07.05.2018
Surveying one km
Surveying one km 11kV
101 11kV line using km 3715.00 HT LINE WORKS
line using Theodolite.
Theodolite.
Surveying one km
Surveying one km 11kV
102 11kV line using km 2497.00
line using Ranging Rod.
Ranging Rod.
Erecting one
100kVA Erecting one 100kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
146 and giving No 4119.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.
Erecting one
160kVA Erecting one 160kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
147 and giving No 4279.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.
Erecting one
250kVA Erecting one 250kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
148 and giving No 5513.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.
Erecting one
315kVA Erecting one 315kVA
Transformer to Transformer to existing
existing Plinth/Platform and
Plinth/Platform giving connections,
149 and giving No 5672.00 including loading from
connections, incl. TMR/SRS/other stacking
loading & place & unloading at site
unloading, but excluding cost for
excluding transporting transformer.
transportation.
Erection of LT 2
Erection of LT 2 way
way distribution
distribution box (normal
box on existing
size 130x40x90cm) on
cross arm giving
existing cross arm, giving
153 connection incl. No 2499.00
connection including
cable and earth
cable and earth
connection
connection (excluding
(excluding
earthing).
earthing).
Erection of LT 4
Erection of LT 4 way
way distribution
distribution box (normal
box on existing
size 190x40x90cm) on
cross arm giving
existing cross arm, giving
155 connection incl. No 2851.00
connection including
cable and earth
cable and earth
connection
connection (excluding
(excluding
earthing).
earthing).
Fitting one
Fitting one additional
additional Fuse
Fuse unit and giving
unit and giving
connection from
156 connection from No 233.00
Transformer to fuse and
Transformer to
Distribution box to LT OH
fuse and DB to LT
line.
OH line.
Conveyance of one
km 11kV line
Conveyance of one km
materials from
11kV line materials from
section km/
168 1157.00 section store/stacking
store/stacking km
place to the work site
place to the work
(excluding poles).
site (excluding
poles).
Fitting one
Additional V cross Fitting one Additional V
arm in existing cross arm in existing
169 No 320.00
single pole incl. single pole including
conveyance of conveyance of materials.
materials.
Fitting one
Additional
Fitting one Additional
75x40mm, 1.8m
75x40mm, 1.8m Channel
Channel cross arm
170 No 320.00 cross arm in existing
in existing single
single pole including
pole incl.
conveyance of materials.
conveyance of
materials.
Fitting one
Additional Fitting one Additional
2.4m/3m Channel 2.4m/3m Channel cross
cross arm arm (100x50x6mm), in
171 No 376.00
(100x50x6mm), in existing 11kV DP
existing 11kV DP including conveyance of
incl. conveyance of materials.
materials.
Fitting one
Additional Fitting one Additional
2.4m/3m Channel 2.4/3m Channel cross
cross arm arm (75x40x6mm), in
172 No 361.00
(75x40x6mm), in existing 11kV DP
existing 11kV DP including conveyance of
incl. conveyance of materials.
materials.
Providing special
Providing special type
type anti-climbing
anti-climbing protection
178 protection 2.5m No 93.00
(2.5m height) for one
height for one 11kV
11kV pole.
pole.
Fitting one
Additional 2.4m Fitting one Additional
Channel cross arm 2.4m Channel cross arm
185 in existing single No 384.00 in existing single pole
pole incl. including conveyance of
conveyance of materials.
materials.
Transporting one
Transporting one LT PSC
LT PSC pole by
pole by Hand cart -
Hand cart - limited
202 P/km 250.00 (normally limited to 4km
to 4km (excluding
(excluding loading and
loading and
unloading).
unloading).
Erecting one LT
Erecting one LT PSC Pole
PSC Pole in
in position including
204 position incl. No 1342.00
digging & back filling pit
digging & back
in ordinary soil.
filling pit.
Stringing, shackling,
fitting cross arms,
insulators and binding,
Stringing one km giving jumper connection
LT Sph 2 wire line etc. using ACSR Rabbit
(Rabbit) incl. fitting for Phase and Neutral, for
cross arm etc. one km LT single phase 2
212 km 11277.00
removing wire line including cutting
touchings and and removing tree
conveyance of branches wherever
materials. necessary and
conveyance of all
materials (except poles)
from stacking place.
Stringing, shackling,
fitting cross arms,
insulators and binding,
Stringing one km
giving jumper connection
LT Sph 3 wire line
etc. using ACSR Rabbit
(Rabbit for Ph&N,
for Phase & Neutral and
Weasel for
ACSR Weasel for street
St.main) incl. fitting
213 km 15798.00 main, for one km LT
cross arm etc.
single phase 3 wire line
removing
including cutting and
touchings and
removing tree branches
conveyance of
wherever necessary and
materials.
conveyance of all
materials (except poles)
from stacking place.
Stringing, shackling,
fitting cross arms,
insulators and binding,
Stringing one km giving jumper connection
LT 3ph 4 wire line etc. using ACSR Rabbit
(Rabbit for Ph, for Phase and ACSR
Weasel for N) incl. Weasel for Neutral, for
214 fitting cross arm km 21250.00 one km LT three phase 4
etc. removing wire line including cutting
touchings and and removing tree
conveyance of branches wherever
materials. necessary and
conveyance of all
materials (except poles)
from stacking place.
215 Stringing one km km 25771.00 Stringing, shackling,
LT 3ph 5 wire line fitting cross arms,
(Rabbit for Ph and insulators and binding,
Weasel for giving jumper connection
N&St.main) incl. etc. using ACSR Rabbit
fitting cross arm for Phase and ACSR
etc. removing Weasel for Neutral &
touchings and Street Main, for one km
conveyance of LT 3ph 5 wire line
materials. including cutting and
removing tree branches
wherever necessary and
conveyance of all
materials (except poles)
from stacking place.
Stringing, shackling,
Stringing one km fitting cross arms,
LT Addl conductor insulators and binding,
(Rabbit) after giving jumper connection
fitting crossarm, etc. for one km additional
but without conductor (ACSR Rabbit)
realigning existing on existing LT line (where
216 conductor, incl. km 5100.00 realignment of existing
fitting cross arm, conductor is not required)
insulator etc. including cutting and
removing removing tree branches
touchings and wherever necessary and
conveyance of conveyance of all
materials. materials (except poles)
from stacking place.
Stringing, shackling,
Stringing one km fitting cross arms,
LT Addl conductor insulators and binding,
(Weasel) after giving jumper connection
fitting crossarm, etc. for one km additional
but without conductor (ACSR Weasel)
realigning existing on existing LT line (where
217 conductor, incl. km 4522.00 realignment of existing
fitting cross arm, conductor is not required)
insulator etc. including cutting and
removing removing tree branches
touchings and wherever necessary and
conveyance of conveyance of all
materials. materials (except poles)
from stacking place.
