MW Nr MW

YEAR PROJECT REGION COUNTRY SCOPE CLIENT SUPPLIER MODEL TYPE


UNIT WTG /MOD TOTAL
2002 Alto de Talefe Europe Portugal Civil Works GE GE 1,5 8 GE 1,5MW 12 Wind
2002 Alto de Talefe Europe Portugal 60kV Substation Civil Works GE Power & Grid
2003 Padrela Europe Portugal Civil Works GE GE 1,5 5 GE 1,5MW 7,5 Wind
2003 Padrela Europe Portugal 60kV Substation Civil Works GEWIND Power & Grid
2003 Lomba da Seixa II Europe Portugal Civil Works GE GE 1,5 8 GE 1,5MW 12 Wind
2003 Lomba da Seixa II Europe Portugal 60kV Substation Civil Works GE Power & Grid
2004 Achada Europe Portugal Civil Balance of Plant (C-BoP) Nordex Nordex 2,3 3 N90 2,3MW 6,9 Wind
2004 Achada Europe Portugal 30kV Switchstation Civil Works NORDEX Power & Grid
2004 Arcela Europe Portugal Civil Works Nordex Nordex 2,3 5 N90 2,3MW 11,5 Wind
2004 Arcela Europe Portugal 30kV Switchstation Civil Works Nordex Power & Grid
2004 Candeeiros Europe Portugal Civil Works Vestas Vestas 3 26 V90 3MW 78 Wind
2004 S. Mamede Europe Portugal Civil Works Nordex Nordex 2,3 3 N90 2,3MW 6,9 Wind
2004 S. Mamede Europe Portugal 30kV Switchstation Civil Works Nordex Power & Grid
2005 Alto de Talefe (phase II) Europe Portugal Civil Works GE GE 1,5 1 GE 1,5MW 1,5 Wind
2005 Candal e Coelheira Europe Portugal Civil Works SIIF (EDF Group) Enercon 2 20 E70 2MW 40 Wind
2005 Fonte da Quelha Europe Portugal Civil Works GE GE 1,5 1 GE 1,5MW 1,5 Wind
2005 Meadas Europe Portugal Civil Works Vestas Vestas 3 3 V90 3MW 9 Wind
2005 Meadas Europe Portugal 30kV Switchstation Civil Works VESTAS Power & Grid
2005 Pampilhosa Europe Portugal Civil Works Vestas Vestas 3 38 V90 3MW 114 Wind
2005 Punta Cana LatAm Dominican Republic Civil Works Vestas Vestas 1,65 5 V82 1,65MW 8,25 Wind
2005 Serra da Freita Europe Portugal Civil Works Nordex Nordex 2,3 16 N90 2,3MW 36,8 Wind
2005 Serra da Freita Europe Portugal 60kV Substation Civil Works GEWIND Power & Grid
2006 Candeeiros II Europe Portugal Civil Works Vestas Vestas 3 11 V90 3MW 33 Wind
2006 Candeeiros II Europe Portugal 60kV Substation Civil Works (remodelation) Vestas Power & Grid
2006 Pinhal Interior Europe Portugal Civil Works Vestas Vestas 3 18 V90 3MW 54 Wind
2006 Pinhal Interior Europe Portugal 150kV Substation Civil Works Vestas Power & Grid
2006 S. Macário Europe Portugal Civil Works Nordex Nordex 2,3 5 N90 2,3MW 11,5 Wind
2006 S. Macário Europe Portugal 60kV Substation Civil Works Nordex Power & Grid
2007 Chiqueiro Europe Portugal Civil Works Vestas Vestas 2 2 V80 2MW 4 Wind
2007 S. Cristóvão Europe Portugal Civil Works Vestas Vestas 2 1 V80 2MW 2 Wind
2007 Terras Altas de Fafe Europe Portugal Civil Works GES-Siemsa Gamesa 2 13 G87 2MW 26 Wind
2007 Terras Altas de Fafe Europe Portugal 150kV Substation Civil Works (remodelation) GES-Siemsa Power & Grid
2007 Leomil Europe Portugal Civil Works Nordex Nordex 2,3 7 N90 2,3MW 16,1 Wind
2007 Jerez de la Frontera Europe Spain Civil Works Suzlon Suzlon 2,1 22 S88 2,1MW 46,2 Wind
2007 Leomil Europe Portugal 60kV Substation Civil Works Nordex Power & Grid
2008 Bornes Europe Portugal Balance of Plant (BoP) Nordex Nordex 2,5 24 N90 2,5MW 60 Wind
2008 Bornes Europe Portugal 60kV Substation Civil Works Nordex Power & Grid
2008 Toutiço Europe Portugal Civil Works Vestas Vestas 3 34 V90 3MW 102 Wind
2008 Veciana Europe Spain Civil Works GES-Siemsa Ecotecnia 2 18 ECO74 / 80 2MW 36 Wind
2008 Łeki Dukielskie Europe Poland Civil Works Martifer Energy Systems Repower 2 5 MM92 2MW 10 Wind
2008 Lousã Europe Portugal Civil Works Nordex Nordex 2,5 18 N90 2,5MW 45 Wind
2008 Lousã II Europe Portugal 60kV Substation Civil Works NORDEX Power & Grid
2009 Baião Europe Portugal Civil Works Martifer Energy Systems Suzlon 2,1 3 S88 2,1MW 6,3 Wind
2009 Tendais Europe Portugal Civil Works SIIF (EDF Group) Enercon 2 1 E82 2MW 2 Wind
2009 Vila Franca de Xira Europe Portugal Civil Works Martifer Energy Systems Suzlon 2,1 6 S88 2,1MW 12,6 Wind
2009 Guerreiros II Europe Portugal Civil Works CME Enercon 2 3 E82 2MW 6 Wind
2010 Cernavoda Europe Romania Civil Works EDP Renewables Vestas Wind
2010 Cernavoda Europe Romania 110kV Underground High Voltage line (5,0km) EDP Renewables Power & Grid
2010 Fatarella Europe Spain Civil Works EDP Renewables Siemens 2,3 21 SWT 2,3MW 48,3 Wind
2010 Przyjma Europe Poland Civil Works Enercon Enercon 0,8 1 E53 0,8MW 0,8 Wind
2010 S. Macário II Europe Portugal 60kV Substation Civil Works Poligreen Power & Grid
2010 S. Macario II Europe Portugal Civil Works Poligreen Nordex 2,3 10 N90 2,3MW 23 Wind
2010 Serra do Açor Europe Portugal Balance of Plant (BoP) EDP Renewables Enercon 2 2 E82 2MW 4 Wind
2010 Vale Grande Europe Portugal Balance of Plant (BoP) Repower Repower 2 6 MM92 2MW 12 Wind
2010 Wigton II LatAm Jamaica Balance of Plant (BoP) Vestas Vestas 2 9 V80 2MW 18 Wind
2010 Wigton II LatAm Jamaica 69kV Substation Engineering + Civil and Electrical Works Vestas Power & Grid
2010 Lagoa Funda Europe Portugal Balance of Plant (BoP) Vestas Vestas 2 6 V90 2MW 12 Wind
2010 Vale Grande Europe Portugal WTG Installation Repower Repower 2 6 MM92 2MW 12 WTG Installation
2010 Lagoa Funda Europe Portugal 15kV Switchstation Civil and Electrical Works Vestas Power & Grid
2011 Nowe Gieralti Europe Poland Civil Works Enercon Enercon 0,8 1 E53 0,8MW 0,8 Wind
2011 Pruszkow Europe Poland Civil Works Enercon Enercon 0,8 1 E53 0,8MW 0,8 Wind
2011 Rymanów Europe Poland Balance of Plant (BoP) MTRE Repower 2 13 MM92 2MW 26 Wind
2011 Rymanów Europe Poland 110kV Substation Civil and Electrical Works MTRE Power & Grid
2011 Sarichioi Europe Romania Civil Works EDP Renewables Vestas 3 11 V90 3MW 33 Wind
2011 Sarichioi Europe Romania 110kV Substation Civil Works EDP Renewables Power & Grid
2011 Tocha Europe Portugal Balance of Plant (BoP) EDP Renewables Vestas 1,8 5 V100 1,8MW 9 Wind
2011 Tocha Europe Portugal 30kV Switchstation Civil and Electrical Works EDP Renewables Power & Grid
2011 Tocha Europe Portugal WTG Installation & Cranes EDP Renewables Vestas 1,8 5 V100 1,8MW 9 WTG Installation
2011 Rubsamen / Hochstatten Europe Germany WTG Installation Vestas Vestas 2 4 V90 2MW 8 WTG Installation
2012 Albesti Europe Romania Balance of Plant (BoP) EDP Renewables Vestas 2 14 V90 2MW 28 Wind
2012 Baião Europe Portugal Generator Exchange & Cranes Suzlon Suzlon 2,1 1 S88 2,1MW 0 WTG Installation
