Key Particulars Unit Rate Particulars in detail

Surveying one km
Surveying one km 11kV
101 11kV line using km 3715.00 HT LINE WORKS
line using Theodolite.
Theodolite.

Surveying one km
Surveying one km 11kV
102 11kV line using km 2497.00
line using Ranging Rod.
Ranging Rod.

Loading HT PSC Loading HT PSC pole to


pole to Hand cart Hand cart from the
from the stacking stacking place and
103 No 304.00
place and unloading the same at
unloading the work site (excluding
same at work site. transportation).

Transporting one HT PSC


Transporting one
pole by Hand cart -
HT PSC pole by
104 P/km 304.00 normally limited to 4km
Hand cart (limited
(excluding loading and
to 4km).
unloading).

Loading HT 'A' type Loading HT 'A' type pole


pole to Hand cart of all sizes to Hand cart
from the stacking from the stacking place
105 No 336.00
place and and unloading the same
unloading the at work site (excluding
same at work site. transportation).

Transporting 'A' type pole


Transporting 'A'
of all sizes by Hand cart -
type pole by Hand
106 P/km 377.00 normally limited to 4km
cart (limited to
(excluding loading and
4km).
unloading).

Loading HT Four legged


Loading HT 4
lattice structure of all
legged pole to
sizes to Hand cart from
Hand cart from the
107 No 449.00 the stacking place and
stacking place and
unloading the same at
unloading the
work site (excluding
same at work site.
transportation).

108 Transporting 4 P/km 529.00 Transporting Four legged


legged pole by lattice structure of all
sizes by Hand cart -
Hand cart (limited normally limited to 4km
to 4km). (excluding loading and
unloading).

Transporting one HT PSC


pole by Head load- for an
Transporting one
average distance of one
HT PSC pole by
109 P/km 1698.00 km where transportation
Head load (limited
by hand cart is not
to 0.3km).
possible. (normally
limited to 0.3km).

Transporting 'A' type pole


of all sizes by Head load-
Transporting 'A' for an average distance
type pole by Head of one km where
110 P/km 1987.00
load (limited to transportation by hand
0.3km). cart is not possible.
(normally limited to
0.3km).

Transporting Four legged


lattice structure of all
Transporting 4 sizes by Head load- for an
legged pole by average distance of one
111 P/km 2756.00
Head load (limited km where transportation
to 0.3km). by hand cart is not
possible. (normally
limited to 0.3km).

Fitting and erecting one


HT PSC Single Pole in
position, including fitting
Fitting and erecting
cross arm, digging and
one HT PSC Pole in
back filling pit in ordinary
position incl. fitting
soil (as per standards),
112 cross arm, digging No 2178.00
drawing sufficient length
& back filling pit,
of GI earthing leads from
drawing earth
F clamp through V cross
leads.
arm to the ground for
earthing (excluding
provision of earthing).

113 Fitting and erecting No 2756.00 Fitting and erecting one


one HT 'A' type Pole HT 'A' type Single Pole in
in position incl. position, including fitting
fitting cross arm, cross arm, digging and
digging & back back filling pit in ordinary
filling pit, drawing soil (as per standards),
earth leads. drawing sufficient length
of GI earthing leads from
F clamp through V cross
arm to the ground for
earthing (excluding
provision of earthing).

Fitting and erecting one


HT Four legged lattice
structure in position
Fitting and erecting
including fitting cross
one HT 4 legged
arm, digging and back
pole in position
filling pit in ordinary soil
incl. fitting cross
114 No 3974.00 (as per standards),
arm, digging &
drawing sufficient length
back filling pit,
of GI earthing leads from
drawing earth
F clamp through V cross
leads.
arm to the ground for
earthing (excluding
provision of earthing).

Additional rate for Additional rate for


providing one disc providing one disc set, PG
115 set on any type of No 105.00 clamp etc. complete, on
HT pole for making any type of HT pole for
cut point. making cut point.

Fitting and erecting one


HT Double Pole Structure
Fitting and erecting using PSC pole in
one HT DP using position including fitting 2
PSC pole in channel cross arms,
position incl. fitting digging and back filling
116 2 channel cross No 5810.00 pit in ordinary soil,
arms, digging & drawing sufficient length
back filling pit, of GI earthing leads
drawing earth through all cross arms to
leads. the ground for earthing
(excluding provision of
earthing).

Fitting and erecting one


HT Double Pole Structure
Fitting and erecting using 'A' type pole in
one HT DP using 'A' position including fitting 2
type pole in No. channel cross arm,
position incl. fitting digging and back filling
117 2 channel cross No 6967.00 pit in ordinary soil,
arms, digging & drawing sufficient length
back filling pit, of GI earthing leads
drawing earth through all cross arms to
leads. the ground for earthing
(excluding provision of
earthing).

118 Fitting and erecting No 9402.00 Fitting and erecting one


one HT DP using 4 HT Double Pole Structure
legged pole in using Four legged lattice
position incl. fitting structure in position
2 channel cross including fitting 2 channel
arms, digging & cross arms, digging and
back filling pit, back filling pit in ordinary
drawing earth soil, drawing sufficient
leads. length of GI earthing
leads through all cross
arms to the ground for
earthing (excluding
provision of earthing).

Fitting and Fitting and providing one


providing one HT HT Stay for 11kV pole,
119 Stay for 11kV pole No 914.00 including digging and
incl. digging & back back filling pit in ordinary
filling pit. soil.

Fitting and Fitting and providing one


providing one Strut Strut using HT PSC pole
120 using HT PSC pole No 2033.00 including digging and
incl. digging & back back filling pit in ordinary
filling pit. soil.

Fitting and Fitting and providing one


providing one Strut Strut using 'A' type pole,
121 using 'A' type pole No 2612.00 including digging and
incl. digging & back back filling pit in ordinary
filling pit. soil.

Fitting and providing one


HT Fly stay for 11kV pole
Fitting and using HT PSC pole
providing one HT including digging and
Fly stay for 11kV back filling pits in
122 No 3197.00
pole using HT PSC ordinary soil, drawing
pole incl. digging & sufficient length of GI
back filling pits. earth leads to the ground
for earthing (excluding
provision of earthing).

Fitting and providing one


HT Fly stay for 11kV pole
Fitting and using 'A' type pole
providing one HT including digging and
Fly stay for 11kV back filling pits in
123 No 3775.00
pole using 'A' type ordinary soil, drawing
pole incl. digging & sufficient length of GI
back filling pits. earth leads to the ground
for earthing (excluding
provision of earthing).

124 Insertion of one HT No 2283.00 Insertion of one HT PSC


PSC pole in pole in existing OH line
existing line incl. including digging &
digging & backfilling pit in ordinary
backfilling pit, soil, fitting cross arm,
fitting cross arm, insulators, binding etc.,
insulators, binding drawing sufficient length
etc. of GI earth leads to the
ground for earthing
(excluding provision of
earthing).

Insertion of one HT 'A'


type pole in existing OH
Insertion of one HT
line including digging &
'A' type pole in
backfilling pit in ordinary
existing line incl.
soil, fitting cross arm,
digging &
125 No 2862.00 insulators, binding etc.,
backfilling pit,
drawing sufficient length
fitting cross arm,
of GI earth leads to the
insulators, binding
ground for earthing
etc.
(excluding provision of
earthing).

Insertion of one HT Four


legged lattice structure in
Insertion of one HT
existing OH line including
4 legged pole in
digging & backfilling pit in
existing line incl.
ordinary soil, fitting cross
digging &
126 No 4292.00 arm, insulators, binding
backfilling pit,
etc., drawing sufficient
fitting cross arm,
length of GI earth leads to
insulators, binding
the ground for earthing
etc.
(excluding provision of
earthing).

Additional rate for Additional rate for


excavation of one excavation of one Pit for
127 No 289.00
Pit for HT Pole/HT HT Pole/HT Stay in
Stay in Laterite. Laterite.

Additional rate for


Additional rate for
excavation of one
excavation of one Pit for
128 Pit for HT Pole/HT No 578.00
HT Pole/HT Stay in Hard
Stay in Hard
Laterite.
Laterite.

Additional rate for Additional rate for


excavation of one excavation of one Pit for
129 No 867.00
Pit for HT Pole/HT HT Pole/HT Stay in Soft
Stay in Soft Rock. Rock.

Additional rate for


Additional rate for
excavation of one
130 No 1735.00 excavation of one Pit for
Pit for HT Pole/HT
HT Pole/HT Stay in Rock.
Stay in Rock.

131 Additional rate for No 434.00 Additional rate for


excavation of Pit excavation of Pit for 'A'
for 'A' type pole in type pole in Laterite.
Laterite.

Additional rate for


Additional rate for
excavation of Pit
132 No 867.00 excavation of Pit for 'A'
for 'A' type pole in
type pole in Hard Laterite.
Hard Laterite.

Additional rate for


Additional rate for
excavation of Pit
133 No 1301.00 excavation of Pit for 'A'
for 'A' type pole in
type pole in Soft Rock.
Soft Rock.

Additional rate for


Additional rate for
excavation of Pit
134 No 2602.00 excavation of Pit for 'A'
for 'A' type pole in
type pole in Rock.
Rock.

Stringing of one km 11kV


Stringing of one km line with ACSR Raccoon
11kV line with (3 conductors) after
ACSR Raccoon (3 fitting insulators and
conductors) incl. giving jumper
135 km 23128.00
cutting and connections including
removing tree cutting and removing tree
branches wherever branches wherever
necessary. necessary excluding cut
point works.

Stringing of one km 11kV


Stringing of one km line with ACSR Rabbit (3
11kV line with conductors) after fitting
ACSR Rabbit (3 insulators and giving
conductors) incl. jumper connections
136 km 19475.00
cutting and including cutting and
removing tree removing tree branches
branches wherever wherever necessary
necessary. excluding cut point
works.

137 Fitting and erecting No 23231.00 Fitting and erecting one


one HT PSC DP, HT Double Pole Structure
fitting all using PSC pole in
accessories (2 position, providing 2
stays, 8 cross stays, fitting 8 channel
arms, AB, DO, LA cross arms, fitting AB
etc.), mounting of switch, DO fuse, station
100kVA class LA etc., drawing GI
Transformer, fixing earthing leads (separate
DB, DTR box and GI strip for LA through
giving all HT & LT insulated conduit) to the
connections. ground, mounting of
100kVA Transformer on
DP structure, clamping
with Transformer belt,
fixing 2way distribution
box, DTR meter with box,
giving all HT & LT
connections upto OH
lines, fixing/sign writing
all statutory display
boards etc. including
digging & back filling pit
in ordinary soil excluding
provision of pipe earthing,
yard fencing and
metaling.

Fitting 6 channel cross


arms, AB switch, DO fuse,
Station class LA, HT & LT
connections upto OH
Fitting 6 channel lines, etc. on existing DP
cross arms, AB structure, Fixing
switch, DO fuse, distribution box/provision
138 LA, HT & LT No 7630.00 for one set (3No.) of LT
connections on fuses, drawing sufficient
existing DP, 3 LT length of GI earthing
fuses. leads to the ground for
earthing, excluding
provision of earthing &
mounting of Transformer
on poles.

Fitting 5 channel cross


arms, AB switch, DO fuse,
LA(Ord), HT & LT
connections upto OH
Fitting 5 channel lines, etc. on existing DP
cross arms, AB structure, Fixing
switch, DO fuse, distribution box/provision
139 LA, HT & LT No 7254.00 for one set (3No.) of LT
connections on fuses, , drawing sufficient
existing DP, 3 LT length of GI earthing
fuses. leads to the ground for
earthing, excluding
provision of earthing &
mounting of Transformer
on poles.

140 Fitting 3 channel No 6502.00 Fitting 3 channel cross


cross arms, AB arms, AB switch, DO fuse,
switch, DO fuse, LA(Ord), HT & LT
LA, HT & LT connections upto OH
connections on lines, etc. on existing DP
existing DP, 3 LT structure, fixing
fuses. distribution box/provision
for one set (3No.) of LT
fuses, drawing sufficient
length of GI earthing
leads to the ground for
earthing, excluding
provision of earthing &
mounting of Transformer
on plinth.

Erecting one CT-PT Erecting one CT-PT unit to


unit to existing DP existing DP and giving
and giving connections, including
connections, incl. loading from
141 No 3381.00
loading & TMR/SRS/other stacking
unloading, place & unloading at site,
excluding but excluding cost for
transportation. transporting CT-PT.

Erecting one 25kVA


Erecting one 25kVA
Transformer to existing
Transformer to
DP and giving
existing DP and
connections, including
giving connections,
142 No 3221.00 loading from
incl. loading &
TMR/SRS/other stacking
unloading,
place & unloading at site
excluding
but excluding cost for
transportation.
transporting transformer.

Erecting one 63kVA


Erecting one 63kVA
Transformer to existing
Transformer to
DP and giving
existing DP and
connections, including
giving connections,
143 No 3381.00 loading from
incl. loading &
TMR/SRS/other stacking
unloading,
place & unloading at site
excluding
but excluding cost for
transportation.
transporting transformer.

Erecting one Erecting one 100kVA


100kVA Transformer to existing
Transformer to DP and giving
existing DP and connections, including
144 giving connections, No 4759.00 loading from
incl. loading & TMR/SRS/other stacking
unloading, place & unloading at site
excluding but excluding cost for
transportation. transporting transformer.

145 Erecting one No 4919.00 Erecting one 160kVA


160kVA Transformer to existing
Transformer to DP and giving
existing DP and connections, including
giving connections, loading from
incl. loading & TMR/SRS/other stacking
unloading, place & unloading at site
excluding but excluding cost for
transportation. transporting transformer.

Erecting one
100kVA Erecting one 100kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
146 and giving No 4119.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.

Erecting one
160kVA Erecting one 160kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
147 and giving No 4279.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.

Erecting one
250kVA Erecting one 250kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
148 and giving No 5513.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.

Erecting one
315kVA Erecting one 315kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
149 and giving No 5672.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.

150 Erecting one No 5832.00 Erecting one 500kVA


500kVA Transformer to existing
Transformer to Plinth/Platform and
existing giving connections,
Plinth/Platform including loading from
and giving TMR/SRS/other stacking
connections, incl. place & unloading at site
loading & but excluding cost for
unloading, transporting transformer.
excluding
transportation.

Installing one DTR Meter


with box (normal size
40x25x100cm) on
Installing one DTR
existing poles including
Meter with box on
fixing of 3 CTs on bus bar,
existing poles and
laying and termination of
giving the
151 No 2499.00 control cable using
complete
proper lugs, fixing of
connections incl.
meters, capacitors,
conveyance of
control fuses and giving
materials.
the complete
connections including
conveyance of materials.

Installing one Border


Meter with box (normal
Installing one
size 40x25x100cm) on
Border Meter with
existing poles including
box on existing
laying and termination of
poles and giving
152 No 2499.00 control cable using
the complete
proper lugs, fixing of
connections incl.
meters, control fuses and
conveyance of
giving the complete
materials.
connections including
conveyance of materials.

Erection of LT 2
Erection of LT 2 way
way distribution
distribution box (normal
box on existing
size 130x40x90cm) on
cross arm giving
existing cross arm, giving
153 connection incl. No 2499.00
connection including
cable and earth
cable and earth
connection
connection (excluding
(excluding
earthing).
earthing).

154 Erection of LT 3 No 2675.00 Erection of LT 3 way


way distribution distribution box (normal
box on existing size 160x40x90cm) on
cross arm giving existing cross arm, giving
connection incl. connection including
cable and earth cable and earth
connection connection (excluding
earthing).
(excluding
earthing).

Erection of LT 4
Erection of LT 4 way
way distribution
distribution box (normal
box on existing
size 190x40x90cm) on
cross arm giving
existing cross arm, giving
155 connection incl. No 2851.00
connection including
cable and earth
cable and earth
connection
connection (excluding
(excluding
earthing).
earthing).

Fitting one
Fitting one additional
additional Fuse
Fuse unit and giving
unit and giving
connection from
156 connection from No 233.00
Transformer to fuse and
Transformer to
Distribution box to LT OH
fuse and DB to LT
line.
OH line.

Providing one Earth using


GI earth pipe of size
38.1mm dia, 2.5m length
Providing one Earth
including digging
using earth pipe
separate pit
incl. digging
(0.45x0.45x2.5m) at a
separate pit at
157 No 1508.00 minimum distance of
standard distance
1.5m away from the
away from the
pole/structure and
pole/structure &
maintaining standard
backfilling.
distance between
different earth pipes in
ordinary soil & backfilling.

Providing one Driven


Earth using GI earth pipe
Providing one
of size 38.1mm dia, 2.5m
Driven Earth using
length at minimum
GI earth pipe at
distance of 1.5m away
158 standard distance No 395.00
from the pole/structure
away from the
and maintaining standard
pole/structure in
distance between
loose soil.
different earth pipes in
loose soil.

159 Providing one No 395.00 Providing one Driven


Driven Earth using Earth using Steel rod of
Steel earth rod at size 19mm dia, 2.5m
standard distance length at a minimum
away from the distance of 1.5m away
pole/structure in from the pole/structure
loose soil. and maintaining standard
distance between
different earth pipes in
loose soil.

Additional rate for Additional rate for


excavation of one excavation of one Earth
160 No 578.00
Earth Pit (2.5m Pit (2.5m depth) in
depth) in Laterite. Laterite.

Additional rate for


Additional rate for
excavation of one
excavation of one Earth
161 Earth Pit (2.5m No 1157.00
Pit (2.5m depth) in Hard
depth) in Hard
Laterite.
Laterite.

Additional rate for


Additional rate for
excavation of one
excavation of one Earth
162 Earth Pit (2.5m No 1735.00
Pit (2.5m depth) in Soft
depth) in Soft
Rock.
Rock.

Providing one Coil Earth


Providing one Coil
using No.8 GI-earth wire
Earth using GI
(50mm dia, 115 turns)
earth wire, digging
including digging
separate pit at
163 No 723.00 separate pit
standard distance
(0.45x0.45x1.5m) at
away from the
standard distance away
pole/structure &
from the pole/structure in
backfilling.
ordinary soil & backfilling.

Fitting one set Fitting one set (3No.)


(3No.) 11kV LA and 11kV LA and giving
164 No 320.00
giving connections connections excluding
excluding earthing. earthing.

Fitting one set


Fitting one set (3No.)
(3No.) 11kV DO
165 No 320.00 11kV DO Fuse and giving
Fuse and giving
connection.
connection.