Stringing, shackling,
fitting insulators
Stringing one km
(excluding fitting of cross
LT Addl conductor
arm) and binding, giving
(Weasel) where
jumper connection etc.
fitting of crossarm
for one km additional
or realigning
conductor (ACSR Weasel)
existing
on existing LT line (where
219 conductoris not km 2787.00
realignment of existing
required, incl.
conductor is not required)
fitting insulators,
including cutting and
removing
removing tree branches
touchings and
wherever necessary and
conveyance of
conveyance of all
materials.
materials (except poles)
from stacking place.
Conversion of one km LT
Conversion of one
single phase 2 wire line to
km LT Sph 2 wire to
LT three phase 4 wire line
3ph 4 wire line incl.
including dismantling the
dismantling
existing 2 conductors,
220 existing 2 km 25437.00
stringing 3 ACSR Rabbit
conductors,
conductor for Phase &
stringing 3 Rabbit &
one Weasel for Neutral
1 Weasel incl.
including conveyance of
conveyance.
materials.
Stringing, shackling,
Stringing one km fitting cross arms,
LT Addl conductor insulators and binding,
(Weasel) after giving jumper connection
fitting crossarm & etc. for one km additional
realigning one of conductor (ACSR Weasel)
the existing on existing LT line after
225 conductors, incl. km 8403.00 realignment of one of the
fitting cross arm, existing conductor,
insulator etc. including cutting and
removing removing tree branches
touchings and wherever necessary and
conveyance of conveyance of all
materials. materials (except poles)
from stacking place.
Providing WP support
Providing WP
with PSC pole including
support with PSC
266 No 1293.00 digging & back filling pit
pole incl. digging &
in ordinary soil. excluding
back filling pit.
transportation of poles.
Conversion of one
Conversion of one span
span Sph 3 wire
OH single phase 2 wire
OH line to 3ph 5
line to three phase 5 wire
wire line, incl.
line including dismantling
dismantling
existing conductors,
273 existing line, No 1213.00
stringing new conductors
stringing new
(ACSR Rabbit for phase
Rabbit for phase
and Weasel for neutral)
and Weasel for
including conveyance of
neutral
all materials.
incl.conveyance.
Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV TW/RSJ/Rail Pole with
TW/RSJ/Rail Pole new PSC pole in place
HT
with new PSC pole including excavation,
301 No 3026.00 MAINTENANCE
in place and erection of new pole,
WORK
refitting of all items backfilling pit and refitting
incl. conveyance of all items etc. and
(except pole). conveyance of all
materials except pole.
Renewal of existing
damaged/old 11kV
Renewal of existing
TW/RSJ/Rail Pole with
damaged/old 11kV
new Four legged lattice
TW/RSJ/Rail Pole
structure in place
with new 4 legged
303 No 5521.00 including excavation,
pole in place and
erection of new pole,
refitting of all items
backfilling pit and refitting
incl. conveyance
of all items etc. and
(except pole).
conveyance of all
materials except pole.
Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV PSC/RCC Pole with new
PSC/RCC Pole with PSC pole in place
new PSC pole in including excavation,
304 No 3490.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items etc. and
(except pole). conveyance of all
materials except pole.
Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV PSC/RCC Pole with new
PSC/RCC Pole with 'A' type pole in place
new 'A' type pole in including excavation,
305 No 4145.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items etc. and
(except pole). conveyance of all
materials except pole.
Renewal of existing
Renewal of existing damaged/old 11kV 'A'
damaged/old 11kV type pole with new 'A'
'A' type pole with type pole in place
new 'A' type pole in including excavation of
307 No 4213.00
place and refitting pole pit, erection of new
of all items incl. pole, backfilling pit and
conveyance refitting of all items etc.
(except pole). and conveyance of all
materials except pole.
Renewal of existing
damaged/old 11kV Four
Renewal of existing
legged lattice structure
damaged/old 11kV
with new Four legged
4 legged pole with
lattice structure in place
new 4 legged pole
308 No 6320.00 including excavation of
in place and
pole pit, erection of new
refitting of all items
pole, backfilling pit and
incl. conveyance
refitting of all items etc.
(except pole).
and conveyance of all
materials except pole.
Renewal of existing
damaged/old 11kV
Renewal of existing
TW/RSJ/Rail DP (2
damaged/old 11kV
channel cross arm) with
TW/RSJ/Rail DP
new PSC DP in place
with new PSC DP in
309 No 7882.00 including excavation,
place and refitting
erection of new pole,
of all items incl.
backfilling pit and refitting
conveyance
of all items etc. and
(except poles).
conveyance of all
materials except poles.
Renewal of existing
Renewal of existing damaged/old 11kV PSC
damaged/old 11kV DP (2 channel cross arm)
PSC DP with new with new PSC DP in place
PSC DP in place including excavation,
310 No 8810.00
and refitting of all erection of new pole,
items incl. backfilling pit and refitting
conveyance of all items etc. and
(except poles). conveyance of all
materials except poles.
Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV TW/RSJ/Rail DP with new
TW/RSJ/Rail DP Four legged lattice
with new 4 legged structure DP in place
312 pole DP in place No 13557.00 including excavation,
and refitting of all erection of new pole,
items incl. backfilling pit and refitting
conveyance of all items etc. and
(except poles). conveyance of all
materials except poles.
Renewal of existing
Renewal of existing damaged/old 11kV
damaged/old 11kV PSC/RCC DP with new 'A'
PSC/RCC DP with type DP in place including
new 'A' type DP in excavation, erection of
313 No 9967.00
place and refitting new pole, backfilling pit
of all items incl. and refitting of all items
conveyance etc. and conveyance of
(except poles). all materials except
poles.
Renewal of existing
damaged/old 11kV
Renewal of existing
PSC/RCC DP with new
damaged/old 11kV
Four legged lattice
PSC/RCC DP with
structure DP in place
new 4 legged pole
314 No 14950.00 including excavation,
DP in place and
erection of new pole,
refitting of all items
back filling pit and
incl. conveyance
refitting of all items etc.
(except poles).
and conveyance of all
materials except poles.
Renewal of existing
Renewal of existing damaged/old 11kV 'A'
damaged/old 11kV type DP with new 'A' type
'A' type DP with DP in place including
new 'A' type DP in excavation of pole pit,
315 No 10256.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items etc. and
(except poles). conveyance of all
materials except poles.
Renewing one
damaged/old
TW/RSJ/Rail Transformer
DP structure with a new
PSC Transformer DP
including excavation,
Renewing
dismantling accessories
damaged
like AB switch, DO fuse,
TW/RSJ/Rail
LA, LT fuses, HT, LT and
Transformer DP
earth connections,
structure with new
dismantling existing
317 PSC Transformer No 22306.00
Transformer, keeping it in
DP and re-erecting
safe custody and re
all accessories &
erecting all accessories
Transformer.
including Transformer on
(excluding renewal
the new DP as per
of pipe earthing).
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.
Renewing one
damaged/old
TW/RSJ/Rail Transformer
DP structure with a new
Four legged lattice
structure Transformer DP
Renewing
including excavation,
damaged
dismantling accessories
TW/RSJ/Rail
like AB switch, DO fuse,
Transformer DP
LA, LT fuses, HT, LT and
structure with new
earth connections,
4 legged pole
319 No 24875.00 dismantling existing
Transformer DP
Transformer, keeping it in
and re-erecting all
safe custody and re
accessories &
erecting all accessories
Transformer
including Transformer on
(excluding renewal
the new DP as per
of pipe earthing).
standards and drawing
sufficient length of GI
earthing leads to the
ground for earthing,
excluding renewal of pipe
earthing.