2012 Ciechocinek Europe Poland Engineering Procurement and Construction (EPC) Baltic Wind Nordex 2,5 3 N100 2,5MW 7,5 Wind
2012 Ciechocinek Europe Poland 15kV Switchstation Civil and Electrical Works Baltic Wind Power & Grid
2012 Cobadin Europe Romania Civil Works EDP Renewables Wind
2012 Sjisjka Europe Sweden WTG Installation Mammoet Vestas 2,6 30 V100 2,6MW 78 WTG Installation
2012 Vialonga Europe Portugal Generator Exchange & Cranes Suzlon Suzlon 2,1 3 S88 2,1MW 0 WTG Installation
2012 Jedrzychowice Europe Poland WTG Installation & Cranes Vestas Vestas 2 13 V90 2MW 26 WTG Installation
2012 Jedrzychowice Europe Poland Balance of Plant (BoP) EDP Renewables Vestas 2 13 V90 2MW 26 Wind
2012 Nordanstig Europe Sweden WTG Installation Mammoet Vestas 1,8 9 V90 1,8MW 16,2 WTG Installation
2012 Horia Europe Romania Civil Works Horia Green GE 2,5 3 GE 2,5MW 7,5 Wind
2012 Prouville Europe France WTG Installation & Cranes EDP Renewables Vestas 2 4 V90 2MW 8 WTG Installation
2012 Salão Europe Portugal WTG Installation Eurotagar Vestas 0,85 5 V52 0,85MW 4,25 WTG Installation
2012 Jedrzychowice Europe Poland 110kV Underground High Voltage line (5,0km) EDP Renewables Power & Grid
2012 Jedrzychowice Europe Poland 110kV Substation Civil and Electrical Works EDP Renewables Power & Grid
2012 Gostyn Europe Poland Balance of Plant (BoP) Acciona Acciona 3 11 AW3000 3MW 33 Wind
2012 Mordogan Europe Turkey WTG Commissioning Suzlon Suzlon 2,1 15 S88 2,1MW 0 WTG Installation
2013 Dzialdowo Europe Poland Balance of Plant (BoP) Gamesa Gamesa 2 2 G90 2MW 4 Wind
2013 Facaeni Europe Romania Civil Works EDP Renewables Wind
2013 Facaeni Europe Romania 400kV Underground High Voltage line (2,5km) EDP Renewables Power & Grid
2013 Facaeni Europe Romania 400kV Substation Civil and Electrical Works EDP Renewables Power & Grid
2013 Facaeni (phase II) Europe Romania Balance of Plant (BoP) EDP Renewables Vestas 3 24 V112 3MW 72 Wind
2013 Ortiga Europe Portugal Civil Works EDP Renewables Wind
2013 San Andres LatAm Chile Civil Works SeaWind/Vestas Solar
2013 San Andres LatAm Chile 220kV Substation Civil Works Isotron Power & Grid

Page 1 / 6 mod.083.3
MW Nr MW
YEAR PROJECT REGION COUNTRY SCOPE CLIENT SUPPLIER MODEL TYPE
UNIT WTG /MOD TOTAL
2013 Taltal LatAm Chile Balance of Plant (BoP) Enel Green Power Vestas 3 33 V112 3MW 99 Wind
2013 Taltal LatAm Chile 220kV Substation Engineering + Civil and Electrical Works (Lalackama) Enel Green Power Power & Grid
2013 Taltal LatAm Chile 220kV Substation Engineering + Civil and Electrical Works Enel Green Power Power & Grid
2013 Taltal LatAm Chile 220kV Overhead High Voltage Line (50,0km) Enel Green Power Power & Grid
2013 Tocha Europe Portugal Blades Set Exchange Vestas Vestas 1,8 1 V100 1,8MW 0 WTG Installation
2013 Vila Nova Europe Portugal Balance of Plant (BoP) EDP Renewables Vestas 2 2 V90 2MW 4 Wind
2013 Wróblew Europe Poland Balance of Plant (BoP) GEO Renewables Vestas 2 18 V90 2MW 36 Wind
2013 Wróblew Europe Poland 110kV Substation Civil and Electrical Works GEO Renewables Power & Grid
2013 Wojciechowo Europe Poland WTG Installation Vestas Vestas 2 14 V90 2MW 28 WTG Installation
2013 Wandylaw Europe UK WTG Installation Mammoet Repower 2 10 MM92 2MW 20 WTG Installation
2013 Grabik Europe Poland Balance of Plant (BoP) GEWIND Repower 3,2 2 3.2M 3,2MW 6,4 Wind
2013 Stensasa Europe Sweden WTG Installation Mammoet Vestas 2 7 V90 2MW 14 WTG Installation
2013 Bergholz Europe Germany WTG Installation Vestas Vestas 2 4 V90 2MW 8 WTG Installation
2013 Hattenbach Europe Germany WTG Installation Repower Repower 2 4 MM92 2MW 8 WTG Installation
2013 Ilza Europe Poland Balance of Plant (BoP) EDP Renewables Vestas 2 25 V90 2MW 50 Wind
2013 Grabik Europe Poland WTG Installation Repower Repower 3,2 2 3XM 3,2MW 6,4 WTG Installation
2013 Ketzin Europe Germany WTG Installation Vestas Vestas 2 3 V90 2MW 6 WTG Installation
2013 Lindendorf Europe Germany WTG Installation Vestas Vestas 2 3 V90 2MW 6 WTG Installation
2013 Oporow Europe Poland WTG Installation Mammoet Vestas 2 3 V90 2MW 6 WTG Installation
2013 Poniatowo Europe Poland WTG Installation Repower Repower 2 3 MM92 2MW 6 WTG Installation
2013 Kuniow Europe Poland WTG Installation Mammoet Vestas 2 2 V90 2MW 4 WTG Installation
2013 Okonek Europe Poland WTG Installation Repower Repower 2 2 MM92 2MW 4 WTG Installation
2013 Sokolow I & II Europe Poland WTG Installation Mammoet Vestas 2 2 V90 2MW 4 WTG Installation
2013 Vila Nova Europe Portugal WTG Installation Vestas Vestas 2 2 V90 2MW 4 WTG Installation
2013 Grodzisk Europe Poland WTG Installation Repower Repower 2 2 MM92 2MW 4 WTG Installation
2013 Olecko Europe Poland WTG Installation Mammoet Vestas 1,8 2 V100 1,8MW 3,6 WTG Installation
2013 Gumtow Europe Poland WTG Installation Vestas Vestas 2 1 V90 2MW 2 WTG Installation
2013 Michowo Europe Poland WTG Installation Mammoet Vestas 2 1 V90 2MW 2 WTG Installation
2013 Nidzica II Europe Poland WTG Installation Vestas Vestas 2 1 V90 2MW 2 WTG Installation
2013 Vorbein Europe Germany WTG Installation Vestas Vestas 2 1 V90 2MW 2 WTG Installation
2013 Winningstedt Europe Germany WTG Installation Vestas Vestas 2 1 V90 2MW 2 WTG Installation
2013 Grabik Europe Poland 20kV Switchstation Civil and Electrical Works GEWIND Power & Grid
2014 Burgos Asia Pacific Philippines WTG Installation Sarens Vestas 3 29 V90 3MW 87 WTG Installation
2014 Moimenta I & II Europe Portugal WTG Installation & Cranes Senvion Senvion 2 42 MM92 2MW 84 WTG Installation
2014 Burgos (phase II) Asia Pacific Philippines WTG Installation Sarens Vestas 3 21 V90 3MW 63 WTG Installation
2014 Goathill Quarry Europe UK Balance of Plant (BoP) Infinite Renewables Vensys 1,5 1 Vensys 77 1,5MW 1,5 Wind
2014 San Antonio LatAm Guatemala WTG Installation Vestas Vestas 3,3 16 V112 3,3MW 52,8 WTG Installation
2014 Hallstavik Europe Sweden WTG Installation Mammoet Vestas 3 16 V112 3MW 48 WTG Installation
2014 Ostaszewo Europe Poland WTG Installation Vestas Vestas 2 20 V90 2MW 40 WTG Installation
2014 Arjäng SV Europe Sweden WTG Installation Mammoet Vestas 3 13 V112 3MW 39 WTG Installation
2014 Tanum Europe Sweden WTG Installation Mammoet Vestas 3 11 V112 3MW 33 WTG Installation
2014 Arjäng NV Europe Sweden WTG Installation Mammoet Vestas 3 9 V112 3MW 27 WTG Installation
