FIVE CONSTINE CONSTRUCTION SDN. BHD.

METHOD STATEMENT FORM


TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR 10)
______________________________________________________________________ PAGE NO: 1
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
1. Form a concrete lintel using 0.02 m2 1 saw machine 1 site supervisor Labour output 1 days
sawn formwork to both sides 1 hand saw 1 carpenter = (0.68 m2/hr)
and soffit of lintel (610mm 1 hammer 1 general labour
length x 125mm wide x 1 spirit level 0.68 m2/hr x 8hr/day
=5.44 m2/day
250mm high) together with 1 measuring 0.05m2/5.44m2/day
timber strut to support the tape =0.01 day
formwork.
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 2
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
2. Fixed 4 nos. (12mm and 144.04kg 1 bar cutting 1 site supervisor Labour output 1 days
10mm diameter) mild steel bar machine 1 bar bender = (36.01kg/hr)
reinforcement hooked at both 1bar bending 1 general labour
machine 36.01kg/hr x 8hr/day
ends with (6mm diameter) =288.08 kg/day
mild steel bar reinforcement 1 measuring 144.04kg/288.08/day
as described stirrups at tape =0.5 day
stirrups at (150mm centers) 1 plyer
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 3
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
3. Pour vibrated reinforced 0.02 m2 1 concrete 1 site supervisor Concrete mixer output 1 days
concrete (Grade 30) into the mixer 1 concretor = (2.25m3/hr)
formwork as lintel (610mm 1 concretor 1 general labour
length x 125mm x 250mm 1 vibrator 2.25m3/hr x 8hr/day
=18m3/day
depth) well packed around 1 bucket 1 0.06m3/18m3/day
reinforcement. hammer =0.01 day

Labour output
=(0.46m3)

0.46m3/hr x 8hr/day
=3.68m3/day
0.02m3/3.68m3/day
=0.01 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 4
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
4. Install 1 set of metal frame 4 (no’s) 1 hammer 1 site supervisor Labour output for 1 days
single leaf aluminium panel 1 hand saw 1 carpenter carpenter =(0.81no/hr)
louvers accordingly to the 1 plane 1 general labour
specific type and size of door 1 spirit level 0.81no/hr x 8hr/day
=6.48 no/day
leaf. 1 plumbub 4no/6.48 no/day
1 nylon string =0.62 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 5
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
5. Tied the metal frame single 4 (no’s) 1 plyer 1 site supervisor Labour output for skilled 1 days
leaf aluminium panel louvers 1 screw driver 1 carpenter labour =(3unit/hr)
with L-Shaped galvanized 1 measuring 1 general labour
mild tape 3unit/hr x 8hr/day
=24 unit/day
4no/24unit/day
=0.17 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 6
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
6. Fixed a pair of butt hinges to 4 (no’s) 1 screw driver 1 site supervisor Labour output for skilled 1 days
the metal frame single leaf 1 measuring 1 carpenter labour =(3unit/hr)
aluminium panel louvers tape 1 general labour
doors 3unit/hr x 8hr/day
=24 unit/day
4no/24unit/day
=0.17 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 7
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
7. Install metal frame single leaf 4 (no’s) 1 screw driver 1 site supervisor Labour output for 1 days
aluminium panel louvers door 1 plane 1 carpenter carpenter =(0.81no/hr)
with glass size (610mm wide x 1 measuring 1 general labour
2100mm high), at frame and tape 0.81no/hr x 8hr/day
=6,48 no/day
fix the other end of the butt 4no/6.48no/day
hinges at the metal frame =0.62 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 8
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
8. Fixed the metal frame single 4 (no’s) 1 screw driver 1 site supervisor Labour output for skilled 1 days
leaf aluminium panel louvers 1 hammer 1 carpenter labour =(3unit/hr)
door frame together with the 1 chisel 1 general labour
rest of the ironmongeries such 1 measuring 3unit/hr x 8hr/day
=24 unit/day
as door closer and door tape 4no/24unit/day
latches. =0.17 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 9
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
9. Fixed a decorative timber 4 (no’s) 1 hand saw 1 site supervisor Labour output for skilled 1 days
architrave, after the plastering 1 hammer 1 carpenter labour =(3unit/hr)
work of the brick walls is 1 measuring 1 general labour
complete. tape 3unit/hr x 8hr/day
=24 unit/day
4no/24unit/day
=0.17 day
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 10
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
10. Prepare and apply 1 layer of 7.42 m2 1 sand paper 1 site supervisor Labour output for painting 1 days
undercoat and 2 layers of 2 paint brush 1 carpenter =(1.07m2/hr)
finishing coat as metal finish 1 painter
or paintings to metal frame 1 general labour 1.07m2x8hrs/day
=8.56m2
single leaf aluminium panel 7.40m2/8.56m2/day
louvers door =0.86 days
FIVE CONSTINE CONSTRUCTION SDN. BHD.
METHOD STATEMENT FORM
TITLE OF PROJECT : CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT KEDAI PEJABAT DUA
_________________________________________________________________________________________________________________
TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918-39923, MEDAN GOPENG, MUKIM HULU KINTA, DAERAH KINTA,
_________________________________________________________________________________________________________________
PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU PERAK BERHAD.
_________________________________________________________________________________________________________________

PREPARED BY : ______________________________________________________________________ DATE : 18/3/2023


__________________________
MUHAMMAD FIRDAUS BIN ZAINUDIN
ELEMENT : METAL FRAME SINGLE LEAF ALUMINIUM PANEL LOUVERS DOORS (DOOR)
______________________________________________________________________ PAGE NO: 11
__________________________

NO. TASK QUANTITY SEQUENTIAL DIAGRAM MACHINERY/ MANPOWER/ OUTPUT DURATION


TOOLS LABOUR
11. Testing and commissioning to 4 (no’s) none 1 site supervisor none 1 days
check the metal frame single
leaf aluminium panel louvers
door is working properly
together with the door lock or
knob and mark the key before
handling to the clients.