Renewal of one
Renewal of one damaged
323 damaged HT Pin No 192.00
HT Pin insulator.
insulator.
Renewal of existing
Renewal of existing
damaged/broken
damaged/broken old
327 old 11kV Stay to No 376.00
11kV Stay to the existing
the existing stay
stay rod.
rod.
Replacing/inserting
Replacing/inserting HT
HT Stay insulator
328 No 376.00 Stay insulator on the
on the existing
existing stay.
stay.
Renewal of existing
damaged/old 11kV Fly
Renewal of existing
stay with new Fly stay
damaged/old 11kV
including renewal of 'A'
Fly stay with new
type pole in place
Fly stay incl.
including excavation &
332 renewal of 'A' type No 5085.00
backfilling of pit,
pole and refitting of
consolidating,
all items and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.
Re-joining one
snapped HT Re-joining one snapped
conductor after HT conductor after
removing damaged removing damaged
334 portion incl. re- No 1105.00 portion including re-
tensioning and tensioning and
conveyance of all conveyance of all
materials materials complete.
complete.
Renewing one
Renewing one 11kV
11kV Jumper using
Jumper connection using
Copper/ACSR
Copper/ACSR conductor
conductor as per
340 No 288.00 as per standard
standard
specification (in loop
specification (in
formation for tapping
loop formation for
from line).
tapping from line).
Renewing one
11kV Jumper Renewing one 11kV
connection using Jumper connection using
341 Copper/ACSR No 201.00 Copper/ACSR conductor
conductor as per as per standard
standard specification.
specification.
Renewing one V
Renewing one V Cross
cross arm on the
arm on the 11kV Pole
342 11kV Pole incl. No 541.00
including dismantling and
dismantling and
conveyance.
conveyance.
Renewing one
damaged cross Renewing one damaged
arm with cross arm with
100x50mm, 100x50mm, 2.4m/3m
344 2.4m/3m Channel No 470.00 Channel cross arm on the
cross arm on the 11kV DP including
11kV DP incl. dismantling and
dismantling and conveyance.
conveyance.
Renewing one
damaged cross Renewing one damaged
arm with cross arm with
35x35x5mm, 35x35x5mm, 2.4m/3m
345 2.4m/3m Channel No 441.00 Channel cross arm on the
cross arm on the 11kV DP including
11kV DP incl. dismantling and
dismantling and conveyance.
conveyance.
Straightening one
Straightening one slanted
slanted 11kV pole
11kV pole after unbinding
347 after unbinding the No 754.00
the line and binding the
line and rebinding
line after work.
the line after work.
Straightening one
Straightening one slanted
slanted 11kV Cut
11kV Cut pole after
pole after lowering
348 No 1249.00 lowering down the
down the existing
existing line and stringing
line and stringing
the line after work.
the line after work.
Dismantling existing
CT/PT unit, erecting new
Dismantling
CT/PT unit in place,
CT/PTunit, erecting
giving connections etc.
349 new CT/PTunit in No 5361.00
including
place incl. loading
loading/unloading of old
& unloading at site.
and new CT/PT unit at
site.
Dismantling existing
63kVA Transformer,
Dismantling 63kVA erecting new 63kVA
Tr., erecting new Transformer in place,
351 63kVA Tr. in place No 5361.00 giving connections etc.
incl. loading & including
unloading at site. loading/unloading of old
and new 63kVA
Transformer at site.
Enhancing Transformer
by dismantling existing
Enhancing 63kVA
63kVA Transformer,
Transformer with
erecting new 100kVA
new 100kVA
Transformer in place,
357 Transformer, giving No 6769.00
giving connections etc.
connections incl.
including
loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.
Enhancing Transformer
by dismantling existing
Enhancing 100kVA
100kVA Transformer,
Transformer with
erecting new 160kVA
160kVA
Transformer in place,
358 Transformer, giving No 7298.00
giving connections etc.
connections etc.
including
incl. loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.
Enhancing Transformer
by dismantling existing
Enhancing 160kVA
160kVA Transformer,
Transformer with
erecting new 250kVA
250kVA
Transformer in place,
359 Transformer, giving No 7652.00
giving connections etc.
connections etc.
including
incl. loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.
Enhancing Transformer
by dismantling existing
Enhancing 315kVA
315kVA Transformer,
Transformer with
erecting new 500kVA
500kVA
Transformer in place,
361 Transformer, giving No 8669.00
giving connections etc.
connections etc.
including
incl. loading &
loading/unloading of old
unloading at site.
and new Transformer at
site.
Reconductoring one km
Reconductoring
11kV Copper/old
one km 11kV old
AAC/ACSR line of 3
line of 3
conductors with new
conductors with
ACSR Raccoon including
362 new ACSR km 33071.00
cutting of tree branches
Raccoon incl.
wherever necessary,
cutting of tree
conveyance of materials
branches and
to and from the stacking
conveyance.
place.
Reconductoring one km
Reconductoring 11kV Copper/old
one km 11kV old AAC/ACSR line of 3
line of 3 conductors with new
conductors with ACSR Rabbit including
391 km 29208.00
new ACSR Rabbit cutting of tree branches
incl. cutting of tree wherever necessary,
branches and conveyance of materials
conveyance. to and from the stacking
place.
Renewal of existing
Renewal of existing damaged/old 11kV Fly
damaged/old 11kV stay with new Fly stay
Fly stay with new (where replacement of
392 Fly stay (excluding No 752.00 stay-pole / stay-rod is not
stay-pole & stay- required) in place ,
rod) including dismantling, refitting of
conveyance. all items, including
conveyance.
Drilling hole of
various sizes on Drilling hole of various
FABRICATING
363 existing No 11.00 sizes on existing
WORKS
Channel/Cross Channel/Cross Arm.
Arm.
Cutting
Cutting Channel/Cross
Channel/Cross
365 No 45.00 Arm/Angle Iron into two
Arm/Angle Iron
pieces.
into two pieces.
Renewal of existing
damaged/old LT
Renewal of existing
TW/RSJ/Rail (single
damaged/old LT
phase line) pole with new
TW/RSJ/Rail (Sph
PSC pole in place
line) pole with new LT
including excavation of
401 PSC pole in place No 2040.00 MAINTENANCE
pole pit, erection of new
and refitting of all WORK
pole, backfilling pit and
items incl.
refitting of all items
conveyance
except street light fitting
(except pole).
etc. and conveyance of
all materials except pole.
Renewal of existing
damaged/old LT
Renewal of existing PSC/RCC (single phase
damaged/old LT line) pole with new PSC
PSC/RCC (Sph line) pole in place including
pole with new PSC excavation of pole pit,
402 No 2329.00
pole in place and erection of new pole,
refitting of all items backfilling pit and refitting
incl. conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT
Renewal of existing PSC/RCC (three phase
damaged/old LT line) pole with new PSC
PSC/RCC (3ph line) pole in place including
pole with new PSC excavation of pole pit,
404 No 2597.00
pole in place and erection of new pole,
refitting of all items backfilling pit and refitting
incl. conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.