2014 Moimenta I & II Europe Portugal Civil Works Senvion Senvion 2 42 MM92 2MW 84 Wind
2014 Myslino Europe Poland Balance of Plant (BoP) Energa Gamesa 2 10 G97 2MW 20 Wind
2014 Myslino Europe Poland 110kV Substation Civil and Electrical Works Energa Power & Grid
2014 Myslino Europe Poland 110kV Overhead High Voltage Line (4,0km) Energa Power & Grid
2014 Nortorf Europe Germany WTG Installation Senvion Senvion 3,2 7 3.2M 3,2MW 22,4 WTG Installation
2014 Radziejów Europe Poland Balance of Plant (BoP) EDP Renewables Acciona 1,5 12 AW82 1,5MW 18 Wind
2014 Raki LatAm Chile Balance of Plant (BoP) Vestas Vestas 3 5 V112 3MW 15 Wind
2014 Raki LatAm Chile 24kV Switchstation Civil and Electrical Works Vestas Power & Grid
2014 Raposeiras Europe Portugal Balance of Plant (BoP) Senvion Senvion 3,4 MW / 2,0 2 3.4M / MM92 3,4 MW / 2,0MW 5,4 Wind
2014 Toutiço Europe Portugal Electrical Works Vestas Vestas V90 MW Wind
2014 Norstedt Europe Germany WTG Installation Senvion Senvion 3,2 6 3.2M 3,2MW 19,2 WTG Installation
2014 Weesby Böxlund Europe Germany WTG Installation Senvion Senvion 3,2 6 3.2M 3,2MW 19,2 WTG Installation
2014 Eggstedt BWP Europe Germany WTG Installation Senvion Senvion 3,2 MW/3,4 5 3.2M / 3.4M 3,2 MW/3,4MW 16,4 WTG Installation
2014 Genk Europe Belgium WTG Installation Gutmann Repower 2 8 MM100 2MW 16 WTG Installation
2014 Retzstadt Europe Germany WTG Installation Vestas Vestas 3 5 V112 3MW 15 WTG Installation
2014 Holt Süd Europe Germany WTG Installation Senvion Senvion 3,2 4 3.2M 3,2MW 12,8 WTG Installation
2014 Parco La Rocca Europe Italy WTG Installation & Cranes EDP Renewables Vestas 2 5 V100 2MW 10 WTG Installation
2014 Uelsby Europe Germany WTG Installation Senvion Senvion 3,2 3 3.2M 3,2MW 9,6 WTG Installation
2014 Losheim II Europe Germany WTG Installation Vestas Vestas 2 4 V90 2MW 8 WTG Installation
2014 Alto dos Forninhos Europe Portugal WTG Installation & Cranes Senvion Senvion 2 4 MM92 2MW 8 WTG Installation
2014 Kronprinzenkoog Zubau II Europe Germany WTG Installation Senvion Senvion 3,4 2 3.4M 3,4MW 6,8 WTG Installation
2014 Lotnisko Europe Poland Balance of Plant (BoP) PGE Alstom 3 30 ECO122 3MW 90 Wind
2014 Grossnotersdorf I & II Europe Germany WTG Installation Vestas Vestas 3,3 2 V112 3,3MW 6,6 WTG Installation
2014 Oldenborstel Europe Germany WTG Installation Senvion Senvion 3,2 2 3.2M 3,2MW 6,4 WTG Installation
2014 Mistelbach Europe Germany WTG Installation Vestas Vestas 3 2 V112 3MW 6 WTG Installation
2014 Roth Europe Germany WTG Installation Vestas Vestas 3 2 V112 3MW 6 WTG Installation
2014 Raposeiras Europe Portugal WTG Installation & Cranes Senvion Senvion 3,4 MW / 2,0 2 3.4M / MM92 3,4 MW / 2,0MW 5,4 WTG Installation
2014 Maasmechelen Europe Belgium WTG Installation Gutmann Repower 2 2 MM100 2MW 4 WTG Installation
2014 Westerlo Europe Belgium WTG Installation Gutmann Repower 2 2 MM92 2MW 4 WTG Installation
2014 Gizalki Europe Poland Balance of Plant (BoP) Martifer Renewables Senvion 2 18 MM92 2MW 36 Wind
2014 Lalackama LatAm Chile Interconection Substation Civil and Electrical Works Enel Green Power Solar
2014 Lotnisko Europe Poland 110kV Underground High Voltage line (38,0km) PGE Power & Grid
2014 Lotnisko Europe Poland 110kV Substation Civil and Electrical Works PGE Power & Grid
2014 Eggstedt Altbetr. Europe Germany WTG Installation Senvion Senvion 3,2 1 3.2M 3,2MW 3,2 WTG Installation
2014 Eggstedt Gemeidew. Egg Europe Germany WTG Installation Senvion Senvion 3,2 1 3.2M 3,2MW 3,2 WTG Installation
2014 Eggstedt Gemeidew. Süd Europe Germany WTG Installation Senvion Senvion 3,2 1 3.2M 3,2MW 3,2 WTG Installation
2014 Eggstedt WES Europe Germany WTG Installation Senvion Senvion 3,2 1 3.2M 3,2MW 3,2 WTG Installation
2014 Windkathedrale Hangen III Europe Germany WTG Installation Vestas Vestas 3 1 V112 3MW 3 WTG Installation
2014 Lousã Europe Portugal Civil Works GE GE #REF! Wind
2014 Grevenbroich Europe Germany WTG Installation Vestas Vestas 2 1 V90 2MW 2 WTG Installation
2014 Scheepvart Europe Belgium WTG Installation Gutmann Repower 2 1 MM100 2MW 2 WTG Installation
2014 Gizalki Europe Poland 110kV Substation Civil and Electrical Works Martifer Renewables Power & Grid
2015 Hüselitz Europe Germany WTG Installation Vestas Vestas 3,3 26 V112 3,3MW 85,8 WTG Installation
2015 Las Peñas LatAm Chile Balance of Plant (BoP) Cristaleria Chile Gamesa 2 4 G114 2MW 8,4 Wind
2015 Mycielin Europe Poland WTG Installation Vestas Vestas 2 24 V110 2MW 48 WTG Installation
2015 Guardão Europe Portugal WTG Installation & Cranes Energetus Senvion 2 14 MM92 2MW 28 WTG Installation
2015 Schlüchtern - Wallroth Europe Germany WTG Installation Vestas Vestas 3 9 V112 3MW 27 WTG Installation
2015 Lousã II Europe Portugal Balance of Plant (BoP) Iberwind Senvion 2 5 MM100 2MW 10 Wind
2015 Jozwin Europe Poland WTG Installation GE GE 2,5 / 2,85 9 2,5_100/2,85_103 2,5 / 2,85MW 25,3 WTG Installation
2015 Sernancelhe Europe Portugal WTG Installation & Cranes Senvion Senvion 2 12 MM100 2MW 24 WTG Installation
2015 Barlt Ost Europe Germany WTG Installation Senvion Senvion 3,2 7 3.XM 3,2MW 22,4 WTG Installation
2015 Picos Vale do Chão Europe Portugal WTG Installation & Cranes Senvion Senvion 2 11 MM92 2MW 22 WTG Installation

Page 2 / 6 mod.083.3
MW Nr MW
YEAR PROJECT REGION COUNTRY SCOPE CLIENT SUPPLIER MODEL TYPE
UNIT WTG /MOD TOTAL
2015 Bornes Europe Portugal Balance of Plant (BoP) Iberwind Senvion 2 5 MM100 2MW 10 Wind
2015 Bornes Europe Portugal 60kV Substation Civil and Electrical Works Iberwind Power & Grid
2015 Brodnica Europe Poland Balance of Plant (BoP) Windflower Vestas 2 3 V100 2MW 6 Wind
2015 Brodnica Europe Poland 15kV Switchstation Civil and Electrical Works Windflower Power & Grid
2015 Budziechów Europe Poland Balance of Plant (BoP) GEWIND Senvion 3,2 2 3.XM 3,2MW 6,4 Wind
2015 Budziechów Europe Poland 20kV Switchstation Civil and Electrical Works GEWIND Power & Grid
2015 Candeeiros Europe Portugal Balance of Plant (BoP) Iberwind Senvion 2 5 MM100 2MW 10 Wind
2015 Candeeiros Europe Portugal 60kV Substation Civil and Electrical Works Iberwind Power & Grid
2015 Neuenkirchen Europe Germany WTG Installation Senvion Senvion 3,2 6 3.XM 3,2MW 19,2 WTG Installation