Fitting one set AB switch,


Fitting one set AB DO fuse (3No.), LA (3No.),
switch, DO fuse, giving all connections
LA, giving from HT line to
connections and Transformer bush and
166 No 2789.00
drawing earth drawing earth leads to
leads for earthing the ground for earthing
excluding provision excluding provision of
of earth. earthing and fixing
channels.

167 Fitting one set AB No 1859.00 Fitting one set AB switch


switch and giving on existing DP, giving
connection connection and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding provision of
earthing.

Conveyance of one
km 11kV line
Conveyance of one km
materials from
11kV line materials from
section km/
168 1157.00 section store/stacking
store/stacking km
place to the work site
place to the work
(excluding poles).
site (excluding
poles).

Fitting one
Additional V cross Fitting one Additional V
arm in existing cross arm in existing
169 No 320.00
single pole incl. single pole including
conveyance of conveyance of materials.
materials.

Fitting one
Additional
Fitting one Additional
75x40mm, 1.8m
75x40mm, 1.8m Channel
Channel cross arm
170 No 320.00 cross arm in existing
in existing single
single pole including
pole incl.
conveyance of materials.
conveyance of
materials.

Fitting one
Additional Fitting one Additional
2.4m/3m Channel 2.4m/3m Channel cross
cross arm arm (100x50x6mm), in
171 No 376.00
(100x50x6mm), in existing 11kV DP
existing 11kV DP including conveyance of
incl. conveyance of materials.
materials.

Fitting one
Additional Fitting one Additional
2.4m/3m Channel 2.4/3m Channel cross
cross arm arm (75x40x6mm), in
172 No 361.00
(75x40x6mm), in existing 11kV DP
existing 11kV DP including conveyance of
incl. conveyance of materials.
materials.

173 Fitting one No 353.00 Fitting one Additional 3m


Additional 3m Channel cross arm
Channel cross arm (35x35x5mm), in existing
(35x35x5mm), in 11kV DP including
existing 11kV DP conveyance of materials.
incl. conveyance of
materials.

Fitting one LT 2 line


cross arm on HT or Fitting one LT 2 line cross
LT existing poles arm on HT or LT existing
174 incl. fitting No 93.00 poles including fitting
insulators and insulators and binding the
binding the same same with LT Line.
with LT Line.

Fitting one LT 4 line


cross arm on HT or Fitting one LT 4 line cross
LT existing poles arm on HT or LT existing
175 incl. fitting No 139.00 poles including fitting
insulators and insulators and binding the
binding the same same with LT Line.
with LT Line.

Providing Bucket type


cradling for one span
11kV line using 8 SWG GI
wire including provision
Providing Bucket
of two stays and drawing
176 type cradling for No 8269.00
sufficient length of GI
one span 11kV line.
earthing leads to the
ground for earthing,
excluding provision of
earthing.

Providing barbed Providing barbed wire


wire protection anti-climbing protection
177 No 152.00
(2.5m height) for (2.5m height) for one
one 11kV pole. 11kV pole.

Providing special
Providing special type
type anti-climbing
anti-climbing protection
178 protection 2.5m No 93.00
(2.5m height) for one
height for one 11kV
11kV pole.
pole.

Additional rate for


Fitting one
providing one HT Pin with
179 additional HT pin No 99.00
insulator, complete on
with insulator
any type of HT pole.

Additional rate for


Fitting one
providing one F top
180 additional F top No 99.00
bracket complete, on any
bracket
type of HT pole.

181 Additional rate for No 607.00 Additional rate for


excavation of Pit excavation of Pit for 4
for 4 legged pole in legged pole in Laterite.
Laterite.
Additional rate for Additional rate for
excavation of Pit excavation of Pit for 4
182 No 1214.00
for 4 legged pole in legged pole in Hard
Hard Laterite. Laterite.

Additional rate for


Additional rate for
excavation of Pit
183 No 1822.00 excavation of Pit for 4
for 4 legged pole in
legged pole in Soft Rock.
Soft Rock.

Additional rate for


Additional rate for
excavation of Pit
184 No 3643.00 excavation of Pit for 4
for 4 legged pole in
legged pole in Rock.
Rock.

Fitting one
Additional 2.4m Fitting one Additional
Channel cross arm 2.4m Channel cross arm
185 in existing single No 384.00 in existing single pole
pole incl. including conveyance of
conveyance of materials.
materials.

Insertion of one HT PSC


pole in existing HT/LT line
Insertion of one HT
including digging & back
PSC pole in
filling of pit in ordinary
existing HT/LT line
soil, fitting cross arm,
incl. digging & back
186 No 2720.00 insulator, binding etc. ,
filling pit, fitting
drawing sufficient length
cross arm,
of GI earth leads to the
insulator, binding
ground for earthing
etc.
(excluding provision of
earthing).

Installing one DTR Meter


with box of suitable size
at a minimum height of
Installing one DTR 1.25 m above the ground
meter with box on level, in the existing
existing Channel/Angle cross arm
channel/angle on DP structure, including
187 cross-arm on DP No 614.00 fixing of 3 CTs on bus bar,
structure and laying and termination of
giving connections control cable using
including proper lugs, fixing of
conveyance meters, control fuses and
giving connections
including cost of
conveyance of materials

201 Loading LT PSC No 250.00 LT LINE WORKS Loading LT PSC pole to


pole to Hand cart Hand cart from the
from the stacking stacking place and
place and unloading the same at
unloading the work site (excluding
same at work site. transportation).

Transporting one
Transporting one LT PSC
LT PSC pole by
pole by Hand cart -
Hand cart - limited
202 P/km 250.00 (normally limited to 4km
to 4km (excluding
(excluding loading and
loading and
unloading).
unloading).

Transporting one LT PSC


Transporting one
pole by Head load - for an
LT PSC pole by
average distance of one
Head load for an
203 P/km 929.00 km where transportation
average distance
by hand cart is not
of one km (limited
possible. (normally
to 0.3km).
limited to 0.3km).

Erecting one LT
Erecting one LT PSC Pole
PSC Pole in
in position including
204 position incl. No 1342.00
digging & back filling pit
digging & back
in ordinary soil.
filling pit.

Providing Stay for Providing Stay for LT


LT poles incl. poles including digging &
205 No 625.00
digging & back back filling pit in ordinary
filling pit. soil.

Providing Strut Providing Strut using LT


using LT PSC pole PSC pole including
206 No 1256.00
incl. digging & back digging and back filling
filling pit. pit in ordinary soil.

Providing Fly stay Providing Fly stay for LT


for LT pole using LT pole using LT PSC pole
207 PSC pole incl. No 2037.00 including digging and
digging & back back filling pit in ordinary
filling pit. soil.

Additional rate for Additional rate for


excavation of one excavation of one Pit for
208 No 145.00
Pit for LT Pole/LT LT Pole/LT Stay in
Stay in Laterite. Laterite.

Additional rate for


Additional rate for
excavation of one
excavation of one Pit for
209 Pit for LT Pole/LT No 289.00
LT Pole/LT Stay in Hard
Stay in Hard
Laterite.
Laterite.

210 Additional rate for No 434.00 Additional rate for


excavation of one excavation of one Pit for
Pit for LT Pole/LT LT Pole/LT Stay in Soft
Stay in Soft Rock. Rock.

Additional rate for


Additional rate for
excavation of one
211 No 867.00 excavation of one Pit for
Pit for LT Pole/LT
LT Pole/LT Stay in Rock.
Stay in Rock.

Stringing, shackling,
fitting cross arms,
insulators and binding,
Stringing one km giving jumper connection
LT Sph 2 wire line etc. using ACSR Rabbit
(Rabbit) incl. fitting for Phase and Neutral, for
cross arm etc. one km LT single phase 2
212 km 11277.00
removing wire line including cutting
touchings and and removing tree
conveyance of branches wherever
materials. necessary and
conveyance of all
materials (except poles)
from stacking place.

Stringing, shackling,
fitting cross arms,
insulators and binding,
Stringing one km
giving jumper connection
LT Sph 3 wire line
etc. using ACSR Rabbit
(Rabbit for Ph&N,
for Phase & Neutral and
Weasel for
ACSR Weasel for street
St.main) incl. fitting
213 km 15798.00 main, for one km LT
cross arm etc.
single phase 3 wire line
removing
including cutting and
touchings and
removing tree branches
conveyance of
wherever necessary and
materials.
conveyance of all
materials (except poles)
from stacking place.

Stringing, shackling,
fitting cross arms,
insulators and binding,
Stringing one km giving jumper connection
LT 3ph 4 wire line etc. using ACSR Rabbit
(Rabbit for Ph, for Phase and ACSR
Weasel for N) incl. Weasel for Neutral, for
214 fitting cross arm km 21250.00 one km LT three phase 4
etc. removing wire line including cutting
touchings and and removing tree
conveyance of branches wherever
materials. necessary and
conveyance of all
materials (except poles)
from stacking place.
215 Stringing one km km 25771.00 Stringing, shackling,
LT 3ph 5 wire line fitting cross arms,
(Rabbit for Ph and insulators and binding,
Weasel for giving jumper connection
N&St.main) incl. etc. using ACSR Rabbit
fitting cross arm for Phase and ACSR
etc. removing Weasel for Neutral &
touchings and Street Main, for one km
conveyance of LT 3ph 5 wire line
materials. including cutting and
removing tree branches
wherever necessary and
conveyance of all
materials (except poles)
from stacking place.

Stringing, shackling,
Stringing one km fitting cross arms,
LT Addl conductor insulators and binding,
(Rabbit) after giving jumper connection
fitting crossarm, etc. for one km additional
but without conductor (ACSR Rabbit)
realigning existing on existing LT line (where
216 conductor, incl. km 5100.00 realignment of existing
fitting cross arm, conductor is not required)
insulator etc. including cutting and
removing removing tree branches
touchings and wherever necessary and
conveyance of conveyance of all
materials. materials (except poles)
from stacking place.

Stringing, shackling,
Stringing one km fitting cross arms,
LT Addl conductor insulators and binding,
(Weasel) after giving jumper connection
fitting crossarm, etc. for one km additional
but without conductor (ACSR Weasel)
realigning existing on existing LT line (where
217 conductor, incl. km 4522.00 realignment of existing
fitting cross arm, conductor is not required)
insulator etc. including cutting and
removing removing tree branches
touchings and wherever necessary and
conveyance of conveyance of all
materials. materials (except poles)
from stacking place.

218 Stringing one km km 3654.00 Stringing, shackling,


LT Addl conductor fitting insulators
(Rabbit) where (excluding fitting of cross
fitting of crossarm arm) and binding, giving
or realigning jumper connection etc.
existing for one km additional
conductoris not conductor (ACSR Rabbit)
required, incl. on existing LT line (where
fitting insulators, realignment of existing
removing conductor is not required)
touchings and including cutting and
conveyance of removing tree branches
materials. wherever necessary and
conveyance of all
materials (except poles)
from stacking place.

Stringing, shackling,
fitting insulators
Stringing one km
(excluding fitting of cross
LT Addl conductor
arm) and binding, giving
(Weasel) where
jumper connection etc.
fitting of crossarm
for one km additional
or realigning
conductor (ACSR Weasel)
existing
on existing LT line (where
219 conductoris not km 2787.00
realignment of existing
required, incl.
conductor is not required)
fitting insulators,
including cutting and
removing
removing tree branches
touchings and
wherever necessary and
conveyance of
conveyance of all
materials.
materials (except poles)
from stacking place.

Conversion of one km LT
Conversion of one
single phase 2 wire line to
km LT Sph 2 wire to
LT three phase 4 wire line
3ph 4 wire line incl.
including dismantling the
dismantling
existing 2 conductors,
220 existing 2 km 25437.00
stringing 3 ACSR Rabbit
conductors,
conductor for Phase &
stringing 3 Rabbit &
one Weasel for Neutral
1 Weasel incl.
including conveyance of
conveyance.
materials.

Fitting one No.


Section fuse on LT Fitting one No. Section
line with dropping fuse on LT line with
221 cables, crimping No 160.00 dropping cables, crimping
sockets, sockets, connecting with
connecting with bolt & nut etc.
bolt&nut etc.

222 Providing Guarding No 3365.00 Providing Guarding for LT


for LT line one span line using No.8 SWG GI
for road crossing. wire one span for road
crossing and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding provision of
earthing.

Fitting one No. LT Fitting one No. LT


lightning arrestor in lightning arrestor in LT
223 LT OH line and No 54.00 OH line and giving
giving connections connections excluding
excluding earthing. earthing.

Conversion of one Conversion of one km LT


km LT Sph 3 wire single phase 3 wire line to
line to 3ph 5 wire LT three phase 5 wire line
line incl. including dismantling the
dismantling existing 3 conductors,
224 existing 3 km 30314.00 stringing 3 ACSR Rabbit
conductors, (for Phase) & two Weasel
stringing 3 ACSR (for Neutral & Street
Rabbit & 2 waeasel Main) conductors
including including conveyance of
conveyance . materials.

Stringing, shackling,
Stringing one km fitting cross arms,
LT Addl conductor insulators and binding,
(Weasel) after giving jumper connection
fitting crossarm & etc. for one km additional
realigning one of conductor (ACSR Weasel)
the existing on existing LT line after
225 conductors, incl. km 8403.00 realignment of one of the
fitting cross arm, existing conductor,
insulator etc. including cutting and
removing removing tree branches
touchings and wherever necessary and
conveyance of conveyance of all
materials. materials (except poles)
from stacking place.

Giving one single phase


Giving one single
WP service connection
phase WP service
including conveyance of
connection, as per SERVICE
251 No 1153.00 materials, fixing meter,
standards, incl. CONNECTION
drawing WP wire, with GI
conveyance of
support wire etc. as per
materials.
standards.

Giving one three Giving one three phase


phase WP service WP service connection
connection (upto (upto 10kW) including
252 10kW) as per No 1715.00 conveyance of materials,
standards, incl. fixing meter, drawing WP
conveyance of wire with GI support wire
materials. etc. as per standards.

253 Giving one three No 1785.00 Giving one three phase


phase WP service WP service connection
connection (above (above 10kW to 25kW)
10kW to 25kW) as including conveyance of
per standards, incl. materials, fixing meter,
conveyance of drawing WP wire with GI
materials. support wire etc. as per
standards.

Giving one three Giving one three phase


phase WP service WP service connection
connection (above using CT including
254 25 kW) as per No 2508.00 conveyance of materials,
standards, incl. fixing meter, CT, drawing
conveyance of WP wire etc. as per
materials. standards.

Converting single phase


WP service connection to
Converting single three phase service
phase WP service connection by replacing
connection to three existing single phase
255 phase service No 2291.00 meter with three phase
connection, incl. meter, WP wire with GI
conveyance of support wire and other
materials. accessories including
conveyance of all
materials.

Converting three phase


WP service connection to
Converting three single phase service
phase WP service connection by replacing
connection to existing three phase
256 single phase No 2010.00 meter with single phase
service connection, meter, WP wire with GI
incl. conveyance of support wire and other
materials. accessories including
conveyance of all
materials.

Constructing one span


Constructing one single phase OH line for
span Sph OH line giving service connection
for giving S/C using PSC pole with one
using PSC pole stay including digging &
257 No 2418.00
with one stay incl. back filling 2 pits in
digging& back ordinary soil, cutting and
filling 2 pits, cutting removing tree branches,
tree branches . excluding WP portion and
transportation of pole.

258 Constructing one No 3049.00 Constructing one span


span Sph OH line single phase OH line for
for giving S/C giving service connection
using PSC pole using PSC pole with PSC
with PSC strut incl. strut (without stay)
digging& back including digging & back
filling 2 pits, cutting filling 2 pits in ordinary
tree branches. soil, cutting and removing
tree branches, excluding
WP portion and
transportation of poles.

Constructing one span


single phase OH line for
Constructing one
giving service connection
span Sph OH line
using PSC pole without
for giving S/C
stay/strut including
using PSC pole
259 No 1794.00 digging & back filling pit
without stay/strut
in ordinary soil, cutting
incl. digging& back
and removing tree
filling pit, cutting
branches, excluding WP
tree branches.
portion and
transportation of poles.

Constructing one span


Constructing one three phase OH line for
span 3ph OH line giving service connection
for giving S/C using PSC pole with one
using PSC pole stay including digging &
260 No 2817.00
with one stay incl. back filling 2 pits in
digging& back ordinary soil, cutting and
filling 2 pits, cutting removing tree branches,
tree branches. excluding WP portion and
transportation of pole.

Constructing one span


three phase OH line for
Constructing one
giving service connection
span 3ph OH line
using PSC pole with PSC
for giving S/C
strut (without stay)
using PSC pole
261 No 3448.00 including digging & back
with PSC strut incl.
filling 2 pits in ordinary
digging& back
soil, cutting and removing
filling 2 pits, cutting
tree branches, excluding
tree branches.
WP portion and
transportation of poles.

262 Constructing one No 2192.00 Constructing one span


span 3ph OH line three phase OH line for
for giving S/C giving service connection
using PSC pole using PSC pole without
without stay/strut stay/strut including
incl. digging& back digging & back filling pit
filling pit, cutting in ordinary soil, cutting
tree branches. and removing tree
branches, excluding WP
portion and
transportation of pole.

Conversion of one Conversion of one span


span Sph 2 wire OH single phase 2 wire
OH line to 3ph 4 service line to three
wire line, incl. phase 4 wire service line
dismantling including dismantling
263 existing line, No 1017.00 existing conductors,
stringing new stringing new conductors
Rabbit for phase (ACSR Rabbit for phase
and Weasel for and Weasel for neutral)
neutral including conveyance of
incl.conveyance. all materials.

Insertion of one LT Insertion of one LT PSC


PSC pole in pole in existing single
existing Sph OH phase OH line including
line incl. digging & digging & back filling pit
264 No 1467.00
back filling pit, in ordinary soil, fitting
fitting cross arm, cross arm, insulator,
insulator, binding binding etc. excluding
etc. transportation of poles.

Insertion of one LT Insertion of one LT PSC


PSC pole in pole in existing three
existing 3ph OH phase OH line including
line incl. digging & digging & back filling pit
265 No 1578.00
back filling pit, in ordinary soil, fitting
fitting cross arm, cross arm, insulator,
insulator, binding binding etc. excluding
etc. transportation of poles.

Providing WP support
Providing WP
with PSC pole including
support with PSC
266 No 1293.00 digging & back filling pit
pole incl. digging &
in ordinary soil. excluding
back filling pit.
transportation of poles.

Installing one pole


Installing one pole top
top service
service connection box
267 connection box No 64.00
single phase 6 way and
Sph 6way and
giving connections.
giving connections.