Renewal of existing
Renewal of existing damaged/old LT stay with
damaged/old LT new stay in place
stay with new stay including excavation of
406 in place and No 792.00 stay pit, erection of new
refitting of all items stay, backfilling pit and
and conveyance of refitting of all items and
all materials. conveyance of all
materials.
Renewal of existing
Renewal of existing
damaged/broken
407 No 289.00 damaged/broken old LT
old LT stay with
stay in existing stay rod.
existing stay rod.
Replacing/inserting Replacing/inserting LT
408 LT stay insulator on No 289.00 stay insulator on the
the existing stay. existing stay.
Renewal of existing
Renewal of
damaged/old LT Fly stay
damaged LT Fly
of any type of pole with
stay with new Fly
new Fly stay including
stay incl. renewal
renewal of PSC pole
of new PSC pole
(used for fly stay) in
410 (used for fly stay) No 2911.00
place, excavation of pit,
and refitting of all
erection of new Fly stay,
items, conveyance
backfilling, dismantling &
(except
refitting of all items and
conveyance of
conveyance of all
pole).
materials except pole.
Re-joining snapped
Re-joining one snapped
one LT conductor
LT conductor after
after removing
removing damaged
damaged portion
414 No 467.00 portion including
incl. Reshackling
Reshackling and
and conveyance of
conveyance of all
all materials
materials complete.
complete.
Renewing one LT
Renewing one LT Jumper
Jumper using
connection using
Copper/ACSR
Copper/ACSR conductor
conductor as per
415 No 96.00 as per standard
standard
specification (in loop
specification (in
formation for tapping
loop formation for
from line).
tapping from line).
Renewing one LT
Jumper connection Renewing one LT Jumper
using connection using
416 Copper/ACSR No 67.00 Copper/ACSR conductor
conductor as per as per standard
standard specification.
specification.
Transferring LT single
Transferring LT Sph phase 2/3 wire OH line to
2/3 wire OH line to newly erected HT/LT pole
newly erected including dismantling
419 No 585.00
HT/LT pole and existing cross arm and
refitting all items to insulators, refitting the
the new pole. same on the new pole,
binding etc. complete.
Transferring LT three
Transferring LT 3ph phase 4/5 wire OH line to
4/5 wire OH line to newly erected HT/LT pole
newly erected including dismantling
420 No 1183.00
HT/LT pole and existing cross arm and
refitting all items to insulators, refitting the
the new pole. same on the new pole,
binding etc. complete.
421 Straightening one No 684.00 Straightening one slanted
Slanted LT pole LT pole after unbinding
after unbinding the the line and binding the
line and rebinding line after work.
the line after work.
Reconductoring
Reconductoring (changing) one km LT
one km LT Sph 2 single phase 2 wire OH
wire OH old line Copper/old AAC/ACSR
423 with new ACSR km 13270.00 conductor line with new
Rabbit conductor ACSR Rabbit conductor
incl. conveyance of including conveyance of
materials. materials to and from the
stacking place.
Reconductoring
Reconductoring (changing) one km LT
one km LT 3ph 4 three phase 4 wire OH
wire OH old line Copper/old AAC/ACSR
with new 3 ACSR conductor line with new 3
424 km 28065.00
Rabbit and one ACSR Rabbit and one
Weasel conductor ACSR Weasel conductor
incl. conveyance of including conveyance of
materials. materials to and from the
stacking place.
Reconductoring
Reconductoring
(changing) one km LT OH
one km LT OH one
Copper/old AAC/ACSR
old conductor with
one conductor with new
425 New ACSR Rabbit km 6635.00
ACSR Rabbit conductor
conductor incl.
including conveyance of
conveyance of
materials to and from the
materials.
stacking place.
Reconductoring
Reconductoring
(changing) one km LT OH
one km LT OH one
Copper/old AAC/ACSR
old conductor with
one conductor with new
426 New ACSR Weasel km 5971.00
ACSR Weasel conductor
conductor incl.
including conveyance of
conveyance of
materials to and from the
materials.
stacking place.
Stringing, shackling,
fitting insulators
(excluding fitting of cross
Stringing one km arm) and binding, giving
LT Addl conductor jumper connection etc.
(Weasel) after for one km additional
relocating one of conductor (ACSR Weasel)
the existing on existing LT line (where
428 conductor, incl. km 4877.00 relocation of one existing
fitting insulators, conductor is also
removing required) including
touchings and cutting and removing tree
conveyance of branches wherever
materials. necessary and
conveyance of all
materials (except poles)
from stacking place.
Renewal of existing
damaged/old LT Fly stay
of any type of pole with
Renewal of
new Fly stay where
damaged LT Fly
renewal of PSC pole
stay with new Fly
429 No 578.00 (used for fly stay), stay
stay incl. refitting
plate, stay rod etc is not
of all items,
required, including
conveyance .
dismantling & refitting of
all items and conveyance
of all materials.
Disconnecting and
Dismantling and lowering down the single
reconnecting Sph phase WP service
MAINTENANCE
service connection connection with guy wire
451 No 64.00 OF SERVICE
from the OH line from the OH line and
CONNECTION
incl. lowering down reconnecting the same
the WP portion. after completing the line
work.
Dismantling
Dismantling (without
(without damage)
damage) one No. 11kV
one No. 11kV
TW/RSJ/Rail pole after
502 TW/RSJ/Rail pole No 1201.00
disconnecting stays, strut
after disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.
Dismantling
Dismantling (without
(without damage)
damage) one 11kV
one 11kV PSC/RCC
PSC/RCC pole after
504 pole after No 2081.00
disconnecting stays, strut
disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.
Dismantling
Dismantling (without
(without damage)
damage) one 11kV 'A'
one 11kV 'A' type
type pole after
506 pole after No 2082.00
disconnecting stays, strut
disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.
Dismantling one
Dismantling one
damaged 11kV Four
damaged 11kV 4
legged lattice structure
legged pole after
507 No 2225.00 after disconnecting stays,
disconnecting
strut etc. attached
stays, strut etc. and
thereon and stacking the
stacking the same.
same.
Dismantling one
Dismantling one
damaged HT
damaged HT
TW/RSJ/Rail Strut
509 No 552.00 TW/RSJ/Rail Strut pole
pole incl. removal
including removal of
of clamps and
clamps and stacking.
stacking.
Dismantling
(without damage) Dismantling (without
one HT damage) one HT
510 TW/RSJ/Rail Strut No 1032.00 TW/RSJ/Rail Strut pole
pole incl. removal including removal of
of clamps and clamps and stacking.
stacking.
Dismantling one
Dismantling one
damaged HT
damaged HT PSC/RCC
PSC/RCC Strut
511 No 1017.00 Strut pole including
pole incl. removal
removal of clamps and
of clamps and
stacking.
stacking.
