Download as pdf
Download as pdf
You are on page 1of 4
FUCHI Engineering (M) Sdn Bhd PROJEK MASS RAPID TRANSIT LALUAN 2 - SUNGAI BULOH - SERDANG - PUTRAJAYA, DESIGN, SUPPLY, FABRICATE AND INSTALL ENTRANCE STEEL STRUCTURE AND METAL ROOFING AT RAJA UDA STATION Main-con : MUJUR MINAT SDN BHD Our Ret = FEM/J001-20°MSBIQ.02 Date: 3rd August 2022 BILL OF QUANTITIES Item Description Unit Qty Rate ey, Amount «eM D | TOMODIFY VERTICAL FIN AT ENTRANCE B. (SCI No: MM-SSP-UG-SCI-KBNS-FEMSB-00388) OMISSION VERTICAL FINS Design, supply and install 6200mm x 5250men vertical fins comprising of 280mm x 350mm rectangular hollow section vertical post, 25mm x 100ram aluminium extruded profile as veical fin, 1Smm diameter galvanised mild steel rod as intermediate suppor included base plate, non shrink grout, connection mechanism, fixing acessories and other ancillary works to ‘complete the works all in accordance tothe Drawings, Specifications and all the Sub-Contract Documents, aceeptenee and approval from Main Contractor, as shown in drawing 'SSP-D-MGKT-UNGW-OVPR-ARC-STS-52000S ADDITION VERTICAL FINS (New Desig Design, supply and instll6200mm x 5250mm vertical ins comprising of 280mm x 380mm rectangular hollow sectcn vertical post, 35mm x 100mm Sluminium extruded profile as venical fin, !Smm diameter galvanised mild see! rod as intermediate suppor: included base plate, non shrink gout, ‘connection mechanism, fixing acessories and other ancillary works to ‘complete the works; all in accordance tothe Drawings, Specifications and all the Sub-Contract Documents, acceptance and spproval from Main Contractor, as shown in drawing 'SSP-D-MGKT-UNGW-OVPR-ARC-STS-S20005 ADDITION VERTICAL FINS (New Design) 1 | Moai walkway steel fon Vertical Finns at Entrance B to suit the design covered (11.00) 11.00 2.00 8,000.00 21,300.00 (88,000.00) 234,300.00, 4,000.00 TOTAL 150,300.00 & "=| [Dvd dons (Nar TNOUWAST=5 SoMa ne NINVEO dOHS caer oos'ge+

You might also like