Installing one pole


Installing one pole top
top service
service connection box
268 connection box No 83.00
three phase 6 way and
3ph 6way and
giving connections.
giving connections.

269 Giving one single No 192.00 Giving one single phase


phase service service connection in
connection in panel existing panel board.
board.
Giving one three
Giving one three phase
phase service
270 No 256.00 service connection in
connection in panel
existing panel board.
board.

Converting single phase


WP service connection to
Converting single
three phase service
phase WP service
connection by replacing
connection to three
existing single phase
phase(5kW to
271 No 2891.00 meter with three phase
10kW) service
meter, WP wire with GI
connection, incl.
support wire and other
conveyance of
accessories including
materials.
conveyance of all
materials.

Converting single phase


WP service connection to
Converting single
three phase service
phase WP service
connection by replacing
connection to three
existing single phase
phase(above 10kW
272 No 3181.00 meter with three phase
) service
meter, WP wire with GI
connection, incl.
support wire and other
conveyance of
accessories including
materials.
conveyance of all
materials.

Conversion of one
Conversion of one span
span Sph 3 wire
OH single phase 2 wire
OH line to 3ph 5
line to three phase 5 wire
wire line, incl.
line including dismantling
dismantling
existing conductors,
273 existing line, No 1213.00
stringing new conductors
stringing new
(ACSR Rabbit for phase
Rabbit for phase
and Weasel for neutral)
and Weasel for
including conveyance of
neutral
all materials.
incl.conveyance.

Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV TW/RSJ/Rail Pole with
TW/RSJ/Rail Pole new PSC pole in place
HT
with new PSC pole including excavation,
301 No 3026.00 MAINTENANCE
in place and erection of new pole,
WORK
refitting of all items backfilling pit and refitting
incl. conveyance of all items etc. and
(except pole). conveyance of all
materials except pole.

302 Renewal of existing No 3681.00 Renewal of existing


damaged/old 11kV damaged/old 11kV
TW/RSJ/Rail Pole TW/RSJ/Rail Pole with
with new 'A' type new 'A' type pole in place
pole in place and including excavation,
refitting of all items erection of new pole,
incl. conveyance backfilling pit and refitting
(except pole). of all items etc. and
conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV
Renewal of existing
TW/RSJ/Rail Pole with
damaged/old 11kV
new Four legged lattice
TW/RSJ/Rail Pole
structure in place
with new 4 legged
303 No 5521.00 including excavation,
pole in place and
erection of new pole,
refitting of all items
backfilling pit and refitting
incl. conveyance
of all items etc. and
(except pole).
conveyance of all
materials except pole.

Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV PSC/RCC Pole with new
PSC/RCC Pole with PSC pole in place
new PSC pole in including excavation,
304 No 3490.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items etc. and
(except pole). conveyance of all
materials except pole.

Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV PSC/RCC Pole with new
PSC/RCC Pole with 'A' type pole in place
new 'A' type pole in including excavation,
305 No 4145.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items etc. and
(except pole). conveyance of all
materials except pole.

306 Renewal of existing No 6217.00 Renewal of existing


damaged/old 11kV damaged/old 11kV
PSC/RCC Pole with PSC/RCC Pole with new
new 4 legged pole Four legged lattice
in place and structure in place
refitting of all items including excavation,
incl. conveyance erection of new pole,
(except pole). backfilling pit and refitting
of all items etc. and
conveyance of all
materials except pole.

Renewal of existing
Renewal of existing damaged/old 11kV 'A'
damaged/old 11kV type pole with new 'A'
'A' type pole with type pole in place
new 'A' type pole in including excavation of
307 No 4213.00
place and refitting pole pit, erection of new
of all items incl. pole, backfilling pit and
conveyance refitting of all items etc.
(except pole). and conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV Four
Renewal of existing
legged lattice structure
damaged/old 11kV
with new Four legged
4 legged pole with
lattice structure in place
new 4 legged pole
308 No 6320.00 including excavation of
in place and
pole pit, erection of new
refitting of all items
pole, backfilling pit and
incl. conveyance
refitting of all items etc.
(except pole).
and conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV
Renewal of existing
TW/RSJ/Rail DP (2
damaged/old 11kV
channel cross arm) with
TW/RSJ/Rail DP
new PSC DP in place
with new PSC DP in
309 No 7882.00 including excavation,
place and refitting
erection of new pole,
of all items incl.
backfilling pit and refitting
conveyance
of all items etc. and
(except poles).
conveyance of all
materials except poles.

Renewal of existing
Renewal of existing damaged/old 11kV PSC
damaged/old 11kV DP (2 channel cross arm)
PSC DP with new with new PSC DP in place
PSC DP in place including excavation,
310 No 8810.00
and refitting of all erection of new pole,
items incl. backfilling pit and refitting
conveyance of all items etc. and
(except poles). conveyance of all
materials except poles.

311 Renewal of existing No 9038.00 Renewal of existing


damaged/old 11kV damaged/old 11kV
TW/RSJ/Rail DP TW/RSJ/Rail DP with new
with new 'A' type 'A' type DP in place
DP in place and including excavation,
refitting of all items erection of new pole,
incl. conveyance backfilling pit and refitting
(except poles). of all items etc. and
conveyance of all
materials except poles.

Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV TW/RSJ/Rail DP with new
TW/RSJ/Rail DP Four legged lattice
with new 4 legged structure DP in place
312 pole DP in place No 13557.00 including excavation,
and refitting of all erection of new pole,
items incl. backfilling pit and refitting
conveyance of all items etc. and
(except poles). conveyance of all
materials except poles.

Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV PSC/RCC DP with new 'A'
PSC/RCC DP with type DP in place including
new 'A' type DP in excavation, erection of
313 No 9967.00
place and refitting new pole, backfilling pit
of all items incl. and refitting of all items
conveyance etc. and conveyance of
(except poles). all materials except
poles.

Renewal of existing
damaged/old 11kV
Renewal of existing
PSC/RCC DP with new
damaged/old 11kV
Four legged lattice
PSC/RCC DP with
structure DP in place
new 4 legged pole
314 No 14950.00 including excavation,
DP in place and
erection of new pole,
refitting of all items
back filling pit and
incl. conveyance
refitting of all items etc.
(except poles).
and conveyance of all
materials except poles.

Renewal of existing
Renewal of existing damaged/old 11kV 'A'
damaged/old 11kV type DP with new 'A' type
'A' type DP with DP in place including
new 'A' type DP in excavation of pole pit,
315 No 10256.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items etc. and
(except poles). conveyance of all
materials except poles.

316 Renewal of existing No 15384.00 Renewal of existing


damaged/old 11kV damaged/old 11kV Four
4 legged pole DP legged lattice structure
with new 4 legged DP with new Four legged
pole DP in place lattice structure DP in
and refitting of all place including
items incl. excavation of pole pit,
conveyance erection of new pole,
(except poles). backfilling pit and refitting
of all items etc. and
conveyance of all
materials except poles.

Renewing one
damaged/old
TW/RSJ/Rail Transformer
DP structure with a new
PSC Transformer DP
including excavation,
Renewing
dismantling accessories
damaged
like AB switch, DO fuse,
TW/RSJ/Rail
LA, LT fuses, HT, LT and
Transformer DP
earth connections,
structure with new
dismantling existing
317 PSC Transformer No 22306.00
Transformer, keeping it in
DP and re-erecting
safe custody and re
all accessories &
erecting all accessories
Transformer.
including Transformer on
(excluding renewal
the new DP as per
of pipe earthing).
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

318 Renewing No 22885.00 Renewing one


damaged damaged/old
TW/RSJ/Rail TW/RSJ/Rail Transformer
Transformer DP DP structure with a new
structure with new 'A' type Transformer DP
'A' type including excavation,
Transformer DP dismantling accessories
and re-erecting all like AB switch, DO fuse,
accessories & LA, LT fuses, HT, LT and
Transformer earth connections,
(excluding renewal dismantling existing
of pipe earthing). Transformer, keeping it in
safe custody and re
erecting all accessories
including Transformer on
the new DP as per
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

Renewing one
damaged/old
TW/RSJ/Rail Transformer
DP structure with a new
Four legged lattice
structure Transformer DP
Renewing
including excavation,
damaged
dismantling accessories
TW/RSJ/Rail
like AB switch, DO fuse,
Transformer DP
LA, LT fuses, HT, LT and
structure with new
earth connections,
4 legged pole
319 No 24875.00 dismantling existing
Transformer DP
Transformer, keeping it in
and re-erecting all
safe custody and re
accessories &
erecting all accessories
Transformer
including Transformer on
(excluding renewal
the new DP as per
of pipe earthing).
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

Renewing one damaged


PSC/RCC Transformer DP
structure with a new PSC
Transformer DP including
excavation, dismantling
accessories like AB
switch, DO fuse, LA, LT
Renewing
fuses, HT, LT and earth
damaged PSC/RCC
connections, dismantling
Transformer DP
existing Transformer,
320 structure with new No 23235.00
keeping it in safe custody
PSC Transformer
and re erecting all
DP and re-erecting
accessories including
all accessories
Transformer on the new
DP as per standards and
drawing sufficient length
of GI earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

321 Renewing No 23813.00 Renewing one damaged


damaged PSC/RCC PSC/RCC Transformer DP
Transformer DP structure with a new 'A'
structure with new type Transformer DP
'A' type including excavation,
Transformer DP dismantling accessories
and re-erecting all like AB switch, DO fuse,
accessories & LA, LT fuses, HT, LT and
Transformer earth connections,
(excluding renewal dismantling existing
of pipe earthing). Transformer, keeping it in
safe custody and re
erecting all accessories
including Transformer on
the new DP as per
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

Renewing one damaged


PSC/RCC Transformer DP
structure with a new Four
legged lattice structure
Transformer DP including
Renewing excavation, dismantling
damaged PSC/RCC accessories like AB
Transformer DP switch, DO fuse, LA, LT
structure with new fuses, HT, LT and earth
4 legged pole connections, dismantling
322 Transformer DP No 26268.00 existing Transformer,
and re-erecting all keeping it in safe custody
accessories & and re erecting all
Transformer accessories including
(excluding renewal Transformer on the new
of pipe earthing). DP as per standards and
drawing sufficient length
of GI earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

Renewal of one
Renewal of one damaged
323 damaged HT Pin No 192.00
HT Pin insulator.
insulator.

Additional rate for


Additional rate for
refitting/redoing
refitting/redoing one Disc
324 one Disc set while No 480.00
set while renewing any
renewing any type
type of 11kV cut pole.
of 11kV cut pole

Additional rate for


Additional rate for
reinstalling LT line
reinstalling LT line on the
on the renewed
325 No 496.00 renewed 11kV pole
11kV pole having
having both HT and LT
both HT and LT
(HT/LT) lines.
(HT/LT) lines.
326 Renewal of existing No 1226.00 Renewal of existing
damaged/old 11kV damaged/old 11kV Stay
Stay with new stay with new stay in place
in place incl. including excavation &
excavation & backfilling of pit,
backfilling of pit dismantling, refitting of
and conveyance. all items and conveyance
of all materials.

Renewal of existing
Renewal of existing
damaged/broken
damaged/broken old
327 old 11kV Stay to No 376.00
11kV Stay to the existing
the existing stay
stay rod.
rod.

Replacing/inserting
Replacing/inserting HT
HT Stay insulator
328 No 376.00 Stay insulator on the
on the existing
existing stay.
stay.

Renewal of any type of


Renewal of existing existing damaged/old
damaged/old 11kV 11kV Strut with new PSC
Strut with new PSC strut in place including
strut in place incl. excavation & backfilling
329 No 3050.00
excavation & of pit, consolidating,
backfilling pit and dismantling and refitting
conveyance of all items and
(except pole). conveyance of all
materials except pole.

Renewal of any type of


existing damaged/old
Renewal of existing
11kV Strut with new 'A'
damaged/old 11kV
type strut in place
Strut with new 'A'
including excavation &
type strut in place
330 No 3339.00 backfilling of pit,
incl. excavation &
consolidating,
backfilling pit and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

331 Renewal of existing No 4651.00 Renewal of existing


damaged/old 11kV damaged/old 11kV Fly
Fly stay with new stay with new Fly stay
Fly stay incl. including renewal of PSC
renewal of PSC pole (used for fly stay) in
pole (used for fly place, excavation &
stay) and refitting backfilling of pit,
of all items and consolidating,
conveyance dismantling and refitting
(except of all items and
conveyance of conveyance of all
pole). materials except pole.

Renewal of existing
damaged/old 11kV Fly
Renewal of existing
stay with new Fly stay
damaged/old 11kV
including renewal of 'A'
Fly stay with new
type pole in place
Fly stay incl.
including excavation &
332 renewal of 'A' type No 5085.00
backfilling of pit,
pole and refitting of
consolidating,
all items and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

Re-Tensioning one span


11kV line including
Re-Tensioning one
replacing pin insulators,
span 11kV line incl.
pin binding, jumpering,
replacing
replacing insulators cross
insulators,
333 No 483.00 arms disc, tightening
tightening stay,
stay, cutting tree
cutting tree
branches etc. wherever
branches and
necessary, including
conveyance.
conveyance of all
materials complete.

Re-joining one
snapped HT Re-joining one snapped
conductor after HT conductor after
removing damaged removing damaged
334 portion incl. re- No 1105.00 portion including re-
tensioning and tensioning and
conveyance of all conveyance of all
materials materials complete.
complete.

Repairing one limb of AB


Repairing one limb switch by replacing male
of AB switch by and female contacts,
replacing male and damaged insulators,
female contacts, applying petroleum jelly,
335 No 465.00
damaged lubricants etc. and
insulators etc. and reconnecting the same,
reconnecting the including reconditioning
same. of the operating
mechanism.

Replacing one set


Replacing one set AB
AB switch incl.
switch including
336 dismantling No 2789.00
dismantling existing AB,
existing AB, giving
giving connections etc.
connections etc.
337 Renewal of one No. No 160.00 Renewal of one No. 11kV
11kV LA incl. LA including conveyance,
conveyance, reconnecting and
reconnecting and dismantling old LA
dismantling old LA (excluding earthing).
(excluding
earthing).

Renewal of one No.


Renewal of one No. 11kV
11kV DO Fuse incl.
DO Fuse including
conveyance,
conveyance,
338 reconnecting and No 160.00
reconnecting and
dismantling old DO
dismantling old DO Fuse
Fuse (excluding
(excluding earthing).
earthing).

Renewing 11kV Jumper


Renewing 11kV
connection for one phase
Jumper connection
from OH line to
for one phase from
Transformer through AB
OH line to
switch, DO Fuse and
339 Transformer No 496.00
connection to LA using
through AB, DO and
Copper/ACSR conductor
LA using
as per standard
Copper/ACSR
specification including
conductor.
dismantling old jumpers.

Renewing one
Renewing one 11kV
11kV Jumper using
Jumper connection using
Copper/ACSR
Copper/ACSR conductor
conductor as per
340 No 288.00 as per standard
standard
specification (in loop
specification (in
formation for tapping
loop formation for
from line).
tapping from line).

Renewing one
11kV Jumper Renewing one 11kV
connection using Jumper connection using
341 Copper/ACSR No 201.00 Copper/ACSR conductor
conductor as per as per standard
standard specification.
specification.

Renewing one V
Renewing one V Cross
cross arm on the
arm on the 11kV Pole
342 11kV Pole incl. No 541.00
including dismantling and
dismantling and
conveyance.
conveyance.

343 Renewing one No 541.00 Renewing one 1.8m


1.8m Channel Channel cross arm on the
cross arm on the 11kV Pole including
11kV Pole incl.
dismantling and dismantling and
conveyance. conveyance.

Renewing one
damaged cross Renewing one damaged
arm with cross arm with
100x50mm, 100x50mm, 2.4m/3m
344 2.4m/3m Channel No 470.00 Channel cross arm on the
cross arm on the 11kV DP including
11kV DP incl. dismantling and
dismantling and conveyance.
conveyance.

Renewing one
damaged cross Renewing one damaged
arm with cross arm with
35x35x5mm, 35x35x5mm, 2.4m/3m
345 2.4m/3m Channel No 441.00 Channel cross arm on the
cross arm on the 11kV DP including
11kV DP incl. dismantling and
dismantling and conveyance.
conveyance.

Providing stay Providing stay (temporary


(temporary nature) nature) by piling Cut Ends
by piling Cut Ends in kole land providing
346 in kole land incl. No 960.00 insulator, including
fabrication of cut fabrication of cut ends
ends and and conveyance of
conveyance. materials.

Straightening one
Straightening one slanted
slanted 11kV pole
11kV pole after unbinding
347 after unbinding the No 754.00
the line and binding the
line and rebinding
line after work.
the line after work.

Straightening one
Straightening one slanted
slanted 11kV Cut
11kV Cut pole after
pole after lowering
348 No 1249.00 lowering down the
down the existing
existing line and stringing
line and stringing
the line after work.
the line after work.

Dismantling existing
CT/PT unit, erecting new
Dismantling
CT/PT unit in place,
CT/PTunit, erecting
giving connections etc.
349 new CT/PTunit in No 5361.00
including
place incl. loading
loading/unloading of old
& unloading at site.
and new CT/PT unit at
site.

350 Dismantling 25kVA No 5121.00 Dismantling existing


Tr., erecting new 25kVA Transformer,
25kVA Tr. in place erecting new 25kVA
incl. loading & Transformer in place,
unloading at site. giving connections etc.
including
loading/unloading of old
and new 25kVA
Transformer at site.

Dismantling existing
63kVA Transformer,
Dismantling 63kVA erecting new 63kVA
Tr., erecting new Transformer in place,
351 63kVA Tr. in place No 5361.00 giving connections etc.
incl. loading & including
unloading at site. loading/unloading of old
and new 63kVA
Transformer at site.

Dismantling Dismantling existing


100kVA 100kVA Transformer,
Transformer, erecting new 100kVA
erecting new Transformer in place,
352 100kVA No 7747.00 giving connections etc.
Transformer, giving including
connections incl. loading/unloading of old
loading & and new Transformer at
unloading at site. site.

Dismantling Dismantling existing


160kVA 160kVA Transformer,
Transformer, erecting new 160kVA
erecting new Transformer in place,
353 160kVA No 7987.00 giving connections etc.
Transformer, giving including
connections incl. loading/unloading of old
loading & and new Transformer at
unloading at site. site.

Dismantling Dismantling existing


250kVA 250kVA Transformer,
Transformer, erecting new 250kVA
erecting new Transformer in place,
354 250kVA No 8878.00 giving connections etc.
Transformer, giving including
connections incl. loading/unloading of old
loading & and new Transformer at
unloading at site. site.

