KA 400 A indoor VC panel (motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 DC 6 of 7 0 3.3 KV 13.1 KA 400 A indoor VC panel (spare motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 DD 7 of 7 0 3.3 KV 13.1 KA 630 A indoor VCB panel (spare transformer feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - GA - 1579 B 1 of 6 0 3.3 KV 13.1 KA panel sw. board (10 panel) at SS - II do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 B 2 of 6 0 3.3 KV 13.1 KA 630 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 B 3 of 6 0 3.3 KV 13.1 KA 630 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 BA 4 of 6 0 3.3 KV 13.1 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 BB 5 of 6 0 3.3 KV 13.1 KA 400 A indoor VC panel (motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 BC 6 of 6 0 3.3 KV 13.1 KA 400 A indoor VC panel (spare motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - GA - 1579 C 1 of 6 0 3.3 KV 13.1 KA panel sw. board (7 panel) at SS - III do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 C 2 of 6 0 3.3 KV 13.1 KA 630 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - BG - 1579 C 3 of 6 0 3.3 KV 13.1 KA 630 A indoor VCB panel (bus section panel) do 3393 / 15.01.11

Page 202 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

1 do do 4158 / 18.03.11 1
3 - OG - 1579 CA 4 of 6 0 3.3 KV 13.1 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 CB 5 of 6 0 3.3 KV 13.1 KA 400 A indoor VC panel (motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1

3 - OG - 1579 CC 6 of 6 0 3.3 KV 13.1 KA 400 A indoor VC panel (spare motor feeder panel) Andrew Yule & Co. Ltd 3393 / 15.01.11

1 do do 4158 / 18.03.11 1

3 - GA - 1579 E 1 of 7 0 6.6 KV 25 KA panel sw. board (20 panel) at SS - V (SS - I of 6.6 kv system) do 3393 / 15.01.11

1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 E 2 of 7 0 6.6 KV 25 KA 1250 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 E 3 of 7 0 6.6 KV 25 KA 1250 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 EA 4 of 7 0 6.6 KV 25 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 EB 5 of 7 0 6.6 KV 25 KA 400 A indoor VC panel (motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 EC 6 of 7 0 6.6 KV 25 KA 400 A indoor VC panel (spare motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1

3 - OG - 1579 ED 7 of 7 0 6.6 KV 25 KA 630 A indoor VCB panel (spare transformer feeder panel) do 3393 / 15.01.11

1 do do 4158 / 18.03.11 1

3 - GA - 1579 F 1 of 7 0 6.6 KV 25 KA panel sw. board (20 panel) at SS - VI (SS - II of 6.6 kv system) do 3393 / 15.01.11

1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 F 2 of 7 0 6.6 KV 25 KA 1250 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 F 3 of 7 0 6.6 KV 25 KA 1250 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 FA 4 of 7 0 6.6 KV 25 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 FB 5 of 7 0 6.6 KV 25 KA 400 A indoor VC panel (motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 FC 6 of 7 0 6.6 KV 25 KA 400 A indoor VC panel (spare motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1

3 - OG - 1579 FD 7 of 7 0 6.6 KV 25 KA 630 A indoor VCB panel (spare transformer feeder panel) do 3393 / 15.01.11

1 do do 4158 / 18.03.11 1

3 - GA - 1579 G 1 of 5 0 6.6 KV 25 KA panel sw. board (7 panel) at SS - VII (SS - III of 6.6 kv system) do 3393 / 15.01.11

1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 G 2 of 5 0 6.6 KV 25 KA 630 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 G 3 of 5 0 6.6 KV 25 KA 630 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 GA 4 of 5 0 6.6 KV 25 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 GB 5 of 5 0 6.6 KV 25 KA 630 A indoor VC panel (spare motor feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1

3 - GA - 1579 H 1 of 5 0 6.6 KV 25 KA panel sw. board (6 panel) at SS - VIII (SS - IV of 6.6 kv system) Andrew Yule & Co. Ltd 3393 / 15.01.11

1 do do 4158 / 18.03.11 1 1
3 - IG - 1579 H 2 of 5 0 6.6 KV 25 KA 630 A indoor VCB panel (incoming panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11
2 do do 4235 / 25.03.11 1
3 - BG - 1579 H 3 of 5 0 6.6 KV 25 KA 630 A indoor VCB panel (bus section panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 HA 4 of 5 0 6.6 KV 25 KA 630 A indoor VCB panel (transformer panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
3 - OG - 1579 HB 5 of 5 0 6.6 KV 25 KA 630 A indoor VC panel (spare transformer feeder panel) do 3393 / 15.01.11
1 do do 4158 / 18.03.11 1
Power circuit - i/c -1 (panel no 5) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
3 - IW - 1579 / 1A 1 of 10 0 do 3393 / 15.01.11 1 1
incomer panel (typical)
CT & PT circuit - i/c -1 (panel no 5) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
2 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

Control circuit 1 - i/c -1 (panel no 5) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
3 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

Page 203 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

Control circuit 2 - i/c -1 (panel no 5) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
4 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

5 of 10 0 Fuse & Terminal plan - i/c -1 (panel no 5) 3.3 KV, 630 A, 13.1 KA (11 panel sw do 3393 / 15.01.11 1
board) incomer panel (typical)
Power circuit - i/c -1 (panel no 7) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
6 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

CT & PT circuit - i/c -1 (panel no 7) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
7 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

8 of 10 0 Control circuit 1 - i/c -1 (panel no 7) 3.3 KV, 630 A, 13.1 KA (11 panel sw board) do 3393 / 15.01.11 1
incomer panel (typical)
Control circuit 2 - i/c -1 (panel no 7) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
9 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

Fuse & Terminal plan - i/c -1 (panel no 7) 3.3 KV, 630 A, 13.1 KA (11 panel sw
10 of 10 0 do 3393 / 15.01.11 1
board) incomer panel (typical)

3 - BW - 1579 / 1A 1 of 6 0 Power circuit (panel no 6) 3.3 KV, 630 A, 13.1 KA (11 panel sw board) bus do 3393 / 15.01.11 1 1
section panel (typical)
CT & PT circuit (panel no 6) 3.3 KV, 630 A, 13.1 KA (11 panel sw board) bus
2 of 6 0 do 3393 / 15.01.11 1
section panel (typical)
Control circuit 1 (panel no 6) 3.3 KV, 630 A, 13.1 KA (11 panel sw board) bus
3 of 6 0 do 3393 / 15.01.11 1
section panel (typical)
Control circuit 2 (panel no 6) 3.3 KV, 630 A, 13.1 KA (11 panel sw board) bus
4 of 6 0 section panel (typical) do 3393 / 15.01.11 1

Fuse & Terminal plan (panel no 6) 3.3 KV, 630 A, 13.1 KA (11 panel sw board)
5 of 6 0 do 3393 / 15.01.11 1
bus section panel (typical)
Bus wire of interlocking circuit 3.3 KV,13.1 KA, 630 A (11 panel sw board) bus
6 of 6 0 section panel (typical) do 3393 / 15.01.11 1

3 - MW - 1579 / 1A 1 of 4 0 Power & CT circuit of motor feeder, motor feeder - 1,2,3,4 3.3 KV, 400 A, 13.1 do 3393 / 15.01.11 1 1
KA (11 panel sw board) motor feeder (typical)
Control circuit 1 of motor feeder, motor feeder - 1,2,3,4 3.3 KV, 400 A, 13.1 KA
2 of 4 0 (11 panel sw board) motor feeder (typical) do 3393 / 15.01.11 1

Control circuit 2 of motor feeder, motor feeder - 1,2,3,4 3.3 KV, 400 A, 13.1 KA
3 of 4 0 (11 panel sw board) motor feeder (typical) Andrew Yule & Co. Ltd 3393 / 15.01.11 1

4 of 4 0 Fuse & Terminal plan of motor feeder, motor feeder - 1,2,3,4 3.3 KV, 400 A, do 3393 / 15.01.11 1
13.1 KA (11 panel sw board) motor feeder (typical)
Power circuit (panel no 1) 3.3 KV, 630 A, 13.1 KA (7 panel sw board)
3 - TW - 1579 / 3A 1 of 6 0 transformer feeder panel (typical) do 3393 / 15.01.11 1 1

CT circuit (panel no 1) 3.3 KV, 630 A, 13.1 KA (7 panel sw board) transformer


2 of 6 0 do 3393 / 15.01.11 1
feeder panel (typical)

3 of 6 0 Control circuit 1 (panel no 1) 3.3 KV, 630 A, 13.1 KA (7 panel sw board) do 3393 / 15.01.11 1
transformer feeder panel (typical)
Control circuit 2 (panel no 1) 3.3 KV, 630 A, 13.1 KA (7 panel sw board)
4 of 6 0 do 3393 / 15.01.11 1
transformer feeder panel (typical)
Aux relay circuit (panel no 1) 3.3 KV, 630 A, 13.1 KA (7 panel sw board)
5 of 6 0 transformer feeder panel (typical) do 3393 / 15.01.11 1

Fuse & Terminal plan (panel no 1) 3.3 KV, 630 A, 13.1 KA (7 panel sw board)
6 of 6 0 transformer feeder panel (typical) do 3393 / 15.01.11 1

Power circuit - i/c -1 (panel no 3) 6.6 KV, 630 A, 25 KA (7 panel sw board)


3 - IW - 1579 / 7A 1 of 10 0 do 3393 / 15.01.11 1 1
incomer panel (typical)
CT & PT circuit - i/c -1 (panel no 3) 6.6 KV, 630 A, 25 KA (7 panel sw board)
2 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

3 of 10 0 Control circuit 1 - i/c -1 (panel no 3) 6.6 KV, 630 A, 25 KA (7 panel sw board) do 3393 / 15.01.11 1
incomer panel (typical)
Control circuit 2 - i/c -1 (panel no 3) 6.6 KV, 630 A, 25 KA (7 panel sw board)
4 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

Fuse & Terminal plan - i/c -1 (panel no 3) 6.6 KV, 630 A, 25 KA (7 panel sw
5 of 10 0 board) incomer panel (typical) do 3393 / 15.01.11 1

6 of 10 0 Power circuit - i/c -2 (panel no 5) 6.6 KV, 630 A, 25 KA (7 panel sw board) do 3393 / 15.01.11 1
incomer panel (typical)
CT & PT circuit - i/c -2 (panel no 5) 6.6 KV, 630 A, 25 KA (7 panel sw board)
7 of 10 0 incomer panel (typical) do 3393 / 15.01.11 1

Control circuit 1 - i/c -2 (panel no 5) 6.6 KV, 630 A, 25 KA (7 panel sw board)


8 of 10 0 do 3393 / 15.01.11 1
incomer panel (typical)

9 of 10 0 Control circuit 2 - i/c -2 (panel no 5) 6.6 KV, 630 A, 25 KA (7 panel sw board) do 3393 / 15.01.11 1
incomer panel (typical)
Fuse & Terminal plan - i/c -2 (panel no 5) 6.6 KV, 630 A, 25 KA (7 panel sw
10 of 10 0 do 3393 / 15.01.11 1
board) incomer panel (typical)
Power circuit (panel no 4) 6.6 KV, 630 A, 25 KA (7 panel sw board) bus section
3 - BW - 1579 / 7A 1 of 6 0 panel (typical) do 3393 / 15.01.11 1 1

PT circuit (panel no 4) 6.6 KV, 630 A, 25 KA (7 panel sw board) bus section


2 of 6 0 panel (typical) do 3393 / 15.01.11 1

Control circuit 1 (panel no 4) 6.6 KV, 630 A, 25 KA (7 panel sw board) bus


3 of 6 0 do 3393 / 15.01.11 1
section panel (typical)

Page 204 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

Control circuit 2 (panel no 4) 6.6 KV, 630 A, 25 KA (7 panel sw board) bus


4 of 6 0 section panel (typical) do 3393 / 15.01.11 1

5 of 6 0 Fuse & Terminal plan (panel no 4) 6.6 KV, 630 A, 25 KA (7 panel sw board) bus do 3393 / 15.01.11 1
section panel (typical)
Bus wire of interlocking circuit 6.6 KV, 25 KA, 630 A bus section panel 7 panel
6 of 6 0 sw board bus section panel (typical) do 3393 / 15.01.11 1

Power circuit (panel no 1, 2) 6.6 KV, 630 A, 25 KA (7 panel sw board)


3 - TW - 1579 / 7A 1 of 6 0 transformer feeder panel (typical) Andrew Yule & Co. Ltd 3393 / 15.01.11 1 1

