Carriage of Materials by MeChaniCal transport

Sand/ Aggregate
Lime,Moorum, Manure or Excavated Aggregates 40mm &
Lead Building rubbish. Earth Sludge Rock below 40 mm Above Soling/Stone Bricks Brick Tiles
in Kms cum cum cum cum cum cum cum per 1000 No per 1000 No

1 128.75 160.93 139.34 257.49 128.75 139.34 151.47 343.32 205.99

2 147.44 184.3 160.26 294.88 147.44 160.26 173.46 393.17 235.9

3 165.84 207.3 180.26 331.67 165.84 180.26 195.1 442.23 265.34

4 183.58 229.48 199.55 367.17 183.58 199.55 215.98 489.56 293.74

5 200.74 250.92 218.19 401.48 200.74 218.19 236.16 535.3 321.18

6 216.4 270.5 235.22 432.81 216.4 235.22 254.59 577.07 346.24

7 232.06 290.08 252.25 464.14 232.06 252.25 273.02 618.84 371.3

8 247.72 309.66 269.28 495.47 247.72 269.28 291.45 660.61 396.36


9 263.38 329.24 286.31 526.8 263.38 286.31 309.88 702.38 421.42
10 279.04 348.82 303.34 558.13 279.04 303.34 328.31 744.15 446.48
11 292.13 365.18 317.57 584.3 292.13 317.57 343.71 779.05 467.42
12 305.22 381.54 331.8 610.47 305.22 331.8 359.11 813.95 488.36
13 318.31 397.9 346.03 636.64 318.31 346.03 374.51 848.85 509.3
14 331.4 414.26 360.26 662.81 331.4 360.26 389.91 883.75 530.24
15 344.49 430.62 374.49 688.98 344.49 374.49 405.31 918.65 551.18
16 357.58 446.98 388.72 715.15 357.58 388.72 420.71 953.55 572.12
17 370.67 463.34 402.95 741.32 370.67 402.95 436.11 988.45 593.06

18 383.76 479.7 417.18 767.49 383.76 417.18 451.51 1023.35 614

19 396.85 496.06 431.41 793.66 396.85 431.41 466.91 1058.25 634.94

20 409.94 512.42 445.64 819.83 409.94 445.64 482.31 1093.15 655.88

21 420.98 526.22 457.64 841.9 420.98 457.64 495.29 1122.58 676.82

22 432.02 540.02 469.64 863.97 432.02 469.64 508.27 1152.01 694.48

23 443.06 553.82 481.64 886.04 443.06 481.64 521.25 1181.44 712.14

24 454.1 567.62 493.64 908.11 454.1 493.64 534.23 1210.87 729.8

25 465.14 581.42 505.64 930.18 465.14 505.64 547.21 1240.3 747.46

26 476.18 595.22 517.64 952.25 476.18 517.64 560.19 1269.73 765.12

27 487.22 609.02 529.64 974.32 487.22 529.64 573.17 1299.16 782.78

28 498.26 622.82 541.64 996.39 498.26 541.64 586.15 1328.59 800.44

29 509.3 636.62 553.64 1018.46 509.3 553.64 599.13 1358.02 818.1

30 520.34 650.42 565.64 1040.53 520.34 565.64 612.11 1387.45 835.76

31 531.38 664.22 577.64 1062.6 531.38 577.64 625.09 1416.88 853.42

32 542.42 678.02 589.64 1084.67 542.42 589.64 638.07 1446.31 871.08

33 553.46 691.82 601.64 1106.74 553.46 601.64 651.05 1475.74 888.74

34 564.5 705.62 613.64 1128.81 564.5 613.64 664.03 1505.17 906.4

35 575.54 719.42 625.64 1150.88 575.54 625.64 677.01 1534.6 924.06

36 586.58 733.22 637.64 1172.95 586.58 637.64 689.99 1564.03 941.72

37 597.62 747.02 649.64 1195.02 597.62 649.64 702.97 1593.46 959.38

38 608.66 760.82 661.64 1217.09 608.66 661.64 715.95 1622.89 977.04

39 619.7 774.62 673.64 1239.16 619.7 673.64 728.93 1652.32 994.7

40 630.74 788.42 685.64 1261.23 630.74 685.64 741.91 1681.75 1012.36

Per KM Add 11.04 13.8 12 22.07 11.04 12 12.98 29.43 17.66

NOTE :- THE RATES WILL BE APPLICABLE TO NET QUANTITIES AFTER DEDUCTION OF PRESCRIBED PERCENTAGE OF VOIDS MENTIONED IN
SPECIFICATION UNDER SUBHEAD "CARRIAGE OF MATERIALS".
Carriage of Materials by MeChaniCal transport
Cement, stone
blocks,
G.I. C.I., A.C.,
Stainless
Steel & C.C.
pipes
below 100 mm
dia and
other heavy Steel/CGI Tar
Lead materials Crates sheets Timber Bitumen Solvent Steam Coal
in Kms tonne tonne tonne cum tonne qtls tonne