355 Dismantling No 9118.00 Dismantling existing


315kVA 315kVA Transformer,
Transformer, erecting new 315kVA
erecting new Transformer in place,
315kVA giving connections etc.
Transformer, giving including
connections incl. loading/unloading of old
loading & and new Transformer at
unloading at site. site.

Dismantling Dismantling existing


500kVA 500kVA Transformer,
Transformer, erecting new 500kVA
erecting new Transformer in place,
356 500kVA No 9357.00 giving connections etc.
Transformer, giving including
connections incl. loading/unloading of old
loading & and new Transformer at
unloading at site. site.

Enhancing Transformer
by dismantling existing
Enhancing 63kVA
63kVA Transformer,
Transformer with
erecting new 100kVA
new 100kVA
Transformer in place,
357 Transformer, giving No 6769.00
giving connections etc.
connections incl.
including
loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.

Enhancing Transformer
by dismantling existing
Enhancing 100kVA
100kVA Transformer,
Transformer with
erecting new 160kVA
160kVA
Transformer in place,
358 Transformer, giving No 7298.00
giving connections etc.
connections etc.
including
incl. loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.

Enhancing Transformer
by dismantling existing
Enhancing 160kVA
160kVA Transformer,
Transformer with
erecting new 250kVA
250kVA
Transformer in place,
359 Transformer, giving No 7652.00
giving connections etc.
connections etc.
including
incl. loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.

360 Enhancing 250kVA No 8429.00 Enhancing Transformer


Transformer with by dismantling existing
315kVA 250kVA Transformer,
Transformer, giving erecting new 315kVA
connections etc. Transformer in place,
incl. loading & giving connections etc.
unloading at site. including
loading/unloading of old
and new Transformer at
site.

Enhancing Transformer
by dismantling existing
Enhancing 315kVA
315kVA Transformer,
Transformer with
erecting new 500kVA
500kVA
Transformer in place,
361 Transformer, giving No 8669.00
giving connections etc.
connections etc.
including
incl. loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.

Reconductoring one km
Reconductoring
11kV Copper/old
one km 11kV old
AAC/ACSR line of 3
line of 3
conductors with new
conductors with
ACSR Raccoon including
362 new ACSR km 33071.00
cutting of tree branches
Raccoon incl.
wherever necessary,
cutting of tree
conveyance of materials
branches and
to and from the stacking
conveyance.
place.

Reconductoring one km
Reconductoring 11kV Copper/old
one km 11kV old AAC/ACSR line of 3
line of 3 conductors with new
conductors with ACSR Rabbit including
391 km 29208.00
new ACSR Rabbit cutting of tree branches
incl. cutting of tree wherever necessary,
branches and conveyance of materials
conveyance. to and from the stacking
place.

Renewal of existing
Renewal of existing damaged/old 11kV Fly
damaged/old 11kV stay with new Fly stay
Fly stay with new (where replacement of
392 Fly stay (excluding No 752.00 stay-pole / stay-rod is not
stay-pole & stay- required) in place ,
rod) including dismantling, refitting of
conveyance. all items, including
conveyance.

393 Renewal of existing No 752.00 Renewal of existing


damaged/old 11kV damaged/old 11kV Fly
Fly stay with new stay with new Fly stay
Fly stay incl. where renewal of PSC
refitting of all items pole (used for fly stay),
and conveyance. stay plate, stay rod etc is
not required, including
dismantling and refitting
of all other items required
for fly stay and
conveyance of all
materials.

Drilling hole of
various sizes on Drilling hole of various
FABRICATING
363 existing No 11.00 sizes on existing
WORKS
Channel/Cross Channel/Cross Arm.
Arm.

Drilling oval shaped


hole of various Drilling oval shaped hole
sizes on existing of various sizes on
364 No 28.00
Channel/Cross existing Channel/Cross
Arm/GI/MS cleat Arm/GI/MS cleat etc.
etc.

Cutting
Cutting Channel/Cross
Channel/Cross
365 No 45.00 Arm/Angle Iron into two
Arm/Angle Iron
pieces.
into two pieces.

Renewal of existing
damaged/old LT
Renewal of existing
TW/RSJ/Rail (single
damaged/old LT
phase line) pole with new
TW/RSJ/Rail (Sph
PSC pole in place
line) pole with new LT
including excavation of
401 PSC pole in place No 2040.00 MAINTENANCE
pole pit, erection of new
and refitting of all WORK
pole, backfilling pit and
items incl.
refitting of all items
conveyance
except street light fitting
(except pole).
etc. and conveyance of
all materials except pole.

Renewal of existing
damaged/old LT
Renewal of existing PSC/RCC (single phase
damaged/old LT line) pole with new PSC
PSC/RCC (Sph line) pole in place including
pole with new PSC excavation of pole pit,
402 No 2329.00
pole in place and erection of new pole,
refitting of all items backfilling pit and refitting
incl. conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.

403 Renewal of existing No 2308.00 Renewal of existing


damaged/old LT damaged/old LT
TW/RSJ/Rail (3ph TW/RSJ/Rail (three
line) pole with new phase line) pole with new
PSC pole in place PSC pole in place
and refitting of all including excavation of
items incl. pole pit, erection of new
conveyance pole, backfilling pit and
(except pole). refitting of all items
except street light fitting
etc. and conveyance of
all materials except pole.

Renewal of existing
damaged/old LT
Renewal of existing PSC/RCC (three phase
damaged/old LT line) pole with new PSC
PSC/RCC (3ph line) pole in place including
pole with new PSC excavation of pole pit,
404 No 2597.00
pole in place and erection of new pole,
refitting of all items backfilling pit and refitting
incl. conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.

Additional rate for


Additional rate for
refitting/redoing
refitting/redoing one
one Shackle set
Shackle Set, including
405 and reshackling No 227.00
reshacling one span,
one span while
while renewing any type
renewing any type
of LT pole.
of pole.

Renewal of existing
Renewal of existing damaged/old LT stay with
damaged/old LT new stay in place
stay with new stay including excavation of
406 in place and No 792.00 stay pit, erection of new
refitting of all items stay, backfilling pit and
and conveyance of refitting of all items and
all materials. conveyance of all
materials.

Renewal of existing
Renewal of existing
damaged/broken
407 No 289.00 damaged/broken old LT
old LT stay with
stay in existing stay rod.
existing stay rod.

Replacing/inserting Replacing/inserting LT
408 LT stay insulator on No 289.00 stay insulator on the
the existing stay. existing stay.

409 Renewal of existing No 1739.00 Renewal of existing


damaged/old LT damaged/old LT Strut of
Strut with new PSC any type with new PSC
strut in place and strut in place including
refitting of all items excavation of pit, erection
incl. conveyance of new strut, backfilling,
(except pole). consolidating,
dismantling and refitting
of all items and
conveyance of all
materials except pole.

Renewal of existing
Renewal of
damaged/old LT Fly stay
damaged LT Fly
of any type of pole with
stay with new Fly
new Fly stay including
stay incl. renewal
renewal of PSC pole
of new PSC pole
(used for fly stay) in
410 (used for fly stay) No 2911.00
place, excavation of pit,
and refitting of all
erection of new Fly stay,
items, conveyance
backfilling, dismantling &
(except
refitting of all items and
conveyance of
conveyance of all
pole).
materials except pole.

Reshackling one span LT


single phase 2 wire OH
Reshackling one
line including pin binding,
span LT Sph 2 wire
jumpering, replacing
OH line, replacing
insulators/cross
insulators,
411 No 174.00 arms/shackle, tightening
tightening stay,
stay, cutting tree
cutting tree
branches etc. wherever
branches incl.
necessary including
conveyance.
conveyance of all
materials.

Reshackling one span LT


three phase 4 wire OH
Reshackling one
line including pin binding,
span LT 3ph 4 wire
jumpering, replacing
OH line, replacing
insulators/cross
insulators,
412 No 328.00 arms/shackle, tightening
tightening stay,
stay, cutting tree
cutting tree
branches etc. wherever
branches incl.
necessary including
conveyance.
conveyance of all
materials.

413 Reshackling one No 77.00 Reshackling one span LT


span LT OH Addl OH Additional conductor
conductor, including pin binding,
replacing jumpering, replacing
insulators, insulators/cross
tightening stay, arms/shackle, tightening
cutting tree stay, cutting tree
branches incl. branches etc. wherever
conveyance. necessary including
conveyance of all
materials complete.

Re-joining snapped
Re-joining one snapped
one LT conductor
LT conductor after
after removing
removing damaged
damaged portion
414 No 467.00 portion including
incl. Reshackling
Reshackling and
and conveyance of
conveyance of all
all materials
materials complete.
complete.

Renewing one LT
Renewing one LT Jumper
Jumper using
connection using
Copper/ACSR
Copper/ACSR conductor
conductor as per
415 No 96.00 as per standard
standard
specification (in loop
specification (in
formation for tapping
loop formation for
from line).
tapping from line).

Renewing one LT
Jumper connection Renewing one LT Jumper
using connection using
416 Copper/ACSR No 67.00 Copper/ACSR conductor
conductor as per as per standard
standard specification.
specification.

Providing/Inserting Providing/Inserting 2 line


417 2 line spacer on the No 58.00 spacer on the existing LT
existing LT OH line. OH line.

Providing/Inserting Providing/Inserting 3 line


418 3 line spacer on the No 70.00 spacer on the existing LT
existing LT OH line. OH line.

Transferring LT single
Transferring LT Sph phase 2/3 wire OH line to
2/3 wire OH line to newly erected HT/LT pole
newly erected including dismantling
419 No 585.00
HT/LT pole and existing cross arm and
refitting all items to insulators, refitting the
the new pole. same on the new pole,
binding etc. complete.

Transferring LT three
Transferring LT 3ph phase 4/5 wire OH line to
4/5 wire OH line to newly erected HT/LT pole
newly erected including dismantling
420 No 1183.00
HT/LT pole and existing cross arm and
refitting all items to insulators, refitting the
the new pole. same on the new pole,
binding etc. complete.
421 Straightening one No 684.00 Straightening one slanted
Slanted LT pole LT pole after unbinding
after unbinding the the line and binding the
line and rebinding line after work.
the line after work.

Straightening one Straightening one slanted


Slanted LT Cut pole LT Cut Pole after lowering
422 after unbinding the No 927.00 down the existing line
line and rebinding and stringing the line
the line after work. after work.

Reconductoring
Reconductoring (changing) one km LT
one km LT Sph 2 single phase 2 wire OH
wire OH old line Copper/old AAC/ACSR
423 with new ACSR km 13270.00 conductor line with new
Rabbit conductor ACSR Rabbit conductor
incl. conveyance of including conveyance of
materials. materials to and from the
stacking place.

Reconductoring
Reconductoring (changing) one km LT
one km LT 3ph 4 three phase 4 wire OH
wire OH old line Copper/old AAC/ACSR
with new 3 ACSR conductor line with new 3
424 km 28065.00
Rabbit and one ACSR Rabbit and one
Weasel conductor ACSR Weasel conductor
incl. conveyance of including conveyance of
materials. materials to and from the
stacking place.

Reconductoring
Reconductoring
(changing) one km LT OH
one km LT OH one
Copper/old AAC/ACSR
old conductor with
one conductor with new
425 New ACSR Rabbit km 6635.00
ACSR Rabbit conductor
conductor incl.
including conveyance of
conveyance of
materials to and from the
materials.
stacking place.

Reconductoring
Reconductoring
(changing) one km LT OH
one km LT OH one
Copper/old AAC/ACSR
old conductor with
one conductor with new
426 New ACSR Weasel km 5971.00
ACSR Weasel conductor
conductor incl.
including conveyance of
conveyance of
materials to and from the
materials.
stacking place.

427 Reconductoring km 19241.00 Reconductoring


one km LT single (changing) one km LT
ph 3 wire OH old single phase 3 wire OH
line with new 2 Copper/old AAC/ACSR
ACSR Rabbit and conductor line with new 2
one weasel ACSR Rabbit and one
condutor incl ACSR Weasel conductor
conveyance of including conveyance of
materials materials to and from the
stacking place.

Stringing, shackling,
fitting insulators
(excluding fitting of cross
Stringing one km arm) and binding, giving
LT Addl conductor jumper connection etc.
(Weasel) after for one km additional
relocating one of conductor (ACSR Weasel)
the existing on existing LT line (where
428 conductor, incl. km 4877.00 relocation of one existing
fitting insulators, conductor is also
removing required) including
touchings and cutting and removing tree
conveyance of branches wherever
materials. necessary and
conveyance of all
materials (except poles)
from stacking place.

Renewal of existing
damaged/old LT Fly stay
of any type of pole with
Renewal of
new Fly stay where
damaged LT Fly
renewal of PSC pole
stay with new Fly
429 No 578.00 (used for fly stay), stay
stay incl. refitting
plate, stay rod etc is not
of all items,
required, including
conveyance .
dismantling & refitting of
all items and conveyance
of all materials.

Disconnecting and
Dismantling and lowering down the single
reconnecting Sph phase WP service
MAINTENANCE
service connection connection with guy wire
451 No 64.00 OF SERVICE
from the OH line from the OH line and
CONNECTION
incl. lowering down reconnecting the same
the WP portion. after completing the line
work.

452 Dismantling and No 99.00 Disconnecting and


reconnecting 3ph lowering down the three
service connection phase WP service
from the OH line connection with guy wire
incl. lowering down from the OH line and
the WP portion. reconnecting the same
after completing the line
work.

Redoing single phase WP


service connection
complete including
lowering down the guy
Redoing Sph WP wire portion, repairing or
S/C complete incl. changing WP wire, GI
changing WP, wire, Fuse unit etc.,
453 E/Meter, cut-out, No 578.00 changing Energy Meter
neutral link etc, and cutout, neutral link etc., if
conveyance of necessary and
material. reconnecting the same
including conveyance of
material to site from
Section office at various
location.

Redoing three phase WP


service connection
complete including
lowering down the guy
Redoing 3ph WP wire portion, repairing or
S/C complete incl. changing WP wire, GI
changing WP, wire, Fuse unit etc.,
454 E/Meter, cut-out, No 729.00 changing Energy Meter
neutral link etc, and cutout, neutral link etc., if
conveyance of necessary and
material. reconnecting the same
including conveyance of
material to site from
Section office at various
location.

Shifting one No. single


phase service connection
metering equipment with
Shifting one Sph
all fittings including
metering
lowering down the WP
equipment with all
service wire, dismantling
455 fittings at new No 549.00
Meter Board without
location and
making damage and
redoing the WP
refitting the same at new
service wire.
location and redoing the
WP service wire with all
fittings.

456 Shifting one 3ph No 723.00 Shifting one No. three


metering phase service connection
equipment with all metering equipment with
fittings at new all fittings including
location and lowering down the WP
service wire, dismantling
redoing the WP Meter Board without
service wire. making damage and
refitting the same at new
location and redoing the
WP service wire with all
fittings.

Shifting one No. three


phase service connection
metering equipment (CT
Shifting one 3ph
connected) with all
metering
fittings including lowering
equipment (with
down the WP service
457 CT) with all fittings No 1084.00
wire, dismantling Meter
at new location and
Board without making
redoing the WP
damage and refitting the
service wire.
same at new location and
redoing the WP service
wire with all fittings.

Changing Faulty single


phase energy meter
Changing faulty
including Dismantling of
Sph Energy meter
old meter, connecting of
with new meter,
METER new meter/giving electric
476 giving connection No 76.00
CHANGING connection including
incl. conveyance of
conveyance of new meter
meter to the site
to the site and returning
and back to store.
old meters to section
store.

Changing Faulty three


phase energy meter
Changing faulty
including Dismantling of
3ph Energy meter
old meter, connecting of
with new meter,
new meter/giving electric
477 giving connection No 140.00
connection including
incl. conveyance of
conveyance of new meter
meter to the site
to the site and returning
and back to store.
old meters to section
store.

Changing Faulty three


phase CT energy meter
including Dismantling of
Changing faulty
old meter, replacing CTs,
3ph CT meter with
renewing PT connection,
new meter & CT,
connecting new
478 giving connection No 785.00
meter/giving electric
incl. conveyance of
connection including
meter to the site
conveyance of new meter
and back to store.
to the site and returning
old meters to section
store.
501 Dismantling one No 730.00 DISMANTLING – Dismantling one
damaged 11kV HT damaged 11kV
TW/RSJ/Rail pole TW/RSJ/Rail pole after
after disconnecting disconnecting stays, strut
stays, strut etc. and etc. attached thereon and
stacking the same. stacking the same.

Dismantling
Dismantling (without
(without damage)
damage) one No. 11kV
one No. 11kV
TW/RSJ/Rail pole after
502 TW/RSJ/Rail pole No 1201.00
disconnecting stays, strut
after disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.

Dismantling one Dismantling one


damaged 11kV damaged 11kV PSC/RCC
PSC/RCC pole pole after disconnecting
503 No 1194.00
after disconnecting stays, strut etc. attached
stays, strut etc. and thereon and stacking the
stacking the same. same.

Dismantling
Dismantling (without
(without damage)
damage) one 11kV
one 11kV PSC/RCC
PSC/RCC pole after
504 pole after No 2081.00
disconnecting stays, strut
disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.

Dismantling one Dismantling one


damaged 11kV 'A' damaged 11kV 'A' type
type pole after pole after disconnecting
505 No 1484.00
disconnecting stays, strut etc. attached
stays, strut etc. and thereon and stacking the
stacking the same. same.

Dismantling
Dismantling (without
(without damage)
damage) one 11kV 'A'
one 11kV 'A' type
type pole after
506 pole after No 2082.00
disconnecting stays, strut
disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.

Dismantling one
Dismantling one
damaged 11kV Four
damaged 11kV 4
legged lattice structure
legged pole after
507 No 2225.00 after disconnecting stays,
disconnecting
strut etc. attached
stays, strut etc. and
thereon and stacking the
stacking the same.
same.

508 Dismantling No 3123.00 Dismantling (without


(without damage) damage) one 11kV Four
one 11kV 4 legged legged lattice structure
pole after after disconnecting stays,
disconnecting strut etc. attached
stays, strut etc. and thereon and stacking the
stacking the same. same.

Dismantling one
Dismantling one
damaged HT
damaged HT
TW/RSJ/Rail Strut
509 No 552.00 TW/RSJ/Rail Strut pole
pole incl. removal
including removal of
of clamps and
clamps and stacking.
stacking.