2 of 6 0 CT circuit (panel no 1, 2) 6.6 KV, 630 A, 25 KA (7 panel sw board) transformer do 3393 / 15.01.11 1
feeder panel (typical)
Control circuit 1 (panel no 1, 2) 6.6 KV, 630 A, 25 KA (7 panel sw board)
3 of 6 0 transformer feeder panel (typical) do 3393 / 15.01.11 1

Control circuit 2 (panel no 1, 2) 6.6 KV, 630 A, 25 KA (7 panel sw board)


4 of 6 0 do 3393 / 15.01.11 1
transformer feeder panel (typical)

5 of 6 0 Aux relay (panel no 1, 2) 6.6 KV, 630 A, 25 KA (7 panel sw board) transformer do 3393 / 15.01.11 1
feeder panel (typical)
Fuse & Terminal plan (panel no 1, 2) 6.6 KV, 630 A, 25 KA (7 panel sw board)
6 of 6 0 do 3393 / 15.01.11 1
transformer feeder panel (typical)
Power & CT circuit of motor feeder, motor feeder - 1,2,3,4,5,7,9 6.6 KV, 400 A,
3 - MW - 1579 / 6A 1 of 4 0 do 3393 / 15.01.11 1 1
25 KA (20 panel sw board) motor feeder (typical)
Control circuit 1 of motor feeder, motor feeder - 1,2,3,4,5,7,9 6.6 KV, 400 A,
2 of 4 0 25 KA (20 panel sw board) motor feeder (typical) do 3393 / 15.01.11 1

Control circuit 2 of motor feeder, motor feeder - 1,2,3,4,5,7,9 6.6 KV, 400 A,
3 of 4 0 do 3393 / 15.01.11 1
25 KA (20 panel sw board) motor feeder (typical)
Fuse & Terminal plan of motor feeder, motor feeder - 1,2,3,4,5,7,9 6.6 KV, 400
4 of 4 0 A, 25 KA (20 panel sw board) motor feeder (typical) do 3393 / 15.01.11 1

1 of 3
BOM (3.3 KV) to 3 of - Motor Feeder (Panel no 1, 4, 8, 11) for S / S - I do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - 2 incoming, 1 bus section (Panel no 5, 6, 7) for S / S - I do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - Motor Feeder (Panel no 1, 3, 8, 10) for S / S - II do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - 2 incoming, 1 bus section (Panel no 5, 6, 7) for S / S - II do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - 1 no 200 KVA transformer feeder for S / S - II do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - Motor Feeder (Panel no 2, 6, 7) for S / S - III do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - 1 no 100 KVA Lighting transformer feeder for S / S - III do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - 2 incoming, 1 bus section (Panel no 3, 4, 5) for S / S - III do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - Motor Feeder (Panel no 1- 5, 11, 12, 15 - 17) for S / S - IV do 4158 / 18.03.11
3

1 of 3
2 nos 1250 KVA transformer feeder, 1 no 100 KVA Lighting transformer feeder,
BOM (3.3 KV) to 3 of - 1 no spare transformer feeder for S / S - IV do 4158 / 18.03.11
3

1 of 3
BOM (3.3 KV) to 3 of - 2 incoming, 1 bus section (Panel no 8, 9, 10) for S / S - IV do 4158 / 18.03.11
3

1 of 3
BOM (6.6 KV) to 3 of - Motor Feeder (Panel no 1, 5, 7, 8, 12 - 18) for S / S - I do 4158 / 18.03.11
3

1 of 3 1 no 200 KVA transformer feeder, 1 no 100 KVA Lighting transformer feeder, 1


BOM (6.6 KV) to 3 of - do 4158 / 18.03.11
no spare transformer feeder for S / S - I
3

1 of 3
BOM (6.6 KV) to 3 of - 2 incoming, 1 bus section (Panel no 9, 10, 11) for S / S - I do 4158 / 18.03.11
3

1 of 3
BOM (6.6 KV) to 3 of - Motor Feeder (Panel no 1- 7, 9, 13 - 18) for S / S - II Andrew Yule & Co. Ltd 4158 / 18.03.11
3

Page 205 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

1 of 3
1 no 200 KVA transformer feeder, 1 no 100 KVA Lighting transformer feeder, 1
BOM (6.6 KV) to 3 of - no spare transformer feeder for S / S - II do 4158 / 18.03.11
3

1 of 3
BOM (6.6 KV) to 3 of - 2 incoming, 1 bus section (Panel no 10, 11, 12) for S / S - II do 4158 / 18.03.11
3

1 of 3
2 nos 630 KVA transformer feeder, 1 no 100 KVA Lighting transformer feeder, 1
BOM (6.6 KV) to 3 of - no spare transformer feeder for S / S - III do 4158 / 18.03.11
3

1 of 3
BOM (6.6 KV) to 3 of - 2 incoming, 1 bus section (Panel no 3, 4, 5) for S / S - III do 4158 / 18.03.11
3

1 of 3
2 nos 630 KVA transformer feeder, 1 no 100 KVA Lighting transformer feeder, 1
BOM (6.6 KV) to 3 of - do 4158 / 18.03.11
no spare transformer feeder for S / S - IV
3

1 of 3
BOM (6.6 KV) to 3 of - 2 incoming, 1 bus section (Panel no 2, 3, 4) for S / S - IV do 4158 / 18.03.11
3

1 of 10
Annexure - A to 10 of - Clarification of the comments on electrical drawings 4158 / 18.03.11
10

1 of 10 Temperature rise calculation for bus bar used in AY make 6.6 kv & 3.3 kv VCB
Annexure - B to 10 of - 4158 / 18.03.11
panels
10

1 of 10 Calculation of short CKT withstand for 1 sec of busbars as used in Andrew Yule
Annexure - C to 10 of - 4158 / 18.03.11
make 6.6 kv & 3.3 kv VCB panels
10

1 of 10
Annexure - D to 10 of - Specification criteria for burden of PT & CT 4158 / 18.03.11
10

Marathon Electric
H.T & L.T Motor
Motors (India) Ltd.
A3C 16587 - 470 1 1 DC280F710 : General arrangement of motor do 3442 / 19.01.11 1 1
A3C 13903 1 0 Neutral point terminal box shorting arrangement do 3442 / 19.01.11 1 1
A3C 13780 - 013 1 0 Assembly drawing of phase segregated terminal box do 3442 / 19.01.11 1 1
A4C 14150 - 001 1 0 Heater terminal box assembly & connection diagram do 3442 / 19.01.11 1 1
A4C 15261 - RTD - BTD 1 0 Arrangement of RTD & BTD T box do 3442 / 19.01.11 1 1
Document 1 0 Data sheet of 125 kw, 3.3 kv, 50 c/s, SCIM do 3442 / 19.01.11
Current vs Time characteristic curve of 125 kw, 4 pole, 3300 v, DC280F710
Document 5 0 motor do 3442 / 19.01.11

Current - Speed curve for 125 kw, 4 pole, 3.3 kv, DC280F710 do 3442 / 19.01.11
Torque vs Speed characteristic curve of 125 kw, 4 pole, 3300 v, DC280F710
motor do 3442 / 19.01.11

Thermal withstand characteristic curve of 125 kw, 4 pole, 3300 v, DC280F710


motor do 3442 / 19.01.11

Efficiency & power factor vs Percentage load curve of 125 kw, 4 pole, 3300 v,
DC280F710 motor do 3442 / 19.01.11

A4C 17867 - 246 1 1 DC355F3 : 4 P outline dimensions drawing of H.T motor do 3442 / 19.01.11 1 1
A3C 13903 1 0 Neutral point terminal box shorting arrangement do 3442 / 19.01.11 1 1
A3C 13780 - 013 1 0 Assembly drawing of phase segregated terminal box do 3442 / 19.01.11 1 1
A4C 14150 - 001 1 0 Heater terminal box assembly & connection diagram do 3442 / 19.01.11 1 1
A4C 15261 - RTD - BTD 1 0 Arrangement of RTD & BTD T box do 3442 / 19.01.11 1 1
Document 1 0 Data sheet of 300 kw, 3.3 kv, 50 c/s, SCIM do 3442 / 19.01.11
Current vs Time characteristic curve of 300 kw, 4 pole, 3300 v, DC355F3 motor Marathon Electric
Document 5 0 3442 / 19.01.11
Motors (India) Ltd.
Current - Speed curve for 300 kw, 4 pole, 3.3 kv, DC355F3 3442 / 19.01.11
Thermal withstand characteristic curve of 300 kw, 4 pole, 3300 v, DC355F3
motor do 3442 / 19.01.11

Torque vs Speed characteristic curve of 300 kw, 4 pole, 6600 v, DC355F3 motor
do 3442 / 19.01.11

Efficiency & power factor vs Percentage load curve of 300 kw, 4 pole, 3300 v,
DC355F3 motor do 3442 / 19.01.11

A4C 17867 - 247 1 1 DC355F3 : 4 P outline dimensions drawing of H.T motor do 3442 / 19.01.11 1 1
A3C 13903 1 0 Neutral point terminal box shorting arrangement do 3442 / 19.01.11 1 1
A3C 13780 - 013 1 0 Assembly drawing of phase segregated terminal box do 3442 / 19.01.11 1 1
A4C 14150 - 001 1 0 Heater terminal box assembly & connection diagram do 3442 / 19.01.11 1 1
A4C 15261 - RTD - BTD 1 0 Arrangement of RTD & BTD T box do 3442 / 19.01.11 1 1
Document 1 0 Data sheet of 300 kw, 6.6 kv, 50 c/s, SCIM do 3442 / 19.01.11
Current vs Time characteristic curve of 300 kw, 4 pole, 6600 v, DC355F3 motor
Document 5 0 do 3442 / 19.01.11

Current - Speed curve for 300 kw, 4 pole, 6.6 kv, DC355F3 do 3442 / 19.01.11

Page 206 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

Torque vs Speed characteristic curve of 300 kw, 4 pole, 6600 v, DC355F3 motor
do 3442 / 19.01.11

Thermal withstand characteristic curve of 300 kw, 4 pole, 6600 v, DC355F3


motor do 3442 / 19.01.11

Efficiency & power factor vs Percentage load curve of 300 kw, 4 pole, 6600 v,
DC355F3 motor do 3442 / 19.01.11

A4C 17867 - 248 1 1 DC355F3 : 4 P outline dimensions drawing of H.T motor do 3442 / 19.01.11 1 1
A3C 13903 1 0 Neutral point terminal box shorting arrangement do 3442 / 19.01.11 1 1
A3C 13780 - 013 1 0 Assembly drawing of phase segregated terminal box do 3442 / 19.01.11 1 1
A4C 14150 - 001 1 0 Heater terminal box assembly & connection diagram do 3442 / 19.01.11 1 1
A4C 15261 - RTD - BTD 1 0 Arrangement of RTD & BTD T box do 3442 / 19.01.11 1 1
Document 1 0 Data sheet of 350 kw, 3.3 kv, 50 c/s, SCIM do 3442 / 19.01.11
Current vs Time characteristic curve of 350 kw, 4 pole, 3300 v, DC355F3 motor
Document 5 0 do 3442 / 19.01.11

Current - Speed curve for 350 kw, 4 pole, 6.6 kv, DC355F3 do 3442 / 19.01.11
Torque vs Speed characteristic curve of 350 kw, 4 pole, 6600 v, DC355F3 motor
do 3442 / 19.01.11

Efficiency & power factor vs Percentage load curve of 350 kw, 4 pole, 6600 v,
DC355F3 motor do 3442 / 19.01.11

do 3442 / 19.01.11
Data sheet with characteristic curve and drawings of of 375 kw / 50 hp, 415 v, ,
Document 5 0 50 c/s, SCIM do 3442 / 19.01.11

