Republic of the Philippines

Bohol Island State University


Candijay Campus
Cogtong, Candijay, Bohol

Vision : A premier Science and Technology University for the formation of a world class and virtues
human resource for sustainable development of Bohol and the country.
Mission: BISU is committed to provide higher education in the arts and sciences, as well as in the
professional and technological fields; undertake research and development and extension services
for the sustainable development of Bohol and the country.

I.Project Title: Purok 3 San Isidro Labrador Chapel Kitchen Renovation

II.Address: Purol 3, Ilihan, Ubay, Bohol

III. Project Proponent/s:


Leader: Leinmar C. Butlig
Members: Analiza B. Amor
                 Ara Lean J. Ocio
                 Amabelle O. Asa
IV. Implementing Unit/Group
NSTP-CWTS

V. Project Duration: 
     2-3 weeks

VI.Objectives:
a.To give a modernized kitchen of the chapel
b.To enhance hospitality if the chapel regularly hosts events or meals.
c.To create a community gathering space.

VII. Background of the project:


Renovation refers to the process of improving or updating an existing building or space.
It involves making changes to the structure, design and functionality of a space in order
to modernize it.
After the typhoon Odette happened in our Province in Bohol, one of the extension
facilities of Ilihan chapel has been damaged, which is the kitchen. This project is not just
wanting to make a change to the facility but also, we are engaging in the youth's vital
role in building a nation, showing care and love to the place of our Almighty God, the
holy place where it is intended to be a social use of the residents belong in the
community.
VIII. Justification of the project:
Renovation of Ilihan Chapel Kitchen improves and updates an existing building or
space. Putting up some kitchen tools and cooking utensils is essential in every chapel
activity. Renovating and putting up tools for the kitchen can make the chapel beneficial
to the residents who belong in the chapel.

IX.Benefits derived from the Project: 


     The benefits of the project will be:
 The chapel kitchen will be useful in every activity.
 The chapel kitchen will be a comfortable working and cooking place.
 The residents of Ilihan Chapel will have a modernized chapel kitchen.

X. Coverage:
     This project would cover where the chapel is located in P. 3, Ilihan, Ubay,  Bohol.

XI. Methodology:

 First our group conducted a virtual open forum for the suggestion about the
possible project to be proposed.

 Our group leader visited the place which is the beneficiary of our renovation
project. He sent a picture of the place in our (gc) group chat for us to be aware
also.

XII. Detailed Budgetary Requirements:

Quantity Unit Description  Unit Cost  Total Cost

22 Pcs. GI Sheets 400 8,800

2 kg # iron nails 60 120

2 kg Umbrella Nails 60 120

5 bags Cement 240 1200

20 Pcs. 4x3x18 cut woods available -

1/2 cubic Sand 500 500


1/2 cubic Sand Gravel 500 500

Total 11,240

XIII. Detailed Schedule of the Activities

Date Activity

March 19,2023  Checking the area, location, for the proposed project.
 Taking documentation

March 21  Discussing on GC our plans for this project.


 We talked about the budget of this project through asking an
expert of this field a local carpenter.
 Sourcing of the budget to fund this project
 Contacting the local barangay and the chapel moderator for their
approval.
 Approval from the University heads
 Once all papers are approved, we will have meeting again for the
proper renovation, meeting with the carpenters, sourcing and
procurement of the materials.

Tentative dates  Start for procurement


After holy week

Tentative dates  Start for renovation


After holy week
Prepared by:
               
                 LEINMAR G. BUTLIG
                        Project Leader 

Recommending Approved:                      Noted:


                                                                               
                                                                                                                                            
                                                                                                                            
                                                                                                MARVIC DAYANAN
                                                                                                  CWTS Instructor

                    LEO L. SIMANGCA       
                     NSTP Coordinator 

  
                                                     Approved:

                                                                  LUZMINDA G. MACHETE, Ed. D.


                                                                             Campus Director

                                                                        