Dismantling
Dismantling (without
(without damage)
damage) one HT
one HT PSC/RCC
512 No 1907.00 PSC/RCC Strut pole
Strut pole incl.
including removal of
removal of clamps
clamps and stacking.
and stacking.
Dismantling one
Dismantling (without
Channel cross arm
damage) one Channel
from existing DP
516 No 188.00 cross arm from existing
structure, and
DP structure and bringing
bringing back to
back to section store.
section store.
Dismantling
(without damage) Dismantling (without
one AB switch damage) one AB switch
517 from existing No 1115.00 from existing structure
structure and and bringing back to
bringing back to section store.
section store.
Dismantling one
Dismantling one HT pin
HT pin insulator
insulator with pin and
518 with pin and bring No 128.00
bring back to section
back to section
store.
store.
Dismantling one
Dismantling one
damaged AB switch from
damaged AB
519 No 785.00 existing structure and
switch from
bringing back to section
existing structure.
store.
Dismantling transformer
station with transformer
erected in DP structure by
dismantling HT Double
Pole Structure using PSC
pole after disconnecting
Dismantling stay wires, 10 channel
transformer station cross arms,AB switch, DO
in DP structure fuse, LA, GI earthing
520 No 9935.00
excluding the rate leads, DTR meter with
of dismantling box with metering
earthing equipments, CTs,
Distribution Box, statutory
display boards etc. but
excluding the rate of
dismantling transformer,
earthing, stay sets &
fencing.
Dismantling
Dismantling (without
(without damage)
damage) one LT
one LT
TW/RSJ/Rail pole after
552 TW/RSJ/Rail pole No 687.00
disconnecting stays, strut
after disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.
Dismantling
Dismantling (without
(without damage)
damage) one LT
one LT PSC/RCC
PSC/RCC pole after
554 pole after No 1280.00
disconnecting stays, strut
disconnecting
etc. attached thereon and
stays, strut etc. and
stacking the same.
stacking the same.
Dismantling
Dismantling (without
(without damage)
damage) LT stay
LT stay incl.
555 No 312.00 including digging pit in all
digging pit in all
classes of soil and
classes of soil and
backfilling.
backfilling
Dismantling
(without damage) Dismantling (without
one LT damage) one LT
557 TW/RSJ/Rail Strut No 625.00 TW/RSJ/Rail Strut pole
pole incl. removal including removal of
of clamps and clamps and stacking.
stacking.
Dismantling one
Dismantling one
damaged LT
damaged LT PSC/RCC
PSC/RCC Strut
558 No 628.00 Strut pole including
pole incl. removal
removal of clamps and
of clamps and
stacking.
stacking.
Dismantling
Dismantling (without
(without damage)
damage) one LT
one LT PSC/RCC
559 No 1057.00 PSC/RCC Strut pole
Strut pole incl.
including removal of
removal of clamps
clamps and stacking.
and stacking.
Dismantling single
phase WP service Dismantling single phase
connection with WP service connection
562 meter & all No 576.00 with meter & all
accessories and accessories and bringing
bringing back to back to section store.
section store.
Dismantling three
phase WP service Dismantling three phase
connection with WP service connection
563 meter & all No 857.00 with meter & all
accessories and accessories and bringing
bringing back to back to section store.
section store.
Dismantling (without
Dismantling
damage) one km LT
(without damage)
single phase 2 wire OH
one km LT Sph 2
line conductor by
565 wire OH line, cross km 4952.00
dismantling cross arms,
arms, insulators
insulators and stacking
and stacking the
the conductors in rolls
conductors in rolls.
properly.
Dismantling (without
Dismantling
damage) one km LT three
(without damage)
phase 4 wire OH line
one km LT 3ph 4
conductor by dismantling
566 wire OH line, cross km 9401.00
cross arms, insulators
arms, insulators
and stacking the
and stacking the
conductors in rolls
conductors in rolls.
properly.
Dismantling
(without damage) Dismantling (without
one km LT damage) one km LT
additional additional conductor line
567 conductor line, km 2230.00 by dismantling cross
cross arms, arms, insulators and
insulators and stacking the conductors
stacking the in rolls properly.
conductors in rolls.
601 Wiring and No 209.00 STREET LIGHT Wiring and installing one
installing one new new ordinary street light
ordinary street light fitting on existing pole
fitting on existing and giving connections.
pole and giving
connections.
Wiring and
installing one new Wiring and installing one
CFL street light new CFL street light
602 No 209.00
fitting on existing fitting on existing pole
pole and giving and giving connections.
connections.
Wiring and
installing one new Wiring and installing one
LED street light new LED street light
603 No 209.00
fitting on existing fitting on existing pole
pole and giving and giving connections
connections.
Dismantling
Dismantling (without
(without damage)
damage) one ordinary
one ordinary street
604 No 104.00 street light/CFL/LED
light/CFL/LED
fitting from the pole and
fitting from the
stacking.
pole and stacking.
Wiring and
Wiring and installing new
installing new set
set 2x40W fluorescent
2x40W fluorescent
606 No 334.00 tube fitting on existing
tube fitting on
poles including giving
existing poles incl.
connection.
giving connection.
Replacing bulb on
Replacing bulb on
608 existing street No 51.20
existing street light.
light.
609 Replacing CFL/LED No 51.20 Replacing CFL/LED on
on existing street existing street light.
light.
Dismantling one
Dismantling one ordinary
ordinary street
street light/CFL/LED
light/CFL/LED
fitting from existing pole
fitting from existing
610 No 327.00 and refitting the same on
pole and refitting
newly erected pole
the same on newly
including disconnecting
erected pole and
and reconnecting wires.
reconnecting.
Dismantling one
Dismantling one 2x40W
2x40W fluorescent
fluorescent tube fitting
tube fitting from
from the existing pole
the existing pole
611 No 501.00 and refitting the same on
and refitting the
newly erected pole
same on newly
including disconnecting
erected pole and
and reconnecting wires.
reconnecting.
Wiring and
Wiring and installing new
installing new set
set Sodium Vapour lamp
SV lamp fitting on
fitting on existing poles
612 existing poles incl. No 1043.00
including giving
giving connection
connection (without
(without using
using aerial lift).
aerial lift).
Wiring and
Wiring and installing new
installing new set
set Mercury Vapour lamp
MV lamp fitting on
fitting on existing poles
613 existing poles incl. No 1043.00
including giving
giving connection
connection (without
(without using
using aerial lift).
aerial lift).
Wiring and
installing new set Wiring and installing new
Metal halide lamp set Metal Halide lamp
fitting on existing fitting on existing poles
614 No 1043.00
poles incl. giving including giving
connection connection (without
(without using using aerial lift).
aerial lift).
Wiring and
Wiring and installing new
installing new set
set Metal Halide lamp
Metal halide lamp
fitting on existing poles
617 fitting on existing No 522.00
including giving
poles incl. giving
connection (using aerial
connection (using
lift).
aerial lift).
Replacing holder,
Replacing holder, fused
fused bulb/CFL,
bulb/CFL, changing wires,
changing wires,
giving connection etc. of
622 giving connection No 104.00
street light including
etc. of street light
conveyance of all
incl. conveyance of
materials.
all materials.