2015 Chão Falcão Europe Portugal Balance of Plant (BoP) Iberwind Senvion 2 5 MM100 2MW 10 Wind
2015 Chão Falcão Europe Portugal 60kV Substation Civil and Electrical Works Iberwind Power & Grid
2015 Neuenkirchen II Europe Germany WTG Installation Senvion Senvion 3,2 6 3.XM 3,2MW 19,2 WTG Installation
2015 Rantrum III Europe Germany WTG Installation Senvion Senvion 3,2 6 3.XM 3,2MW 19,2 WTG Installation
2015 Brienza Europe Italy WTG Installation Senvion Senvion 3 6 3.XM 3MW 18 WTG Installation
2015 Munro LatAm Jamaica Balance of Plant (BoP) Vestas Vestas 3,3 11 V112 3,3MW 36,3 Wind
2015 Munro LatAm Jamaica 69kV Substation Engineering + Civil and Electrical Works VESTAS Power & Grid
2015 Parsówek Europe Poland Civil Works Gamesa Gamesa 2 13 G97 2MW 26 Wind
2015 Tüngeda Europe Germany WTG Installation Vestas Vestas 2 5 V126 3,3 MW /V90 2MW 15,2 WTG Installation
2015 S. Cristóvão Europe Portugal Balance of Plant (BoP) Iberwind Vestas 2 1 V90 2MW 2 Wind
2015 Schenkenberg Europe Germany Civil Works GE GE 2,75 1 2.75-120m RD/SFTm 2,75MW 2,75 Wind
2015 Simonswood Europe UK Balance of Plant (BoP) Confidential EWT 0,5 1 DW54 0,5MW 0,5 Wind
2015 Stand Lees Europe UK Civil Works Confidential EWT 0,5 1 D54 0,5MW 0,5 Wind
2015 Tafarnaubach Europe UK Balance of Plant (BoP) Clenergy EWT 0,5 1 DW54 0,5MW 0,5 Wind
2015 Terras Altas de Fafe Europe Portugal Civil Works Lusovento Wind
2015 Todo-o-Mundo Europe Portugal Balance of Plant (BoP) Iberwind Senvion 2 1 MM100 2MW 2 Wind
2015 Todo-o-Mundo Europe Portugal 30kV Switchstation Civil and Electrical Works (remodelation) IBERWIND Power & Grid
2015 Naundorf Europe Germany WTG Installation Vestas Vestas 2,0 MW / 3,0 5 V112 2,0 MW / 3,0MW 14 WTG Installation
2015 Wigton III LatAm Jamaica Balance of Plant (BoP) Gamesa Gamesa 2 12 G80 2MW 24 Wind
2015 Wigton III LatAm Jamaica 69kV Substation Engineering + Civil and Electrical Works GAMESA Power & Grid
2015 Wróblew Europe Poland Balance of Plant (BoP) GEO Renewables Vestas 2 1 V90 2MW 2 Wind
2015 Zagórów Europe Poland Balance of Plant (BoP) GEO Renewables GE 2,75 2 2,75-120 2,75MW 5,5 Wind
2015 Zagórów Europe Poland 15kV Switchstation Civil and Electrical Works GEO Renewables Power & Grid
2015 Weikersheim Europe Germany WTG Installation Senvion Senvion 3.2 4 MM92 1,0MW/3.XM 3.2MW 11,6 WTG Installation
2015 Lousã II Europe Portugal WTG Installation & Cranes Senvion Senvion 2 5 MM100 2MW 10 WTG Installation
2015 Bisaccia Europe Italy WTG Installation Senvion Senvion 2 5 MM100 2MW 10 WTG Installation
2015 Bornes Europe Portugal WTG Installation & Cranes Senvion 2 5 MM100 2MW 10 WTG Installation
2015 Candeeiros Europe Portugal WTG Installation & Cranes Senvion 2 5 MM100 2MW 10 WTG Installation
2015 Chão Falcão Europe Portugal WTG Installation & Cranes Senvion 2 5 MM100 2MW 10 WTG Installation
2015 Torre Di Ruggiero Europe Italy WTG Installation Senvion Senvion 2 5 MM82 2MW 10 WTG Installation
2015 Watford Lodge Europe UK WTG Installation & Cranes Senvion Senvion 2 5 MM92 2MW 10 WTG Installation
2015 Hohen Luckow Europe Germany WTG Installation Senvion Senvion 3,2 3 3.XM 3,2MW 9,6 WTG Installation
2015 Merzig-Merchingen Europe Germany WTG Installation Vestas Vestas 3 3 V112 3MW 9 WTG Installation
2015 Los Loros LatAm Chile Civil Balance of System (C-BoS) Isotron - - Crystalline 300 Wp 53 Solar
2015 Korytnica Europe Poland Balance of Plant (BoP) WF Korytnica Sp. Zoo Vestas 3,3 25 V126 3,3MW 82,5 Wind
2015 Kerzenheim Europe Germany WTG Installation Vestas Vestas 3,3 2 V126 3,3MW 6,6 WTG Installation
2015 Lürschau Europe Germany WTG Installation Senvion Senvion 3,2 2 3.XM 3,2MW 6,4 WTG Installation
2015 Brodnica Europe Poland WTG Installation Vestas 2 3 V100 2MW 6 WTG Installation
2015 Rantrum Heidfeld Europe Germany WTG Installation Senvion Senvion 3,4 1 3.XM 3,4MW 3,4 WTG Installation
2015 Guardão Europe Portugal Civil Works Energetus Senvion 2 14 MM92 2MW 28 Wind
2015 Ilewind Europe Germany WTG Installation Senvion Senvion 3,2 1 3.XM 3,2MW 3,2 WTG Installation
2015 Las Peñas LatAm Chile 24kV Switchstation Civil and Electrical Works Cristaleria Chile Power & Grid
2015 Los Loros LatAm Chile 220kV Substation Civil Works Isotron Power & Grid
2015 Lousã II Europe Portugal 60kV Substation Civil and Electrical Works IBERWIND Power & Grid
2015 Creglingen Europe Germany WTG Installation Senvion Senvion 2 1 MM100 2MW 2 WTG Installation
2015 Todo-o-Mundo Europe Portugal WTG Installation & Cranes Senvion Senvion 2 1 MM100 2MW 2 WTG Installation
2015 Veer Dörper Europe Germany WTG Installation Senvion Senvion 2 1 MM82 2MW 2 WTG Installation
2016 Kyaia Europe Portugal Engineering Procurement and Construction (EPC) Kyaia Solar Up - - 260 Wp Polycrystalline 0,025 Solar
2016 Kilgallioch Europe UK WTG Installation Gamesa Gamesa 2,5 39 G114 2,5 MW/G90 2,5MW 97,5 WTG Installation
2016 Rethwisch I & II Europe Germany WTG Installation Vestas Vestas Vestas V112 V112 3,3 MW 46,2 WTG Installation
2016 3 Marcos Europe Portugal WTG Installation Senvion Senvion 2 19 MM92 2MW 38 WTG Installation
2016 Quixwood Europe UK WTG Installation Sarens Senvion 2 12 MM92/MM82 2 MW 24 WTG Installation
2016 Wilhelmshaven - Westerhausen I & II Europe Germany WTG Installation Vestas Vestas 3,3 7 V112 3,3MW 23,1 WTG Installation
2016 Buseto Europe Italy WTG Installation Senvion Senvion 2 11 MM92 2MW 22 WTG Installation
2016 Simeri Crichi Europe Italy WTG Installation Senvion Senvion 2 11 MM92 2MW 22 WTG Installation
2016 Parchim IV Europe Germany WTG Installation Vestas Vestas 3,3 6 V112 3,3MW 19,8 WTG Installation
2016 Tommywhell Europe UK WTG Installation Sarens Senvion 2 9 MM92 2MW 18 WTG Installation
2016 Wittefeld Europe Germany WTG Installation Senvion Senvion Senvion 3,0M 3,0M 3,0 MW 18 WTG Installation
2016 Hämelhausen Europe Germany WTG Installation Vestas Vestas 3,3 5 V126 3,3MW 16,5 WTG Installation
2016 Ora More Europe UK WTG Installation GE GE 2,5 6 2,5M 2,5 MW 15 WTG Installation
2016 Odervorland Europe Germany WTG Installation Vestas Vestas 3,3 4 V112 3,3MW 13,2 WTG Installation
2016 Hohen Luckow Europe Germany WTG Installation Senvion Senvion 3,2 4 3.2M 3,2MW 12,8 WTG Installation
2016 Rot am See Europe Germany WTG Installation Vestas Vestas 3,3 3 V126 3,3 MW 9,9 WTG Installation
2016 Oerlenbach Europe Germany WTG Installation Vestas Vestas 3,3 3 V126 3,3MW 9,9 WTG Installation