1 114.44 343.32 114.44 147.14 128.75 12.87 147.14


2 131.06 393.17 131.06 168.5 147.44 14.74 168.5

3 147.41 442.23 147.41 189.53 165.84 16.58 189.53

4 163.19 489.56 163.19 209.81 183.58 18.36 209.81

5 178.43 535.3 178.43 229.41 200.74 20.07 229.41

6 192.35 577.07 192.35 247.31 216.4 21.64 247.31

7 206.27 618.84 206.27 265.21 232.06 23.21 265.21

8 220.19 660.61 220.19 283.11 247.72 24.78 283.11


9 234.11 702.38 234.11 301.01 263.38 26.35 301.01
10 248.03 744.15 248.03 318.91 279.04 27.92 318.91
11 259.66 779.05 259.66 333.87 292.13 29.23 333.87
12 271.29 813.95 271.29 348.83 305.22 30.54 348.83
13 282.92 848.85 282.92 363.79 318.31 31.85 363.79
14 294.55 883.75 294.55 378.75 331.4 33.16 378.75
15 306.18 918.65 306.18 393.71 344.49 34.47 393.71
16 317.81 953.55 317.81 408.67 357.58 35.78 408.67
17 329.44 988.45 329.44 423.63 370.67 37.09 423.63

18 341.07 1023.35 341.07 438.59 383.76 38.4 438.59

19 352.7 1058.25 352.7 453.55 396.85 39.71 453.55

20 364.33 1093.15 364.33 468.51 409.94 41.02 468.51

21 374.14 1122.58 374.14 481.12 420.98 42.12 481.12

22 383.95 1152.01 383.95 493.73 432.02 43.22 493.73

23 393.76 1181.44 393.76 506.34 443.06 44.32 506.34

24 403.57 1210.87 403.57 518.95 454.1 45.42 518.95

25 413.38 1240.3 413.38 531.56 465.14 46.52 531.56

26 423.19 1269.73 423.19 544.17 476.18 47.62 544.17

27 433 1299.16 433 556.78 487.22 48.72 556.78

28 442.81 1328.59 442.81 569.39 498.26 49.82 569.39

29 452.62 1358.02 452.62 582 509.3 50.92 582

30 462.43 1387.45 462.43 594.61 520.34 52.02 594.61

31 472.24 1416.88 472.24 607.22 531.38 53.12 607.22

32 482.05 1446.31 482.05 619.83 542.42 54.22 619.83

33 491.86 1475.74 491.86 632.44 553.46 55.32 632.44

34 501.67 1505.17 501.67 645.05 564.5 56.42 645.05

35 511.48 1534.6 511.48 657.66 575.54 57.52 657.66

36 521.29 1564.03 521.29 670.27 586.58 58.62 670.27

37 531.1 1593.46 531.1 682.88 597.62 59.72 682.88

38 540.91 1622.89 540.91 695.49 608.66 60.82 695.49

39 550.72 1652.32 550.72 708.1 619.7 61.92 708.1

40 560.53 1681.75 560.53 720.71 630.74 63.02 720.71

Per KM Add 9.81 29.43 9.81 12.61 11.04 1.1 12.61

NOTE :- THE RATES WILL BE APPLICABLE TO NET QUANTITIES AFTER DEDUCTION OF PRESCRIBED PERCENTAGE OF VOIDS
MENTIONED IN SPECIFICATION UNDER SUBHEAD "CARRIAGE OF MATERIALS".
Carriage of Materials by MeChaniCal transport