Dismantling
(without damage) Dismantling (without
one HT damage) one HT
510 TW/RSJ/Rail Strut No 1032.00 TW/RSJ/Rail Strut pole
pole incl. removal including removal of
of clamps and clamps and stacking.
stacking.

Dismantling one
Dismantling one
damaged HT
damaged HT PSC/RCC
PSC/RCC Strut
511 No 1017.00 Strut pole including
pole incl. removal
removal of clamps and
of clamps and
stacking.
stacking.

Dismantling
Dismantling (without
(without damage)
damage) one HT
one HT PSC/RCC
512 No 1907.00 PSC/RCC Strut pole
Strut pole incl.
including removal of
removal of clamps
clamps and stacking.
and stacking.

Dismantling Dismantling (without


(without damage) damage) one km 11kV
one km 11kV line line (three conductors)
(3 conductors), including dismantling
513 cross arm, km 9198.00 cross arm, insulators,
insulators, disc, disc, disconnecting
rolling the jumper connection, rolling
conductor and the conductor and
stacking. stacking the materials.

Dismantling Dismantling (without


(without damage) damage) one HT stay
one HT stay incl. including digging pit in all
514 No 601.00
back filling, and classes of soil and
bringing back to backfilling, and bringing
section store. back to section store.

515 Dismantling one V No 128.00 Dismantling (without


cross arm/Channel damage) one V cross
cross arm from arm/Channel cross arm
existing Pole, and from existing Pole and
bringing back to bringing back to section
section store. store.

Dismantling one
Dismantling (without
Channel cross arm
damage) one Channel
from existing DP
516 No 188.00 cross arm from existing
structure, and
DP structure and bringing
bringing back to
back to section store.
section store.

Dismantling
(without damage) Dismantling (without
one AB switch damage) one AB switch
517 from existing No 1115.00 from existing structure
structure and and bringing back to
bringing back to section store.
section store.

Dismantling one
Dismantling one HT pin
HT pin insulator
insulator with pin and
518 with pin and bring No 128.00
bring back to section
back to section
store.
store.

Dismantling one
Dismantling one
damaged AB switch from
damaged AB
519 No 785.00 existing structure and
switch from
bringing back to section
existing structure.
store.

Dismantling transformer
station with transformer
erected in DP structure by
dismantling HT Double
Pole Structure using PSC
pole after disconnecting
Dismantling stay wires, 10 channel
transformer station cross arms,AB switch, DO
in DP structure fuse, LA, GI earthing
520 No 9935.00
excluding the rate leads, DTR meter with
of dismantling box with metering
earthing equipments, CTs,
Distribution Box, statutory
display boards etc. but
excluding the rate of
dismantling transformer,
earthing, stay sets &
fencing.

521 Dismanling No 9484.00 Dismanling plinth


transformer station mounted transformer
with transformer station by dismantling HT
erected in plinth Double Pole Structure
excluding the rate using PSC pole after
of dismantling disconnecting stay wires,
transformer 8 channel cross arms,AB
switch, DO fuse, LA, GI
earthing leads, DTR meter
with box, Distribution Box,
statutory display boards
etc. but excluding the rate
of dismantling
transformer, civil
structures, earthing, stay
sets & fencing.

Dismantling one Dismantling one


damaged LT damaged LT TW/RSJ/Rail
TW/RSJ/Rail pole DISMANTLING – pole after disconnecting
551 No 382.00
after disconnecting LT stays, strut etc. attached
stays, strut etc. and thereon and stacking the
stacking the same. same.

Dismantling
Dismantling (without
(without damage)
damage) one LT
one LT
TW/RSJ/Rail pole after
552 TW/RSJ/Rail pole No 687.00
disconnecting stays, strut
after disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.

Dismantling one Dismantling one


damaged LT damaged LT PSC/RCC
PSC/RCC pole pole after disconnecting
553 No 671.00
after disconnecting stays, strut etc. attached
stays, strut etc. and thereon and stacking the
stacking the same. same.

Dismantling
Dismantling (without
(without damage)
damage) one LT
one LT PSC/RCC
PSC/RCC pole after
554 pole after No 1280.00
disconnecting stays, strut
disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.

Dismantling
Dismantling (without
(without damage)
damage) LT stay
LT stay incl.
555 No 312.00 including digging pit in all
digging pit in all
classes of soil and
classes of soil and
backfilling.
backfilling

556 Dismantling one No 339.00 Dismantling one


damaged LT damaged LT TW/RSJ/Rail
TW/RSJ/Rail Strut Strut pole including
pole incl. removal removal of clamps and
of clamps and stacking.
stacking.

Dismantling
(without damage) Dismantling (without
one LT damage) one LT
557 TW/RSJ/Rail Strut No 625.00 TW/RSJ/Rail Strut pole
pole incl. removal including removal of
of clamps and clamps and stacking.
stacking.

Dismantling one
Dismantling one
damaged LT
damaged LT PSC/RCC
PSC/RCC Strut
558 No 628.00 Strut pole including
pole incl. removal
removal of clamps and
of clamps and
stacking.
stacking.

Dismantling
Dismantling (without
(without damage)
damage) one LT
one LT PSC/RCC
559 No 1057.00 PSC/RCC Strut pole
Strut pole incl.
including removal of
removal of clamps
clamps and stacking.
and stacking.

Dismantling one LT 2 line


Dismantling one LT
cross arm with clamp
560 2 line cross arm No 46.00
from existing pole and
from existing pole.
stacking.

Dismantling one LT 4 line


Dismantling one LT
cross arm with clamp
561 4 line cross arm No 70.00
from existing pole and
from existing pole.
stacking.

Dismantling single
phase WP service Dismantling single phase
connection with WP service connection
562 meter & all No 576.00 with meter & all
accessories and accessories and bringing
bringing back to back to section store.
section store.

Dismantling three
phase WP service Dismantling three phase
connection with WP service connection
563 meter & all No 857.00 with meter & all
accessories and accessories and bringing
bringing back to back to section store.
section store.

564 Dismantling No 815.00 Dismantling (without


(without damage) damage) one span of HT
one span of HT or or LT cradling and
LT cradling and stacking the same neatly
stacking the same and in good condition for
neatly and in good re-use.
condition for re-
use.

Dismantling (without
Dismantling
damage) one km LT
(without damage)
single phase 2 wire OH
one km LT Sph 2
line conductor by
565 wire OH line, cross km 4952.00
dismantling cross arms,
arms, insulators
insulators and stacking
and stacking the
the conductors in rolls
conductors in rolls.
properly.

Dismantling (without
Dismantling
damage) one km LT three
(without damage)
phase 4 wire OH line
one km LT 3ph 4
conductor by dismantling
566 wire OH line, cross km 9401.00
cross arms, insulators
arms, insulators
and stacking the
and stacking the
conductors in rolls
conductors in rolls.
properly.

Dismantling
(without damage) Dismantling (without
one km LT damage) one km LT
additional additional conductor line
567 conductor line, km 2230.00 by dismantling cross
cross arms, arms, insulators and
insulators and stacking the conductors
stacking the in rolls properly.
conductors in rolls.

Dismantling one section


Dismantling one fuse from structure and
568 128.00
section fuse bringing back to section
store.

Dismantling one section


Dismantling one
fuse from distribution box
569 section fuse from 216.00
and bringing back to
distribution box
section store.

Dismantling three phase


Dismantling three CT connected WP service
phase CT connection with metering
570 No 1115.00
Connected WP equipmets & all other
service connection accessories and bringing
back to section store.

601 Wiring and No 209.00 STREET LIGHT Wiring and installing one
installing one new new ordinary street light
ordinary street light fitting on existing pole
fitting on existing and giving connections.
pole and giving
connections.

Wiring and
installing one new Wiring and installing one
CFL street light new CFL street light
602 No 209.00
fitting on existing fitting on existing pole
pole and giving and giving connections.
connections.

Wiring and
installing one new Wiring and installing one
LED street light new LED street light
603 No 209.00
fitting on existing fitting on existing pole
pole and giving and giving connections
connections.

Dismantling
Dismantling (without
(without damage)
damage) one ordinary
one ordinary street
604 No 104.00 street light/CFL/LED
light/CFL/LED
fitting from the pole and
fitting from the
stacking.
pole and stacking.

Dismantling one ordinary


Dismantling one
street light/CFL/LED
ordinary street
fitting from existing pole
light/CFL/LED
cleaning, rewiring,
fitting from pole,
605 No 313.00 repairing/replacing the
repairing and
holder, changing bulbs
refitting the same
and refitting the same in
in position and
position and giving
giving connection.
connection.

Wiring and
Wiring and installing new
installing new set
set 2x40W fluorescent
2x40W fluorescent
606 No 334.00 tube fitting on existing
tube fitting on
poles including giving
existing poles incl.
connection.
giving connection.

Dismantling one set 2x40


Dismantling one
W fluorescent tube fitting
set 2x40 W
from existing pole
fluorescent tube
cleaning, rewiring,
fitting from pole,
607 No 501.00 repairing/replacing
repairing and
holder, changing tubes
refitting the same
and refitting the same in
in position and
position and giving
giving connection.
connection.

Replacing bulb on
Replacing bulb on
608 existing street No 51.20
existing street light.
light.
609 Replacing CFL/LED No 51.20 Replacing CFL/LED on
on existing street existing street light.
light.

Dismantling one
Dismantling one ordinary
ordinary street
street light/CFL/LED
light/CFL/LED
fitting from existing pole
fitting from existing
610 No 327.00 and refitting the same on
pole and refitting
newly erected pole
the same on newly
including disconnecting
erected pole and
and reconnecting wires.
reconnecting.

Dismantling one
Dismantling one 2x40W
2x40W fluorescent
fluorescent tube fitting
tube fitting from
from the existing pole
the existing pole
611 No 501.00 and refitting the same on
and refitting the
newly erected pole
same on newly
including disconnecting
erected pole and
and reconnecting wires.
reconnecting.

Wiring and
Wiring and installing new
installing new set
set Sodium Vapour lamp
SV lamp fitting on
fitting on existing poles
612 existing poles incl. No 1043.00
including giving
giving connection
connection (without
(without using
using aerial lift).
aerial lift).

Wiring and
Wiring and installing new
installing new set
set Mercury Vapour lamp
MV lamp fitting on
fitting on existing poles
613 existing poles incl. No 1043.00
including giving
giving connection
connection (without
(without using
using aerial lift).
aerial lift).

Wiring and
installing new set Wiring and installing new
Metal halide lamp set Metal Halide lamp
fitting on existing fitting on existing poles
614 No 1043.00
poles incl. giving including giving
connection connection (without
(without using using aerial lift).
aerial lift).

Wiring and Wiring and installing new


installing new set set Sodium Vapour lamp
SV lamp fitting on fitting on existing poles
615 No 522.00
existing poles incl. including giving
giving connection connection (using aerial
(using aerial lift). lift).

616 Wiring and No 522.00 Wiring and installing new


installing new set set Mercury Vapour lamp
MV lamp fitting on fitting on existing poles
existing poles incl. including giving
giving connection connection (using aerial
(using aerial lift). lift).

Wiring and
Wiring and installing new
installing new set
set Metal Halide lamp
Metal halide lamp
fitting on existing poles
617 fitting on existing No 522.00
including giving
poles incl. giving
connection (using aerial
connection (using
lift).
aerial lift).

Dismantling one Sodium


Vapour/Mercury
Dismantling
Vapour/Metal Halide
SV/MV/Metal
lamp fitting from existing
halide lamp fitting,
pole, cleaning, rewiring,
repairing & refitting
repairing/replacing
618 the same in No 1565.00
holder, tube, bulb, igniter,
position and giving
choke, capacitor etc. and
connection
refitting the same in
(without using
position and giving
aerial lift).
connection (without
using aerial lift).

Dismantling one Sodium


Vapour/Mercury
Dismantling Vapour/Metal Halide
SV/MV/Metal lamp fitting from existing
halide lamp fitting, pole, cleaning, rewiring,
repairing & refitting repairing/replacing
619 No 782.00
the same in holder, tube, bulb, igniter,
position and giving choke, capacitor etc. and
connection (using refitting the same in
aerial lift). position and giving
connection (using aerial
lift).

Dismantling Dismantling one Sodium


SV/MV/Metal Vapour/Mercury
halide lamp fitting Vapour/Metal Halide
from the existing lamp fitting from the
pole and refitting existing pole and refitting
620 No 1565.00
the same on newly the same on newly
erected pole and erected pole including
reconnecting disconnecting and
(without using reconnecting wires
aerial lift). (without using aerial lift).

621 Dismantling No 782.00 Dismantling one Sodium


SV/MV/Metal Vapour/Mercury
halide lamp fitting Vapour/Metal Halide
from the existing lamp fitting from the
pole and refitting existing pole and refitting
the same on newly the same on newly
erected pole and erected pole including
reconnecting disconnecting and
(using aerial lift). reconnecting wires (using
aerial lift).

Replacing holder,
Replacing holder, fused
fused bulb/CFL,
bulb/CFL, changing wires,
changing wires,
giving connection etc. of
622 giving connection No 104.00
street light including
etc. of street light
conveyance of all
incl. conveyance of
materials.
all materials.

Wiring and
Wiring and installing new
installing new set
set 1x40W fluorescent
1x40W fluorescent
623 No 271.00 tube fitting on existing
tube fitting on
poles including giving
existing poles incl.
connection.
giving connection.

Dismantling one set 1x40


Dismantling one
W fluorescent tube fitting
set 1x40 W
from existing pole
fluorescent tube
cleaning, rewiring,
fitting from pole,
624 No 407.00 repairing/replacing
repairing and
holder, changing tubes
refitting the same
and refitting the same in
in position and
position and giving
giving connection.
connection.

Dismantling one
Dismantling one 1x40W
1x40W fluorescent
fluorescent tube fitting
tube fitting from
from the existing pole
the existing pole
625 No 407.00 and refitting the same on
and refitting the
newly erected pole
same on newly
including disconnecting
erected pole and
and reconnecting wires.
reconnecting.

Clearing touchings on
Clearing touchings 11kV HT lines, cutting
on HT lines 11kV, branches of trees,
cutting tree bamboo clusters,
branches, bamboo CLEARING coconut cudjans etc.
651 km 1333.00
clusters, coconut TOUCHINGS (HT) from above the lines for a
cudjans etc. as distance of 1.8m from
specified by dept. the outer conductor as
(Urban/Town). specified by dept.
(Urban/Town).

652 Clearing touchings km 1785.00 Clearing touchings on


on HT lines 11kV, 11kV HT lines, cutting
cutting tree branches of trees,
branches, bamboo bamboo clusters,
clusters, coconut coconut cudjans etc.
cudjans etc. as from above the lines for a
specified by dept. distance of 1.8m from
(Rural/Remote). the outer conductor as
specified by dept.
(Rural/Remote).

Clearing touchings on
Clearing touchings HT/LT lines, cutting
on HT/LT lines, branches of trees,
cutting tree bamboo clusters,
branches, bamboo coconut cudjans etc.
653 km 1600.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 1.8m from
specified by dept. the outer conductor as
(Urban/Town). specified by dept.
(Urban/Town).

Clearing touchings on
Clearing touchings HT/LT lines, cutting
on HT/LT lines, branches of trees,
cutting branches of bamboo clusters,
trees, bamboo coconut cudjans etc.
654 km 2142.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 1.8m from
specified by dept. the outer conductor as
(Rural/Remote). specified by dept.
(Rural/Remote).

Clearing touchings on
Clearing touchings 33kV lines, cutting
on 33kV lines, branches of trees,
cutting tree bamboo clusters,
branches, bamboo coconut cudjans etc.
655 km 2000.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 2.0m from
specified by dept. the outer conductor as
(Urban/Town). specified by dept.
(Urban/Town).

Clearing touchings on
Clearing touchings 33kV lines, cutting
on 33kV lines, branches of trees,
cutting tree bamboo clusters,
branches, bamboo coconut cudjans etc.
656 km 2677.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 2.0m from
specified by dept. the outer conductor as
(Rural/Remote). specified by dept.
(Rural/Remote).
657 Clearing touchings km 1238.00 CLEARING Clearing touchings on LT
on LT lines, cutting TOUCHINGS (LT) lines, cutting branches of
tree branches, trees, bamboo clusters,
bamboo clusters, coconut cudjans etc.
coconut cudjans from above the lines for a
etc. as specified. distance of 1.8m from
(Urban/Town). the outer conductor as
specified. (Urban/Town).

Clearing touchings on LT
Clearing touchings lines, cutting branches of
on LT lines, cutting trees, bamboo clusters,
tree branches, coconut cudjans etc.
658 bamboo clusters, km 1507.00 from above the lines for a
coconut cudjans distance of 1.8m from
etc. as specified. the outer conductor as
(Rural/Remote). specified.
(Rural/Remote).

Cutting trees Cutting trees having girth


beyond 30cm but beyond 30cm but upto
upto and incl. and including 60cm
60cm girth, cutting (felling trees including
676 No 322.00 Tree Cutting
of trunks/branches, cutting of trunks and
removing the root branches) and removing
completely and the root completely and
stacking. stacking etc. 1 No.

Cutting trees
Cutting trees having girth
beyond 60cm but
beyond 60cm but upto
upto and incl.
and including 120cm
120cm girth,
(felling trees including
677 cutting of No 543.00
cutting of trunks and
trunks/branches,
branches) and removing
removing the root
the root completely and
completely and
stacking etc. 1 No.
stacking.

Cutting trees
Cutting trees having girth
beyond 120cm but
beyond 120cm but upto
upto and incl.
and including 180cm
180cm girth,
(felling trees including
678 cutting of No 831.00
cutting of trunks and
trunks/branches,
branches) and removing
removing the root
the root completely and
completely and
stacking etc. 1 No.
stacking.

679 Cutting trees No 482.00 Cutting trees having girth


beyond 30cm but beyond 30cm but upto
upto and incl. and including 60cm, in
60cm girth, cutting between the line and
branches, removing Buildings where space for
root completely falling trees is not
and stacking available/enough (felling
(where space for trees including cutting of
falling trees is not trunks and branches) and
enough). removing the root
completely and stacking
etc. 1 No.

Cutting trees having girth


Cutting trees
beyond 60cm but upto
beyond 60cm but
and including 120cm, in
upto and incl.
between the line and
120cm girth,
Buildings where space for
cutting branches,
falling trees is not
680 removing root No 863.00
available/enough (felling
completely and
trees including cutting of
stacking (where
trunks and branches) and
space for falling
removing the root
trees is not
completely and stacking
enough).
etc. 1 No.