2016 Aldenhoven Nord I Europe Germany WTG Installation Senvion Senvion 3,2 M 3,2 MW 9,6 WTG Installation
2016 Vila Lobos Europe Portugal 30kV Switchstation Civil and Electrical Works (remodelation) IBERWIND Power & Grid
2016 Lambs Hill Europe UK WTG Installation Sarens Senvion 2 4 MM100 2 MW 8 WTG Installation
2016 Glen App Europe UK WTG Installation Gamesa Gamesa 2 4 G90 2 MW 8 WTG Installation
2016 Radzanowo Europe Poland WTG Installation Vestas Vestas 2 4 V090 2MW 8 WTG Installation
2016 Crockbaravally Europe UK WTG Installation Vensys Vensys VEN100 2,5 VEN100 2,5 MW 7,5 WTG Installation
2016 Friedrichskboog Europe Germany WTG Installation Senvion Senvion 3,4 2 3,4M 3,4MW 6,8 WTG Installation
2016 Glaubitz II Europe Germany WTG Installation Vestas Vestas 3,3 2 V126 3,3MW 6,6 WTG Installation
2016 Dinkelsbühl Europe Germany WTG Installation Vestas Vestas Vestas V126 V126 3,3 MW 6,6 WTG Installation
2016 Markt Taschendorf Europe Germany WTG Installation Vestas Vestas 3,3 2 V112 3,3MW 6,6 WTG Installation
2016 Zöthen Europe Germany WTG Installation Vestas Vestas Vestas V126 V126 3,3 MW 6,6 WTG Installation
2016 Chaléons Europe France WTG Installation Senvion Senvion 2 3 MM92 2MW 6 WTG Installation
2016 Fogia Europe Italy WTG Installation Senvion Senvion 2 3 MM100 2MW 6 WTG Installation
2016 Beringen Europe Belgium WTG Installation Vestas Vestas 2 2 V90 2 MW 4 WTG Installation
2016 Berlin Pankow Europe Germany WTG Installation Senvion Senvion 3,4 1 3,4M 3,4MW 3,4 WTG Installation
2016 Friedrichsk Acolus Europe Germany WTG Installation Senvion Senvion 3,4 1 3,4M 3,4MW 3,4 WTG Installation
2016 Friedrichsk Hafenwind Europe Germany WTG Installation Senvion Senvion 3,4 1 3,4 3,4 WTG Installation
2016 Michelbach Europe Germany WTG Installation Vestas Vestas 3,3 1 V126 3,3MW 3,3 WTG Installation
2016 Aldenhoven Nord I Europe Germany WTG Installation Senvion Senvion 3,2 1 3,2 M 3,2 MW 3,2 WTG Installation
2016 Norstedt Nord Europe Germany WTG Installation Senvion Senvion 3,2 1 3.2M 3,2MW 3,2 WTG Installation
2016 Ahrensfeld Europe Germany WTG Installation Senvion Senvion 3 1 3,0M 3MW 3 WTG Installation

Page 3 / 6 mod.083.3
MW Nr MW
YEAR PROJECT REGION COUNTRY SCOPE CLIENT SUPPLIER MODEL TYPE
UNIT WTG /MOD TOTAL
2016 Maesgwyn Europe UK WTG Installation Vensys Vensys 2,5 1 VEN100 2,5MW 2,5 WTG Installation
2016 Mosteiro Europe Portugal WTG Installation Senvion Senvion 2 1 MM92 2 MW 2 WTG Installation
2016 Ollignies Europe Belgium WTG Installation Vestas Vestas 2 1 V100 2MW 2 WTG Installation
2016 Pena Suar Europe Portugal WTG Installation & Cranes Senvion Senvion 2 1 MM100 2MW 2 WTG Installation
2016 Piastowo Europe Poland WTG Installation Vestas Vestas 2 1 V90 2MW 2 WTG Installation
2016 Gibsley Farm Europe UK WTG Installation Vensys Vensys VEN87 1,5 VEN87 1,5 MW 1,5 WTG Installation
2016 Newstead Europe UK WTG Installation Vensys Vensys 1,5 1 VEN82 1,5MW 1,5 WTG Installation
2016 Southrigg Europe UK WTG Installation Vensys Vensys VEN87 1,5 VEN87 1,5 MW 1,5 WTG Installation
2016 Woodbank Farm Europe UK WTG Installation Vensys Vensys VEN87 1,5 VEN87 1,5 MW 1,5 WTG Installation
2016 Vila Lobos Europe Portugal WTG Disassembling | RT | HOP |SF Blair Fox Enercon 0,5 19 E-40 0,5MW 0 WTG Installation
2017 Langenburg Europe Germany WTG Installation Vestas Vestas 3,3 12 3,4M/3,4MW 39,6 WTG Installation
2017 Milow Europe Germany WTG Installation Vestas Vestas 3,45 10 V126 34,5 WTG Installation
2017 Lübke Koog Repowering Europe Germany WTG Installation Vestas Vestas 3,3 9 V117 3,3MW 29,7 WTG Installation
2017 Fleetmark II & Fleetmark Pawlas Europe Germany WTG Installation Vestas Vestas 3,3 6 V117/3,30MW 19,8 WTG Installation
2017 Uetze Europe Germany WTG Installation Vestas Vestas 3,3 6 V112 3.3MW 19,8 WTG Installation
2017 Hohengüstow II Europe Germany WTG Installation GE GE 3,2 6 3,2_134/3,20MW 19,2 WTG Installation
2017 Wendhausen Europe Germany WTG Installation GE GE 2,75 6 2,75M 2,75MW 16,5 WTG Installation
2017 Häcklingen Melbeck Europe Germany WTG Installation GE GE 2,75 5 2,75_120/2,75MW 13,75 WTG Installation
2017 Luckow Petershagen Europe Germany WTG Installation Vestas Vestas 3,45 3 V112/3.3MW 10,35 WTG Installation
2017 Mainhardt Europe Germany WTG Installation Vestas Vestas 3,45 3 V136/3MW 10,35 WTG Installation
2017 Odisheim Europe Germany WTG Installation Senvion Senvion 3,4 3 3,4M/3,4MW 10,2 WTG Installation
2017 Vila Lobos Europe Portugal WTG Installation Senvion Senvion 3,4 3 3,4M 3,4MW 10,2 WTG Installation
2017 Dünsbach Europe Germany WTG Installation Vestas Vestas 3,3 3 V126/3,30MW 9,9 WTG Installation
2017 Garlipp I & II Europe Germany WTG Installation Vestas Vestas 3,3 3 V117 3,3MW 9,9 WTG Installation
2017 Riemst Europe Belgium WTG Installation Vestas Vestas 3,3 3 V117/3,30MW 9,9 WTG Installation
2017 Tauberbischofsheim Europe Germany WTG Installation Vestas Vestas 3,3 3 V126 9,9 WTG Installation
2017 Burton Wold South Europe UK WTG Installation GE GE 2,75 3 2,75M 2,75MW 8,25 WTG Installation
2017 Alexigros Europe Chipre Generator Exchange Vensys Vensys 1,5 2 VEN82 1,5MW 0 Wind
2017 Cybuk LatAm Serbia Balance of Plant (BoP) GE GE 2,78 57 2,78 MW 110HH 120 158,46 Wind
2017 Kletzin VI -VII Europe Germany WTG Installation Vestas Vestas 3,3 2 V112/V126 3.3MW 6,6 WTG Installation
2017 Bernsdorf-Gersdorf Europe Germany WTG Installation Vestas Vestas 3,3 2 V112/V126 3.3MW 6,6 WTG Installation
2017 Sohland III Europe Germany WTG Installation Vestas Vestas 3,3 2 V126/3,30MW 6,6 WTG Installation
2017 Vila do Bispo Europe Portugal Blade Exchange Bussolamper Fuhrländer 1,5 1 FL MD/77 1,5MW 0 WTG Installation
2017 Wayra I LatAm Peru Engineering Procurement and Construction (EPC) Enel Green Power Acciona 3,15 42 T87.5-V2 / 3.15 132,3 Wind
2017 Wayra I LatAm Peru 220kV Substation Engineering + Civil and Electrical Works (Poroma - remodelation) Enel Green Power Power & Grid
2017 Wayra I LatAm Peru 220kV Substation Engineering + Civil and Electrical Works (Flamenco) Enel Green Power Power & Grid
2017 Wayra I LatAm Peru 220kV Overhead High Voltage Line (0,7km) Enel Green Power Power & Grid
2017 Breitenbach am Herzberg Europe Germany WTG Installation GE GE 2,75 2 2,75_139 5,5 WTG Installation