S.W. PIPES

Lead 100 mm dia 150 mm dia 200 mm dia 230 mm dia 250 mm dia 300 mm dia 350 mm dia 400 mm dia 450 mm dia 500 mm dia 600 mm dia empty cement bags
in Kms per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 1000 No's
1 171.66 343.32 572.2 817.44 980.92 1226.15 1716.61 2452.31 3121.12 3433.23 4291.53 51.5
2 196.59 393.17 655.29 936.12 1123.35 1404.18 1965.86 2808.36 3574.28 3931.71 4914.64 58.98
3 221.11 442.23 737.05 1052.93 1263.51 1579.39 2211.15 3158.78 4020.27 4422.29 5527.87 66.33
4 244.78 489.56 815.93 1165.62 1398.74 1748.43 2447.8 3496.85 4450.54 4895.6 6119.49 73.43
5 267.65 535.3 892.17 1274.53 1529.43 1911.79 2676.51 3823.58 4866.38 5353.02 6691.27 80.3
6 288.54 577.07 961.79 1373.99 1648.78 2060.97 2885.37 4121.95 5246.12 5770.74 7213.41 86.57
7 309.43 618.84 1031.41 1473.45 1768.13 2210.15 3094.23 4420.32 5625.86 6188.46 7735.55 92.84
8 330.32 660.61 1101.03 1572.91 1887.48 2359.33 3303.09 4718.69 6005.6 6606.18 8257.69 99.11
9 351.21 702.38 1170.65 1672.37 2006.83 2508.51 3511.95 5017.06 6385.34 7023.9 8779.83 105.38
10 372.1 744.15 1240.27 1771.83 2126.18 2657.69 3720.81 5315.43 6765.08 7441.62 9301.97 111.65
11 389.55 779.05 1298.44 1854.92 2225.89 2782.33 3895.31 5564.71 7082.35 7790.62 9738.22 116.88
12 407 813.95 1356.61 1938.01 2325.6 2906.97 4069.81 5813.99 7399.62 8139.62 10174.47 122.11
13 424.45 848.85 1414.78 2021.1 2425.31 3031.61 4244.31 6063.27 7716.89 8488.62 10610.72 127.34
14 441.9 883.75 1472.95 2104.19 2525.02 3156.25 4418.81 6312.55 8034.16 8837.62 11046.97 132.57
15 459.35 918.65 1531.12 2187.28 2624.73 3280.89 4593.31 6561.83 8351.43 9186.62 11483.22 137.8
16 476.8 953.55 1589.29 2270.37 2724.44 3405.53 4767.81 6811.11 8668.7 9535.62 11919.47 143.03
17 494.25 988.45 1647.46 2353.46 2824.15 3530.17 4942.31 7060.39 8985.97 9884.62 12355.72 148.26
18 511.7 1023.35 1705.63 2436.55 2923.86 3654.81 5116.81 7309.67 9303.24 10233.62 12791.97 153.49
19 529.15 1058.25 1763.8 2519.64 3023.57 3779.45 5291.31 7558.95 9620.51 10582.62 13228.22 158.72
20 546.6 1093.15 1821.97 2602.73 3123.28 3904.09 5465.81 7808.23 9937.78 10931.62 13664.47 163.95
21 561.32 1122.58 1871.02 2672.81 3207.37 4009.2 5612.97 8018.46 10205.34 11225.94 14032.37 168.36
22 576.04 1152.01 1920.07 2742.89 3291.46 4114.31 5760.13 8228.69 10472.9 11520.26 14400.27 172.77
23 590.76 1181.44 1969.12 2812.97 3375.55 4219.42 5907.29 8438.92 10740.46 11814.58 14768.17 177.18
24 605.48 1210.87 2018.17 2883.05 3459.64 4324.53 6054.45 8649.15 11008.02 12108.9 15136.07 181.59
25 620.2 1240.3 2067.22 2953.13 3543.73 4429.64 6201.61 8859.38 11275.58 12403.22 15503.97 186
26 634.92 1269.73 2116.27 3023.21 3627.82 4534.75 6348.77 9069.61 11543.14 12697.54 15871.87 190.41
27 649.64 1299.16 2165.32 3093.29 3711.91 4639.86 6495.93 9279.84 11810.7 12991.86 16239.77 194.82
28 664.36 1328.59 2214.37 3163.37 3796 4744.97 6643.09 9490.07 12078.26 13286.18 16607.67 199.23
29 679.08 1358.02 2263.42 3233.45 3880.09 4850.08 6790.25 9700.3 12345.82 13580.5 16975.57 203.64
30 693.8 1387.45 2312.47 3303.53 3964.18 4955.19 6937.41 9910.53 12613.38 13874.82 17343.47 208.05
31 708.52 1416.88 2361.52 3373.61 4048.27 5060.3 7084.57 10120.76 12880.94 14169.14 17711.37 212.46
32 723.24 1446.31 2410.57 3443.69 4132.36 5165.41 7231.73 10330.99 13148.5 14463.46 18079.27 216.87
33 737.96 1475.74 2459.62 3513.77 4216.45 5270.52 7378.89 10541.22 13416.06 14757.78 18447.17 221.28
34 752.68 1505.17 2508.67 3583.85 4300.54 5375.63 7526.05 10751.45 13683.62 15052.1 18815.07 225.69
35 767.4 1534.6 2557.72 3653.93 4384.63 5480.74 7673.21 10961.68 13951.18 15346.42 19182.97 230.1
36 782.12 1564.03 2606.77 3724.01 4468.72 5585.85 7820.37 11171.91 14218.74 15640.74 19550.87 234.51
37 796.84 1593.46 2655.82 3794.09 4552.81 5690.96 7967.53 11382.14 14486.3 15935.06 19918.77 238.92
38 811.56 1622.89 2704.87 3864.17 4636.9 5796.07 8114.69 11592.37 14753.86 16229.38 20286.67 243.33
39 826.28 1652.32 2753.92 3934.25 4720.99 5901.18 8261.85 11802.6 15021.42 16523.7 20654.57 247.74
40 841 1681.75 2802.97 4004.33 4805.08 6006.29 8409.01 12012.83 15288.98 16818.02 21022.47 252.15
PER KM ADD 14.72 29.43 49.05 70.08 84.09 105.11 147.16 210.23 267.56 294.32 367.9 4.41

