The document outlines a 4 item work schedule from May to July 2023 for the preparation, fabrication, and installation of a steel cage platform and hoisting beam. It includes procuring materials in the first 7 days, fabricating the lifting beam through cutting, welding, sandblasting and painting over 7 days in May and June, installing the beam over 8 days in July, and a final inspection on the last day. The steel cage will also be fabricated through cutting, welding and powder coating over 14 days in June and July, with final inspection on the last day.
The document outlines a 4 item work schedule from May to July 2023 for the preparation, fabrication, and installation of a steel cage platform and hoisting beam. It includes procuring materials in the first 7 days, fabricating the lifting beam through cutting, welding, sandblasting and painting over 7 days in May and June, installing the beam over 8 days in July, and a final inspection on the last day. The steel cage will also be fabricated through cutting, welding and powder coating over 14 days in June and July, with final inspection on the last day.
The document outlines a 4 item work schedule from May to July 2023 for the preparation, fabrication, and installation of a steel cage platform and hoisting beam. It includes procuring materials in the first 7 days, fabricating the lifting beam through cutting, welding, sandblasting and painting over 7 days in May and June, installing the beam over 8 days in July, and a final inspection on the last day. The steel cage will also be fabricated through cutting, welding and powder coating over 14 days in June and July, with final inspection on the last day.
Work Schedule for Preparation, Fabrication and Installation of Steel Cage Platform (Hoisting Beam)
ITEM PROJECTS NAME DUR 2023
May-23 Jun-23 Jul-23 (LIFTING BEAM) W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 1 PROCUREMENT WORKS Preparing & Submission of Drawing DONE Purchasing & Delivery Process of Materials 7 days 2 FABRICATION WORKS Cut & Weld 7 days Sand blast & Painting 7 days 3 INSTALLATION WORKS Lifting Beam Installation 8 days 4 FINAL INSPECTION Final Joint Inspection & Final As-built Joint Survey 1 day (STEEL CAGE) W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 1 PROCUREMENT WORKS Preparing & Submission of Drawing DONE Purchasing & Delivery Process of Materials 7 days 2 FABRICATION WORKS Cut & Weld 7 days Powder Coat 14 days 4 FINAL INSPECTION Final Joint Inspection & Final As-built Joint Survey 1 day