7. 原版維修手冊 - MS-2015

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

6 Maintenance

6.1 Visual Inspection MS-2007/2010/2015

6 Maintenance
The regular system maintenance must include a software check according to the
manufacturer's instructions. The test results must be recorded and compared to the
values in the accompanying documents.

Maintenance work not described in this section may only be accomplished by a


qualified technician authorised by SCHILLER AG.

The following table indicates the intervals and responsibilities of the maintenance
work required. Local regulations in your country may stipulate additional or different
inspection intervals and tests.

Interval Inspection Responsible


Before each use • Visual inspection of the device and ECG electrodes  User
• Visual inspection of the device
(see page 48, 6.4 Functional test after repairing)
– Touch screen test
Every 6 months – Cables and accessories  User
– Power supply unit
• Functional tests according to the instructions (see page 48, 6.4
Functional test after repairing)
 Qualified service
Every 12 months • Safety test according to IEC/EN 62353
personnel
 Qualified service
Every 3-5 years • Life item replacement every 3 - 5 years
personnel

6.1 Visual Inspection


Visual inspection of the unit and the cable assembly for the following:

 Device casing and power supply unit not broken or cracked


 LCD screen not broken or cracked
 Electrode cable sheathing and connectors not damaged
 No kinks, abrasion or wear in any cable assembly.
 Input/output connectors not damaged. Art. no.: 2.540061 Rev.: a

In addition to the visual inspection, switch on the MS-2007/2010/2015, toggle through


the menu and check some functions randomly. In this way, you can check that:

• the unit performs faultlessly


• the display works
• the touch screen works

 Defective units or damaged cables must be replaced immediately.

Page 44

You might also like