Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

IO’s LETTERHEAD

_______________
Date

FINAL COMPLETION INSPECTION REPORT


(Central Office)

Contract ID : ________________

Contract Name and : ______________________________________________


Location
Contract Cost (Original/Revised) : ______________________________________________

Contractor : ______________________________________________

Implementing Office : ______________________________________________

Date of Inspection : ________________

Findings : Provide here a Narrative Report of the Inspectorate


Team's findings. Attach the Team's Previous Completion
Inspection Report(s) indicating defects/ deficiencies
observed by the Inspectorate Team and repair works
were done by the contractor. If the First Completion
Inspection Report (No.1) shows no defects/deficiencies,
include here the Team's commendation of the contractor
and/or the DPWH Consultants' Supervision Team.

We, the undersigned members of the Inspectorate Team, conducted a joint inspection of
the
above stated project and found the same to be satisfactorily completed on __________ in
accordance with the Plans and Specifications of the Contract.

NAME & SIGNATURE NAME & SIGNATURE


BQS BRS/BOD/BOC/BOM

NAME & SIGNATURE NAME & SIGNATURE


BRS/BOD/BOC/BOM Regional Office

NAME & SIGNATURE


Implementing Office
IO’s LETTERHEAD

PIF-14-PCA-06A Rev 00
_______________
Date

FINAL COMPLETION INSPECTION REPORT


(Regional Office)

Contract ID : ________________

Contract Name and : ______________________________________________


Location
Contract Cost (Original/Revised) : ______________________________________________

Contractor : ______________________________________________

Implementing Office : ______________________________________________

Date of Inspection : ________________

Findings : Provide here a Narrative Report of the Inspectorate


Team's findings. Attach the Team's Previous Completion
Inspection Report(s) indicating defects/ deficiencies
observed by the Inspectorate Team and repair works
were done by the contractor. If the First Completion
Inspection Report (No.1) shows no defects/deficiencies,
include here the Team's commendation of the contractor
and/or the DPWH Consultants' Supervision Team.

We, the undersigned members of the Inspectorate Team, conducted a joint inspection of
the
above stated project and found the same to be satisfactorily completed on __________ in
accordance with the Plans and Specifications of the Contract.

NAME & SIGNATURE NAME & SIGNATURE


Construction Division Planning and Design Division

NAME & SIGNATURE NAME & SIGNATURE


Maintenance Division Quality Assurance and Hydrology Division

NAME & SIGNATURE


District Office
IO’s LETTERHEAD

PIF-14-PCA-06B Rev 00
_______________
Date

FINAL COMPLETION INSPECTION REPORT


(District Office)

Contract ID : ________________

Contract Name and : ______________________________________________


Location
Contract Cost (Original/Revised) : ______________________________________________

Contractor : ______________________________________________

Implementing Office : ______________________________________________

Date of Inspection : ________________

Findings : Provide here a Narrative Report of the Inspectorate


Team's findings. Attach the Team's Previous Completion
Inspection Report(s) indicating defects/ deficiencies
observed by the Inspectorate Team and repair works
were done by the contractor. If the First Completion
Inspection Report (No.1) shows no defects/deficiencies,
include here the Team's commendation of the contractor
and/or the DPWH Consultants' Supervision Team.

We, the undersigned members of the Inspectorate Team, conducted a joint inspection of
the
above stated project and found the same to be satisfactorily completed on __________ in
accordance with the Plans and Specifications of the Contract.

NAME & SIGNATURE NAME & SIGNATURE


Construction Section Planning and Design Section

NAME & SIGNATURE NAME & SIGNATURE


Maintenance Section Quality Assurance Section
IO’s LETTERHEAD

PIF-14-PCA-06C Rev 00

You might also like