NOTE :- THE LENGTH OF S.W. PIPES WILL BE MEASURED EXCLUSIVE OF INTERNAL DEPTH OF SOCKETS.
Carriage of Materials by MeChaniCal transport

R.C.C. PIPE,AC PIPES,STEEL CYLINDER,R.C PIPES,G.I. PIPES,D.I. PIPES,C.I. PIPES AND UNREINFORCED CEMENT PIPES

450, 600, 700, 750, 1000, 1100,


100 mm dia 125 mm dia 150 mm dia 200 mm dia 250 mm dia 300 mm dia 350 mm dia 400 mm dia 900 mm dia
Lead 500 mm dia 800mm dia 1200mm dia
in Kms per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m
1 281.41 375.9 469.02 762.94 1084.18 1340.06 1876.08 2558.29 3126.8 4690.2 7035.3 9380.4
2 322.27 430.48 537.12 873.71 1241.59 1534.63 2148.48 2929.74 3580.79 5371.19 8056.78 10742.38
3 362.48 484.19 604.14 982.73 1396.51 1726.11 2416.55 3295.3 4027.59 6041.39 9062.08 12082.77
4 401.28 536.01 668.8 1087.91 1545.98 1910.85 2675.19 3647.99 4458.65 6687.97 10031.96 13375.95
5 438.77 586.1 731.29 1189.56 1690.43 2089.39 2925.15 3988.83 4875.24 7312.86 10969.29 14625.73
6 473.01 631.84 788.35 1282.39 1822.34 2252.43 3153.41 4300.09 5255.67 7883.51 11825.26 15767.03
7 507.25 677.58 845.41 1375.22 1954.25 2415.47 3381.67 4611.35 5636.1 8454.16 12681.23 16908.33
8 541.49 723.32 902.47 1468.05 2086.16 2578.51 3609.93 4922.61 6016.53 9024.81 13537.2 18049.63
9 575.73 769.06 959.53 1560.88 2218.07 2741.55 3838.19 5233.87 6396.96 9595.46 14393.17 19190.93
10 609.97 814.8 1016.59 1653.71 2349.98 2904.59 4066.45 5545.13 6777.39 10166.11 15249.14 20332.23
11 638.58 853.01 1064.27 1731.26 2460.19 3040.81 4257.16 5805.19 7095.24 10642.88 15964.3 21285.77
12 667.19 891.22 1111.95 1808.81 2570.4 3177.03 4447.87 6065.25 7413.09 11119.65 16679.46 22239.31
13 695.8 929.43 1159.63 1886.36 2680.61 3313.25 4638.58 6325.31 7730.94 11596.42 17394.62 23192.85
14 724.41 967.64 1207.31 1963.91 2790.82 3449.47 4829.29 6585.37 8048.79 12073.19 18109.78 24146.39
15 753.02 1005.85 1254.99 2041.46 2901.03 3585.69 5020 6845.43 8366.64 12549.96 18824.94 25099.93
16 781.63 1044.06 1302.67 2119.01 3011.24 3721.91 5210.71 7105.49 8684.49 13026.73 19540.1 26053.47
17 810.24 1082.27 1350.35 2196.56 3121.45 3858.13 5401.42 7365.55 9002.34 13503.5 20255.26 27007.01
18 838.85 1120.48 1398.03 2274.11 3231.66 3994.35 5592.13 7625.61 9320.19 13980.27 20970.42 27960.55
19 867.46 1158.69 1445.71 2351.66 3341.87 4130.57 5782.84 7885.67 9638.04 14457.04 21685.58 28914.09
20 896.07 1196.9 1493.39 2429.21 3452.08 4266.79 5973.55 8145.73 9955.89 14933.81 22400.74 29867.63