2017 Heek Wext Europe Germany WTG Installation Senvion Senvion 3,4 1 M122/ 3,4MW 3,4 WTG Installation
2017 Kahlenberg Europe Germany WTG Installation Vestas Vestas 3,3 1 V126 3,3MW 3,3 WTG Installation
2017 Krevese Rossau Europe Germany WTG Installation Vestas Vestas 3,3 1 V126 3,3MW 3,3 WTG Installation
2017 Ahrensröh Europe Germany WTG Installation Vestas Vestas 3,3 1 V117/3,30MW 3,3 WTG Installation
2017 Oelerse VIII Europe Germany WTG Installation Vestas Vestas 3,3 1 V112 3.3MW 3,3 WTG Installation
2017 Olderup Europe Germany WTG Installation Vestas Vestas 3,3 1 V117 / 3,30MW 3,3 WTG Installation
2017 Reichenbach Europe Germany WTG Installation Vestas Vestas 3,3 1 V126/3,30MW 3,3 WTG Installation
2017 Vielau Europe Germany WTG Installation Vestas Vestas 3,3 1 V126 / 3,30MW 3,3 WTG Installation
2017 Wilhelmshaven-Tammhausen Europe Germany WTG Installation Vestas Vestas 3,3 1 V112 3.3MW 3,3 WTG Installation
2017 Hardegsen Europe Germany WTG Installation Senvion Senvion 3 1 3,0M/3,0MW 3 WTG Installation
2017 Grabniki Europe Belarus WTG Installation Vensys Vensys 2,5 1 VEM 100-100m HH 2,5 WTG Installation
2017 Picos Verdes Europe Portugal WTG Installation Senvion Senvion 2 1 MM92 2MW 2 WTG Installation
2017 Barver II Europe Germany WTG Installation Vensys Vensys 1,5 1 VEN100 1,5 WTG Installation
2017 Craigannet Europe UK WTG Installation Vensys Vensys 1,5 1 VEN82 1,5MW 1,5 WTG Installation
2017 Nante Bach Europe UK WTG Installation Vensys Vensys 1,5 1 VEM 852-58 m HH 1,5MW 1,5 WTG Installation
2017 Badgingarra_RT&HOP Asia Pacific Australia WTG Installation | RT | HOP Blair Fox Enercon 0,5 19 E-40 / 0,50MW 0 WTG Installation
2018 Jóia Calçado Europe Portugal Engineering Procurement and Construction (EPC) Jóia Calçado Jinko - - 414 PVs 270 W 0 Solar
2018 Gandesa Europe Spain Blade Bearing Exchange GE GE 2,5 4 2,5_139 0 WTG Installation
2018 Jungenwald Europe Germany Blade Bearing Exchange GE GE 2,75 2 2,75 5,5 WTG Installation
2018 Kovacica Europe Serbia WTG Installation GE GE 2,75 38 GE 2,75 MW 104,5 WTG Installation
2018 Los Hercules LatAm Argentina WTG Installation & Cranes Senvion Senvion 3,6 27 3,6M114 97,2 WTG Installation
2018 Kosava Europe Serbia WTG Installation Vestas Vestas 3,45 20 V126_112mHH 69 WTG Installation
2018 Heinersdorf Europe Germany Generator Exchange Vensys Vensys 1,5 1 VEN 100-80m HH 1,5 WTG Installation
2018 Penacova Europe Portugal WTG Installation & Cranes Senvion Senvion 3,6 13 3,6M_114m HH 46,8 WTG Installation
2018 Vigia Europe Portugal WTG Installation & Cranes Senvion Senvion 3,6 8 3,6M_93m HH 28,8 WTG Installation
2018 Grohnde - Kirchohsen Europe Germany WTG Installation Vestas Vestas 3,45 8 V136 27,6 WTG Installation
2018 Gadegast Europe Germany Blade Bearing Exchange GE GE 2,5 1 2,5_120 2,5 WTG Installation
2018 Hettenhausen Europe Germany Blade Exchange Vensys Vensys 2,5 1 VEN112-14m HH 2,5 WTG Installation
2018 Bodensee Europe Germany WTG Installation Vestas Vestas 3,45 7 V136 / V126 24,15 WTG Installation
2018 Reußenköge Europe Germany WTG Installation Vestas Vestas 3,45 5 V112-94m HH 17,25 WTG Installation
2018 Maunça Europe Portugal WTG Installation & Cranes Senvion Senvion 2 8 MM92 16 WTG Installation
2018 Fernelmont II Europe Belgium WTG Installation Vestas Vestas 3,45 4 V112-94m HH 13,8 WTG Installation
2018 Uhlhorn Europe Germany WTG Installation Vestas Vestas 3,3 3 V126 9,9 WTG Installation
2018 Welsebruch-Briest Europe Germany WTG Installation Vestas Vestas 3,5 2 V126 7 WTG Installation
2018 Gölheimer Wald Europe Germany Blade Bearing Exchange GE GE 2,5 4 2,5_120 10 WTG Installation
2018 Geel Laakdal Europe Belgium WTG Installation Vestas Vestas 2,2 3 V100 6,6 WTG Installation
2018 Gänserndorf Europe Austria WTG Installation Vestas Vestas 2,00/2,2 3 V100_95mHH, V100_100mHH 6,2 WTG Installation
2018 Aurora LatAm Chile 220kV Substation Engineering + Civil and Electrical Works Mainstream Power & Grid
2018 Aurora LatAm Chile 220kV Overhead High Voltage Line (0,3km) Mainstream Power & Grid
2018 Aurora LatAm Chile Engineering Procurement and Construction (EPC) Mainstream Senvion 3 43 3.0 M122 129 Wind
2018 Bad Laasphe Europe Germany Discommissioning & Installation Vestas Vestas 3,3 2 6,6 6,6 WTG Installation
2018 Beurnfeld Europe Germany Generator Exchange Vensys Vensys 1,5 1 VEN 82-85m HH 0 WTG Installation
2018 Beuvraignes & Laucourt Europe France Blade Bearing Exchange GE GE 2,5 3 2,5_139 7,5 WTG Installation
2018 El Nogal LatAm Chile Balance of Plant (BoP) Arroyo Energy GE 3,6 3 General Electric GE 3.6 MW 10,8 Wind
2018 ETA LAPR Faro_Olhão Europe Portugal Engineering Procurement and Construction (EPC) Acciona Jinko - - 230 PVs Eaglel 60/270 W 0,06 Solar
2018 Kovacica Europe Serbia Balance of Plant (BoP) Electrawinds K-Wind GE 2,75 38 GE 2,75 MW 104,5 Wind
2018 Maitén LatAm Chile Balance of Plant (BoP) Arroyo Energy GE 3,6 3 General Electric GE 3.6 MW 10,8 Wind
2018 Offenbach Europe Germany Blade Bearing Exchange GE GE 2,5 3 2,5_120 0,0432 WTG Installation
2018 Punta Sierra LatAm Chile Engineering Procurement and Construction (EPC) Pacific Hydro Chile Goldwind 2,5 32 2,5 MW GOLDWIND 80 Wind
2018 Punta Sierra LatAm Chile 220kV Substation Engineering + Civil and Electrical Works Pacific Hydro Chile Power & Grid
2018 Punta Sierra LatAm Chile 220kV Overhead High Voltage Line (1,0km) Pacific Hydro Chile Power & Grid
2018 Quinta da Eira Europe Portugal Engineering Procurement and Construction (EPC) Quinta da Eira Jinko - - 160PVs 270W 0,00111 Solar
2018 Rietz Europe Germany Blade Bearing Exchange GE GE 2,5 6 2,5_120 0 WTG Installation
2018 Silwingen Europe Germany Blade Exchange Vensys Vensys 2,5 3 VEN 112-140m HH 0 WTG Installation
2018 St. Margarethen Europe Germany Blade Exchange Vensys Vensys 2,5 1 VEN 112-93m HH 0 WTG Installation
2018 Troia II Europe Italy Blade Bearing Exchange GE GE 1,5 1 1,5 1,5 Wind

Page 4 / 6 mod.083.3
MW Nr MW
YEAR PROJECT REGION COUNTRY SCOPE CLIENT SUPPLIER MODEL TYPE
UNIT WTG /MOD TOTAL
2018 Cabeço Rainha I Europe Portugal WTG Installation & Cranes Senvion Senvion 2 2 MM100 4 WTG Installation
2018 RIA Blades Europe Portugal WTG Installation & Cranes RIA Blades RIA Blades 3,6 1 3.6M-110m HH 3,6 WTG Installation
2018 Freiländeralm Europe Austria WTG Installation Vestas Vestas 3,45 1 V126-117m HH 3,45 WTG Installation
