DOGMUND DM-5125 - Install Manual
DOGMUND DM-5125 - Install Manual
DM-5125
Install Manual
Technical Publication
Revision Rev. 0
Date 2011. 06. 03
1/25
Install Manual: DM-5125
TABLE OF CONTENTS
For better performance and safety, this manual may be changed without and
Notice prior notice.
2/25
Install Manual: DM-5125
PART 1. Install
3/25
Install Manual: DM-5125
1. Generator
1-1. Composition
EM swich HF
Power AD/DC HV TANK
Supply Delay Convertor DC/AC Inverter
EM swich X-ray
TUBE
IGBT
Driver
Stater
OP
PANEL
HT CONT
Collimator
PWR
FILAMENT
IF
AEC ION
Chamber
AC input voltage is converted into DC voltage by a single-phase all wave rectifier circuit. This DC voltage is
inverted in high-frequency voltage of about 20kHz by IGBT inverter.
The high-frequency voltage is converted into the 40 (+20kV/-20kV) to 125kV (+62.5kV/-62.5kV) DC high
voltage by a high-voltage transformer and the multi-voltage rectifier circuit. This DC high voltage is supplied to
an X-ray tube through a high-voltage cable, and PWM INV controls this X-ray tube voltage. Modulating the
Filament voltage controls the tube current.
4/25
Install Manual: DM-5125
1-2. Specification
5/25
Install Manual: DM-5125
400. 0 m
m
200 m
.0m
36. 0 m
m
42. 0 m
m
6/25
Install Manual: DM-5125
7/25
Install Manual: DM-5125
8/25
Install Manual: DM-5125
9/25
Install Manual: DM-5125
10/25
Install Manual: DM-5125
3. Bucky Table
3-1. Introduction
This manual provides information relative to the four way floating top table.
The table system, hereinafter to as the DM-BT-1.
The apparatus describe in this a heavy-duty, four way floating top table is designed for general radiographic
examinations.
3-2. Description
Outline Data
11/25
Install Manual: DM-5125
3-3. Install
1) Preliminary Consideration
The following factors must be consider, in order to planning an efficient Installation site layout.
- Maximum space for the table system. (Refer to outline data)
- Location of tube stand.
- Location of auxiliary equipment (bucky stand, cassette holder, etc.).
- Incoming power for X-ray generator and auxiliary equipments.
The tube stand, floor-ceiling tube stand should be installed before installation of DM-BT-1 table system, and
tube stand must be aligned to longitudinal travel.
The floor should be leveled the area where the system is being installed.
2) Electrical Wiring
Interconnecting cable is supplied with this system, it is highly recommended to use adequate size of floor
trough from control console to high tension transformer and rear of the DM-BT-1 table.
The trough should have removable cover flush with the finished surface of the floor.
If the power is being supplied from wall disconnect box, #12 AWG stranded wire should be used for table
power and #10 AWG for equipment ground.
3) System Calibration
1. Set the table into position under the tube stand.
2. A plum line can be used from the X-ray, align the table center line along the longitudinal travel of the
movement.
3. The table top should be level at this time, if necessary the table should be shimmed.
4. Secure the table to the floor.
5. Check all connections between each component before apply the power to the table.
6. Turn SW 1 on.
7. All locks should be functioning.
8. Verify that power on & off indication green lamp should be on.
9. Depress the foot S/W, the longitudinal and transverse locks should be released.
10. Check bucky lock release function by pulling the cassette tray toward to the front direction.
11. Check the table top transverse center, depress the foot S/W and move the table top, at the center of the
table top is aligned to the table bucky, the BZ1 (Table center indication buzzer) should be sounded.
12. The table bucky function should be check, make an exposure and verify that the bucky grid starts
oscillating during the X-ray generator exposure cycle.