21 920.19 1229.12 1533.6 2494.61 3543.02 4381.67 6134.38 8365.04 10223.94 15335.88 23003.85 30671.77
22 944.31 1261.34 1573.81 2560.01 3633.96 4496.55 6295.21 8584.35 10491.99 15737.95 23606.96 31475.91
23 968.43 1293.56 1614.02 2625.41 3724.9 4611.43 6456.04 8803.66 10760.04 16140.02 24210.07 32280.05
24 992.55 1325.78 1654.23 2690.81 3815.84 4726.31 6616.87 9022.97 11028.09 16542.09 24813.18 33084.19
25 1016.67 1358 1694.44 2756.21 3906.78 4841.19 6777.7 9242.28 11296.14 16944.16 25416.29 33888.33
26 1040.79 1390.22 1734.65 2821.61 3997.72 4956.07 6938.53 9461.59 11564.19 17346.23 26019.4 34692.47
27 1064.91 1422.44 1774.86 2887.01 4088.66 5070.95 7099.36 9680.9 11832.24 17748.3 26622.51 35496.61
28 1089.03 1454.66 1815.07 2952.41 4179.6 5185.83 7260.19 9900.21 12100.29 18150.37 27225.62 36300.75
29 1113.15 1486.88 1855.28 3017.81 4270.54 5300.71 7421.02 10119.52 12368.34 18552.44 27828.73 37104.89
30 1137.27 1519.1 1895.49 3083.21 4361.48 5415.59 7581.85 10338.83 12636.39 18954.51 28431.84 37909.03
31 1161.39 1551.32 1935.7 3148.61 4452.42 5530.47 7742.68 10558.14 12904.44 19356.58 29034.95 38713.17
32 1185.51 1583.54 1975.91 3214.01 4543.36 5645.35 7903.51 10777.45 13172.49 19758.65 29638.06 39517.31
33 1209.63 1615.76 2016.12 3279.41 4634.3 5760.23 8064.34 10996.76 13440.54 20160.72 30241.17 40321.45
34 1233.75 1647.98 2056.33 3344.81 4725.24 5875.11 8225.17 11216.07 13708.59 20562.79 30844.28 41125.59
35 1257.87 1680.2 2096.54 3410.21 4816.18 5989.99 8386 11435.38 13976.64 20964.86 31447.39 41929.73
36 1281.99 1712.42 2136.75 3475.61 4907.12 6104.87 8546.83 11654.69 14244.69 21366.93 32050.5 42733.87
37 1306.11 1744.64 2176.96 3541.01 4998.06 6219.75 8707.66 11874 14512.74 21769 32653.61 43538.01
38 1330.23 1776.86 2217.17 3606.41 5089 6334.63 8868.49 12093.31 14780.79 22171.07 33256.72 44342.15
39 1354.35 1809.08 2257.38 3671.81 5179.94 6449.51 9029.32 12312.62 15048.84 22573.14 33859.83 45146.29
40 1378.47 1841.3 2297.59 3737.21 5270.88 6564.39 9190.15 12531.93 15316.89 22975.21 34462.94 45950.43
PER KM ADD 24.12 32.22 40.21 65.4 92.94 114.88 160.83 219.31 268.05 402.07 603.11 804.14

NOTE:- THE LENGTH OF THE FLANGED OR PLAIN ENDED CONCRETE R.C.C. PIPES,STEEL CYLINDERS,R.C. PIPES & C.I. PIPES SHALL BE MEASURED OVERALL.
THE LENGTH OF SOCKETED PIPES SHALL BE MEASURED EXCLUSIVE OF INTERNAL DEPTH OF SOCKETS.
Carriage of Materials by Manual labour