Cutting trees having girth


Cutting trees
beyond 120cm but upto
beyond 120cm but
and including 180cm in
upto and incl.
between the line and
180cm girth,
Buildings where space for
cutting branches,
falling trees is not
681 removing root No 1215.00
available/enough (felling
completely and
trees including cutting of
stacking (where
trunks and branches) and
space for falling
removing the root
trees is not
completely and stacking
enough).
etc. 1 No.

Loading HT
Labour charges for
TW/RSJ/Rail pole
loading HT TW/RSJ/Rail
from the stacking
pole from the stacking
place and LOADING AND
701 No 232.00 place and unloading the
unloading the UNLOADING
same at work site
same at work site
(transportation by any
(transport by
vehicle).
vehicle).

Loading HT PSC
Labour charges for
pole from the
loading HT PSC pole from
stacking place and
the stacking place and
702 unloading the No 507.00
unloading the same at
same at work site
work site (transportation
(transport by
by any vehicle).
vehicle).

703 Loading HT 'A' type No 603.00 Labour charges for


pole from the loading HT 'A' type pole
stacking place and from the stacking place
unloading the and unloading the same
same at work site at work site
(transport by (transportation by any
vehicle). vehicle).

Loading HT 4 Labour charges for


legged pole from loading HT Four legged
the stacking place lattice structure from the
704 and unloading the No 846.00 stacking place and
same at work site unloading the same at
(transport by work site (transportation
vehicle). by any vehicle).

Loading LT
Labour charges for
TW/RSJ/Rail pole
loading LT TW/RSJ/Rail
from the stacking
pole from the stacking
place and
705 No 168.00 place and unloading the
unloading the
same at work site
same at work site
(transportation by any
(transport by
vehicle).
vehicle).

Loading LT PSC
Labour charges for
pole from the
loading LT PSC pole from
stacking place and
the stacking place and
706 unloading the No 319.00
unloading the same at
same at work site
work site (transportation
(transport by
by any vehicle).
vehicle).

Unloading one
Unloading one
Transformer (upto
Transformer (upto and
and incl. 160kVA)
including 160kVA) from
707 from vehicle to No 898.00
any vehicle to ground
ground incl.
including conveyance
conveyance upto
upto 25m at site.
25m.

Unloading one
Unloading one
Transformer
Transformer (above
(above 160kVA)
160kVA) from any vehicle
708 from vehicle to No 1507.00
to ground including
ground incl.
conveyance upto 25m at
conveyance upto
site.
25m.

Loading one
Loading one Transformer
Transformer (upto
(upto and including
and incl. 160kVA)
160kVA) from ground to
709 from ground to No 1187.00
any vehicle including
vehicle incl.
conveyance upto 25m at
conveyance upto
site.
25m.

710 Loading one No 1796.00 Loading one Transformer


Transformer (above 160kVA) from
(above 160kVA) ground to any vehicle
from ground to including conveyance
vehicle incl. upto 25m at site.
conveyance upto
25m.

Dismantling one Dismantling one


Transformer upto Transformer (upto and
160kVA from including 160kVA) from
structure and existing structure and
711 No 1311.00
loading to vehicle loading to any vehicle
incl. disconnecting directly, including
HT/LT/Earth disconnecting
connections. HT/LT/Earth connections.

Dismantling one
Dismantling one
Transformer above
Transformer (above
160kVA from plinth
160kVA) from existing
and loading to
712 No 1616.00 plinth and loading to any
vehicle incl.
vehicle directly, including
disconnecting
disconnecting
HT/LT/Earth
HT/LT/Earth connections.
connections.

Dismantling one
Dismantling one
Transformer (upto and
Transformer (upto
including 160kVA) from
and incl. 160kVA)
713 No 1616.00 existing structure to
from existing
ground, including
structure to
disconnecting
ground.
HT/LT/Earth connections.

Dismantling one
Dismantling one
Transformer (above
Transformer
160kVA) from existing
714 (above 160kVA) No 1920.00
plinth to ground, including
from existing plinth
disconnecting
to ground.
HT/LT/Earth connections.

Transporting poles Transporting poles by


by hired vehicle to hired vehicle to a
a distance upto Transportation of distance upto 5km and
726 5km and carrying Trip 1428.57 Transformer/pole carrying upto 4 numbers
upto 4 poles by lorry of poles excluding
excluding loading & loading& unloading
unloading. charges.

Transporting poles
Transporting poles by
by hired vehicle to
hired vehicle to a
a distance beyond
727 km 43.00 distance beyond 5km and
5km and carrying
carrying upto 4 numbers
upto 4 poles.
of poles. (Running km)
(Running km).

728 Transporting Trip 1428.57 Transporting


Transformers by Transformers by hired
hired vehicle upto vehicle to a distance upto
5km and upto 2 5km and carrying upto 2
No. of 63 to numbers of
250kVA 63/100/160/250kVA
Transformers / Transformers / Ring Main
RMUs excluding Units excluding loading&
loading & unloading charges.
unloading.

Transporting
Transformers by Transporting
hired vehicle to a Transformers by hired
distance beyond vehicle to a distance
5km and upto 2 beyond 5km and carrying
729 km 43.00
No. of 63 to upto 2 numbers of
250kVA 63/100/160/250kVA
Transformers / Transformers / Ring Main
RMUs (Running Units (Running km).
km).

Engaging one boat


Transportation of Engaging one boat man
man with
751 day 669.00 Tr./pole by with Boat/Country
Boat/Country
Country boat Boat/Vallam.
Boat/Vallam.

Transporting HT Transporting HT
TW/RSJ/Rail Poles TW/RSJ/Rail Poles by
by Country Country boat/Vallam upto
752 boat/Vallam upto No 337.00 6km including loading
6km incl. loading, and unloading charges
unloading and hire and hire charge of
charges. Country boat/Vallam.

Transporting HT
Transporting HT
TW/RSJ/Rail Poles
TW/RSJ/Rail Poles by
753 by Country km 57.80
Country boat/Vallam
boat/Vallam
beyond 6km.
beyond 6km.

Transporting HT Transporting HT PSC


PSC Poles by Poles by Country
Country boat/Vallam upto 6km
754 boat/Vallam upto No 760.00 including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.

Transporting HT
PSC Poles by Transporting HT PSC
755 Country km 87.00 Poles by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.

756 Transporting 'A' No 894.00 Transporting 'A' type


type Poles by Poles by Country
Country boat/Vallam upto 6km
boat/Vallam upto including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.

Transporting 'A'
type Poles by Transporting 'A' type
757 Country km 116.00 Poles by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.

Transporting 4 Transporting Four legged


legged poles by lattice structures by
Country Country boat/Vallam upto
758 boat/Vallam upto No 1342.00 6km including loading
6km incl. loading, and unloading charges
unloading and hire and hire charge of
charges. Country boat/Vallam.

Transporting 4
Transporting Four legged
legged poles by
lattice structures by
759 Country km 173.00
Country boat/Vallam
boat/Vallam
beyond 6km.
beyond 6km.

Transporting LT Transporting LT
TW/RSJ/Rail Poles TW/RSJ/Rail Poles by
by Country Country boat/Vallam upto
760 boat/Vallam upto No 273.00 6km including loading
6km incl. loading, and unloading charges
unloading and hire and hire charge of
charges. Country boat/Vallam.

Transporting LT
Transporting LT
TW/RSJ/Rail Poles
TW/RSJ/Rail Poles by
761 by Country km 34.70
Country boat/Vallam
boat/Vallam
beyond 6km.
beyond 6km.

Transporting LT Transporting LT PSC


PSC Poles by Poles by Country
Country boat/Vallam upto 6km
762 boat/Vallam upto No 639.00 including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.

Transporting LT
PSC Poles by Transporting LT PSC
763 Country km 69.00 Poles by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.
764 Transporting No 1278.00 Transporting
63/100/160kVA 63/100/160kVA
Transformer by Transformer by Country
Country boat/Vallam upto 6km
boat/Vallam upto including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.

Transporting
63/100/160kVA Transporting
Transformer by 63/100/160kVA
765 km 173.00
Country Transformer by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.

Transporting Transporting
250/315/500kVA 250/315/500kVA
Transformer by Transformer by Country
Country boat/Vallam upto 6km
766 No 1525.00
boat/Vallam upto including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.

Transporting
250/315/500kVA Transporting
Transformer by 250/315/500kVA
767 km 173.00
Country Transformer by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.

776 Pole numbering No 50.00 Painting Pole numbering using


using printed printed Aluminium sheets
Aluminium sheets / of 22 SWG having size 20
Painting the x 12 cm or Painting the
surface of pole surface of line supports
with anti algal where numbers are to be
yellow paint and inscribed, Pole numbers
painting Letters shall be painted in
with black paint as circular / rectangular
specified incl. cost background, using
of paint. approved quality anti
algal yellow paint in two
coat after scraping and
cleaning the surface at a
height of 2.5 metre above
ground level. The number
and letters should be in
black synthetic enamel
paint. The size of the
number should be at
least 2cm in height x
1.5cm in width. including
cost of paint.

Preparing index Preparing index register


register (book & (book & soft copy)
soft copy) showing showing name of
name of Transformer, post
777 No 5.00
Transformer, post numbers, consumer
numbers, numbers (in separate
consumer numbers column of excel sheet)
as specified. etc.

Object Marking (traffic


signal painting) in one LT,
Traffic signal HT, HT/LT pole for a
painting of pole height of 1.5m from
1.5m height using ground level using
black and white approved quality primer
778 No 241.00
paints in alternate one coat and two coats
rings of 25cm anti algal black and
width incl. cost of fluorescent white paint in
paint as specified. alternate rings of 25cm
width including cost of
paints.

Supplying and fixing


permanently, screen
Supplying and
printed consumer
fixing permanently,
premises identification
screen printed
number card of size
consumer
10x7cm using
premises
779 No 20.80 screw/adhesives.
identification
(Con.No. of digit 2cm
number card of
height, 1.5cm width &
size 10x7cm using
0.5cm thickness, Name
screw/adhesives
of section of character
as specified.
1cm height, 1cm width &
0.25cm thickness).

Painting 'A' pole


structure with one Painting 'A' pole structure
coat Synchromate with one coat
primer and two Synchromate primer and
780 No 1469.00
coat grey two coat grey enamel
enamel/aluminium paint/aluminium paint
paint incl. cost of including cost of paint.
paint.

781 Numbering of Tree No 10.00 Numbering of Tree


(marking for (marking for cutting the
cutting the tree) tree) using yellow enamel
using yellow paint as specified
enamel paint as including cost of paint.
specified incl. cost
of paint.

Scrapping and cleaning


of old paint,rust,oil etc.
over the old 25
transformer installed at
site (DP or plinth) and
applying one or more
Repainting 25 kVA coat of synthetic enamel
782 transformers at No 1735.00 paint (over a coat of iron
site primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

Scrapping and cleaning


of old paint,rust,oil etc.
over the old 50/63 kVA
transformer installed at
site (DP or plinth) and
applying one or more
Repainting 50/63 coat of synthetic enamel
783 kVA transformers No 1983.00 paint (over a coat of iron
at site primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

Scrapping and cleaning


of old paint,rust,oil etc.
over the old 100 kVA
transformer installed at
site (DP or plinth) and
applying one or more
Repainting 100 kVA coat of synthetic enamel
784 transformers at No 2407.00 paint (over a coat of iron
site primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

785 Repainting 160 kVA No 3095.00 Scrapping and cleaning


transformers at of old paint,rust,oil etc.
site over the old 160 kVA
transformer installed at
site (DP or plinth) and
applying one or more
coat of synthetic enamel
paint (over a coat of iron
primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

Scrapping and cleaning


of old paint,rust,oil etc.
over the old 250 kVA
transformer installed at
site (plinth) and applying
one or more coat of
Repainting 250 kVA synthetic enamel paint
786 transformers at No 4481.00 (over a coat of iron
site primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

Scrapping and cleaning


of old paint,rust,oil etc.
over the old 500 kVA
transformer installed at
site (plinth) and applying
one or more coat of
Repainting 500 kVA synthetic enamel paint
787 transformers at No 5838.00 (over a coat of iron
site primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

788 Repainting 315 kVA No 5243.00 Scrapping and cleaning


transformers at of old paint,rust,oil etc.
site over the old 315 kVA
transformer installed at
site (plinth) and applying
one or more coat of
synthetic enamel paint
(over a coat of iron
primer, wherever
required) of approved
quality and colour as per
standard specification
including cost of
materials, conveyance
etc, complete.

Loading HT Loading HT TW/RSJ/Rail


TW/RSJ/Rail pole pole to Hand cart from
to Hand cart from TW/RSJ/RAIL - the stacking place and
801 No 225.00
the stacking place HT unloading the same at
and unloading the work site (excluding
same at work site. transportation).

Transporting one
Transporting one HT
HT TW/RSJ/Rail
TW/RSJ/Rail pole by
pole by Hand cart -
802 P/km 225.00 Hand cart - normally
limited to 4km
limited to 4km (excluding
(excluding loading
loading and unloading)
and unloading)

Transporting one HT
Transporting one TW/RSJ/Rail pole by
HT TW/RSJ/Rail Head load - for an
pole by Head load average distance of one
803 P/km 913.00
for an average km where transportation
distance of one km by hand cart is not
(limited to 0.3km). possible. (normally
limited to 0.3km).

Fitting and erecting one


HT TW Single Pole in
Fitting and erecting
position, including fitting
one HT TW Pole in
cross arm, digging and
position incl. fitting
back filling pit in ordinary
804 cross arm, digging No 1249.00
soil, drawing sufficient
& back filling pit,
length of GI earthing
drawing earth
leads to the ground for
leads.
earthing (excluding
provision of earthing).

Fitting and erecting one


HT RSJ Single Pole in
Fitting and erecting
position, including fitting
one HT RSJ Pole in
cross arm, digging and
position incl. fitting
back filling pit in ordinary
805 cross arm, digging No 1249.00
soil, drawing sufficient
& back filling pit,
length of GI earthing
drawing earth
leads to the ground for
leads.
earthing (excluding
provision of earthing).

806 Fitting and erecting No 1249.00 Fitting and erecting one


one HT Rail Pole in HT Rail Single Pole in
position incl. fitting position, including fitting
cross arm, digging cross arm, digging and
& back filling pit, back filling pit in ordinary
drawing earth soil, drawing sufficient
leads. length of GI earthing
leads to the ground for
earthing (excluding
provision of earthing).

Fitting and erecting one


HT Double Pole Structure
Fitting and erecting using TW pole in position
one HT DP using including fitting 2 No.
TW pole in position channel cross arm,
incl. fitting 2 digging and back filling
807 No 3953.00
channel cross arm, pit in ordinary soil,
digging & back drawing sufficient length
filling pit, drawing of GI earthing leads to the
earth leads. ground for earthing
(excluding provision of
earthing).

Fitting and erecting one


HT Double Pole Structure
Fitting and erecting
using RSJ pole in position
one HT DP using
including fitting 2 No.
RSJ pole in
channel cross arm,
position incl. fitting
digging and back filling
808 2 channel cross No 3953.00
pit in ordinary soil,
arm, digging &
drawing sufficient length
back filling pit,
of GI earthing leads to the
drawing earth
ground for earthing
leads.
(excluding provision of
earthing).

Fitting and erecting one


HT Double Pole Structure
Fitting and erecting using Rail pole in position
one HT DP using including fitting 2 No.
Rail pole in position channel cross arm,
incl. fitting 2 digging and back filling
809 No 3953.00
channel cross arm, pit in ordinary soil,
digging & back drawing sufficient length
filling pit, drawing of GI earthing leads to the
earth leads. ground for earthing
(excluding provision of
earthing).

Fitting and Fitting and providing one


providing one Strut Strut using HT TW pole,
810 using HT TW pole No 1105.00 including digging and
incl. digging & back back filling pit in ordinary
filling pit. soil.
811 Fitting and No 1105.00 Fitting and providing one
providing one Strut Strut using HT RSJ pole,
using HT RSJ pole including digging and
incl. digging & back back filling pit in ordinary
filling pit. soil.

Fitting and Fitting and providing one


providing one Strut Strut using HT Rail pole,
812 using HT Rail pole No 1105.00 including digging and
incl. digging & back back filling pit in ordinary
filling pit. soil.

Fitting and providing one


Fitting and HT Fly stay for 11kV pole
providing one HT using HT TW pole,
Fly stay for 11kV including digging and
pole using HT TW back filling pits in
813 No 2268.00
pole incl. digging & ordinary soil, drawing
back filling pits, sufficient length of GI
drawing earth earth leads to the ground
leads. for earthing (excluding
provision of earthing).

Fitting and providing one


Fitting and HT Fly stay for 11kV pole
providing one HT using HT RSJ pole,
Fly stay for 11kV including digging and
pole using HT RSJ back filling pits in
814 No 2268.00
pole incl. digging & ordinary soil, drawing
back filling pits, sufficient length of GI
drawing earth earth leads to the ground
leads. for earthing (excluding
provision of earthing).

Fitting and providing one


Fitting and HT Fly stay for 11kV pole
providing one HT using HT Rail pole,
Fly stay for 11kV including digging and
pole using HT Rail back filling pits in
815 No 2268.00
pole incl. digging & ordinary soil, drawing
back filling pits, sufficient length of GI
drawing earth earth leads to the ground
leads. for earthing (excluding
provision of earthing).

816 Insertion of one HT No 1355.00 Insertion of one HT TW


TW pole in existing pole in existing OH line
line incl. digging & including digging &
backfilling pit, backfilling pit in ordinary
fitting cross arm, soil, fitting cross arm,
insulators, binding insulators, binding etc.,
etc. drawing sufficient length
of GI earth leads to the
ground for earthing
(excluding provision of
earthing).

Insertion of one HT RSJ


pole in existing OH line
Insertion of one HT including digging &
RSJ pole in existing backfilling pit in ordinary
line incl. digging & soil, fitting cross arm,
817 backfilling pit, No 1355.00 insulators, binding etc.,
fitting cross arm, drawing sufficient length
insulators, binding of GI earth leads to the
etc. ground for earthing
(excluding provision of
earthing).

Insertion of one HT Rail


pole in existing OH line
Insertion of one HT including digging &
Rail pole in existing backfilling pit in ordinary
line incl. digging & soil, fitting cross arm,
818 backfilling pit, No 1355.00 insulators, binding etc.,
fitting cross arm, drawing sufficient length
insulators, binding of GI earth leads to the
etc. ground for earthing
(excluding provision of
earthing).