Data sheet with characteristic curve and drawings of of 90 kw / 50 hp, 415 v,


Document 5 0 50 c/s, SCIM do 3442 / 19.01.11

Travelling Tripper TRF Limited


ZC/TRF/031/TP/10 - 11 1 of 6 0 GA, OD, BOM, Circuit diagram & terminal plan of Tripper control panel do 3694 / 09.02.11
1 do do 347 / 28.04.11 1 1 2331 / 25.05.11
2 of 6 0 do do 3694 / 09.02.11
1 do do 347 / 28.04.11 1 2331 / 25.05.11
3 of 6 0 do do 3694 / 09.02.11
1 do do 347 / 28.04.11 2331 / 25.05.11
2 do do 827 / 03.06.11 1
4 of 6 0 do TRF Limited 3694 / 09.02.11
1 do do 347 / 28.04.11 1 2331 / 25.05.11
5 of 6 0 do do 3694 / 09.02.11
1 do do 347 / 28.04.11 1 2331 / 25.05.11
6 of 6 0 do do 3694 / 09.02.11
1 do do 347 / 28.04.11 1 2331 / 25.05.11
ZC/TRF/031/CJB/10 - 11 1 of 1 0 GA, OD, BOM of control junction box (20 T) do 3694 / 09.02.11 1 1
ZC/TRF/031/PJB/10 - 11 1 of 1 0 GA, OD, BOM of power junction box (63 A) do 3694 / 09.02.11 1 1
TC / 325166 1 0 GA of Thruster operated brake do 3694 / 09.02.11 1 1
TC / 41806 1 A GA of Roller lever operated limit switch do 3694 / 09.02.11 1 1
TC / 41816 1 C GA of 'V' lever operated limit switch do 3694 / 09.02.11 1 1
1 of 5
Data Sheet to 5 of 0 Technical data sheet of 7.5 kw travelling tripper motor do 3694 / 09.02.11
5
QAP No. ZC/TRF/031/QAP/10 - 11 1 of 4 Quality Assurance Plan of tripper control panel, control junction box & power
to 4 of 0 junction box do 3694 / 09.02.11
4
Two way Divertor Gate
Merit BMH Engineering
MBMH / SKSL/ 011 / M / 01 1 of 1 B GA of Two way Divertor Gate 3748 / 14.02.11 1 1 2275 / 23.04.11
Pvt Ltd

M/s Merit
MTIL / SKSL/ 351 / M / 01 1 of 1 A GA of Two way Divertor Gate Technologies (India) 923 / 10.06.11 1 1 2596 / 30.03.12
Ltd
do (Compliance Report) 100 / 09.04.12 2609 / 10.05.12
do (Clarrification) 842 / 28.05.12
Electro Hydraulic Thrustor Elektromag Methods
105/156/500-34/01 1 0 Assembly drawing of 500 dia M.T.O.B with 34 kg Electro hydraulic thrustor do 3749 / 14.02.11 1 1 2292 / 29.04.11
105/156/400-34/01 1 0 Assembly drawing of 400 dia M.T.O.B with 34 kg Electro hydraulic thrustor do 3749 / 14.02.11 1 1 2292 / 29.04.11
1 of 4 Manufacturing quality plan for Elektro hydraulic thrustor
MQP No EMM to 4 of 0 do 3749 / 14.02.11
4
105/156/500 DS-114 TL / LS /1 1 0 GA drawing of f 500 * M.T.O.B with 114 kg Electro Hydraulic Thrustor do 1515 / 18.07.11 1 1
105/156/400 -46 TL / LS /1 1 0 Assembly drawing of f 400 * M.T.O.B with 46 kg Electro hydraulic thrustor do 1515 / 18.07.11 1 1

Power sub Distribution Board BGS Enterprise


GA for power sub distribution board (PSDB - V & VI) at the Feeder floor of Truck
BGS / 10 - 11 / 51 1 of 3 0 loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1 1

Page 207 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

SLD for power sub distribution board (PSDB - V & VI) at the Feeder floor of
2 of 3 0 Truck loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1
Control wiring for power sub distribution board (PSDB - V & VI) at the Feeder
3 of 3 0 floor of Truck loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1
GA for power sub distribution board (PSDB - VII to XIV) at the Feeder floor of
BGS / 10 - 11 / 52 1 of 3 0 Truck loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1 1
SLD for power sub distribution board (PSDB - VII to XIV) at the Feeder floor of
2 of 3 0 Truck loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1
Control wiring for power sub distribution board (PSDB - VII to XIV) at the
3 of 3 0 Feeder floor of Truck loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1
BOM for power sub distribution board (PSDB - V & VI) at the Feeder floor of
BGS / 10 - 11 / 51 1 of 1 0 Truck loading hopper. BGS Enterprise 3791 / 16.02.11

1 do do 339 / 28.04.11 1 1
BOM for power sub distribution board (PSDB - VII to XIV) at the Feeder floor of
BGS / 10 - 11 / 52 1 of 1 0 Truck loading hopper. do 3791 / 16.02.11

1 do do 339 / 28.04.11 1 1

3 - BE - 051 1 of 11 0 415 V Power Sub Distribution Board (PSDB 1 - 4) do 4295 / 30.03.11


1 do do 226 / 20.04.11 1 1
2 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
3 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
4 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
5 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
6 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
7 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
8 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1
9 of 11 0 do do 4295 / 30.03.11
1 do do 226 / 20.04.11 1

10 of 11 0 do do 4295 / 30.03.11

1 do do 226 / 20.04.11 1

11 of 11 0 do do 4295 / 30.03.11

1 do do 226 / 20.04.11 1

Main Lighting Distribution Board BGS Enterprise

BGS / 10-11/53 1 of 8 0 GA for MLDB - 1 at Sub station III of 3.3 kv system do 3670 / 12.01.12 1 1
2 of 8 0 Component layout for MLDB -1 at Sub station III of 3.3 kv system do 3670 / 12.01.12 1
3 of 8 0 SLD for MLDB - 1 at Sub station III of 3.3 kv system do 3670 / 12.01.12 1
4 of 8 0 do do 3670 / 12.01.12 1
5 of 8 0 do do 3670 / 12.01.12 1
6 of 8 0 Control scheme for MLDB -1 at Sub station III of 3.3 kv system do 3670 / 12.01.12 1
7 of 8 0 do do 3670 / 12.01.12 1
8 of 8 0 do do 3670 / 12.01.12 1
BGS / 10-11/54 1 of 7 0 GA for MLDB - 2 at Sub station IV of 3.3 kv system do 3670 / 12.01.12 1 1
2 of 7 0 Component layout for MLDB -2 at Sub station IV of 3.3 kv system do 3670 / 12.01.12 1
3 of 7 0 SLD for MLDB - 2 at Sub station IV of 3.3 kv system do 3670 / 12.01.12 1
4 of 7 0 do do 3670 / 12.01.12 1
5 of 7 0 Control scheme for MLDB -2 at Sub station IV of 3.3 kv system do 3670 / 12.01.12 1
6 of 7 0 do do 3670 / 12.01.12 1
7 of 7 0 do do 3670 / 12.01.12 1
BGS / 10-11/55 1 of 7 0 GA for MLDB - 3 at Sub station II of 6.6 kv system do 3670 / 12.01.12 1 1
2 of 7 0 Component layout for MLDB -3 at Sub station II of 6.6 kv system do 3670 / 12.01.12 1
3 of 7 0 SLD for MLDB - 3 at Sub station II of 6.6 kv system do 3670 / 12.01.12 1
4 of 7 0 do do 3670 / 12.01.12 1
5 of 7 0 Control scheme for MLDB -3 at Sub station II of 6.6 kv system do 3670 / 12.01.12 1
6 of 7 0 do do 3670 / 12.01.12 1
7 of 7 0 do do 3670 / 12.01.12 1
BGS / 10-11/56 1 of 8 0 GA for MLDB - 4 at Sub station III of 6.6 kv system do 3670 / 12.01.12 1 1
2 of 8 0 Component layout for MLDB -4 at Sub station III of 6.6 kv system do 3670 / 12.01.12 1

Page 208 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

3 of 8 0 SLD for MLDB - 4 at Sub station III of 6.6 kv system do 3670 / 12.01.12 1
4 of 8 0 do do 3670 / 12.01.12 1
5 of 8 0 do do 3670 / 12.01.12 1
6 of 8 0 Control scheme for MLDB -4 at Sub station III of 6.6 kv system do 3670 / 12.01.12 1
7 of 8 0 do do 3670 / 12.01.12 1
8 of 8 0 do do 3670 / 12.01.12 1
1 of 3
Document to 0 Bill of Material / Feeder components of Main Lighting Distribution Board - I do 3670 / 12.01.12
3 of 3

1 of 3
Document to 0 Bill of Material / Feeder components of Main Lighting Distribution Board - II do 3670 / 12.01.12
3 of 3

1 of 2
Document to 0 Bill of Material / Feeder components of Main Lighting Distribution Board - III do 3670 / 12.01.12
2 of 2

1 of 2
Document to 0 Bill of Material / Feeder components of Main Lighting Distribution Board - IV do 3670 / 12.01.12
2 of 2

Powermaster
Lighting Transformer Electricals Pvt. Ltd
Outline GA drawing for 100 KVA, 3300 / 415 V, 3 PH, 50 HZ, cooling onan,
PE-GA-100-3.3 KV-01 1 of 1 0 vector GR - Dyn - 11, indoor type Transformer. do 3954 / 02.03.11 1 1

Rating & diagram plate for 100 KVA, 3300 / 415 V, 3 PH, 50 HZ, cooling onan,
PME-NP-100-3.3 KV-01 1 of 1 0 vector GR - Dyn - 11, indoor type Transformer. do 3954 / 02.03.11 1 1

Wiring diagram for OTI & WTI of 100 KVA, 3300 / 415 V, 3 PH, 50 HZ, cooling
PE-WD-100-3.3 KV-01 1 of 1 0 onan, vector GR - Dyn - 11, indoor type Transformer. do 3954 / 02.03.11 1 1

Outline GA drawing for 100 KVA, 6600 / 230 V, 3 PH, 50 HZ, cooling onan,
PE-GA-100-6.6 KV-01 1 of 1 0 vector GR - Dyn - 11, indoor type Transformer. do 3954 / 02.03.11 1 1

Rating & diagram plate for 100 KVA, 6600 / 230 V, 3 PH, 50 HZ, cooling onan,
PME-NP-100-6.6 KV-01 1 of 1 0 vector GR - Dyn - 11, indoor type Transformer. do 3954 / 02.03.11 1 1

Wiring diagram for OTI & WTI of 100 KVA, 6600 / 230 V, 3 PH, 50 HZ, cooling
PE-WD-100-6.6 KV-01 1 of 1 0 onan, vector GR - Dyn - 11, indoor type Transformer. do 3954 / 02.03.11 1 1

Elecon Engineering Co
Gear Coupling Ltd
57 - 74 - 1349 1 0 Dimension sheet for Gear coupling do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1350 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1351 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1352 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1353 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1354 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1355 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1356 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1357 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
57 - 74 - 1358 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
1 of 1 B do do 3649 / 11.01.12
57 - 74 - 1360 1 0 do do 4076 / 12.03.11 1 1 2429 / 02.09.11
QAP No : QP. QA. 19.00 1 of 1 0 Reference quality plan - 05 for Gear coupling do 4076 / 12.03.11

Power cable RPG Cables


1 of 10
152 / CABLE / LT - 002 to 10 of 0 Technical data sheet of LT (CU) cables do 3869 / 23.02.11 / 19.04.11
10
1 do do 869 / 06.06.11
1 of 6
152 / CABLE / LT - 002A to 6 of 0 Basic assumption for current ratings & rating factors do 869 / 06.06.11
6

1 of 2
152 / CABLE / LT - 003 to 2 of 0 Technical data sheet of power & control cables Incab Industries Ltd 4087 / 14.03.11
2

1 of 4
Quality plan to 4 0 Quality plan for FRLS PVC ARMD. Cables (Power & control cables) do 4087 / 14.03.11
of 4

1 of 6
Havels India Ltd (Cable
152 / CABLE / HT - 001 to 6 0 Technical data sheet of HT (CU) cables 634 / 20.05.11 2338 / 06.06.11
of 6 division)

1 of 6
to 4 1 do do 1093 / 22.06.11
of 6

Page 209 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

5 of 6
to 6 0 Basic assumption for current ratings & rating factors do 1093 / 22.06.11
of 6

1 of 2
152 / CONT.CABLE - 004 to 2 0 Technical data sheet of control cable do 1541 / 19.07.11
of 2

1 of 2
152 / SPEC.CABLE - 005 to 2 0 Technical data sheet of special cable do 1541 / 19.07.11
of 2

Belt Scrapper Kaveri Ultra Polymers


Pvt. Ltd
K / BS / J - 10390 / 101 1 of 1 0 GA of external belt scrapper - primary type do 012 / 02.04.11 1 1 2388 / 01.07.11
K / BS / J - 10390 / 102 1 of 1 0 GA of external belt scrapper - secondary type do 012 / 02.04.11 1 1 2388 / 01.07.11
K / BS / J - 10390 / 103 1 of 1 0 GA of external belt scrapper - reversible type do 012 / 02.04.11 1 1 2388 / 01.07.11
K / BS / J - 10390 / 104 1 of 1 0 GA of external belt scrapper -' V'- plough type do 012 / 02.04.11 2388 / 01.07.11
1 do 1382 / 02.04.11 1 1
K / BS / J - 10390 / 105 1 of 1 0 GA of external belt scrapper -' D'- plough type do 012 / 02.04.11 2388 / 01.07.11
1 do 1382 / 02.04.11 1 1
J - 10390 / 001 1 - Data sheet of belt scrapper ( external & internal) do 012 / 02.04.11 2388 / 01.07.11
J - 10390 / 002 1 - Quality Assurance Plan for belt scrapper - external do 012 / 02.04.11 2388 / 01.07.11
J - 10390 / 003 1 - Quality Assurance Plan for belt scrapper - internal do 012 / 02.04.11 2388 / 01.07.11