Lime,Moorum Earth Manure Excavated Sand/Agg. Aggregate Soling/Stone Bricks


Lead Building Rubbish or sludge rock below 40mm 40mm & above
in metres cum cum cum cum cum cum cum per 1000 No
50.00 160.53 200.67 174.49 321.07 200.67 216.94 236.08 374.58
100.00 195.48 244.36 212.48 390.98 244.36 264.17 287.48 456.14
150.00 230.43 288.05 250.47 460.89 288.05 311.4 338.88 537.7
200.00 265.38 331.74 288.46 530.8 331.74 358.63 390.28 619.26
250.00 300.33 375.43 326.45 600.71 375.43 405.86 441.68 700.82
300.00 335.28 419.12 364.44 670.62 419.12 453.09 493.08 782.38
350.00 370.23 462.81 402.43 740.53 462.81 500.32 544.48 863.94
400.00 405.18 506.5 440.42 810.44 506.5 547.55 595.88 945.5
450.00 440.13 550.19 478.41 880.35 550.19 594.78 647.28 1027.06
500.00 475.08 593.88 516.4 950.26 593.88 642.01 698.68 1108.62
550.00 510.03 637.57 554.39 1020.17 637.57 689.24 750.08 1190.18
600.00 544.98 681.26 592.38 1090.08 681.26 736.47 801.48 1271.74
650.00 579.93 724.95 630.37 1159.99 724.95 783.7 852.88 1353.3
700.00 614.88 768.64 668.36 1229.9 768.64 830.93 904.28 1434.86
750.00 649.83 812.33 706.35 1299.81 812.33 878.16 955.68 1516.42
800.00 684.78 856.02 744.34 1369.72 856.02 925.39 1007.08 1597.98
850.00 719.73 899.71 782.33 1439.63 899.71 972.62 1058.48 1679.54
900.00 754.68 943.4 820.32 1509.54 943.4 1019.85 1109.88 1761.1
950.00 789.63 987.09 858.31 1579.45 987.09 1067.08 1161.28 1842.66
1000.00 824.58 1030.78 896.3 1649.36 1030.78 1114.31 1212.68 1924.22
Per 50m add 34.95 43.69 37.99 69.91 43.69 47.23 51.4 81.56
Carriage of Materials by Manual labour

Cement, stone blocks,


G.I. C.I., A.C., Stainless
Steel & C.C. pipes
below 100 mm dia
and
other heavy
materials/knitted
crates Steel/CGI
Lead Brick Tiles Steam Coal Cement sheets Timber Tar Bitumen
in metres per 1000 No tonne tonne tonne tonne cum tonne
50.00 234.11 187.29 146.51 116.22 249.61 160.46 146.51
100.00 285.08 228.07 168.01 133.27 286.24 184.01 168.01
150.00 336.05 268.85 189.51 150.32 322.87 207.56 189.51
200.00 387.02 309.63 211.01 167.37 359.5 231.11 211.01
250.00 437.99 350.41 232.51 184.42 396.13 254.66 232.51
300.00 488.96 391.19 254.01 201.47 432.76 278.21 254.01
350.00 539.93 431.97 275.51 218.52 469.39 301.76 275.51
400.00 590.9 472.75 297.01 235.57 506.02 325.31 297.01
450.00 641.87 513.53 318.51 252.62 542.65 348.86 318.51
500.00 692.84 554.31 340.01 269.67 579.28 372.41 340.01
550.00 743.81 595.09 361.51 286.72 615.91 395.96 361.51
600.00 794.78 635.87 383.01 303.77 652.54 419.51 383.01
650.00 845.75 676.65 404.51 320.82 689.17 443.06 404.51
700.00 896.72 717.43 426.01 337.87 725.8 466.61 426.01
750.00 947.69 758.21 447.51 354.92 762.43 490.16 447.51
800.00 998.66 798.99 469.01 371.97 799.06 513.71 469.01
850.00 1049.63 839.77 490.51 389.02 835.69 537.26 490.51
900.00 1100.6 880.55 512.01 406.07 872.32 560.81 512.01
950.00 1151.57 921.33 533.51 423.12 908.95 584.36 533.51
1000.00 1202.54 962.11 555.01 440.17 945.58 607.91 555.01
Per 50m add 50.97 40.78 21.5 17.05 36.63 23.55 21.5
Carriage of Materials by Manual labour
S.W. PIPES
Lead 100 mm dia 150 mm dia 200 mm dia 230 mm dia 250 mm dia 300 mm dia 350 mm dia 400 mm dia 450 mm dia 500 mm dia 600 mm dia Empty cement bags
in metres per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m per 100 m 1000 No's
50.00 293.28 482.08 674.62 864.04 1123.25 1604.64 2246.5 2808.12 3403.79 4160.18 5105.68 37.46