Loading LT Loading LT TW/RSJ/Rail


TW/RSJ/Rail pole pole to Hand cart from
to Hand cart from TW/RSJ/RAIL - the stacking place and
826 No 104.00
the stacking place LT unloading the same at
and unloading the work site (excluding
same at work site. transportation).

Transporting one
Transporting one LT
LT TW/RSJ/Rail
TW/RSJ/Rail pole by
pole by Hand cart -
827 P/km 104.00 Hand cart - normally
limited to 4km
limited to 4km (excluding
(excluding loading
loading and unloading).
and unloading).

Transporting one LT
Transporting one TW/RSJ/Rail pole by
LT TW/RSJ/Rail Head load - for an
pole by Head load - average distance of one
828 P/km 464.00
for an average km where transportation
distance of one km by hand cart is not
(limited to 0.3km). possible. (normally
limited to 0.3km).

Erecting one LT TW Erecting one LT TW Pole


Pole in position in position including
829 No 764.00
incl. digging & back digging & back filling pit
filling pit. in ordinary soil.
830 Erecting one LT No 764.00 Erecting one LT RSJ Pole
RSJ Pole in in position including
position incl. digging & back filling pit
digging & back in ordinary soil.
filling pit.

Erecting one LT Rail Erecting one LT Rail Pole


Pole in position in position including
831 No 764.00
incl. digging & back digging & back filling pit
filling pit. in ordinary soil.

Providing Strut Providing Strut using LT


using LT TW pole TW pole including digging
832 No 677.00
incl. digging and and back filling pit in
back filling pit. ordinary soil.

Providing Strut Providing Strut using LT


using LT RSJ pole RSJ pole including
833 No 677.00
incl. digging and digging and back filling
back filling pit. pit in ordinary soil.

Providing Strut Providing Strut using LT


using LT Rail pole Rail pole including
834 No 677.00
incl. digging and digging and back filling
back filling pit. pit in ordinary soil.

Providing Fly stay Providing Fly stay for LT


for LT pole using LT pole using LT TW pole
835 TW pole incl. No 1459.00 including digging and
digging and back back filling pit in ordinary
filling pit. soil.

Providing Fly stay Providing Fly stay for LT


for LT pole using LT pole using LT RSJ pole
836 RSJ pole incl. No 1459.00 including digging and
digging and back back filling pit in ordinary
filling pit. soil.

Providing Fly stay Providing Fly stay for LT


for LT pole using LT pole using LT Rail pole
837 Rail pole incl. No 1459.00 including digging and
digging and back back filling pit in ordinary
filling pit. soil.

Constructing one span


Constructing one single phase OH line for
span Sph OH line giving service connection
for giving S/C using TW pole with one
using TW pole with stay including digging &
838 No 1840.00
one stay incl. back filling 2 pits in
digging & back ordinary soil, cutting and
filling 2 pits, cutting removing tree branches,
tree branches. excluding WP portion and
transportation of pole.
839 Constructing one No 1840.00 Constructing one span
span Sph OH line single phase OH line for
for giving S/C giving service connection
using RSJ pole using RSJ pole with one
with one stay incl. stay including digging &
digging & back back filling 2 pits in
filling 2 pits, cutting ordinary soil, cutting and
tree branches. removing tree branches,
excluding WP portion and
transportation of pole.

Constructing one span


Constructing one single phase OH line for
span Sph OH line giving service connection
for giving S/C using Rail pole with one
using Rail pole with stay including digging &
840 No 1840.00
one stay incl. back filling 2 pits in
digging & back ordinary soil, cutting and
filling 2 pits, cutting removing tree branches,
tree branches. excluding WP portion and
transportation of pole.

Constructing one span


single phase OH line for
Constructing one
giving service connection
span Sph OH line
using TW pole with TW
for giving S/C
strut (without stay)
using TW pole with
841 No 1893.00 including digging & back
TW strut incl.
filling 2 pits in ordinary
digging& back
soil, cutting and removing
filling 2 pits, cutting
tree branches, excluding
tree branches.
WP portion and
transportation of poles.

Constructing one span


single phase OH line for
Constructing one
giving service connection
span Sph OH line
using RSJ pole with RSJ
for giving S/C
strut (without stay)
using RSJ pole
842 No 1893.00 including digging & back
with RSJ strut incl.
filling 2 pits in ordinary
digging & back
soil, cutting and removing
filling 2 pits, cutting
tree branches, excluding
tree branches.
WP portion and
transportation of poles.

843 Constructing one No 1893.00 Constructing one span


span Sph OH line single phase OH line for
for giving S/C giving service connection
using Rail pole with using Rail pole with Rail
Rail strut incl. strut (without stay)
digging& back including digging & back
filling 2 pits, cutting filling 2 pits in ordinary
tree branches. soil, cutting and removing
tree branches, excluding
WP portion and
transportation of poles.

Constructing one span


single phase OH line for
Constructing one
giving service connection
span Sph OH line
using TW pole without
for giving S/C
stay/strut including
using TW pole
844 No 1215.00 digging & back filling pit
without stay/strut
in ordinary soil, cutting
incl. digging& back
and removing tree
filling pit, cutting
branches, excluding WP
tree branches.
portion and
transportation of poles.

Constructing one span


single phase OH line for
Constructing one
giving service connection
span Sph OH line
using RSJ pole without
for giving S/C
stay/strut including
using RSJ pole
845 No 1215.00 digging & back filling pit
without stay/strut
in ordinary soil, cutting
incl. digging& back
and removing tree
filling pit, cutting
branches, excluding WP
tree branches.
portion and
transportation of poles.

Constructing one span


single phase OH line for
Constructing one
giving service connection
span Sph OH line
using Rail pole without
for giving S/C
stay/strut including
using Rail pole
846 No 1215.00 digging & back filling pit
without stay/strut
in ordinary soil, cutting
incl. digging& back
and removing tree
filling pit, cutting
branches, excluding WP
tree branches.
portion and
transportation of poles.

Constructing one span


Constructing one three phase OH line for
span 3ph OH line giving service connection
for giving S/C using TW pole with one
using TW pole with stay including digging &
847 No 2239.00
one stay incl. back filling 2 pits in
digging & back ordinary soil, cutting and
filling 2 pits, cutting removing tree branches,
tree branches. excluding WP portion and
transportation of pole.

848 Constructing one No 2239.00 Constructing one span


span 3ph OH line three phase OH line for
for giving S/C giving service connection
using RSJ pole using RSJ pole with one
with one stay incl. stay including digging &
digging& back back filling 2 pits in
filling 2 pits, cutting ordinary soil, cutting and
tree branches. removing tree branches,
excluding WP portion and
transportation of pole.

Constructing one span


Constructing one three phase OH line for
span 3ph OH line giving service connection
for giving S/C using Rail pole with one
using Rail pole with stay including digging &
849 No 2239.00
one stay incl. back filling 2 pits in
digging& back ordinary soil, cutting and
filling 2 pits, cutting removing tree branches,
tree branches. excluding WP portion and
transportation of pole.

Constructing one span


three phase OH line for
Constructing one
giving service connection
span 3ph OH line
using TW pole with TW
for giving S/C
strut (without stay)
using TW pole with
850 No 2292.00 including digging & back
TW strut incl.
filling 2 pits in ordinary
digging& back
soil, cutting and removing
filling 2 pits, cutting
tree branches, excluding
tree branches.
WP portion and
transportation of poles.

Constructing one span


three phase OH line for
Constructing one
giving service connection
span 3ph OH line
using RSJ pole with RSJ
for giving S/C
strut (without stay)
using RSJ pole
851 No 2292.00 including digging & back
with RSJ strut incl.
filling 2 pits in ordinary
digging& back
soil, cutting and removing
filling 2 pits, cutting
tree branches, excluding
tree branches.
WP portion and
transportation of poles.

Constructing one span


three phase OH line for
Constructing one
giving service connection
span 3ph OH line
using Rail pole with Rail
for giving S/C
strut (without stay)
using Rail pole with
852 No 2292.00 including digging & back
Rail strut incl.
filling 2 pits in ordinary
digging & back
soil, cutting and removing
filling 2 pits, cutting
tree branches, excluding
tree branches.
WP portion and
transportation of poles.
853 Constructing one No 1614.00 Constructing one span
span 3ph OH line three phase OH line for
for giving S/C giving service connection
using TW pole using TW pole without
without stay/strut stay/strut including
incl. digging& back digging & back filling pit
filling pit, cutting in ordinary soil, cutting
tree branches. and removing tree
branches, excluding WP
portion and
transportation of pole.

Constructing one span


three phase OH line for
Constructing one
giving service connection
span 3ph OH line
using RSJ pole without
for giving S/C
stay/strut including
using RSJ pole
854 No 1614.00 digging & back filling pit
without stay/strut
in ordinary soil, cutting
incl. digging& back
and removing tree
filling pit, cutting
branches, excluding WP
tree branches.
portion and
transportation of pole.

Constructing one span


three phase OH line for
Constructing one
giving service connection
span 3ph OH line
using Rail pole without
for giving S/C
stay/strut including
using Rail pole
855 No 1614.00 digging & back filling pit
without stay/strut
in ordinary soil, cutting
incl. digging& back
and removing tree
filling pit, cutting
branches, excluding WP
tree branches.
portion and
transportation of pole.

Providing WP support
Providing WP
with TW pole including
support with TW
856 No 715.00 digging & back filling pit
pole incl. digging &
in ordinary soil. excluding
back filling pit.
transportation of poles.

Renewal of existing
damaged/old 11kV pole
Renewal of existing
(any type) with new TW
damaged/old 11kV
pole in place including
pole with new TW
TW/RSJ/RAIL HT excavation of pole pit,
857 pole in place and No 2097.00
MAINTENANCE erection of new pole,
refitting of all items
backfilling pit and refitting
incl. conveyance
of all items etc. and
(except pole).
conveyance of all
materials except pole.

858 Renewal of existing No 2097.00 Renewal of existing


damaged/old 11kV damaged/old 11kV pole
pole with new RSJ (any type) with new RSJ
pole in place and pole in place including
refitting of all items excavation of pole pit,
incl. conveyance erection of new pole,
(except pole). backfilling pit and refitting
of all items etc. and
conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV pole
Renewal of existing
(any type) with new Rail
damaged/old 11kV
pole in place including
pole with new Rail
excavation of pole pit,
859 pole in place and No 2097.00
erection of new pole,
refitting of all items
backfilling pit and refitting
incl. conveyance
of all items etc. and
(except pole).
conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV DP
Renewal of existing (any type) (2 channel
damaged/old 11kV cross arm) with new TW
DP with new TW DP in place including
860 DP in place and No 6024.00 excavation of pole pit,
refitting of all items erection of new pole,
incl. conveyance backfilling pit and refitting
(except poles). of all items etc. and
conveyance of all
materials except poles.

Renewal of existing
damaged/old 11kV DP
Renewal of existing (any type) (2 channel
damaged/old 11kV cross arm) with new RSJ
DP with new RSJ DP in place including
861 DP in place and No 6024.00 excavation of pole pit,
refitting of all items erection of new pole,
incl. conveyance backfilling pit and refitting
(except poles). of all items etc. and
conveyance of all
materials except poles.

862 Renewal of existing No 6024.00 Renewal of existing


damaged/old 11kV damaged/old 11kV DP
DP with new Rail (any type) (2 channel
DP in place and cross arm) with new Rail
refitting of all items DP in place including
incl. conveyance excavation of pole pit,
(except poles). erection of new pole,
backfilling pit and refitting
of all items etc. and
conveyance of all
materials except poles.

Renewing one damaged


Transformer DP (any
type) structure with a new
TW Transformer DP
including excavation,
dismantling accessories
Renewing
like AB switch, DO fuse,
damaged
LA, LT fuses, HT, LT and
Transformer DP
earth connections,
structure with new
dismantling existing
TW Transformer
863 No 20449.00 Transformer, keeping it in
DP and re-erecting
safe custody and re
all accessories &
erecting all accessories
Transformer
including Transformer on
(excluding renewal
the new DP as per
of pipe earthing).
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

Renewing one damaged


Transformer DP (any
type) structure with a new
RSJ Transformer DP
including excavation,
dismantling accessories
Renewing
like AB switch, DO fuse,
damaged
LA, LT fuses, HT, LT and
Transformer DP
earth connections,
structure with new
dismantling existing
RSJ Transformer
864 No 20449.00 Transformer, keeping it in
DP and re-erecting
safe custody and re
all accessories &
erecting all accessories
Transformer
including Transformer on
(excluding renewal
the new DP as per
of pipe earthing).
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

865 Renewing No 20449.00 Renewing one damaged


damaged Transformer DP (any
Transformer DP type) structure with a new
structure with new Rail Transformer DP
Rail Transformer including excavation,
DP and re-erecting dismantling accessories
all accessories & like AB switch, DO fuse,
Transformer LA, LT fuses, HT, LT and
(excluding renewal earth connections,
of pipe earthing) . dismantling existing
Transformer, keeping it in
safe custody and re
erecting all accessories
including Transformer on
the new DP as per
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.

Renewal of any type of


existing damaged/old
Renewal of existing
11kV Strut (any type) with
damaged/old 11kV
new TW strut in place
Strut with new TW
including excavation &
strut in place incl.
866 No 1657.00 backfilling of pit,
excavation &
consolidating,
backfilling of pit
dismantling and refitting
and conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

Renewal of any type of


existing damaged/old
Renewal of existing
11kV Strut (any type) with
damaged/old 11kV
new RSJ strut in place
Strut with new RSJ
including excavation &
strut in place incl.
867 No 1657.00 backfilling of pit,
excavation &
consolidating,
backfilling of pit
dismantling and refitting
and conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

Renewal of any type of


existing damaged/old
Renewal of existing
11kV Strut (any type) with
damaged/old 11kV
new Rail strut in place
Strut with new Rail
including excavation &
strut in place incl.
868 No 1657.00 backfilling of pit,
excavation &
consolidating,
backfilling of pit
dismantling and refitting
and conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

869 Renewal of existing No 3403.00 Renewal of existing


damaged/old 11kV damaged/old 11kV Fly
Fly stay with new stay (any type) with new
Fly stay incl. Fly stay including renewal
renewal of HT TW of HT TW pole in place
pole and refitting of including excavation &
all items and backfilling of pit,
conveyance consolidating,
(except pole). dismantling and refitting
of all items and
conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV Fly
Renewal of existing
stay (any type) with new
damaged/old 11kV
Fly stay including renewal
Fly stay with new
of HT RSJ pole in place
Fly stay incl.
including excavation &
870 renewal of HT RSJ No 3403.00
backfilling of pit,
pole and refitting of
consolidating,
all items and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

Renewal of existing
damaged/old 11kV Fly
Renewal of existing
stay (any type) with new
damaged/old 11kV
Fly stay including renewal
Fly stay with new
of HT Rail pole in place
Fly stay incl.
including excavation &
871 renewal of HT Rail No 3403.00
backfilling of pit,
pole and refitting of
consolidating,
all items and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT (single
Renewal of existing phase line) pole (any
damaged/old LT type) with new TW pole in
(Sph line) pole with place including
new TW pole in TW/RSJ/RAIL LT excavation of pole pit,
872 No 1461.00
place and refitting MAINTENANCE erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.

873 Renewal of existing No 1461.00 Renewal of existing


damaged/old LT damaged/old LT (single
(Sph line) pole with phase line) pole (any
new RSJ pole in type) with new RSJ pole
place and refitting in place including
of all items incl. excavation of pole pit,
conveyance erection of new pole,
(except pole). backfilling pit and refitting
of all items except street
light fitting etc. and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT (single
Renewal of existing phase line) pole (any
damaged/old LT type) with new Rail pole
(Sph line) pole with in place including
new Rail pole in excavation of pole pit,
874 No 1461.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT (three
Renewal of existing phase line) pole (any
damaged/old LT type) with new TW pole in
(3ph line) pole with place including
new TW pole in excavation of pole pit,
875 No 1730.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT (three
Renewal of existing phase line) pole (any
damaged/old LT type) with new RSJ pole
(3ph line) pole with in place including
new RSJ pole in excavation of pole pit,
876 No 1730.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.

877 Renewal of existing No 1730.00 Renewal of existing


damaged/old LT damaged/old LT (three
(3ph line) pole with phase line) pole (any
new Rail pole in type) with new Rail pole
place and refitting in place including
of all items incl. excavation of pole pit,
erection of new pole,
conveyance backfilling pit and refitting
(except pole). of all items except street
light fitting etc. and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT Strut of
Renewal of existing any type with new TW
damaged/old LT strut in place including
Strut with new TW excavation of pit, erection
878 strut in place and No 872.00 of new strut, backfilling,
refitting of all items consolidating,
incl. conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT Strut of
Renewal of existing any type with new RSJ
damaged/old LT strut in place including
Strut with new RSJ excavation of pit, erection
879 strut in place and No 872.00 of new strut, backfilling,
refitting of all items consolidating,
incl. conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT Strut of
Renewal of existing any type with new Rail
damaged/old LT strut in place including
Strut with new Rail excavation of pit, erection
880 strut in place and No 872.00 of new strut, backfilling,
refitting of all items consolidating,
incl. conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT Fly stay
Renewal of of any type of pole with
damaged LT Fly new Fly stay including
stay with new Fly new LT TW pole in place
stay incl. new LT including excavation of
881 No 2044.00
TW pole in place pit, erection of new Fly
and refitting of all stay, backfilling and
items, conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.
882 Renewal of No 2044.00 Renewal of existing
damaged LT Fly damaged/old LT Fly stay
stay with new Fly of any type of pole with
stay incl. new LT new Fly stay including
RSJ pole in place new LT RSJ pole in place
and refitting of all including excavation of
items, conveyance pit, erection of new Fly
(except pole). stay, backfilling and
dismantling and refitting
of all items and
conveyance of all
materials except pole.

Renewal of existing
damaged/old LT Fly stay
Renewal of of any type of pole with
damaged LT Fly new Fly stay including
stay with new Fly new LT Rail pole in place
stay incl. new LT including excavation of
883 No 2044.00
Rail pole in place pit, erection of new Fly
and refitting of all stay, backfilling and
items, conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.

Excavation of cable
trench of appropriate size
( normally 1.2m deep and
0.35m /0.5m wide for
Excavation of cable
single/double run) in all
trench in all
classes of soil including
classes of soil and
breaking clods, watering,
926 backfilling after m 197.00 UG CABLE
ramming and sectioning
laying of cable
of soil bank etc. and back
(excluding laying of
filling the soil after cable
cable).
laying and consolidating
the soil in layers of 75cm
(excluding laying of
cable).