Wiring and
Wiring and installing new
installing new set
set 1x40W fluorescent
1x40W fluorescent
623 No 271.00 tube fitting on existing
tube fitting on
poles including giving
existing poles incl.
connection.
giving connection.
Dismantling one
Dismantling one 1x40W
1x40W fluorescent
fluorescent tube fitting
tube fitting from
from the existing pole
the existing pole
625 No 407.00 and refitting the same on
and refitting the
newly erected pole
same on newly
including disconnecting
erected pole and
and reconnecting wires.
reconnecting.
Clearing touchings on
Clearing touchings 11kV HT lines, cutting
on HT lines 11kV, branches of trees,
cutting tree bamboo clusters,
branches, bamboo CLEARING coconut cudjans etc.
651 km 1333.00
clusters, coconut TOUCHINGS (HT) from above the lines for a
cudjans etc. as distance of 1.8m from
specified by dept. the outer conductor as
(Urban/Town). specified by dept.
(Urban/Town).
Clearing touchings on
Clearing touchings HT/LT lines, cutting
on HT/LT lines, branches of trees,
cutting tree bamboo clusters,
branches, bamboo coconut cudjans etc.
653 km 1600.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 1.8m from
specified by dept. the outer conductor as
(Urban/Town). specified by dept.
(Urban/Town).
Clearing touchings on
Clearing touchings HT/LT lines, cutting
on HT/LT lines, branches of trees,
cutting branches of bamboo clusters,
trees, bamboo coconut cudjans etc.
654 km 2142.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 1.8m from
specified by dept. the outer conductor as
(Rural/Remote). specified by dept.
(Rural/Remote).
Clearing touchings on
Clearing touchings 33kV lines, cutting
on 33kV lines, branches of trees,
cutting tree bamboo clusters,
branches, bamboo coconut cudjans etc.
655 km 2000.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 2.0m from
specified by dept. the outer conductor as
(Urban/Town). specified by dept.
(Urban/Town).
Clearing touchings on
Clearing touchings 33kV lines, cutting
on 33kV lines, branches of trees,
cutting tree bamboo clusters,
branches, bamboo coconut cudjans etc.
656 km 2677.00
clusters, coconut from above the lines for a
cudjans etc. as distance of 2.0m from
specified by dept. the outer conductor as
(Rural/Remote). specified by dept.
(Rural/Remote).
657 Clearing touchings km 1238.00 CLEARING Clearing touchings on LT
on LT lines, cutting TOUCHINGS (LT) lines, cutting branches of
tree branches, trees, bamboo clusters,
bamboo clusters, coconut cudjans etc.
coconut cudjans from above the lines for a
etc. as specified. distance of 1.8m from
(Urban/Town). the outer conductor as
specified. (Urban/Town).
Clearing touchings on LT
Clearing touchings lines, cutting branches of
on LT lines, cutting trees, bamboo clusters,
tree branches, coconut cudjans etc.
658 bamboo clusters, km 1507.00 from above the lines for a
coconut cudjans distance of 1.8m from
etc. as specified. the outer conductor as
(Rural/Remote). specified.
(Rural/Remote).
Cutting trees
Cutting trees having girth
beyond 60cm but
beyond 60cm but upto
upto and incl.
and including 120cm
120cm girth,
(felling trees including
677 cutting of No 543.00
cutting of trunks and
trunks/branches,
branches) and removing
removing the root
the root completely and
completely and
stacking etc. 1 No.
stacking.
Cutting trees
Cutting trees having girth
beyond 120cm but
beyond 120cm but upto
upto and incl.
and including 180cm
180cm girth,
(felling trees including
678 cutting of No 831.00
cutting of trunks and
trunks/branches,
branches) and removing
removing the root
the root completely and
completely and
stacking etc. 1 No.
stacking.
Loading HT
Labour charges for
TW/RSJ/Rail pole
loading HT TW/RSJ/Rail
from the stacking
pole from the stacking
place and LOADING AND
701 No 232.00 place and unloading the
unloading the UNLOADING
same at work site
same at work site
(transportation by any
(transport by
vehicle).
vehicle).
Loading HT PSC
Labour charges for
pole from the
loading HT PSC pole from
stacking place and
the stacking place and
702 unloading the No 507.00
unloading the same at
same at work site
work site (transportation
(transport by
by any vehicle).
vehicle).
Loading LT
Labour charges for
TW/RSJ/Rail pole
loading LT TW/RSJ/Rail
from the stacking
pole from the stacking
place and
705 No 168.00 place and unloading the
unloading the
same at work site
same at work site
(transportation by any
(transport by
vehicle).
vehicle).
Loading LT PSC
Labour charges for
pole from the
loading LT PSC pole from
stacking place and
the stacking place and
706 unloading the No 319.00
unloading the same at
same at work site
work site (transportation
(transport by
by any vehicle).
vehicle).
Unloading one
Unloading one
Transformer (upto
Transformer (upto and
and incl. 160kVA)
including 160kVA) from
707 from vehicle to No 898.00
any vehicle to ground
ground incl.
including conveyance
conveyance upto
upto 25m at site.
25m.
Unloading one
Unloading one
Transformer
Transformer (above
(above 160kVA)
160kVA) from any vehicle
708 from vehicle to No 1507.00
to ground including
ground incl.
conveyance upto 25m at
conveyance upto
site.
25m.
Loading one
Loading one Transformer
Transformer (upto
(upto and including
and incl. 160kVA)
160kVA) from ground to
709 from ground to No 1187.00
any vehicle including
vehicle incl.
conveyance upto 25m at
conveyance upto
site.
25m.
Dismantling one
Dismantling one
Transformer above
Transformer (above
160kVA from plinth
160kVA) from existing
and loading to
712 No 1616.00 plinth and loading to any
vehicle incl.
vehicle directly, including
disconnecting
disconnecting
HT/LT/Earth
HT/LT/Earth connections.
connections.
Dismantling one
Dismantling one
Transformer (upto and
Transformer (upto
including 160kVA) from
and incl. 160kVA)
713 No 1616.00 existing structure to
from existing
ground, including
structure to
disconnecting
ground.
HT/LT/Earth connections.
Dismantling one
Dismantling one
Transformer (above
Transformer
160kVA) from existing
714 (above 160kVA) No 1920.00
plinth to ground, including
from existing plinth
disconnecting
to ground.
HT/LT/Earth connections.
Transporting poles
Transporting poles by
by hired vehicle to
hired vehicle to a
a distance beyond
727 km 43.00 distance beyond 5km and
5km and carrying
carrying upto 4 numbers
upto 4 poles.
of poles. (Running km)
(Running km).
Transporting
Transformers by Transporting
hired vehicle to a Transformers by hired
distance beyond vehicle to a distance
5km and upto 2 beyond 5km and carrying
729 km 43.00
No. of 63 to upto 2 numbers of
250kVA 63/100/160/250kVA
Transformers / Transformers / Ring Main
RMUs (Running Units (Running km).
km).