Air Blaster M.M Fabricators Pvt Ltd

MMF / SKS / 11-09100.00 1 A0 Location of Air Blaster Arrangement in RCC overhead bunker 1 & 2 do 091 / 08.04.11 2368 / 24.06.11
A1 do 1357 / 08.07.11 1 1 2421 / 12.08.11
General Arrangement of Air Blaster instllation in RCC overhead bunker 1 & 2
MMF / SKS / 11-09100.01 1 A0 do 091 / 08.04.11 1 1 2368 / 24.06.11

MMF / SKS / 11-09100.02 1 A0 Air Blaster vessel details. 150 ltrs (AB - 10 - 150) do 091 / 08.04.11 2368 / 24.06.11
A1 do 1357 / 08.07.11 1 1 2421 / 12.08.11
MMF / SKS / 11-09100.03 1 A0 Nozzle details do 091 / 08.04.11 1 1 2368 / 24.06.11
MMF / SKS / 11-09100.04 1 A0 Details of pneumatic Control Panel (4 - outputs) do 091 / 08.04.11 1 1 2368 / 24.06.11
MMF / SKSPL / 2011-03 / 100 1 of 1 0 Quality Assurance Plan for Air Blaster do 091 / 08.04.11 2368 / 24.06.11
Operating priciples, Commissioning procedure & Compressor capacity
Document 3 0 calculation do 091 / 08.04.11 2368 / 24.06.11

Elecon Engineering Co.


Conveyor Pulley
Ltd
PY0493 / 3 2 2 Assembly of Conveyor pulley (Drive & Head) do 096 / 08.04.11 2294 / 30.04.11
3 do do 580 / 16.05.11 2362 / 20.06.11
5 do do 1179 / 27.06.11 1 1 2414 / 02.08.11
3 4 do do 3034 / 29.11.11 1
5 do do 1304 / 29.06.12
PY0493 / 3 4 2 Assembly of Conveyor pulley (Non Drive) do 096 / 08.04.11 2294 / 30.04.11
3 do do 580 / 16.05.11 2362 / 20.06.11
3 do do 1179 / 27.06.11 2414 / 02.08.11
4 do do 1840 / 11.08.11 1
5 4 do do 3034 / 29.11.11 1
5 do do 1304 / 29.06.12
PY0493 / 4 1 0 do 580 / 16.05.11
Clarrification sent 881/30.05.12
1 of 3
QP / 011 to 3 0 Quality plan for Pulleys do 096 / 08.04.11
of 3
2294 / 30.04.11
PY0493 / 3 2 2 Assembly of Conveyor pulley (Drive & Head) do 096 / 08.04.11 2362 / 20.06.11
3 do do 580 / 16.05.11 1 1 2414 / 02.08.11
5 do do 1179 / 27.06.11 1
3 4 do do 3034 / 29.11.11
5 do do 1304 / 29.06.12 2294 / 30.04.11
PY0493 / 3 4 2 Assembly of Conveyor pulley (Non Drive) do 096 / 08.04.11 2362 / 20.06.11
3 do do 580 / 16.05.11 2414 / 02.08.11
3 do do 1179 / 27.06.11 1
4 do do 1840 / 11.08.11 1
5 4 do do 3034 / 29.11.11
5 do do 1304 / 29.06.12
3/1 5 Assembly of Conveyor pulley (Drive & Head) for P1, Q1, R1 do 1304 / 29.06.12
3/2 5 Assembly of Conveyor pulley (Drive & Head) for P2, Q2, R2 do 1304 / 29.06.12
3/3 5 Assembly of Conveyor pulley (Drive & Head) for C1 to C8 do 1304 / 29.06.12
5/1 5 Assembly of Conveyor pulley (Non Drive) for P1, Q1, R1 do 1304 / 29.06.12
5/2 5 Assembly of Conveyor pulley (Non Drive) for P2, Q2, R2 do 1304 / 29.06.12
5/3 5 Assembly of Conveyor pulley (Non Drive) for C1 to C8 do 1304 / 29.06.12

Page 210 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

PY0493 / 4 1 0 do 580 / 16.05.11


Clarrification sent 881/30.05.12
1 of 3
QP / 011 to 3 of 0 Quality plan for Pulleys do 096 / 08.04.11
3
Document
Calculation of shaft diameter of drive & head / discharge pulleys of surface
151/TS/PULLEY/001A 1 of 1 0 conveyors do 1179 / 27.06.11

Calculation of shaft diameter of non drive (tail / take up / bend / snub /


1 of 1 0 deflector) pulleys of surface conveyors for B1, B2, B3, B4, B5, B6 & B7 do 1179 / 27.06.11

Calculation of shaft diameter of non drive (tail / take up / bend / snub /


1 of 1 0 deflector) pulleys of surface conveyors for B8 & B9 do 1179 / 27.06.11

Calculation of shaft diameter of non drive (tail / take up / bend / snub /


1 of 1 0 deflector) pulleys of surface conveyors for B10 & B11 do 1179 / 27.06.11

Calculation of shaft diameter of non drive (tail / take up / bend / snub /


1 of 1 0 deflector) pulleys of surface conveyors for B12, B13, B22 & B23 do 1179 / 27.06.11

M/s Bhagabati
Lighting Distribution Board
Enterprise
3 - BE - 052 1 of 9 0 Drawing for Lighting Distribution Board - I at Substation II of 3.3 kv system do 199 / 18.04.11 1 1 2621 / 25.05.12
2 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
3 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
4 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
5 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
6 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
7 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
8 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
3 - BE - 053 1 of 8 0 Drawing for Lighting Distribution Board - II at Substation I of 3.3 kv system do 199 / 18.04.11 1 1 2621 / 25.05.12
2 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
3 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
4 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
5 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
6 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
7 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
Drawing for 230 v Lighting Distribution Board - III at Substation I of 6.6 kv
3 - BE - 054 1 of 8 0 system do 199 / 18.04.11 1 1 2621 / 25.05.12

2 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12


3 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
4 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
5 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
6 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
7 of 8 0 do do 199 / 18.04.11 1 2621 / 25.05.12
Drawing for 230 v Lighting Distribution Board - IV at Substation IV of 6.6 kv
3 - BE - 055 1 of 9 0 system do 199 / 18.04.11 1 1 2621 / 25.05.12

2 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12


3 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
4 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
5 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
6 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
7 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
8 of 9 0 do do 199 / 18.04.11 1 2621 / 25.05.12
Document
Bill of materials for Lighting Distribution Board - I at Substation II of 3.3 kv
3 - BE - 052 9 of 9 0 system do 199 / 18.04.11 2621 / 25.05.12

Bill of materials for Lighting Distribution Board - II at Substation I of 3.3 kv


3 - BE - 053 8 of 8 0 system do 199 / 18.04.11 2621 / 25.05.12

Bill of materials for Lighting Distribution Board - III at Substation I of 6.6 kv


3 - BE - 054 8 of 8 0 system do 199 / 18.04.11 2621 / 25.05.12

Bill of materials for 230 v Lighting Distribution Board - IV at Substation IV of 6.6


3 - BE - 055 9 of 9 0 kv system do 199 / 18.04.11 2621 / 25.05.12

Air Compressor Elgi Equipments Ltd


02 / 03 /4848 / A 1 of 2 3 GA of Reciprocating air compressor package do 699 / 24.05.11 1 1 2368 / 24.06.11
2 of 2 3 do do 699 / 24.05.11 1 2368 / 24.06.11

Protocontrol
Safety Switches Instruments (India) Pvt
Ltd
CD 110435 1 0 Electro dynamic zero speed switch do 572 / 16.05.11 2355 / 16.06.11

Page 211 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

0 do ( Compliance Report ) 1202 / 28.06.11 2404 / 15.07.11


CD 110436 1 0 Belt sway switch with terminal block do 572 / 16.05.11 2355 / 16.06.11
0 do ( Compliance Report ) 1202 / 28.06.11 2404 / 15.07.11
CD 110437 1 0 Pull cord switch with terminal block do 572 / 16.05.11 2355 / 16.06.11
0 do ( Compliance Report ) 1202 / 28.06.11 2404 / 15.07.11
Tractel Tirfor India (Pvt)
Hoist
Ltd
05 - 005 - 3357 1 1 G. A of Manual Hoist do 1003 / 16.06.11 1 1
1 of 2 Standard Quality Assurance Plan for Chain Pulley Block and geard Travelling
QAP no TTI-QC-273 to 2 0 Trolley do 1003 / 16.06.11
of 2

Electric Hoist
X 2556 - 5 T 1 of 1 1 INDEF Electric hoist with trolley (Model : NHL - 5T) - capacity 5T INDEF 1981 / 22.08.11 1 1 2448 / 19.09.11
1 do - clarrification INDEF 860 / 29.05.12 2642 / 19.06.12
2 INDEF Electric hoist with trolley (Model : NHL - 5T) - capacity 5T INDEF 1313 / 30.06.12 2664 / 21/23.07.12
do - clarrification 1697 / 28.07.12 2748 / 27/29.12.12
3 INDEF Electric hoist with trolley (Model : NHL - 5T) - capacity 5T 0142 / 11.04.13

X 0889 - 5 T 1 of 1 1 INDEF Electric hoist with trolley (Model : NP 202) - capacity 5T INDEF 1981 / 22.08.11 1 1 2448 / 19.09.11
1 do - clarrification INDEF 860 / 29.05.12 2642 / 19.06.12
2 INDEF Electric hoist with trolley (Model : NP 202) - capacity 5T INDEF 1313 / 30.06.12 2664 / 21/23.07.12
do - clarrification 1697 / 28.07.12 2748 / 27/29.12.12
3 INDEF Electric hoist with trolley (Model : NP 202) - capacity 5T 0142 / 11.04.13

X 2302 - 10 T 1 of 1 1 INDEF Electric hoist with trolley (Model : HW 3) - capacity 10T INDEF 1981 / 22.08.11 1 1 2448 / 19.09.11
1 do - clarrification INDEF 860 / 29.05.12 2642 / 19.06.12
2 INDEF Electric hoist with trolley (Model : HW 3) - capacity 10T INDEF 1313 / 30.06.12 2664 / 21/23.07.12
do - clarrification 1697 / 28.07.12 2748 / 27/29.12.12
3 INDEF Electric hoist with trolley (Model : HW 3) - capacity 10T 0142 / 11.04.13

Power & control diagram for INDEF Electric hoist with trolley (Model : NP202) -
EL 0889 - 5 T 1 of 1 1 capacity 5 T INDEF 1981 / 22.08.11 1 1 2448 / 19.09.11

Power & control diagram for INDEF Electric hoist with trolley (Model : HW 3) -
EL 2302 - 10 T 1 of 1 1 capacity 10 T INDEF 1981 / 22.08.11 1 1 2448 / 19.09.11

Power & control diagram for INDEF Electric hoist with trolley (Model : NHL -
EL 2556 - 5 T 1 of 1 1 5T) - capacity 5 T INDEF 1981 / 22.08.11 1 1 2448 / 19.09.11

Document 1 of 1 0 Technical specification for Electric hoist INDEF 1981 / 22.08.11 2448 / 19.09.11
1 of 2
QAP No EH/SKSL/SECL/01 to 2 Quality Assurance Plan for Electric hoist INDEF 1981 / 22.08.11 2448 / 19.09.11
of 2
Document 1 of 1 0 Schedule of Hoists INDEF 1981 / 22.08.11 2448 / 19.09.11

Wire Rope Hoist with Bogie electric Trolley, capacity - 5T, Model : NP202, Type:
X 0889 / R0 1 0 WRH - II Eliquip Tools Pvt Ltd 3050 / 29.11.11

Electric Circuit of power and control diagram for 5T hoist, Model - NP202, Type:
EL - 0889/R0 1 0 WRH - II do 3050 / 29.11.11

Wire Rope Electric Hoist with Bogie electric Trolley, capacity - 3T, Model : HW2
X 1843 / R0 1 0 do 3050 / 29.11.11

Electric Circuit of power and control diagram for 3T hoist, Model - HW2
EL 1843 / R0 1 0 do 3050 / 29.11.11