927 Additional rate for m 112.00 Additional rate for


excavation of cable excavation of cable
trench in trench of appropriate size
exceptionally hard (normally 1.2m deep and
conditions ( like in 0.35m /0.5m wide for
*ordinary rock). single/double run) in
exceptionally hard
conditions (like in
ordinary rock).
* (As per the PWD
Standard Data book
,'ordinary rock' is defined
as any material which
can be quarried or split
with crowbars or
wedges).

Laying HT XLPE UG cable


of sizes upto and
including 3x185 sq mm
including conveying cable
from Sub Regional
Store/stacking place to
work site and laying it
carefully using cable
rollers, taking through
stone ware/G.I.pipes at
road
Laying HT XLPE UG
crossing/culverts/bridges
cable (of sizes
etc. whereever necessary,
upto and incl.
providing identification
928 3x185 sqmm) as m 298.00
tags at 5m intervals,
per specification
filling the space around
excl. excavation
the cable with riddled soil
and backfilling.
and covering the top with
bricks, providing cable
route markers at 100m
intervals, inclusive of cost
of all materials (other
than cost of GI/HDPE
pipe & UG Cable), labour
and transport including
crane charges excluding
excavation and
backfilling.

929 Laying HT XLPE UG m 349.00 Laying HT XLPE UG cable


cable (of sizes of sizes beyond 3x185 sq
beyond 3x185 mm and upto and
sqmm and upto including 3x300 sqmm
and incl. 3x300 including conveying cable
sqmm) as per from Sub Regional
specification excl. Store/stacking place to
excavation and work site and laying it
backfilling. carefully using cable
rollers, taking through
stone ware/G.I.pipes at
road
crossing/culverts/bridges
etc. whereever necessary,
providing identification
tags at 5m intervals,
filling the space around
the cable with riddled soil
and covering the top with
bricks, providing cable
route markers at 100m
intervals, inclusive of cost
of all materials (other
than cost of GI/HDPE
pipe & UG Cable), labour
and transport including
crane charges excluding
excavation and
backfilling.

Doing straight joint on HT


XLPE UG cables of sizes
upto and including 3x185
sqmm using the cable
Doing straight joint jointing kit supplied
on cables of sizes departmentally as per
upto and incl. specification after
3x185 sqmm using providing proper traffic
930 No 2090.00
the cable jointing signalling and caution
kit supplied board fencing etc.
departmentally as wherever necessary,
per specification. including charges for
cable jointer and other
sundries etc. as per the
direction of departmental
officers at site.

Doing straight joint on HT


XLPE UG cables of sizes
beyond 3x185 sqmm and
upto and including 3x300
Doing straight joint
sq mm using the cable
on cables of sizes
jointing kit supplied
beyond 3x185
departmentally as per
sqmm and upto
specification after
and incl. 3x300 sq
931 No 2148.00 providing proper traffic
mm using the
signalling and caution
cable jointing kit
board fencing etc.
supplied
wherever necessary,
departmentally as
including charges for
per specification.
cable jointer and other
sundries etc. as per the
direction of departmental
officers at site.

932 Doing one cable No 1223.00 Doing one cable end


end termination on termination on HT XLPE
cables of sizes UG cables of sizes upto
upto and incl. and including 3x185
3x185 sqmm using sqmm using the cable
the cable jointing jointing kit supplied
kit supplied departmentally after
departmentally. making fencing, caution
board and all other safety
measures including
charges for cable jointer
etc. complete as per the
direction of the
departmental officers.

Doing one cable end


termination on HT XLPE
UG cables of sizes
Doing one cable
beyond 3x185 sqmm and
end termination on
upto and including 3x300
cables of sizes
sq mm using the cable
beyond 3x185
jointing kit supplied
sqmm and upto
933 No 1281.00 departmentally after
and incl. 3x300 sq
making fencing,caution
mm using the
board and all other safety
cable jointing kit
measures including
supplied
charges for cable jointer
departmentally.
etc. complete as per the
direction of the
departmental officers.

Mounting and connecting


Mounting the cable
HT XLPE UG cable ends
ends of all sizes
of all sizes upto and
upto and incl.
including 3x300 sq mm
3x300 sq mm with
with special type cable
special type cable
934 No 778.00 clamps, bolts, nuts,
clamps incl. cost
terminal protectors
of extra materials if
etc.including cost of extra
needed and giving
materials if needed and
necessary
giving necessary jumper
connections.
connections.

Excavation of cable
trench (soil surface) and
Excavation of cable digging out the faulty
trench (soil portion of the cable from
surface) and the trench for redoing
digging out the straight through joint, re-
935 m 181.00
faulty cable from laying the cable after
the trench and jointing, refilling and
refilling after work. consolidating the trench
(excluding joining). as per standard
specification. (excluding
joining).

Additional rate for


Additional rate for
excavating trench
excavating trench on
936 on tarred/concrete m 181.00
tarred/concrete surface
surface of
of specified size.
specified size.

937 Dismantling faulty No 504.00 Dismantling the faulty


cable end from the cable end from the
structure/pole and structure/pole after
mounting the same disconnecting 11kV
after redoing End jumper connections and
termination and mounting the same after
giving connections. redoing End termination
(excluding end and giving jumper
termination). connections. (excluding
end termination).

Excavation of cable
trench for
maintenance of
cable in all classes
938 of soil and m3 409.00
backfilling after
laying of cable
(excluding laying of
cable)

Constructing Transformer
plinth of size
1.5x1.5x1.5m on
1.8x1.8x0.75m basement
inclusive of cost of all
Constructing materials. [Excavation
Transformer plinth 1.8x1.8x0.75m, Random
951 inclusive of cost of No 37446.00 CIVIL WORKS Rubble in CM(1:6)
all materials (as 1.8x1.8x0.75m +
per specification). 1.5x1.5x1.5m, concrete
(1:2:4, 20mm)
1.5x1.5x0.10 m, plaster
CM (1:3) 12mm,
1.5x1.5m, Pointing CM
(1:3) 1.5x1.5mx 4 sides].

Providing concrete
muffing of size 0.45x0.
Providing concrete 45x1.5m (0.5m above GL
muffing and 1m below GL).
(0.45x0.45x1.5m) Excavation
952 No 3802.00
inclusive of cost of 0.45x0.45x1m, concrete
all material (as per (1:3:6, 20mm)
specification). 0.45x0.45x1.5m,
Plastering (1:3) 12mm
0.45x0.45mx5sides.

953 Providing m2 1539.00 Providing Transformer


Transformer fencing to a height of 1.8
fencing , using m above ground level
50x50x6mm Angle using MS Angle frames of
iron, 40 x 6 mm MS size ISA 50x50x6mm for
flat and 8 mm MS outer frame, 2 runs of 40
rod as specified, x 6 MS flat for horizondal
incl cost of brasing and grills with MS
transportation & rods 8 mm Dia @ 10cm
foundation c/c for verticals,
providing gate with
locking arrangements,
providing danger board &
name board, embeding
the legs in cement
concrete 1:2:4, footing of
size 30cmx30cmx50cm,
painting with synthetic
enamel paint two coats
over one coat of iron
primer etc complete, incl
cost of transportation

Cleaning and levelling of


transformer yard/RMU,
spreading 40 mm broken
stone in yard for a
Providing yard
thickness of 10 cm above
metallings with
bed of 10 cm thick 6 mm
6mm & 40mm
broken stone, after
954 thick blue metal as m2 715.00
constructing a curb wall
specified after
of height 20cm above
constructing a curb
ground and 10cm below
wall.
level including cost of all
materials and charges for
conveying, spreading,
consolidating etc.

956 Providing m2 946.00 Providing Transformer


Transformer fencing using steel work
fencing using GI using 40 mm Dia GI pipes
chain link. for verticals & outer
frame of gate, providing
gate with locking
arrangements, with two
horizondal brasings using
40 x 6 mm MS flat & grills
with MS rods 8 mm Dia @
10cm c/c for verticals for
the gate, providing
danger board & name
board, fixing in position,
concreting the base with
1:2:4 CC, applying one
coat of zinc chromate
primer and two coats of
aluminium paint for
fencing post and gate
frame, providing fencing
with 4 mm GI chain link
fixed to GI post, as per
detailed specifications
including all charges.

Brick work in cement


Brick work in
mortar 1:4 with country
cement mortar for
burnt bricks for
957 superstructure as m3 9117.00
superstructure as per the
per the direction of
direction of departmental
departmental staff.
staff

Providing one Earth using


GI earth pipe of size
38.1mm dia, 2.5m length
including digging
separate pit
(0.45x0.45x2.5m) at
Providing one Earth
standard distance (1.5m)
using earth pipe
away from the
incl. digging &
955 No 3236.00 Earthing pole/structure in ordinary
backfilling pit and
soil & backfilling the pit
supply of charcoal,
with 15cm alternate layer
salt, sand etc.
of charcoal, salt and sand
up to 90cm from the
bottom. including the
cost of 20kg salt, 25kg
charcoal, excluding
supply of earth pipe.

0 Cost of installation 0.00 Installation of Cost of construction of


& commissioning RMU foundation, base plates,
including fixing anchor bots,
transportation of loading & unloading,
materials of Data handling, erection,
Acquisition alignment and allied
compatible works for the installation
Extensible type of Data Acquisition
Ring Main Unit compatible Extensible
without of different type Ring Main Units with
specifications terminal protector boots
& extension modules,
actuators for remote
operations,
communicable FPIs, CTs,
PTs & relay contacts for
SCADA, giving power &
control wiring and
connections, providing
terminal protector,
interconnecting RMU bus
bar and control cables,
providing metered LT
supply from nearest LT
pole, providing 2 nos pipe
earthing, cable mounting
& terminations, giving
connections after
ascertain proper phase
sequence, providing
location name & warning
boards, burying cables &
refilling, conducting all
pre-commissioning tests
as required, complete,
except cost of
conveyance

RMU Bus Couplers


/ Add-On units with RMU Bus Couplers / Add-
991 Load Break No 28034.00 On units with Load Break
switch(s) & Earth switch(s) & Earth switch
switch

RMUs with two nos


RMUs with two nos load
load break
992 No 42376.00 break switches & one
switches & one
VCB
VCB

Additional rate for


Additional rate for RMUs
RMUs with one
993 No 9381.00 with one additional Load
additional Load
Break switch / VCB
Break switch / VCB

Coupling of
994 Set 3138.00 Coupling of Busbars
Busbars

Cleaning and
levelling of
transformer
yard/RMU,
spreading 40 mm
broken stone in
yard for a
thickness of 10 cm
above bed of 10
cm thick 6 mm
broken stone, after
1001 Custom
constructing a curb
wall of height
20cm above
ground and 10cm
below level
including cost of all
materials and
charges for
conveying,
spreading,
consolidating etc.
1002

1003

1004

1005

1006

1007

1008

1009

1010

1011

1012

1013

1014

1015

1016

1017

1018

1019

1020

1021

1022

1023

1024

1025

1026

1027

1028

1029

1030
1031

1032

1033

1034

1035

1036

1037

1038

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058
1059

Materials Rate

1 PSC Pole 7m E POLES

2 PSC Pole 8m E 2704.00

3 PSC Pole 9m E

4 A Pole 10m E

5 A Pole 11m E

6 A Pole 12m E 15169.00

7 A Pole 13m E

8 A Pole 14m E

Pin insulator with


9 pin and packing E 26.00 LINE MATERIALS
clamp - LT

Pin insulator with


10 E 65.00
pin - LT

11 Packing clamp - LT E

Pin insulator with


12 E 127.00
pin -11kV

Tension Set with


13 Insulator Disc - 11 E
kV

Disc insulator – 11
14 E
kV

Composite Disc
15 E
Insulator -11kV

Hard ware fittings


16 E
– 11kV

17 MS Cleat E

18 GI Cleat E

Pole top bracket - F


19 E 112.00
Type -11 kV

Shackle insulator
20 with strap bolt and E
nut – LT
21 Shackle insulator - E
LT

GI Strap with bolt


22 E
and nut

23 Line spacer -2 Line E

24 Line spacer -4 Line E

Stay Set Complete


25 E 1164.00
- 11 kV

Stay Set Complete


26 E
- LT

Stay insulator - 11
27 E
kV

28 Stay insulator - LT E

29 Stay rod - HT E

30 Stay rod - LT E

31 Stay Tightner - HT E

32 Stay Tightner - LT E

33 RCC stayblock E

AB Switch 11kV
34 E 12041.00
400A

Flexible copper belt


35 E
for AB switch

Aluminium
36 connector for AB E
switch - 400A

Female contact for


37 E
AB switch - 400A

Male contact for


38 E
AB switch - 400A

Insulator for AB
39 E
switch - 11 kV

Drop Out Fuse Unit


40 E
– 11 kV

41 Fuse Unit 63A E

42 Fuse Unit 100A E


43 Fuse Unit 200A E

44 Fuse Unit 300A E

45 HRC fuse unit E

46 Fuse wire kg

Lightning Arrestor
47 E
– 11KV

48 2 Line cross arm E 210.00

2 Line cross arm


49 with clamp, bolt E
and nut

50 4 Line cross arm E

4 Line cross arm


51 with clamp, bolt E
and nut

Clamp for 2/4 line


52 E 65.00
cross arm

Channel cross arm


53 E 901.00
- 1.8m

Channel cross arm


54 - 1.8m with clamp, E
bolt and nut

Channel cross arm


55 E 1273.00
- 2.4m

Channel cross arm


56 - 2.4m with clamp, E
bolt and nut

Channel cross arm


57 E 1967.00
- 3m

Channel cross arm


58 - 3m with clamp, E
bolt and nut

Clamp for channel


59 E 83.00
cross arm

V Cross arm - 11
60 E
kV

Clamp for V Cross


61 E
arm
62 GI Bolt and nut kg
(assorted size)

PG clamp
63 E
(Raccoon)

CABLE AND
64 ACSR Raccoon m 64.28
CONDUCTORS

65 ACSR Rabbit m 34.59

66 ACSR Weasel km

67 ACSR Squirrel km

Aluminium
armoured cable
68 mtr
3.5C x 150 sq.mm -
LT

PVC cable 1.5


69 Single Core (WP Coil
Wire 1.5 sq.mm)

PVC cable 1/1.8


70 Twin Core (WP Mtr 13.45
Wire 2.5 sq.mm)

PVC cable 1/2.8


71 Twin Core (WP Coil
Wire 6 sq.mm)

PVC cable 25
72 m
sq.mm Single Core

PVC cable 50
73 m
sq.mm Single core

PVC cable 70
74 m
sq.mm Single core

PVC cable 95
75 m
sq.mm Single core

PVC cable 120


76 m
sq.mm Single core

PVC cable 150


77 m
sq.mm Single core

PVC cable 185


78 m
sq.mm Single core

79 XLPE cable 25 m
sq.mm Single core
- LT

XLPE Cable 50
80 sq.mm Single core m
- LT

XLPE Cable 70
81 sq.mm Single core m
- LT

XLPE Cable 95
82 sq.mm Single core m
- LT

XLPE Cable 120


83 sq.mm Single core m
- LT

XLPE Cable 150


84 sq.mm Single core m
- LT

XLPE Cable 185


85 sq.mm Single core m
- LT

XLPE Cable 3 x 300


86 m
sq.mm UG Cable

End termination kit


87 (Push on type) 300 E
sq.mm XLPE cable

End termination kit


(Heat shrinkable
88 E
type) 300 sq.mm
XLPE cable

Straight joint kit


(Heat shrinkable
89 E
type) 300 sq.mm
XLPE cable

Straight joint kit -


90 3X300 sq.mm E
XLPE cable

Aluminium
91 Crimping socket 50 E
sq.mm

Aluminium
92 Crimping socket 70 E
sq.mm
93 Aluminium E
Crimping socket 95
sq.mm

Aluminium
94 Crimping socket E
120 sq.mm

Aluminium
95 Crimping socket E
150 sq.mm

Aluminium
96 Crimping socket E
185 sq.mm

Earth pipe 2.5m -


97 E 437.00
40mm

98 HT Stay wire E

99 GI Wire No8 kg 64.00

Transformer 25 TRANSFORMERS
100 E
kVA AND SPARES

Transformer 50/63
101 E
kVA

Transformer 100
102 E
kVA

Transformer 160
103 E
kVA

Transformer 250
104 E
kVA

Transformer 315
105 E
kVA

Transformer 500
106 E
kVA

Transformer 100
107 E
kVA - 3 star rated

Transformer 160
108 E
kVA - 3 star rated

109 Silica gel kg

Single phase static METERING


110 E
meter EQUIPMENTS

111 Three phase static E


meter

Three phase static


112 E
CT meter

113 DTR meter E

114 LT TOD meter E

115 CT - 100/5 E

116 CT - 150/5 E

117 CT - 200/5 E

118 CT/PT unit - 11 kV E

119 DTR Box E

Fluorescent Lamp - ELECTRIC LIGHT


120 E
40W FITTINGS

Double tube
fluorescent street
121 light fitting with E
bracket, clamp,
B&N

Pipe fittings for


fluorescent tube
122 E
with clamp, bolt &
nut

123 Sealing Lead kg OTHERS

124 Sealing wire kg

Polycarbonate
125 E
meter seal

126 LT Stay Wire kg

Bolt and nut(


127 kg
6X1/2)

Bolt and nut(


128 kg
3X1/2)

Bolt and nut(


129 kg
3X5/8)

Bolt and nut(


130 kg
8X3/4)

131 Bolt and nut( kg


10X3/4)
Bolt and nut(
132 kg
12X3/4)

PSC Pole 7m (used


133 No
& reusable)

RCC Pole
134 (Damaged & No
unserviceble)

PSC Pole 8m
135 (Damaged & No
unserviceble)

PSC Pole 9m
136 (Damaged & No
unserviceble)

137 Aluminium Scrap kg

138 Iron Scrap kg

GI Wire 4mm
139 kg
(No.8)

140 PoleRS Joist No

Bolt & Nut


141 kg 90.00
12x100mm(1/2x4)

Bolt & Nut


142 kg
12x75mm(1/2x3)

143 ACSR Scrap kg

144 Bolt & Nut 10x3/4 kg

145 Bolt & Nut 8x3/4 kg

Teak wood Pole


146 (Damaged & No
unserviceble)

Bolt and nut(


147 kg
4X1/2)

Pin For 11kv Pin


148 No
Insulator

149 Pin Insulator 11kv No

Bolt and nut(


150 kg
2X1/2)

151 Bolt and nut all size kg 91.00


152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180
181

182

183

184

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208
209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237
238

239

240

241

242

243

244

245

246

247

248

249

250

You might also like