2018 Zephyress Europe Belgium WTG Installation Vestas Vestas 2,2 1 V110_125mHH 2,2 WTG Installation
2018 Kovacica Europe Serbia 220kV Substation Civil and Electrical Works (Interconection - remodelation) Electrawinds K-Wind Power & Grid
2018 Kovacica Europe Serbia 220kV Substation Civil and Electrical Works Electrawinds K-Wind Power & Grid
2018 Cadafaz Europe Portugal WTG Installation & Cranes Senvion Senvion 2 1 MM100 2 WTG Installation
2018 Kovacica Europe Serbia 220kV Overhead High Voltage Line (1,6km) Electrawinds K-Wind Power & Grid
2019 Ludwinów Europe Poland Balance of System (BoS) R. Power - - - 3630 un of PV 275 Wp 1 Solar
2019 Hitra II Europe Norway WTG Installation Vestas Vestas 3,6 26 V117_3,6MW_HH87 93,6 WTG Installation
2019 Hotel Fundador Europe Portugal Engineering Procurement and Construction (EPC) Fundador S.A. - - - 160 Pvs of 330 W 0,0528 Solar
2019 Hotel Guimarães Europe Portugal Engineering Procurement and Construction (EPC) Herculanos S.A. - - - 180 PVs OF 330W 0,0594 Solar
2019 Markbygden Europe Sweden WTG Installation GE GE 3,6 24 3,6 86,4 WTG Installation
2019 Grabiszew Europe Poland Balance of System (BoS) R. Power - - - 3564 un of PV 280 Wp 1 Solar
2019 Hennoy Europe Norway WTG Installation Vestas Vestas 4,2 12 V136 - 4,4MW_HH82 50,4 WTG Installation
2019 Cofrentes Europe Spain WTG Installation GE GE 3,8 13 3,8_111,5HH 49,4 WTG Installation
2019 Brännliden Europe Sweden WTG Installation Vestas Vestas 4,2 10 V136 - 4,4MW_HH152/HH135 42 WTG Installation
2019 El Hierro Europe Spain WTG Installation & Cranes Vestas Vestas 3,6 8 V136_3,6MW_HH110 28,8 WTG Installation
2019 Sierra Costera Europe Spain WTG Installation & Cranes Vestas Vestas 3,6 7 V136_HH82 25,2 WTG Installation
2019 Muniesa Europe Spain WTG Installation & Cranes Vestas Vestas 3,6 6 V136_HH105 21,6 Wind
2019 San Pedro Europe Spain WTG Installation & Cranes Vestas Vestas 3,6 6 V136_HH105 21,6 WTG Installation
2019 Viinamäki Europe Finland WTG Installation Vestas Vestas 4,2 5 V150 - 4,2MW_HH175 21 WTG Installation
2019 Torozos Europe Spain WTG Installation & Cranes Vestas Vestas 2,2 9 V120_HH90 19,8 WTG Installation
2019 Farlán Europe Spain WTG Installation & Cranes Vestas Vestas 3,6 5 V136_HH105 18 WTG Installation
2019 Kittlitz III Europe Germany WTG Installation Vestas Vestas 3,45/3,60 5 V126_HH137 , V136_HH132 17,55 WTG Installation
2019 Korsze Europe Poland Civil Balance of Plant (C-BoP) EDP Renewables Gamesa 2,5 15 G114 2,5MW 37,5 Wind
2019 Wölsickendorf Europe Germany WTG Installation Vestas Vestas 4 4 V150_4,0MW_145HH 16 WTG Installation
2019 Pelarda Europe Spain WTG Installation Vestas Vestas 3,6 4 V136_HH82 14,4 WTG Installation
2019 Valsneset Europe Norway WTG Installation Vestas Vestas 4,2 3 V117 - 4,2MW_HH87 12,6 WTG Installation
2019 Aachen Münsterwald Europe Germany WTG Installation Vestas Vestas 3,3 2 V112_3,3MW_140HH 6,6 WTG Installation
2019 W19 Prototype Europe Netherlands WTG Installation GE GE 5,3 1 5,3_158 5,3 WTG Installation
2019 Azabache * LatAm Chile Balance of System (BoS) Enel Green Power 154 170 un of PV 395 Wp 62,64 Solar
2019 Dachnów Europe Poland Engineering Procurement and Construction (EPC) Martifer Renewables - - - 2968 PVs 335 wp 1 Solar
2019 Duna Huambos LatAm Peru Engineering Procurement and Construction (EPC) Grenergy Siemens Gamesa 2,625 14 G114 T80 36,75 Wind
2019 Duna Huambos LatAm Peru 138kV Substation Engineering + Civil and Electrical Works Grenergy Power & Grid
2019 Duna Huambos LatAm Peru 138kV Overhead High Voltage Line (0,2km) Grenergy Power & Grid
2019 El Nogal LatAm Chile 24kV Switchstation Civil and Electrical Works Arroyo Energy Power & Grid
2019 Malleco LatAm Chile Balance of Plant (BoP) WPD Vestas 3,45 - 3,6 77 Vestas 273 Wind
2019 Negrete LatAm Chile Civil Balance of Plant (C-BoP) WPD Vestas 3,6 10 V136-3,60 MW HH 120m; 36 Wind
2019 Nowy Białcz Europe Poland Balance of System (BoS) R. Power - - - 3630 un of PV 275 Wp 1 Solar
2019 Pomerania Europe Poland Engineering Procurement and Construction (EPC) Ignitis Nordex 3,3 29 G114 2,5MW 93,8 Wind
2019 Pomerania Europe Poland 110kV Underground High Voltage line (30,0km) IGNITIS Power & Grid
2019 Pomerania Europe Poland 110kV Substation Engineering + Civil and Electrical Works IGNITIS Power & Grid
2019 Sarco LatAm Chile Engineering Procurement and Construction (EPC) Mainstream Senvion 3,4 50 3.4 M114 170 Wind
2019 Sarco LatAm Chile 220kV Substation Engineering + Civil and Electrical Works Mainstream Power & Grid
2019 Sarco LatAm Chile 220kV Overhead High Voltage Line (72,0km) Mainstream Power & Grid
2019 Stary Dworek I Europe Poland Balance of System (BoS) R. Power - - - 3630 un of PV 275 Wp 1 Solar
2019 Stary Dworek II Europe Poland Balance of System (BoS) R. Power - - - 3630 un of PV 275 Wp 1 Solar
2019 Stary Dworek III Europe Poland Balance of System (BoS) R. Power - - - 3630 un of PV 275 Wp 1 Solar
2019 Stary Dworek IV Europe Poland Balance of System (BoS) R. Power - - - 3630 un of PV 275 Wp 1 Solar
2019 Świnice Warckie Europe Poland Balance of System (BoS) R. Power - - - 3564 un of PV 280 Wp 1 Solar
2019 Mamut Europe Spain WTG Installation Vensys Vensys 2,5 1 VEM_GW121_HH90m 2,5 WTG Installation
2020 Ideal Europe Portugal Engineering Procurement and Construction (EPC) 0,04 Solar
2020 Guleslettene * Europe Norway WTG Installation Vestas Vestas 4 47 V136_90mHH 188 WTG Installation
2020 Piiparinmäki Europe Finland WTG Installation Vestas Vestas 4,2 13 V150_4.2MW_155mHH 54,6 WTG Installation
2020 Hundhammerfjellet * Europe Norway WTG Installation Vestas Vestas 4 12 V136-4.0MW_90mHH 48 WTG Installation
2020 Serracapriola Europe Italy WTG Installation GE GE 4 7 137_4.0MW_81.5mHH 28 WTG Installation
2020 Encinillas Europe Spain WTG Installation GE GE 3,8 7 3.8_111.5HH 26,6 WTG Installation
2020 Molinos Del Ebro Europe Spain WTG Installation Vestas Vestas 4 6 V150-4.0MW MK3E HH105 24 WTG Installation
2020 Blaakweg & Suyderlandt Europe Netherlands WTG Installation Nordex Nordex 3,6 6 N131_TS84 21,6 WTG Installation
2020 Dauer Europe Germany WTG Installation GE GE 3,6 6 137_3.6MW_131.4mHH 21,6 WTG Installation
2020 Marvila Europe Portugal WTG Installation Vestas Vestas 3,6 6 V126_3.6MW_117mHH 21,6 WTG Installation