100.00 336.32 552.82 773.61 990.83 1288.07 1840.1 2576.15 3220.18 3903.26 4770.64 5854.88 45.62

150.00 379.36 623.56 872.6 1117.62 1452.89 2075.56 2905.8 3632.24 4402.73 5381.1 6604.08 53.78

200.00 422.4 694.3 971.59 1244.41 1617.71 2311.02 3235.45 4044.3 4902.2 5991.56 7353.28 61.94

250.00 465.44 765.04 1070.58 1371.2 1782.53 2546.48 3565.1 4456.36 5401.67 6602.02 8102.48 70.1

300.00 508.48 835.78 1169.57 1497.99 1947.35 2781.94 3894.75 4868.42 5901.14 7212.48 8851.68 78.26

350.00 551.52 906.52 1268.56 1624.78 2112.17 3017.4 4224.4 5280.48 6400.61 7822.94 9600.88 86.42

400.00 594.56 977.26 1367.55 1751.57 2276.99 3252.86 4554.05 5692.54 6900.08 8433.4 10350.08 94.58

450.00 637.6 1048 1466.54 1878.36 2441.81 3488.32 4883.7 6104.6 7399.55 9043.86 11099.28 102.74

500.00 680.64 1118.74 1565.53 2005.15 2606.63 3723.78 5213.35 6516.66 7899.02 9654.32 11848.48 110.9

550.00 723.68 1189.48 1664.52 2131.94 2771.45 3959.24 5543 6928.72 8398.49 10264.78 12597.68 119.06

600.00 766.72 1260.22 1763.51 2258.73 2936.27 4194.7 5872.65 7340.78 8897.96 10875.24 13346.88 127.22

650.00 809.76 1330.96 1862.5 2385.52 3101.09 4430.16 6202.3 7752.84 9397.43 11485.7 14096.08 135.38

700.00 852.8 1401.7 1961.49 2512.31 3265.91 4665.62 6531.95 8164.9 9896.9 12096.16 14845.28 143.54

750.00 895.84 1472.44 2060.48 2639.1 3430.73 4901.08 6861.6 8576.96 10396.37 12706.62 15594.48 151.7

800.00 938.88 1543.18 2159.47 2765.89 3595.55 5136.54 7191.25 8989.02 10895.84 13317.08 16343.68 159.86

850.00 981.92 1613.92 2258.46 2892.68 3760.37 5372 7520.9 9401.08 11395.31 13927.54 17092.88 168.02

900.00 1024.96 1684.66 2357.45 3019.47 3925.19 5607.46 7850.55 9813.14 11894.78 14538 17842.08 176.18

950.00 1068 1755.4 2456.44 3146.26 4090.01 5842.92 8180.2 10225.2 12394.25 15148.46 18591.28 184.34

1000.00 1111.04 1826.14 2555.43 3273.05 4254.83 6078.38 8509.85 10637.26 12893.72 15758.92 19340.48 192.5

Per 50m add 43.04 70.74 98.99 126.79 164.82 235.46 329.65 412.06 499.47 610.46 749.2 8.16

NOTE :- THE LENGTH OF S.W. PIPES WILL BE MEASURED EXCLUSIVE OF INTERNAL DEPTH OF SOCKETS.
Carriage of Materials by Manual labour
R.C.C. PIPE,AC PIPES,STEEL CYLINDER,R.C PIPES,G.I. PIPES,D.I. PIPES,C.I. PIPES AND UNREINFORCED CEMENT PIPES