Wire Rope Electric Hoist with Bogie electric Trolley, capacity - 3T, Model : WRH
X 2280 / R0 1 0 N do 3050 / 29.11.11

Electric Circuit of power and control diagram for 3T hoist, Model - WRH N
EL 2280 / R0 1 0 do 3050 / 29.11.11

X 2276 / R0 1 0 Wire Rope Electric Hoist with electric Trolley, capacity - 5T, Model : HW 4L do 3050 / 29.11.11
Electric Circuit of power and control diagram for 5T hoist, Model - HW 4L
EL 2276 / R0 1 0 do 3050 / 29.11.11

X 0605 / R0/3T 1 0 Manual Hoist with geard trolley, capacity 3T do 3050 / 29.11.11
X 0605 / R0/5T 1 0 Manual Hoist with geard trolley, capacity 5T do 3050 / 29.11.11

M/s Prayas Automation


Power Distribution Board Pvt. Ltd
CA/PN 1103 393/PDB 1 1 of 1 0 General Arrangement drawing for Power Distribution Board 1 do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 1/SLD 1 of 5 0 Single line diagram for Power Distribution Board 1 do 1873 / 12.08.11 2449 / 20.09.11
2 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 1 1 of 10 0 Typical power & control circuit diagram for Power Distribution Board 1 do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 1/CC 2 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

Page 212 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

CA/PN 1103 393/PDB 1/CC 3 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11


CA/PN 1103 393/PDB 1 4 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 1 5 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 1 6 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 1 7 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
M/s Prayas Automation
CA/PN 1103 393/PDB 1 8 of 10 0 Typical power & control circuit diagram for Power Distribution Board 1 1873 / 12.08.11 2449 / 20.09.11
Pvt. Ltd
CA/PN 1103 393/PDB 1 9 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

CA/PN 1103 393/PDB 1 10 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

27 nos
CA/PN 1103 393/PDB 1 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 1 do 2457 / 29.09.11 1 27
sht
CA/PN 1103 393/PDB 2 1 of 1 0 General Arrangement drawing for Power Distribution Board 2 do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/A002/PDB2/SLD
1 of 6 0 Single line diagram for Power Distribution Board 2 do 1873 / 12.08.11 2449 / 20.09.11

2 of 6 0 do do 1873 / 12.08.11 2449 / 20.09.11


3 of 6 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 6 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 6 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 6 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 2 1 of 15 0 Typical power & control circuit diagram for Power Distribution Board 2 do 1873 / 12.08.11 2449 / 20.09.11
2 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

10 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

11 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

12 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

13 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

14 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

15 of 15 0 do do 1873 / 12.08.11 2449 / 20.09.11

33 nos
CA/PN 1103 393/PDB 2 sht 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 2 do 2457 / 29.09.11 1 33

CA/PN 1103 393/PDB 3 1 of 1 0 General Arrangement drawing for Power Distribution Board 3 do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/A003/PDB3/SLD
1 of 5 0 Single line diagram for Power Distribution Board 3 do 1873 / 12.08.11 2449 / 20.09.11

2 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11


3 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 5 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 3 1 of 12 0 Typical power & control circuit diagram for Power Distribution Board 3 do 1873 / 12.08.11 2449 / 20.09.11
2 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11

10 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11

11 of 12 0 do do 1873 / 12.08.11 2449 / 20.09.11

CA/PN 1103 393/PDB 3 12 of 12 0 Typical power & control circuit diagram for Power Distribution Board 3 M/s Prayas Automation 1873 / 12.08.11 2449 / 20.09.11
Pvt. Ltd
28 nos
CA/PN 1103 393/PDB 3 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 3 do 2457 / 29.09.11 1 28
sht
CA/PN 1103 393/PDB 4 1 of 3 0 General Arrangement drawing for Power Distribution Board 4 do 1873 / 12.08.11 2449 / 20.09.11
2 of 3 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 3 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 4/SLD 1 of 13 0 Single line diagram for Power Distribution Board 4 do 1873 / 12.08.11 2449 / 20.09.11
2 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11

Page 213 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

3 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11


4 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11

10 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11

11 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11

12 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11

13 of 13 0 do do 1873 / 12.08.11 2449 / 20.09.11

CA/PN 1103 393/PDB 4 1 of 30 0 Typical power & control circuit diagram for Power Distribution Board 4 do 1873 / 12.08.11 2449 / 20.09.11
2 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

10 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

11 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

12 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

13 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

14 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

15 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

16 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

17 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

18 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

19 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

20 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

21 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

22 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

23 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

24 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

25 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

26 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

27 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

M/s Prayas Automation


CA/PN 1103 393/PDB 4 28 of 30 0 Typical power & control circuit diagram for Power Distribution Board 4 1873 / 12.08.11 2449 / 20.09.11
Pvt. Ltd

29 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11

30 of 30 0 do do 1873 / 12.08.11 2449 / 20.09.11


65 nos
CA/PN 1103 393/PDB 4 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 4 do 2457 / 29.09.11 1 65
sht
CA/PN 1103 393/PDB 5 1 of 2 0 General Arrangement drawing for Power Distribution Board 5 do 1873 / 12.08.11 2449 / 20.09.11
2 of 2 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 5/SLD 1 of 7 0 Single line diagram for Power Distribution Board 5 do 1873 / 12.08.11 2449 / 20.09.11
2 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11

Page 214 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

4 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11


5 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 5 1 of 10 0 Typical power & control circuit diagram for Power Distribution Board 5 do 1873 / 12.08.11 2449 / 20.09.11
2 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

10 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

CA/PN 1103 393/PDB 5 28 nos 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 5 do 2457 / 29.09.11 1 28
sht
CA/PN 1103 393/PDB 6 1 of 2 0 General Arrangement drawing for Power Distribution Board 6 do 1873 / 12.08.11 2449 / 20.09.11
2 of 2 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 6/SLD 1 of 8 0 Single line diagram for Power Distribution Board 6 do 1873 / 12.08.11 2449 / 20.09.11
2 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 8 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 6 1 of 10 0 Typical power & control circuit diagram for Power Distribution Board 6 do 1873 / 12.08.11 2449 / 20.09.11
2 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

10 of 10 0 do do 1873 / 12.08.11 2449 / 20.09.11

30 nos
CA/PN 1103 393/PDB 6 sht 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 6 do 2457 / 29.09.11 1 30

CA/PN 1103 393/PDB 7 1 of 2 0 General Arrangement drawing for Power Distribution Board 7 do 1873 / 12.08.11 2449 / 20.09.11
2 of 2 0 do do 1873 / 12.08.11 2449 / 20.09.11
M/s Prayas Automation
CA/PN 1103 393/PDB 7/SLD 1 of 7 0 Single line diagram for Power Distribution Board 7 Pvt. Ltd 1873 / 12.08.11 2449 / 20.09.11

2 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11


3 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 7 1 of 19 0 Typical power & control circuit diagram for Power Distribution Board 7 do 1873 / 12.08.11 2449 / 20.09.11
2 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
10 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

11 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

12 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

13 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

14 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

15 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

16 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

Page 215 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

17 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

18 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

19 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

39 nos
CA/PN 1103 393/PDB 7 sht 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 7 do 2457 / 29.09.11 1 39

CA/PN 1103 393/PDB 8 1 of 2 0 General Arrangement drawing for Power Distribution Board 8 do 1873 / 12.08.11 2449 / 20.09.11
2 of 2 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 8/SLD 1 of 7 0 Single line diagram for Power Distribution Board 8 do 1873 / 12.08.11 2449 / 20.09.11
2 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 7 0 do do 1873 / 12.08.11 2449 / 20.09.11
CA/PN 1103 393/PDB 8 1 of 19 0 Typical power & control circuit diagram for Power Distribution Board 8 do 1873 / 12.08.11 2449 / 20.09.11
2 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
3 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
4 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
5 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
6 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
7 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
8 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11
9 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

CA/PN 1103 393/PDB 8 10 of 19 0 Typical power & control circuit diagram for Power Distribution Board 8 M/s Prayas Automation 1873 / 12.08.11 2449 / 20.09.11
Pvt. Ltd

11 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

12 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

13 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

14 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

15 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

16 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

17 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

18 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

19 of 19 0 do do 1873 / 12.08.11 2449 / 20.09.11

39 nos
CA/PN 1103 393/PDB 8 1 GA, SLD, BOM and Control circuit diagram for Power Distribution Board 8 do 2457 / 29.09.11 1 39
sht

1 of 5
CA/PN 1103 393/PDB 1/BOM to 5 0 Bill of Materials for PDB 1 do 1873 / 12.08.11 2449 / 20.09.11
of 5

1 of 6
CA/PN 1103 393/PDB 2/BOM to 6 0 Bill of Materials for PDB 2 do 1873 / 12.08.11 2449 / 20.09.11
of 6

1 of 5
CA/PN 1103 393/PDB 3/BOM to 5 0 Bill of Materials for PDB 3 do 1873 / 12.08.11 2449 / 20.09.11
of 5

1 of 12
CA/PN 1103 393/PDB 4/BOM to 12 0 Bill of Materials for PDB 4 do 1873 / 12.08.11 2449 / 20.09.11
of 12

1 of 5
CA/PN 1103 393/PDB 5/BOM to 5 0 Bill of Materials for PDB 5 do 1873 / 12.08.11 2449 / 20.09.11
of 5

1 of 5
CA/PN 1103 393/PDB 6/BOM to 5 0 Bill of Materials for PDB 6 do 1873 / 12.08.11 2449 / 20.09.11
of 5

1 of 6
CA/PN 1103 393/PDB 7/BOM to 6 0 Bill of Materials for PDB 7 do 1873 / 12.08.11 2449 / 20.09.11
of 6

1 of 6
CA/PN 1103 393/PDB 8/BOM to 6 0 Bill of Materials for PDB 8 do 1873 / 12.08.11 2449 / 20.09.11
of 6

Page 216 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

Recommendation letter of M/s Schneider Electric in favour of M/s Prayas


Document 1 Automation Pvt Ltd do 1873 / 12.08.11 2449 / 20.09.11

CA/PN 1103 393/DB 1 - 6 26 nos 1 GA, SLD, BOM for Space Heater Distribution Board 1 do 2457 / 29.09.11 1 26
sht

Sub Lighting Distribution Board BGS Enterprise


GA & note for SLDB -1, SLDB-24, SLDB-26, SLDB-43, SLDB-31, SLDB-31A (54),
BGS / 11 - 12 / 72 1 of 3 0 SLDB-32, SLDB-32B (28), SLDB-44, SLDB-45, SLDB-46, SLDB-47, SLDB-50, SLDB- do 3601 / 06.01.12 1 1
53,

2 of 3 0 SLD for SLDB - 1 do 3601 / 06.01.12 1


SLD for SLDB-24, SLDB-26, SLDB-43, SLDB-31, SLDB-31A , SLDB-32, SLDB-32B ,
3 of 3 0 SLDB-44, SLDB-45, SLDB-46, SLDB-47, SLDB-50, SLDB-53, do 3601 / 06.01.12 1

BGS / 11 - 12 / 76 1 of 2 0 GA & note for SLDB - 1 do 3601 / 06.01.12 1 1


2 of 2 0 SLD for SLDB - 2 do 3601 / 06.01.12 1
BGS / 11 - 12 / 77 1 of 3 0 GA & note for SLDB - 3, SLDB - 4 do 3601 / 06.01.12 1 1
2 of 3 0 SLD for SLDB - 3, SLDB - 4 do 3601 / 06.01.12 1
3 of 3 0 do do 3601 / 06.01.12 1
GA & note for SLDB-25, SLDB-27, SLDB-29, SLDB-30, SLDB-48, SLDB-55
BGS / 11 - 12 / 71 1 of 2 0 do 3601 / 06.01.12 1 1

2 of 2 0 SLD for SLDB-25, SLDB-27, SLDB-29, SLDB-30, SLDB-48, SLDB-55 do 3601 / 06.01.12 1
BGS / 11 - 12 / 70 1 of 2 0 GA & note for SLDB - 49 do 3601 / 06.01.12 1 1
2 of 2 0 SLD for SLDB - 49 do 3601 / 06.01.12 1
BGS / 11 - 12 / 63 1 of 2 0 GA & note for SLDB - 16, SLDB - 42 do 3601 / 06.01.12 1 1
2 of 2 0 SLD for SLDB - 16, SLDB - 42 do 3601 / 06.01.12 1
BGS / 11 - 12 / 64 1 of 2 0 GA & note for SLDB - 13, SLDB - 14, SLDB - 41 do 3601 / 06.01.12 1 1
2 of 2 0 SLD for SLDB - 13, SLDB - 14, SLDB - 41 do 3601 / 06.01.12 1
BGS / 11 - 12 / 65 1 of 3 0 GA & note for SLDB - 8 do 3601 / 06.01.12 1 1
2 of 3 0 SLD for SLDB - 8 do 3601 / 06.01.12 1
3 of 3 0 do do 3601 / 06.01.12 1
GA & note for SLDB -19, SLDB-6, SLDB-7, SLDB-9, SLDB-10, SLDB-15, SLDB-17,
BGS / 11 - 12 / 66 1 of 3 0 SLDB-21, SLDB-34, SLDB-35, SLDB-36, SLDB-37, SLDB-38, SLDB-39, SLDB-40 do 3601 / 06.01.12 1 1