2020 Kabeljauwbeek Europe Netherlands WTG Installation Nordex Nordex 3,6 5 N117_3800 (Delta) 18 WTG Installation
2020 Cañaseca Europe Spain WTG Installation Vestas Vestas 3,45 5 V136-3.45MW MK3B HH82 17,25 WTG Installation
2020 Cluster Portugal Europe Portugal WTG Installation Vestas Vestas 2 7 V100_2MOW_95mHH 14 WTG Installation
2020 Krackow Europe Germany WTG Installation Vestas Vestas 3,45 4 V136_3.45MW_137mHH 13,8 WTG Installation
2020 Bijvanck Europe Netherlands WTG Installation Vestas Vestas 3,45 4 V137_3.45MW_116.5mHH 13,8 WTG Installation
2020 Groetpolder Europe Netherlands WTG Installation Vestas Vestas 2,2 6 V100_2.2MW_100mHH 13,2 WTG Installation
2020 Nieuwe Hemweg ISM Europe Netherlands WTG Installation Vestas Vestas 2,2 6 V100_2.2MW_100mHH 13,2 WTG Installation
2020 Langstedt Europe Germany WTG Installation Vestas Vestas 4 3 V150_4.0MW_123mHH 12 WTG Installation
2020 Quintanilla Europe Spain WTG Installation GE GE 3,8 3 3.8_111.5HH 11,4 WTG Installation
2020 Dornbock Europe Germany WTG Installation Vestas Vestas 5,6 2 V150_5.6MW_166mHH 11,2 WTG Installation
2020 Heek Europe Germany WTG Installation Vestas Vestas 3,45 2 V117_3.45MW_116.5mHH 6,9 WTG Installation
2020 Miltzow Europe Germany WTG Installation Vestas Vestas 3,45 2 V_112_119mHH & 94mHH 6,9 WTG Installation
2020 Rebaix Europe Belgium WTG Installation Vestas Vestas 3,45 2 V117_3.45MW_91.5mHH 6,9 WTG Installation
2020 Grajewo Europe Poland Civil Balance of Plant (C-BoP) GEO Renewables Vestas 2 14 V110-2,0 Mk10A/B IEC3B 125m 14 Wind
2020 Brunow-Kleeste Europe Germany WTG Installation Vestas Vestas 4,2 1 V136_4.2MW_149mHH 4,2 WTG Installation
2020 Maldegem Europe Belgium WTG Installation Vestas Vestas 3,45 1 V126_3.45MW_117mHH 3,45 WTG Installation
2020 Azabache - Chiu Chiu LatAm Chile 110kV Substation Engineering + Civil and Electrical Works Enel Green Power Power & Grid
2020 Bogoria Europe Poland Civil Balance of Plant (C-BoP) EDP Renewables Vestas 2 10 V110-2.0 IEC3B HH120m 22,6 WTG Installation
2020 Mława * Europe Poland Civil Balance of Plant (C-BoP) GEO Renewables Vestas 2,2 17 V110-2.0/2.2 IEC3B/S HH125 37,4 Wind
2020 Premafe Europe Portugal Engineering Procurement and Construction (EPC) 484 PV’s of 280Wp 0,136 Solar
2020 Renaico II LatAm Chile 220kV Substation Engineering + Civil and Electrical Works Enel Green Power Power & Grid
2020 Renaico II * LatAm Chile Balance of Plant (BoP) Enel Green Power Goldwind 4,2 32 GW155-4200kW 134,4 Wind
2020 Wielkopolska * Europe Poland Civil Balance of Plant (C-BoP) TDI Management Siemens Gamesa 2 13 24 Wind
2020 Windpeshi * LatAm Colombia Balance of Plant (BoP) Enel Green Power Nordex 4,8 41 Nordex N_149 200 Wind
2021 Åby-Alebo * Europe Sweden WTG Installation Vestas Vestas 4,2 36 V150_4.2MW_125HH 151,2 WTG Installation
2021 Simo - Sarvisuo * Europe Finland WTG Installation Vestas Vestas 5,6 27 V162_5.6MW_166HH 151,2 WTG Installation
2021 Piiparinmäki_Phase II * Europe Finland WTG Installation Vestas Vestas 4 28 V150_4.0MW_155HH 112 WTG Installation
2021 Sincelo * Europe Portugal WTG Installation Vestas Vestas 4,2 22 V117_4.2MW_91.5HH 92,4 WTG Installation
2021 Alvesta - Lyngsåsa * Europe Sweden WTG Installation Vestas Vestas 4 22 V150_4.0MW_135HH 88 WTG Installation
2021 Metsälamminkangas* Europe Finland WTG Installation GE GE 5,5 14 5,5_158HH 77 WTG Installation
2021 Campo Lindo* LatAm Chile WTG Installation Vestas Vestas 4,2 12 V150_4,2MW_140HH 50,4 WTG Installation
2021 Duqueco* LatAm Chile WTG Installation Vestas Vestas 4,2 11 V150_4,2MW_140HH 46,2 WTG Installation

Page 5 / 6 mod.083.3
MW Nr MW
YEAR PROJECT REGION COUNTRY SCOPE CLIENT SUPPLIER MODEL TYPE
UNIT WTG /MOD TOTAL
2021 Hankila * Europe Finland WTG Installation Vestas Vestas 5,6 8 V162_5.6MW_166HH 44,8 WTG Installation
2021 Elimi* Europe Italy WTG Installation Vestas Vestas 4 11 V136_4.0MW_112HH 44 WTG Installation
2021 Loma los Pinos-TSA* Europe Spain WTG Installation GE GE 5,5 7 5.5_101HH 38,5 WTG Installation
2021 Kokoneva* Europe Finland WTG Installation Nordex Nordex 3,9 9 N149_3.9MW_155HH 35,1 WTG Installation
2021 Alt Zachun Europe Germany WTG Installation Vestas Vestas 3,45 8 V122_3.45MW_140HH 27,6 WTG Installation
2021 Serra del Vento* Europe Italy WTG Installation Vestas Vestas 3,45 8 V136_3.45MW_82HH 27,6 WTG Installation
2021 Luce * Europe France WTG Installation Nordex Nordex 3,9 6 N131_3.9MW_114HH 23,4 WTG Installation
2021 Roussac Europe France WTG Installation Nordex Nordex 3 5 N131_3.0MW_114HH 15 WTG Installation
2021 Retie E34 * Europe Belgium WTG Installation Vestas Vestas 4 3 V136_4.0MW_112HH 12 WTG Installation
2021 Gronau Epe * Europe Germany WTG Installation GE GE 5,3 2 5.3_161HH 10,6 WTG Installation
2021 Osterwick * Europe Germany WTG Installation GE GE 5,3 2 5.3_161HH 10,6 WTG Installation
2021 Auma * Europe Germany WTG Installation Vestas Vestas 4 2 V150_4.0MW_166HH_LDST 8 WTG Installation
2021 Luce * Europe France WTG Installation Nordex Nordex 3,6 2 N117_3.6MW_120HH 7,2 WTG Installation
2021 Rosario Europe Italy WTG Installation Vestas Vestas 3,45 2 V136_3.45MW_112HH 6,9 WTG Installation
2021 Mação* Europe Portugal WTG Installation Vestas Vestas 4,2 1 V150_4.2MW_105HH 4,2 WTG Installation
2021 Grajewo II Europe Poland Civil Balance of Plant (C-BoP) OX2 Vestas 3,3333333 12 V126_3,45 137 HH 40 Wind
2021 Terreiro das Bruxas* Europe Portugal WTG Installation Vestas Vestas 2 1 V90_2MW_80HH 2 WTG Installation
2021 Serra da Laje Europe Portugal Civil Balance of Plant (C-BoP) WTG Energias Vestas 4,2 1 V150_4,2 HH105 4,2 Wind
2021 Ujazd Europe Poland Balance of Plant (BoP) EDP Renewables Siemens Gamesa 2,1 15 G 114 2.1 31,5 Wind
2021 Valpaços Europe Portugal Balance of System (BoS) Simplewatt 76 216 un of PV 525 Wp 40,01 Solar
2021 Valpaços Europe Portugal 60/30 kV Substation Engineering + Civil and Electrical Works Simplewatt Power & Grid
2021 Manzano LatAm Chile Interconnection bay Substation (33/220 kV) + Civil and Electrical Works Enel Green Power Power & Grid
2021 Manzano LatAm Chile 33 kV Switchingstation Civil and Electrical Works Enel Green Power Power & Grid

TOTAL EUROPE MW 6945 TOTAL WIND MW 3704

TOTAL LATAM MW 1943 TOTAL SOLAR MW 165


, ,
TOTAL ASIA PACIFIC MW 150 TOTAL P&G # 74
# - number of projects

TOTAL WTG INST MW 5168

TOTAL MW 9038 TOTAL MW 9038

Page 6 / 6 mod.083.3