Transporting HT Transporting HT
TW/RSJ/Rail Poles TW/RSJ/Rail Poles by
by Country Country boat/Vallam upto
752 boat/Vallam upto No 337.00 6km including loading
6km incl. loading, and unloading charges
unloading and hire and hire charge of
charges. Country boat/Vallam.
Transporting HT
Transporting HT
TW/RSJ/Rail Poles
TW/RSJ/Rail Poles by
753 by Country km 57.80
Country boat/Vallam
boat/Vallam
beyond 6km.
beyond 6km.
Transporting HT
PSC Poles by Transporting HT PSC
755 Country km 87.00 Poles by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.
Transporting 'A'
type Poles by Transporting 'A' type
757 Country km 116.00 Poles by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.
Transporting 4
Transporting Four legged
legged poles by
lattice structures by
759 Country km 173.00
Country boat/Vallam
boat/Vallam
beyond 6km.
beyond 6km.
Transporting LT Transporting LT
TW/RSJ/Rail Poles TW/RSJ/Rail Poles by
by Country Country boat/Vallam upto
760 boat/Vallam upto No 273.00 6km including loading
6km incl. loading, and unloading charges
unloading and hire and hire charge of
charges. Country boat/Vallam.
Transporting LT
Transporting LT
TW/RSJ/Rail Poles
TW/RSJ/Rail Poles by
761 by Country km 34.70
Country boat/Vallam
boat/Vallam
beyond 6km.
beyond 6km.
Transporting LT
PSC Poles by Transporting LT PSC
763 Country km 69.00 Poles by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.
764 Transporting No 1278.00 Transporting
63/100/160kVA 63/100/160kVA
Transformer by Transformer by Country
Country boat/Vallam upto 6km
boat/Vallam upto including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.
Transporting
63/100/160kVA Transporting
Transformer by 63/100/160kVA
765 km 173.00
Country Transformer by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.
Transporting Transporting
250/315/500kVA 250/315/500kVA
Transformer by Transformer by Country
Country boat/Vallam upto 6km
766 No 1525.00
boat/Vallam upto including loading and
6km incl. loading, unloading charges and
unloading and hire hire charge of Country
charges. boat/Vallam.
Transporting
250/315/500kVA Transporting
Transformer by 250/315/500kVA
767 km 173.00
Country Transformer by Country
boat/Vallam boat/Vallam beyond 6km.
beyond 6km.
Transporting one
Transporting one HT
HT TW/RSJ/Rail
TW/RSJ/Rail pole by
pole by Hand cart -
802 P/km 225.00 Hand cart - normally
limited to 4km
limited to 4km (excluding
(excluding loading
loading and unloading)
and unloading)
Transporting one HT
Transporting one TW/RSJ/Rail pole by
HT TW/RSJ/Rail Head load - for an
pole by Head load average distance of one
803 P/km 913.00
for an average km where transportation
distance of one km by hand cart is not
(limited to 0.3km). possible. (normally
limited to 0.3km).
Transporting one
Transporting one LT
LT TW/RSJ/Rail
TW/RSJ/Rail pole by
pole by Hand cart -
827 P/km 104.00 Hand cart - normally
limited to 4km
limited to 4km (excluding
(excluding loading
loading and unloading).
and unloading).
Transporting one LT
Transporting one TW/RSJ/Rail pole by
LT TW/RSJ/Rail Head load - for an
pole by Head load - average distance of one
828 P/km 464.00
for an average km where transportation
distance of one km by hand cart is not
(limited to 0.3km). possible. (normally
limited to 0.3km).
Providing WP support
Providing WP
with TW pole including
support with TW
856 No 715.00 digging & back filling pit
pole incl. digging &
in ordinary soil. excluding
back filling pit.
transportation of poles.
Renewal of existing
damaged/old 11kV pole
Renewal of existing
(any type) with new TW
damaged/old 11kV
pole in place including
pole with new TW
TW/RSJ/RAIL HT excavation of pole pit,
857 pole in place and No 2097.00
MAINTENANCE erection of new pole,
refitting of all items
backfilling pit and refitting
incl. conveyance
of all items etc. and
(except pole).
conveyance of all
materials except pole.
Renewal of existing
damaged/old 11kV pole
Renewal of existing
(any type) with new Rail
damaged/old 11kV
pole in place including
pole with new Rail
excavation of pole pit,
859 pole in place and No 2097.00
erection of new pole,
refitting of all items
backfilling pit and refitting
incl. conveyance
of all items etc. and
(except pole).
conveyance of all
materials except pole.
Renewal of existing
damaged/old 11kV DP
Renewal of existing (any type) (2 channel
damaged/old 11kV cross arm) with new TW
DP with new TW DP in place including
860 DP in place and No 6024.00 excavation of pole pit,
refitting of all items erection of new pole,
incl. conveyance backfilling pit and refitting
(except poles). of all items etc. and
conveyance of all
materials except poles.
Renewal of existing
damaged/old 11kV DP
Renewal of existing (any type) (2 channel
damaged/old 11kV cross arm) with new RSJ
DP with new RSJ DP in place including
861 DP in place and No 6024.00 excavation of pole pit,
refitting of all items erection of new pole,
incl. conveyance backfilling pit and refitting
(except poles). of all items etc. and
conveyance of all
materials except poles.
Renewal of existing
damaged/old 11kV Fly
Renewal of existing
stay (any type) with new
damaged/old 11kV
Fly stay including renewal
Fly stay with new
of HT RSJ pole in place
Fly stay incl.
including excavation &
870 renewal of HT RSJ No 3403.00
backfilling of pit,
pole and refitting of
consolidating,
all items and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.
Renewal of existing
damaged/old 11kV Fly
Renewal of existing
stay (any type) with new
damaged/old 11kV
Fly stay including renewal
Fly stay with new
of HT Rail pole in place
Fly stay incl.
including excavation &
871 renewal of HT Rail No 3403.00
backfilling of pit,
pole and refitting of
consolidating,
all items and
dismantling and refitting
conveyance
of all items and
(except pole).
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT (single
Renewal of existing phase line) pole (any
damaged/old LT type) with new TW pole in
(Sph line) pole with place including
new TW pole in TW/RSJ/RAIL LT excavation of pole pit,
872 No 1461.00
place and refitting MAINTENANCE erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT (single
Renewal of existing phase line) pole (any
damaged/old LT type) with new Rail pole
(Sph line) pole with in place including
new Rail pole in excavation of pole pit,
874 No 1461.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT (three
Renewal of existing phase line) pole (any
damaged/old LT type) with new TW pole in
(3ph line) pole with place including
new TW pole in excavation of pole pit,
875 No 1730.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT (three
Renewal of existing phase line) pole (any
damaged/old LT type) with new RSJ pole
(3ph line) pole with in place including
new RSJ pole in excavation of pole pit,
876 No 1730.00
place and refitting erection of new pole,
of all items incl. backfilling pit and refitting
conveyance of all items except street
(except pole). light fitting etc. and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT Strut of
Renewal of existing any type with new TW
damaged/old LT strut in place including
Strut with new TW excavation of pit, erection
878 strut in place and No 872.00 of new strut, backfilling,
refitting of all items consolidating,
incl. conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT Strut of
Renewal of existing any type with new RSJ
damaged/old LT strut in place including
Strut with new RSJ excavation of pit, erection
879 strut in place and No 872.00 of new strut, backfilling,
refitting of all items consolidating,
incl. conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT Strut of
Renewal of existing any type with new Rail
damaged/old LT strut in place including
Strut with new Rail excavation of pit, erection
880 strut in place and No 872.00 of new strut, backfilling,
refitting of all items consolidating,
incl. conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT Fly stay
Renewal of of any type of pole with
damaged LT Fly new Fly stay including
stay with new Fly new LT TW pole in place
stay incl. new LT including excavation of
881 No 2044.00
TW pole in place pit, erection of new Fly
and refitting of all stay, backfilling and
items, conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.