2 of 3 0 GA & note for SLDB-6, SLDB-7 do 3601 / 06.01.12 1


GA & note for SLDB-9, SLDB-10, SLDB-21, SLDB -19, SLDB-15, SLDB-17, SLDB-
3 of 3 0 34, SLDB-35, SLDB-36, SLDB-37, SLDB-38, SLDB-39, SLDB-40 do 3601 / 06.01.12 1

BGS / 11 - 12 / 67 1 of 2 0 GA & note for SLDB - 5 do 3601 / 06.01.12 1 1


2 of 2 0 SLD for SLDB - 5 do 3601 / 06.01.12 1
BGS / 11 - 12 / 68 1 of 2 0 GA & note for SLDB - 18, SLDB - 20, SLDB - 56 do 3601 / 06.01.12 1 1
2 of 2 0 SLD for SLDB - 18, SLDB - 20, SLDB - 56 do 3601 / 06.01.12 1
1 of 2

Document to 0 Bill of material for 6.6 kv Substation do 3601 / 06.01.12


2
of 32
1 of
to
Document 0 Bill of material for 3.3 kv Substation do 3601 / 06.01.12
3
of 3
do
Pressurized Ventilation System Argosy
General Arrangement, plan & elevation for pressurised ventilation system for
101- 3.3 - I - PVG - 11 1 0 3.3 kv sub station - I do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 3.3 - II - PVG - 21 1 0 3.3 kv sub station - II do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 3.3 - III - PVG - 31 1 0 3.3 kv sub station - III do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 3.3 - IV - PVG - 41 1 0 3.3 kv sub station - IV do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 6.6 - I - PVG - 51 1 0 6.6 kv sub station - I do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 6.6 - II - PVG - 61 1 0 6.6 kv sub station - II do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 6.6 - III - PVG - 71 1 0 6.6 kv sub station - III do 3797 / 24.01.12 1 1

General Arrangement, plan & elevation for pressurised ventilation system for
101- 6.6 - IV - PVG - 81 1 0 6.6 kv sub station - IV do 3797 / 24.01.12 1 1

Document
System description, principle of operation, selection calculations and detail
101/SS -IV / 6.6 KV / PV / CAL- 08 - 0 specifications for pressurised ventilation system of switch gear room at do 3797 / 24.01.12
substations ( 3.3 kv & 6.6 kv).

M/s Nivo Control Pvt


Level Switch
Ltd
Document
Technical data sheet of 20 nos RF type Level switches for Bunker low level
152/RF.LVL.SWITCH - 002 3 0 indication. 3965 / 07.02.12

Page 217 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

Control Desk - 1 A C Power


ACPS / 11 - 12 / CD-1/GA/070 1 of 2 0 General arrangement drawing of control desk 1 do 3995 / 09.02.12 1 1 2602 / 25.04.12
2 of 2 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
ACPS / 11 - 12 / MIMIC/070 1 of 1 0 Mimic Flow diagram for control desk 1 do 3995 / 09.02.12 1 1 2602 / 25.04.12
ACPS / 11 - 12 / CD-1/CKT/070 1 of 45 0 Control power supply arrangement do 3995 / 09.02.12 1 1 2602 / 25.04.12
2 of 45 0 Strating / Stopping circuit do 3995 / 09.02.12 1 2602 / 25.04.12
3 of 45 0 Selection of Flap gates FG 11 & FG 12 on conveyor B4 & B5 do 3995 / 09.02.12 1 2602 / 25.04.12
3A of 45 0 Faulty Hooter cicuit do 3995 / 09.02.12 1 2602 / 25.04.12
4 of 45 0 Selection / start / stop of vibro feedre at reclaim pockets of bunkers do 3995 / 09.02.12 1 2602 / 25.04.12
5 of 45 0 Positioning of tripper on conveyor B1 / B2 / B3 do 3995 / 09.02.12 1 2602 / 25.04.12
6 of 45 0 Positioning of tripper on conveyor B1 / B2 / B3 / B4 & B5 do 3995 / 09.02.12 1 2602 / 25.04.12
6A of 45 0 Positioning of tripper on conveyor B6 / B7 & conveyor B22 / B23 do 3995 / 09.02.12 1 2602 / 25.04.12
7 of 45 0 Strating / Stopping & status indication of conveyor P2 & Q2 do 3995 / 09.02.12 1 2602 / 25.04.12
8 of 45 0 Strating / Stopping & status indication of conveyor R2 do 3995 / 09.02.12 1 2602 / 25.04.12
9 of 45 0 Strating / Stopping & status indication of conveyor P1 do 3995 / 09.02.12 1 2602 / 25.04.12
10 of 45 0 Strating / Stopping & status indication of conveyor Q1 do 3995 / 09.02.12 1 2602 / 25.04.12
11 of 45 0 Strating / Stopping & status indication of conveyor R1 do 3995 / 09.02.12 1 2602 / 25.04.12
12 of 45 0 Strating / Stopping & status indication of conveyor B1 / B2 / B3 do 3995 / 09.02.12 1 2602 / 25.04.12
13 of 45 0 Strating / Stopping & status indication of conveyor B4 & B5 do 3995 / 09.02.12 1 2602 / 25.04.12
14 of 45 0 Strating / Stopping & status indication of conveyor B6, B7 B8 & B9 do 3995 / 09.02.12 1 2602 / 25.04.12
15 of 45 0 Strating / Stopping & status indication of conveyor B10 & B11 do 3995 / 09.02.12 1 2602 / 25.04.12
16 of 45 0 Strating / Stopping & status indication of conveyor B12 & B13 do 3995 / 09.02.12 1 2602 / 25.04.12
17 of 45 0 Strating / Stopping & status indication of flap gate 09 to 15 do 3995 / 09.02.12 1 2602 / 25.04.12
18 of 45 0 Strating / Stopping & status indication of flap gate 16 to 20 do 3995 / 09.02.12 1 2602 / 25.04.12
18A of 45 0 Auxiliary equipments control circuit do 3995 / 09.02.12 1 2602 / 25.04.12
19 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
20 of 45 0 Mimic circuit do 3995 / 09.02.12 1 2602 / 25.04.12
21 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
22 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
23 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
24 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
25 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
26 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
27 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
28 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
29 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
30 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
31 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
32 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
33 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
34 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
35 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
36 of 45 0 Circuit breaker status indicating circuit do 3995 / 09.02.12 1 2602 / 25.04.12
37 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
38 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
39 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
40 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
41 of 45 0 Annunciation circuit - I do 3995 / 09.02.12 1 2602 / 25.04.12
42 of 45 0 Annunciation circuit - II do 3995 / 09.02.12 1 2602 / 25.04.12
43 of 45 0 Metering circuit do 3995 / 09.02.12 1 2602 / 25.04.12
44 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
45 of 45 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
Document 1 of 1 0 Bill of material for Control Desk 1 do 3995 / 09.02.12 2602 / 25.04.12
Clarrification sent for all above drawing 488 / 10.05.12
commented 2611 / 10.05.12
Clarrification sent for all above drawing 837 / 31.05.12
Control Desk - 2 A C Power
ACPS / 11 - 12 / CD-2/GA/070 1 of 2 0 General arrangement drawing of control desk 2 do 3995 / 09.02.12 1 1 2602 / 25.04.12
2 of 2 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
ACPS / 11 - 12 / MIMIC/070 1 of 1 0 Mimic Flow diagram for control desk 2 do 3995 / 09.02.12 1 1 2602 / 25.04.12
ACPS / 11 - 12 / CD-2/CKT/070 1 of 35 0 Control power supply arrangement do 3995 / 09.02.12 1 1 2602 / 25.04.12
2 of 35 0 Strating / Stopping circuit do 3995 / 09.02.12 1 2602 / 25.04.12
3 of 35 0 Route selection circuit do 3995 / 09.02.12 1 2602 / 25.04.12
4 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
5 of 35 0 Vibro feeder selection circuit do 3995 / 09.02.12 1 2602 / 25.04.12
6 of 35 0 Status indication & strat / stop CKT of conveyor C1, C2, C3 & C4 do 3995 / 09.02.12 1 2602 / 25.04.12
7 of 35 0 Status indication & strat / stop CKT of conveyor C5, C6, C7 & C8 do 3995 / 09.02.12 1 2602 / 25.04.12

8 of 35 0 Status indication & strat / stop CKT of conveyor FG-01, FG-02, FG-03 & FG-04 do 3995 / 09.02.12 1 2602 / 25.04.12

9 of 35 0 Status indication & strat / stop CKT of conveyor FG-05, FG-06, FG-07 & FG-08 do 3995 / 09.02.12 1 2602 / 25.04.12

Page 218 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

10 of 35 0 Auxiliary equipments control circuit do 3995 / 09.02.12 1 2602 / 25.04.12


11 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
12 of 35 0 Mimic circuit do 3995 / 09.02.12 1 2602 / 25.04.12
13 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
14 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
15 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
16 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
17 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
18 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
19 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
20 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
21 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
22 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
23 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
24 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
25 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
26 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
27 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
28 of 35 0 Annunciation circuit - I do 3995 / 09.02.12 1 2602 / 25.04.12
29 of 35 0 Annunciation circuit - II do 3995 / 09.02.12 1 2602 / 25.04.12
30 of 35 0 Metering circuit do 3995 / 09.02.12 1 2602 / 25.04.12
31 of 35 0 Circuit breaker status indicating circuit do 3995 / 09.02.12 1 2602 / 25.04.12
32 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
33 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
34 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
35 of 35 0 do do 3995 / 09.02.12 1 2602 / 25.04.12
Document 1 of 1 0 Bill of material for Control Desk 2 do 3995 / 09.02.12 2602 / 25.04.12
commented 2611 / 10.05.12
Clarrification sent for all above drawing 837 / 28.05.12

Liner of Discharge Chute Tega Industries Limited

G A of Tega lining of discharge chute of in pit conveyor nos P1, Q1 & R1 feedinf
TIL/SKS/ W/ 8168 1 of 2 0 conveyor nos B1, B2 & B3 do 4532 / 22.03.12 1 1 2618 / 19.05.12

1 do do 831 / 28.05.12
2 do do 1534 / 22.03.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12

TIL/SKS/ W/ 8169 1 of 1 0 C.L of Tega lining of discharge chute of in pit conveyor nos P1, Q1 & R1 feedinf do 4532 / 22.03.12 1 1 2618 / 19.05.12
conveyor nos B1, B2 & B3
1 do
TIL/SKS/ W/ 8170 1 of 2 0 G A of Tega lining of discharge chute of conveyor nos B10 & B11 do 4532 / 22.03.12 1 1 2618 / 19.05.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
TIL/SKS/ W/ 8171 1 of 1 0 C L of Tega lining of discharge chute of conveyor nos B10 & B11 do 4532 / 22.03.12 1 1 2618 / 19.05.12
TIL/SKS/ W/ 8172 1 of 2 0 G A of Tega lining of discharge chute of in pit conveyor nos C1, C2, C3 & C4 do 4532 / 22.03.12 1 1 2618 / 19.05.12
0 do do 2685 / 17.10.12
1 do do 3282 / 22.11.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
0 do do 2685 / 17.10.12
1 do do 3282 / 22.11.12
TIL/SKS/ W/ 8173 1 of 1 0 C L of Tega lining of discharge chute of in pit conveyor nos C1, C2, C3 & C4 do 4532 / 22.03.12 1 1 2618 / 19.05.12
0 do 2685 / 17.10.12
TIL/SKS/ W/ 8174 1 of 2 0 G A of Tega lining of discharge chute of in pit conveyor nos C5, C6, C7 & C8 do 4532 / 22.03.12 1 1 2618 / 19.05.12
0 do 2685 / 17.10.12
1 do do 3282 / 22.11.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
0 do 2685 / 17.10.12
1 do do 3282 / 22.11.12
TIL/SKS/ W/ 8175 1 of 1 0 G A of Tega lining of discharge chute of in pit conveyor nos C5, C6, C7 & C8 do 4532 / 22.03.12 1 1 2618 / 19.05.12
0 do 2685 / 17.10.12
TIL/SKS/ W/ 8176 1 of 2 0 G A of Tega lining of discharge chute of conveyor nos B8 & B9 do 4532 / 22.03.12 1 1 2618 / 19.05.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
TIL/SKS/ W/ 8177 1 of 1 0 C L of Tega lining of discharge chute of conveyor nos B8 & B9 do 4532 / 22.03.12 1 1 2618 / 19.05.12
TIL/SKS/ W/ 8178 1 of 2 0 G A of Tega lining of discharge chute of conveyor nos B12 & B13 do 4532 / 22.03.12 1 1 2618 / 19.05.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
TIL/SKS/ W/ 8179 1 of 1 0 C L of Tega lining of discharge chute of conveyor nos B12 & B13 do 4532 / 22.03.12 1 1 2618 / 19.05.12
TIL/SKS/ W/ 8180 1 of 2 0 G A of Tega lining of discharge chute of conveyor nos B22 & B23 do 4532 / 22.03.12 1 1 2618 / 19.05.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
TIL/SKS/ W/ 8181 1 of 1 0 C L of Tega lining of discharge chute of conveyor nos B22 & B23 do 4532 / 22.03.12 1 1 2618 / 19.05.12
G A of Tega lining of discharge chute of conveyor nos B1, B2 & B3 feeding
TIL/SKS/ W/ 8182 1 of 2 0 conveyor nos B4, B5, B6 & B7 do 4532 / 22.03.12 1 1 2618 / 19.05.12

