FUCHI Engineering (M) Sdn Bhd
PROJEK MASS RAPID TRANSIT LALUAN 2 - SUNGAI BULOH - SERDANG - PUTRAJAYA,
DESIGN, SUPPLY, FABRICATE AND INSTALL ENTRANCE STEEL STRUCTURE AND METAL ROOFING AT RAJA UDA
STATION
Main-con : MUJUR MINAT SDN BHD
Our Ret = FEM/J001-20°MSBIQ.02
Date: 3rd August 2022
BILL OF QUANTITIES
Item Description
Unit
Qty
Rate
ey,
Amount
«eM
D | TOMODIFY VERTICAL FIN AT ENTRANCE B.
(SCI No: MM-SSP-UG-SCI-KBNS-FEMSB-00388)
OMISSION VERTICAL FINS
Design, supply and install 6200mm x 5250men vertical fins comprising of
280mm x 350mm rectangular hollow section vertical post, 25mm x 100ram
aluminium extruded profile as veical fin, 1Smm diameter galvanised mild
steel rod as intermediate suppor included base plate, non shrink grout,
connection mechanism, fixing acessories and other ancillary works to
‘complete the works all in accordance tothe Drawings, Specifications and
all the Sub-Contract Documents, aceeptenee and approval from Main
Contractor, as shown in drawing
'SSP-D-MGKT-UNGW-OVPR-ARC-STS-52000S
ADDITION VERTICAL FINS (New Desig
Design, supply and instll6200mm x 5250mm vertical ins comprising of
280mm x 380mm rectangular hollow sectcn vertical post, 35mm x 100mm
Sluminium extruded profile as venical fin, !Smm diameter galvanised mild
see! rod as intermediate suppor: included base plate, non shrink gout,
‘connection mechanism, fixing acessories and other ancillary works to
‘complete the works; all in accordance tothe Drawings, Specifications and
all the Sub-Contract Documents, acceptance and spproval from Main
Contractor, as shown in drawing
'SSP-D-MGKT-UNGW-OVPR-ARC-STS-S20005
ADDITION VERTICAL FINS (New Design)
1 | Moai
walkway steel
fon Vertical Finns at Entrance B to suit the design covered
(11.00)
11.00
2.00
8,000.00
21,300.00
(88,000.00)
234,300.00,
4,000.00
TOTAL
150,300.00& "=| [Dvd dons