12/25
Install Manual: DM-5125
3-4. Circuit
13/25
Install Manual: DM-5125
14/25
Install Manual: DM-5125
4. Tube Stand
4-1. Introduction
4-2. Features
Dongmun Tube support units series are designed for heave duty usage with all tables and erect bucky stands,
assuring a wide and precise tube positions with stability, rigidity of tube arm and, support capacity. It’s fully
counter balance providing all positions and angulations.
4-3. Constructions
15/25
Install Manual: DM-5125
4-4. Assemble
16/25
Install Manual: DM-5125
5. Bucky Stand
5-1. Description
Dongmun Vertical Bucky Stand, DM-VB-1 is designed for space efficiency and adopt free standing mounting and
counter weight balance system.
It is engineered for use of radiography of Chest, Skull, Thoracic, Spinal. The height is widely adjusted from 50cm
to 165cm above the floor level.
5-2. Components
Stand
Jaw rest
Vertical movement
Bucky device
Lock switch
Base
17/25
Install Manual: DM-5125
5-3. Circuit
18/25
Install Manual: DM-5125
6-1. Installation
1. Make sure that the receptacle socket assembly is correctly mounted on X-ray tube and generator
according to IEC 60526 or NEMA XR 7. And is clean.
2. Make sure that the termination plug and the mounting accessories are clean.
3. Screw out the Grub Screw and slip the ring nut over the sleeve.
4. Place the divided flange onto the ring flange.
5. Wet the silicone washer (Both sides) and the rubber gasket with the silicone oil.
6. Fit the rubber gasket onto the plug, against the ring flange.
7. Push the silicone washer over the contact pins.
8. Insert the termination plug into the receptacle socket (Watch the Nipple on the plug to ensure correct
positioning of the contact pins).
9. Hand tighten the ring nut.
10. Tighten the grub screw
Always replace the Silicone Washer by a new one in case the Ring Nut
Notice has been loosened.
19/25
Install Manual: DM-5125
20/25
Install Manual: DM-5125
7. Collimator
This X-ray collimator is designed for such applications as shown in the specifications of this manual and must be
sued with the X-ray tube to restrict and define the area covered by the X-ray beam and also to reduce stray
radiation.
The beam that is collimated by the two control knobs shall over the smallest area of the patient necessary to
produce the required radiograph. The collimator that allows a step less adjustment of a field size utilizes a light
localizer to project a visible beam with coverage equivalent to the coverage of the X-ray beam.
1. Provided with a push button switch timer to automatically switch off the lamp of light localizer in 30 seconds.
2. The lamp of light localizer easily replaceable with minimum error of the same lamp position and the lamp
filament position can be easily adjusted.
4. Minimum X-ray field size at SID 100cm is 0cm x 0cm (blades overlapped)
6. The contrast ratio on the light field edge is 4 : 1 or more, which allows an easy identification of light field and
its size.
7. Leakage radiation is within 35mR/h at a position 100cm from the focal spot.
21/25
Install Manual: DM-5125
22/25
Install Manual: DM-5125
7-4. Installation
1. Unpacking
Carefully unpacking the collimator and check each piece for visible damage incurred during shipment. Any
damage should be referred to the agency that delivered the collimator.
a. Remove the flange ring (A) from the top of the collimator by remove the two installation plates of ring (C).
b. Use the proper screw length to insure that the mounting screw engage at least 5 threads into the X-ray tube
port bottom, or mounting, surface tapped holes if adaptor plate is used.
c. Attach the flange ring assembly to the X-ray tube (or tube support) with mounting spacer (no supply) inserted
between the ring and the X-ray tube support.
d. Thread the side safety screw (B2) in about 6mm, leaving the flange screw (B1) flush with the inside of the
ring.
e. Lift the collimator up to the installed flange ring.
f. While the supporting the collimator, thread the side safety screw (B1) in, then tighten both safety screw
(B1 and B2).
g. Check the installation thoroughly for correct and safe mounting.
23/25
Install Manual: DM-5125
24/25
Install Manual: DM-5125
Block Diagram
25/25