2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12


C L of Tega lining of discharge chute of conveyor nos B1, B2 & B3 feeding
TIL/SKS/ W/ 8183 1 of 1 0 conveyor nos B4, B5, B6 & B7 do 4532 / 22.03.12 1 1 2618 / 19.05.12

Page 219 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sheet Dwg. Submission by Dwg. commented


Sl. No. Drawing No Rev Description Name of Vendor SKSL vide letter no & from CMPDI to SKSL
No date to SECL/CMPDI vide letter no & date

G A of Tega lining of discharge chute for RCC overhead surge Bunker1 feeding
TIL/SKS/ W/ 8188 1 of 2 0 conveyor nos B12 & B13 (Through vibrating feeders VF 25 to VF 44) do 4532 / 22.03.12 1 1 2618 / 19.05.12

2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12


C L of Tega lining of discharge chute for RCC overhead surge Bunker1 feeding
TIL/SKS/ W/ 8189 1 of 1 0 conveyor nos B12 & B13 (Through vibrating feeders VF 25 to VF 44) do 4532 / 22.03.12 1 1 2618 / 19.05.12

G A of Tega lining of discharge chute for RCC overhead surge Bunker2 feeding
TIL/SKS/ W/ 8190 1 of 2 0 conveyor nos B8 & B9 (Through vibrating feeders VF 45 to VF 60) do 4532 / 22.03.12 1 1 2618 / 19.05.12

2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12


C L of Tega lining of discharge chute for RCC overhead surge Bunker2 feeding
TIL/SKS/ W/ 8191 1 of 1 0 conveyor nos B8 & B9 (Through vibrating feeders VF 45 to VF 60) do 4532 / 22.03.12 1 1 2618 / 19.05.12

G A of Tega lining of discharge chute of in pit conveyor nos P2, Q2 & R2 feeding
TIL/SKS/ W/ 8192 1 of 2 0 conveyor nos P1, Q1 & R1 do 4532 / 22.03.12 1 1 2618 / 19.05.12

1
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
C L of Tega lining of discharge chute of in pit conveyor nos P2, Q2 & R2 feeding
TIL/SKS/ W/ 8193 1 of 1 0 conveyor nos P1, Q1 & R1 do 4532 / 22.03.12 1 1 2618 / 19.05.12

G A of Tega lining of discharge chute for RCC overhead surge Bunker2 feeding
TIL/SKS/ W/ 8196 1 of 2 0 conveyor nos B10 & B11 (Through vibrating feeders VF 61 to VF 64) do 4532 / 22.03.12 1 1 2618 / 19.05.12

2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12


C L of Tega lining of discharge chute for RCC overhead surge Bunker2 feeding
TIL/SKS/ W/ 8197 1 of 1 0 conveyor nos B10 & B11 (Through vibrating feeders VF 61 to VF 64) do 4532 / 22.03.12 1 1 2618 / 19.05.12

G A of Tega lining of discharge chute for Truck receiving hoppers feeding


TIL/SKS/ W/ 8198 1 of 2 0 conveyor nos C1 to C8 (Through vibrating feeders ) do 4532 / 22.03.12 1 1 2618 / 19.05.12

0 do 2685 / 17.10.12
2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12
0 do 2685 / 17.10.12
C L of Tega lining of discharge chute for Truck receiving hoppers feeding
TIL/SKS/ W/ 8199 1 of 1 0 conveyor nos C1 to C8 (Through vibrating feeders ) do 4532 / 22.03.12 1 1 2618 / 19.05.12

0 do 2685 / 17.10.12
G A of Tega lining of discharge chute for Truck loading hoppers feeding trucks
TIL/SKS/ W/ 8200 1 of 2 0 (Through vibrating feeders at TLS 1 & 2) do 4532 / 22.03.12 1 1 2618 / 19.05.12

2 of 2 0 do do 4532 / 22.03.12 1 2618 / 19.05.12


C L of Tega lining of discharge chute for Truck loading hoppers feeding trucks
TIL/SKS/ W/ 8201 1 of 1 0 (Through vibrating feeders at TLS 1 & 2) do 4532 / 22.03.12 1 1 2618 / 19.05.12

Clarrification sent for all above drawing 831 / 28.05.12 2658 / 12.07.12

Page 220 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

dwg sht dwg sht dwg sht

1705 / 13.09.10 619 / 18.09.10 5 days 106 days

1705 / 13.09.10 619 / 18.09.10 5 days 106 days

1705 / 13.09.10 619 / 18.09.10 5 days 106 days

1705 / 13.09.10 619 / 18.09.10 5 days 106 days

1894 / 22.11.10 1 1 904 / 29.11.10 1 1 7 days 35 days

1894 / 22.11.10 1 1 904 / 29.11.10 1 1 7 days 35 days

3333 / 06.12.10 1 1 966 / 14.12.10 1 1 8 days 50 days

1894 / 22.11.10 1 1 904 / 29.11.10 1 1 7 days 35 days

1894 / 22.11.10 1 1 904 / 29.11.10 1 1 7 days 35 days

1894 / 22.11.10 1 1 904 / 29.11.10 1 1 7 days 35 days

2038 / 18.01.11 1 1 1129/ 25.01.11 1 1 7 days 49 days

2038 / 18.01.11 1 1 1129/ 25.01.11 1 1 7 days 49 days

2067 / 28.01.11 1 1 H - 648/ 07.02.11 1 1 10 days 45 days


2067 / 28.01.11 1 1 H - 648/ 07.02.11 1 1 10 days 45 days
2067 / 28.01.11 1 1 H - 648/ 07.02.11 1 1 10 days 45 days
2067 / 28.01.11 1 1 H - 648/ 07.02.11 1 1 10 days 45 days
708 / 30.03.11
708 / 30.03.11
708 / 30.03.11

2037 / 18.01.11 1 1 1125/ 25.01.11 1 1 7 days 28 days

2087 / 08.02.11 1 1 H - 684 / 15.03.11 1 1 35 days 66 days

2305 / 07.05.11 1 1 804 / 13.05.11 1 1 6 days 99 days

2305 / 07.05.11 1 1 804 / 13.05.11 1 1 6 days 99 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

Page 221 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 192 days

2488 / 29.11.11 1 1 1077 / 12.12.11 1 1

2488 / 29.11.11 1 1 1077 / 12.12.11 1 1

2488 / 29.11.11 1 1 1077 / 12.12.11 1 1

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 188 days

2400 / 14.07.11 1 1 H - 907 / 19.07.11 1 1 5 days 188 days

2553 / 14.07.11 1 1 1172 / 07.02.12 1 1

2553 / 14.07.11 1 1 1172 / 07.02.12 1 1

2553 / 14.07.11 1 1 1172 / 07.02.12 1 1

2217 / 26.03.11 708 / 30.03.11 4 days 77 days


2789 / 22.02.13 1 1 H - 736 / 02.03.13 1 1 Approval not yet received

2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1


2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1
2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1

2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1

2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1


Approval not yet received
2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1
2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1
2735 / 17/20.12.12 1 1 H - 602 / 02.01.13 1 1

2735 / 17/20.12.12 H - 602 / 02.01.13

2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days


2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days

Page 222 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days


2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 700 / 21.03.11 6 days 67 days

2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days


2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 700 / 21.03.11 6 days 67 days

2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days


2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 700 / 21.03.11 6 days 67 days

2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days


2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 1 1 700 / 21.03.11 1 1 6 days 67 days
2182 / 15.03.11 700 / 21.03.11 6 days 67 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

Page 223 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 1 1

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

Page 224 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

Page 225 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 1 H - 741 / 12.04.11 1 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

2239 / 05.04.11 1 H - 741 / 12.04.11 1 7 days 87 days

Page 226 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days


2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days


2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days


2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

Page 227 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days


2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 1 1 710 / 30.03.11 1 1 15 days 70 days
2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2183 / 15.03.11 710 / 30.03.11 15 days 70 days

2365 / 23.06.11 1 1 921 / 25.07.11 1 1 32 days 166 days

2365 / 23.06.11 1 921 / 25.07.11 1 32 days 166 days

2365 / 23.06.11 1 921 / 25.07.11 1 32 days 166 days

2365 / 23.06.11 1 921 / 25.07.11 1 32 days 166 days

2365 / 23.06.11 1 921 / 25.07.11 1 32 days 166 days

2365 / 23.06.11 1 921 / 25.07.11 1 32 days 166 days

2249 / 08.04.11 1 1 H - 756 / 15.04.11 1 1 7 days 65 days


2249 / 08.04.11 1 1 H - 756 / 15.04.11 1 1 7 days 65 days
2249 / 08.04.11 1 1 H - 756 / 15.04.11 1 1 7 days 65 days

2666 / 19.07.12 1 1 259 / 31.07.12 1 1

Approval not yet received

2451 / 21.09.11 1 1 1001 / 24.09.11 1 1 3 days 68 days


2451 / 21.09.11 1 1 1001 / 24.09.11 1 1 3 days 68 days

2347 / 11.06.11 1 1 H - 848 / 16.06.11 1 1 5 days 120 days

Page 228 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2347 / 11.06.11 1 H - 848 / 16.06.11 1 5 days 120 days

2347 / 11.06.11 1 H - 848 / 16.06.11 1 5 days 120 days

2347 / 11.06.11 1 1 H - 848 / 16.06.11 1 1 5 days 120 days

2347 / 11.06.11 1 H - 848 / 16.06.11 1 5 days 120 days

2347 / 11.06.11 1 H - 848 / 16.06.11 1 5 days 120 days

2347 / 11.06.11 H - 848 / 16.06.11 5 days 120 days

2347 / 11.06.11 H - 848 / 16.06.11 5 days 120 days

2318 / 16.05.11 1 1 H - 820 / 24.05.11 1 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2318 / 16.05.11 1 H - 820 / 24.05.11 1 8 days 55 days

2619 / 23.05.12 1 1 H - 118 / 26.05.12 1 1


2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 1 H - 118 / 26.05.12 1 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 1 H - 118 / 26.05.12 1 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
Approval not yet received
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 1 H - 118 / 26.05.12 1 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1

Page 229 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after Approval not yet received
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2619 / 23.05.12 1 H - 118 / 26.05.12 1


2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1
2619 / 23.05.12 1 H - 118 / 26.05.12 1

2619 / 23.05.12 H - 118 / 26.05.12

2619 / 23.05.12 H - 118 / 26.05.12

2619 / 23.05.12 H - 118 / 26.05.12

2619 / 23.05.12 H - 118 / 26.05.12

2253 / 11.04.11 1 1 H - 755 / 15.04.11 1 1 4 days 44 days

2253 / 11.04.11 1 1 H - 755 / 15.04.11 1 1 4 days 44 days

2253 / 11.04.11 1 1 H - 755 / 15.04.11 1 1 4 days 44 days

2253 / 11.04.11 1 1 H - 755 / 15.04.11 1 1 4 days 44 days

2253 / 11.04.11 1 1 H - 755 / 15.04.11 1 1 4 days 44 days

2253 / 11.04.11 1 1 H - 755 / 15.04.11 1 1 4 days 44 days

1 1 1002 / 26.09.11 1 1
1 1 1002 / 26.09.11 1 1
1 1 1002 / 26.09.11 1 1
1 1 2874 / 20.05.13 401 / 21.05.13 1 1
1 1 2874 / 20.05.13 401 / 21.05.13 1 1 Approval not yet received
1 1 2874 / 20.05.13 401 / 21.05.13 1 1
1 1 1002 / 26.09.11 1 1
1 1 1002 / 26.09.11 1 1
1 1 1002 / 26.09.11 1 1
1 1
2874 / 20.05.13 401 / 21.05.13 1 1
Approval not yet received
1 1 2874 / 20.05.13 401 / 21.05.13 1 1