882 Renewal of No 2044.00 Renewal of existing
damaged LT Fly damaged/old LT Fly stay
stay with new Fly of any type of pole with
stay incl. new LT new Fly stay including
RSJ pole in place new LT RSJ pole in place
and refitting of all including excavation of
items, conveyance pit, erection of new Fly
(except pole). stay, backfilling and
dismantling and refitting
of all items and
conveyance of all
materials except pole.
Renewal of existing
damaged/old LT Fly stay
Renewal of of any type of pole with
damaged LT Fly new Fly stay including
stay with new Fly new LT Rail pole in place
stay incl. new LT including excavation of
883 No 2044.00
Rail pole in place pit, erection of new Fly
and refitting of all stay, backfilling and
items, conveyance dismantling and refitting
(except pole). of all items and
conveyance of all
materials except pole.
Excavation of cable
trench of appropriate size
( normally 1.2m deep and
0.35m /0.5m wide for
Excavation of cable
single/double run) in all
trench in all
classes of soil including
classes of soil and
breaking clods, watering,
926 backfilling after m 197.00 UG CABLE
ramming and sectioning
laying of cable
of soil bank etc. and back
(excluding laying of
filling the soil after cable
cable).
laying and consolidating
the soil in layers of 75cm
(excluding laying of
cable).
Excavation of cable
trench (soil surface) and
Excavation of cable digging out the faulty
trench (soil portion of the cable from
surface) and the trench for redoing
digging out the straight through joint, re-
935 m 181.00
faulty cable from laying the cable after
the trench and jointing, refilling and
refilling after work. consolidating the trench
(excluding joining). as per standard
specification. (excluding
joining).
Excavation of cable
trench for
maintenance of
cable in all classes
938 of soil and m3 409.00
backfilling after
laying of cable
(excluding laying of
cable)
Constructing Transformer
plinth of size
1.5x1.5x1.5m on
1.8x1.8x0.75m basement
inclusive of cost of all
Constructing materials. [Excavation
Transformer plinth 1.8x1.8x0.75m, Random
951 inclusive of cost of No 37446.00 CIVIL WORKS Rubble in CM(1:6)
all materials (as 1.8x1.8x0.75m +
per specification). 1.5x1.5x1.5m, concrete
(1:2:4, 20mm)
1.5x1.5x0.10 m, plaster
CM (1:3) 12mm,
1.5x1.5m, Pointing CM
(1:3) 1.5x1.5mx 4 sides].
Providing concrete
muffing of size 0.45x0.
Providing concrete 45x1.5m (0.5m above GL
muffing and 1m below GL).
(0.45x0.45x1.5m) Excavation
952 No 3802.00
inclusive of cost of 0.45x0.45x1m, concrete
all material (as per (1:3:6, 20mm)
specification). 0.45x0.45x1.5m,
Plastering (1:3) 12mm
0.45x0.45mx5sides.
Coupling of
994 Set 3138.00 Coupling of Busbars
Busbars
Cleaning and
levelling of
transformer
yard/RMU,
spreading 40 mm
broken stone in
yard for a
thickness of 10 cm
above bed of 10
cm thick 6 mm
broken stone, after
1001 Custom
constructing a curb
wall of height
20cm above
ground and 10cm
below level
including cost of all
materials and
charges for
conveying,
spreading,
consolidating etc.
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
Materials Rate
3 PSC Pole 9m E
4 A Pole 10m E
5 A Pole 11m E
7 A Pole 13m E
8 A Pole 14m E
11 Packing clamp - LT E
Disc insulator – 11
14 E
kV
Composite Disc
15 E
Insulator -11kV
17 MS Cleat E
18 GI Cleat E
Shackle insulator
20 with strap bolt and E
nut – LT
21 Shackle insulator - E
LT
Stay insulator - 11
27 E
kV
28 Stay insulator - LT E
29 Stay rod - HT E
30 Stay rod - LT E
31 Stay Tightner - HT E
32 Stay Tightner - LT E
33 RCC stayblock E
AB Switch 11kV
34 E 12041.00
400A
Aluminium
36 connector for AB E
switch - 400A
Insulator for AB
39 E
switch - 11 kV
46 Fuse wire kg
Lightning Arrestor
47 E
– 11KV
V Cross arm - 11
60 E
kV
PG clamp
63 E
(Raccoon)
CABLE AND
64 ACSR Raccoon m 64.28
CONDUCTORS
66 ACSR Weasel km
67 ACSR Squirrel km
Aluminium
armoured cable
68 mtr
3.5C x 150 sq.mm -
LT
PVC cable 25
72 m
sq.mm Single Core
PVC cable 50
73 m
sq.mm Single core
PVC cable 70
74 m
sq.mm Single core
PVC cable 95
75 m
sq.mm Single core
79 XLPE cable 25 m
sq.mm Single core
- LT
XLPE Cable 50
80 sq.mm Single core m
- LT
XLPE Cable 70
81 sq.mm Single core m
- LT
XLPE Cable 95
82 sq.mm Single core m
- LT
Aluminium
91 Crimping socket 50 E
sq.mm
Aluminium
92 Crimping socket 70 E
sq.mm
93 Aluminium E
Crimping socket 95
sq.mm
Aluminium
94 Crimping socket E
120 sq.mm
Aluminium
95 Crimping socket E
150 sq.mm
Aluminium
96 Crimping socket E
185 sq.mm
98 HT Stay wire E
Transformer 25 TRANSFORMERS
100 E
kVA AND SPARES
Transformer 50/63
101 E
kVA
Transformer 100
102 E
kVA
Transformer 160
103 E
kVA
Transformer 250
104 E
kVA
Transformer 315
105 E
kVA
Transformer 500
106 E
kVA
Transformer 100
107 E
kVA - 3 star rated
Transformer 160
108 E
kVA - 3 star rated
115 CT - 100/5 E
116 CT - 150/5 E
117 CT - 200/5 E
Double tube
fluorescent street
121 light fitting with E
bracket, clamp,
B&N
Polycarbonate
125 E
meter seal
RCC Pole
134 (Damaged & No
unserviceble)
PSC Pole 8m
135 (Damaged & No
unserviceble)
PSC Pole 9m
136 (Damaged & No
unserviceble)
GI Wire 4mm
139 kg
(No.8)
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250