450, 500 mm 600, 700, 750, 800mm


100 mm dia 125 mm dia 150 mm dia 200 mm dia 250 mm dia 300 mm dia 350 mm dia 400 mm dia
Lead dia dia
in metres 100 m 100 m 100 m 100 m 100 m 100 m 100 m 100 m 100 m 100 m
50.00 395.98 484.51 557.91 837.2 1471.51 1841.39 2632.62 3063.41 4084.54 4493
100.00 454.09 555.61 639.78 960.05 1687.44 2111.59 3018.93 3512.93 4683.9 5152.3
150.00 512.2 626.71 721.65 1082.9 1903.37 2381.79 3405.24 3962.45 5283.26 5811.6
200.00 570.31 697.81 803.52 1205.75 2119.3 2651.99 3791.55 4411.97 5882.62 6470.9
250.00 628.42 768.91 885.39 1328.6 2335.23 2922.19 4177.86 4861.49 6481.98 7130.2
300.00 686.53 840.01 967.26 1451.45 2551.16 3192.39 4564.17 5311.01 7081.34 7789.5
350.00 744.64 911.11 1049.13 1574.3 2767.09 3462.59 4950.48 5760.53 7680.7 8448.8
400.00 802.75 982.21 1131 1697.15 2983.02 3732.79 5336.79 6210.05 8280.06 9108.1
450.00 860.86 1053.31 1212.87 1820 3198.95 4002.99 5723.1 6659.57 8879.42 9767.4
500.00 918.97 1124.41 1294.74 1942.85 3414.88 4273.19 6109.41 7109.09 9478.78 10426.7
550.00 977.08 1195.51 1376.61 2065.7 3630.81 4543.39 6495.72 7558.61 10078.14 11086
600.00 1035.19 1266.61 1458.48 2188.55 3846.74 4813.59 6882.03 8008.13 10677.5 11745.3
650.00 1093.3 1337.71 1540.35 2311.4 4062.67 5083.79 7268.34 8457.65 11276.86 12404.6
700.00 1151.41 1408.81 1622.22 2434.25 4278.6 5353.99 7654.65 8907.17 11876.22 13063.9
750.00 1209.52 1479.91 1704.09 2557.1 4494.53 5624.19 8040.96 9356.69 12475.58 13723.2
800.00 1267.63 1551.01 1785.96 2679.95 4710.46 5894.39 8427.27 9806.21 13074.94 14382.5
850.00 1325.74 1622.11 1867.83 2802.8 4926.39 6164.59 8813.58 10255.73 13674.3 15041.8
900.00 1383.85 1693.21 1949.7 2925.65 5142.32 6434.79 9199.89 10705.25 14273.66 15701.1
950.00 1441.96 1764.31 2031.57 3048.5 5358.25 6704.99 9586.2 11154.77 14873.02 16360.4
1000.00 1500.07 1835.41 2113.44 3171.35 5574.18 6975.19 9972.51 11604.29 15472.38 17019.7
Per 50m add 58.11 71.1 81.87 122.85 215.93 270.2 386.31 449.52 599.36 659.3

NOTE:- THE LENGTH OF THE FLANGED OR PLAIN ENDED CONCRETE R.C.C. PIPES,STEEL CYLINDERS,R.C. PIPES & C.I. PIPES SHALL BE MEASURED OVERALL.
THE LENGTH OF SOCKETED PIPES SHALL BE MEASURED EXCLUSIVE OF INTERNAL DEPTH OF SOCKETS.
Carriage of Materials by Manual labour
Asbestos Cement Pipes

50 mm dia 80 mm dia 100 mm dia 150 mm dia


Lead
in metres per 100 m per 100 m per 100 m per 100 m
50.00 66.97 184.14 263.06 368.28
100.00 76.8 211.16 301.66 422.32
150.00 86.63 238.18 340.26 476.36
200.00 96.46 265.2 378.86 530.4
250.00 106.29 292.22 417.46 584.44
300.00 116.12 319.24 456.06 638.48
350.00 125.95 346.26 494.66 692.52
400.00 135.78 373.28 533.26 746.56
450.00 145.61 400.3 571.86 800.6
500.00 155.44 427.32 610.46 854.64
550.00 165.27 454.34 649.06 908.68
600.00 175.1 481.36 687.66 962.72
650.00 184.93 508.38 726.26 1016.76
700.00 194.76 535.4 764.86 1070.8
750.00 204.59 562.42 803.46 1124.84
800.00 214.42 589.44 842.06 1178.88
850.00 224.25 616.46 880.66 1232.92
900.00 234.08 643.48 919.26 1286.96
950.00 243.91 670.5 957.86 1341
1000.00 253.74 697.52 996.46 1395.04
1050.00 263.57 724.54 1035.06 1449.08
1100.00 273.4 751.56 1073.66 1503.12
Per 50m add 9.83 27.02 38.6 54.04

NOTE:- THE LENGTH OF ASBESTOS CEMENT PIPES SHALL BE


MEASURED EXCLUSIVE OF INTERNAL DEPTH OF SOCKETS.