2366 / 23.06.11 H - 875 / 02.07.11 10 days 27 days

2366 / 23.06.11 H - 875 / 02.07.11 10 days 27 days

2252 / 11.04.11 H - 753 / 15.04.11 4 days 32 days

2252 / 11.04.11 H - 753 / 15.04.11 4 days 32 days

2384 / 28.06.11 H - 888 / 06.07.11 8 days 47 days

Page 230 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2384 / 28.06.11 H - 888 / 06.07.11 8 days 14 days

2419 / 10.08.11 953 / 17.08.11 7 days 29 days

2419 / 10.08.11 953 / 17.08.11 7 days 29 days

2411 / 10.09.11 1 1 H - 984 / 16.09.11 1 1 6 days 167 days


2411 / 10.09.11 1 1 H - 984 / 16.09.11 1 1 6 days 167 days
2411 / 10.09.11 1 1 H - 984 / 16.09.11 1 1 6 days 167 days

2411 / 10.09.11 1 1 H - 984 / 16.09.11 1 1 6 days 167 days

2411 / 10.09.11 1 1 H - 984 / 16.09.11 1 1 6 days 167 days

2454 / 23.09.11 1 1 1004 / 28.09.11 1 1

2454 / 23.09.11 1 1 1004 / 28.09.11 1 1

2454 / 23.09.11 1 1 1004 / 28.09.11 1 1


2454 / 23.09.11 1 1 1004 / 28.09.11 1 1
2454 / 23.09.11 1 1 1004 / 28.09.11 1 1
2454 / 23.09.11 1004 / 28.09.11

2426 / 29.08.11 1 1 967 / 05.09.11 1 1 7 days 151 days


Approval not yet received
2670 / 06.08.12 1 H - 303 / 17.08.12 1

2426 / 29.08.11 1 967 / 05.09.11 1 7 days 151 days


Approval not yet received
2670 / 06.08.12 1 H - 303 / 17.08.12 1

2426 / 29.08.11 967 / 05.09.11 7 days 151 days

2426 / 29.08.11 1 1 967 / 05.09.11 1 1 7 days 151 days

2426 / 29.08.11 1 967 / 05.09.11 1 7 days 151 days

2670 / 06.08.12 1 H - 303 /17.08.12 1


2807/16.03.13 1 H - 788 / 20.03.13 1
2807/16.03.13 1 H - 788 / 20.03.13 1
2670 / 06.08.12 1 H - 303 /17.08.12 1
2807/16.03.13 1 H - 788 / 20.03.13 1
2807/16.03.13 1 H - 788 / 20.03.13 1

Page 231 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

1 1 2660 / 17.07.12 1 1 H - 244 /25.07.12 1 1


1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 1 2660 / 17.07.12 1 1 H - 244 /25.07.12 1 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1

1 1 2660 / 17.07.12 1 1 H - 244 /25.07.12 1 1

1 2660 / 17.07.12 1 H - 244 /25.07.12 1


1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1

1 1 2660 / 17.07.12 1 1 H - 244 /25.07.12 1 1

1 2660 / 17.07.12 1 H - 244 /25.07.12 1


1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1
1 2660 / 17.07.12 1 H - 244 /25.07.12 1

2660 / 17.07.12 H - 244 /25.07.12

2660 / 17.07.12 H - 244 /25.07.12

2660 / 17.07.12 H - 244 /25.07.12

2660 / 17.07.12 H - 244 /25.07.12

2455 / 23.09.11 1 1 1003 / 28.09.11 1 1 5 days 127 days


2455 / 23.09.11 1 1003 / 28.09.11 1 5 days 127 days

Page 232 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2404 / 15.07.11 H - 909 / 22.07.11 7 days 67 days

2404 / 15.07.11 H - 909 / 22.07.11 7 days 67 days

2404 / 15.07.11 H - 909 / 22.07.11 7 days 67 days

2446 / 13.09.11 1 1 987 / 19.09.11 1 1 6 days 95 days

2869 / 10.05.13 911 / 13.05.13

2869 / 10.05.13 911 / 13.05.13

2869 / 10.05.13 911 / 13.05.13

Page 233 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2481 / 18.11.11 1 27 1073 / 08.12.11 1 27

2481 / 18.11.11 1 33 1073 / 08.12.11 1 33

2481 / 18.11.11 1 28 1073 / 08.12.11 1 28

Page 234 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2481 / 18.11.11 1 65 1073 / 08.12.11 1 65

Page 235 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2481 / 18.11.11 1 28 1073 / 08.12.11 1 28

2481 / 18.11.11 1 30 1073 / 08.12.11 1 30

Page 236 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2481 / 18.11.11 1 39 1073 / 08.12.11 1 39

2481 / 18.11.11 1 39 1073 / 08.12.11 1 39

Page 237 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2481 / 18.11.11 1 26 1073 / 08.12.11 1 26

2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1

2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1


2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1

2627 / 31.05.12 1 H - 141 / 09.06.12 1


2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1

2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1


2627 / 31.05.12 1 H - 141 / 09.06.12 1
2627 / 31.05.12 1 1 H - 141 / 09.06.12 1 1
2627 / 31.05.12 1 H - 141 / 09.06.12 1

2627 / 31.05.12 H - 141 / 09.06.12

2627 / 31.05.12 H - 141 / 09.06.12

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12 1 1 H - 36 / 20.04.12 1 1

2598 / 10.04.12

2635 / 08.06.12 310 / 13.06.12

Page 238 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2743 / 22.12.12 1 1 H- 614 / 07.01.13 1 1


2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 1 H- 614 / 07.01.13 1 1
2743 / 22.12.12 1 1 H- 614 / 07.01.13 1 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 H- 614 / 07.01.13

2743 / 22.12.12 1 1 H- 614 / 07.01.13 1 1


2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 1 H- 614 / 07.01.13 1 1
2743 / 22.12.12 1 1 H- 614 / 07.01.13 1 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1

2743 / 22.12.12 1 H- 614 / 07.01.13 1

2743 / 22.12.12 1 H- 614 / 07.01.13 1

Page 239 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2743 / 22.12.12 1 H- 614 / 07.01.13 1


2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 1 H- 614 / 07.01.13 1
2743 / 22.12.12 H- 614 / 07.01.13

2863 / 13/15.04.13 870 / 22.04.13


2863 / 13/15.04.13 870 / 22.04.13

2863 / 13/15.04.13 870 / 22.04.13


2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1
2660 / 17.07.12 1 H - 239 / 24.07.12 1
2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2773/ 30.01.13 1 1 672/ 02.02.13 1 1

2773/ 30.01.13 1 672/ 02.02.13 1

2863 / 13/15.04.13 870 / 22.04.13

2773/ 30.01.13 1 1 672/ 02.02.13 1 1

2773/ 30.01.13 1 672/ 02.02.13 1

2863 / 13/15.04.13 870 / 22.04.13


2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1
2660 / 17.07.12 1 H - 239 / 24.07.12 1
2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1
2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1
2660 / 17.07.12 1 H - 239 / 24.07.12 1
2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1
2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1
2660 / 17.07.12 1 H - 239 / 24.07.12 1
2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 H - 239 / 24.07.12 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

Page 240 of 245


STATUS OF VENDOR DRAWINGS FOR DIPKA MAIN CHP AS ON 18.03.2013

02/06/23

Dwg. approval Time taken by SECL Time taken by


Dwg. approval from from SECL to SKSL after receipt of SECL after
CMPDI to SECL vide Remarks
letter no & date vide letter no & approval from submission of
date CMPDI drawing by SKSL

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 H - 239 / 24.07.12 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 H - 239 / 24.07.12 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2863 / 13/15.04.13 870 / 22.04.13


2863 / 13/15.04.13 870 / 22.04.13

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 H - 239 / 24.07.12 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2863 / 13/15.04.13 870 / 22.04.13

2863 / 13/15.04.13 870 / 22.04.13

870 / 22.04.13
2863 / 13/15.04.13

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

2660 / 17.07.12 1 H - 239 / 24.07.12 1

2660 / 17.07.12 1 1 H - 239 / 24.07.12 1 1

28 42

Page 241 of 245


STATEMENT OF DRAWING SUBMISSION AND APPROVAL STATUS OF DIPKA MAIN CHP AS ON 27.11.2012

S.K.SAMANTA & CO. ( P ) LIMITED


KOLKATA 02/06/23
DRAWING / DOCUMENT CONTROL LIST
PROJECT: DIPKA MAIN CHP
CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Nos of Drawing approved Nos of Drawing approved Nos of Drawing lying with Nos of Drawing lying with
Category of Drawing Unit Nos of Drawing submitted
No by CMPDI by SECL CMPDI SECL

Dwg Shts Dwg Shts Dwg Shts Dwg Shts Dwg Shts
1 Civil Drawing nos 88 261 83 249 80 246 5 12 3 3
2 (i) Structural GA Drawing nos 58 178 58 178 58 178 0 0 0 0
Structural Fabrication
(ii) Drawing nos 48 1156 48 1156 48 1156 0 0 0 0
Mechanical System & GA
3 (i) Drawing nos 65 168 65 168 65 168 0 0 4 16
Mechanical Fabrication
(ii) Drawing nos 82 214 11 52 11 52 71 162 0 0

4 Electrical Drawing nos 129 199 129 199 129 199 0 0 0 0


5 Vendor Drawing nos 301 1345 301 1345 301 1345 0 0 38 78
Total nos 771 3521 695 3347 692 3344 76 174 45 97

Page 242 of 245


Sl. No Unit No of sheet
1 Truck Receiving Station-1 7
Sub total 7

2 Truck Receiving Station-2 7


Sub total 7

3 Conveyor C1 & C2 10
Sub total 10

4 Conveyor C3 & C4 11
Sub total 11

5 Conveyor C5 C6 13
Sub total 13

6 Conveyor C7 & C8 13
8
Sub total 21

7 Conveyor P1,Q1,R1 39
20
78
Sub total 137

8 Conveyor P2,Q2,R2 35
26
81
Sub total 142

9 Conveyor B1,B2,B3 26
13
40
9
Sub total 88

10 Conveyor B4,B5 6
7
Sub total 13

11 Conveyor B6,B7 6
7
Sub total 13

12 Conveyor B8,B9 22
3
27
8
Sub total 60

13 Conveyor B10, B11 20


7
Sl. No Unit No of sheet
30
9
Sub total 66

14 Conveyor B12, B13 21


3
25
8
Sub total 57

15 Transfer House-1 44
Sub total 44

16 Transfer House-2 25
Sub total 25

17 Transfer House-3 43
Sub total 43

18 Transfer House-4 25
Sub total 25

19 Transfer House-7 20
Sub total 20

20 Transfer House-8 37
Sub total 37

21 Transfer House-9 115


Sub total 115

22 Transfer House-10 26
Sub total 26

23 Transfer House-11 26
Sub total 26

24 Bunker 1 19
Sub total 19

25 Bunker 2 19
Sub total 19

26 Truck Loading Station - I 48


Sub total 48

27 Truck Loading Station -2 48


Sub total 48
Grand total
STATUS OF DRAWING FOR DIPKA MAIN CHP ASON 31.07.13

S.K.SAMANTA & CO. ( P ) LIMITED

KOLKATA 02/06/23

DRAWING / DOCUMENT CONTROL LIST

PROJECT: DIPKA MAIN CHP

CLIENT: SOUTH EASTERN COALFIELDS LIMITED

Sl. Nos of Drawing approved Nos of Drawing lying with


Category of Drawing Unit Nos of Drawing submitted
No by SECL SECL
Dwg Shts Dwg Shts Dwg Shts
1 Civil Drawing nos 88 261 80 246 7 12
2 Structural GA Drawing nos 58 178 58 178 0 0
3 Mechanical System & GA nos 65 168 65 168 0 0
Drawing
4 Electrical Drawing nos 129 199 129 199 0 0
5 Vendor Drawing nos 301 1345 301 1345 0 0
Total nos 641 2151 633 2136 7 12