Professional Documents
Culture Documents
CHE345
CHE345
CHE345
PACKAGE CONTENT
1 Cover Page
2 Task List
3 Schedule of Results
4 Authentication
5 Condition Score Matrix
INSTRUCTIONS
1 Load button to start and save form.
2 Complete a Risk Assessment before starting work.
3 If an approved alternative risk assessment is used, record the reference number
under observations.
4 Complete the top section of each page of the Equipment Schedule of Results.
5 Add additional equipment as required to the Equipment Schedule of Results.
6 Perform the Inspection listed at the top of the Task List.
7 Select the equipment specific section from the Task List.
8 Complete the remaining tasks listed for that equipment.
9 Refer to the work order for possible special job instructions.
10 Record Results and Condition Score on the Equipment Schedule of Results.
11 Fields not completed shall be marked with line (---) unless greyed out.
12 Items that cannot be tested shall be marked a (3) in condition score
and noted in limitations as not tested.
13 Provide comments on form for all equipment with a score of 2,3,4, or 5.
14 Include photographs for all equipment with a score of 4 or 5.
15 Records shall be submitted by the end of each week from date of completion.
16 Submit record.
Doc ID: CHE345 - Mechanical - Test and Inspection - Pressure Relief Device Revision:3 - Active: 7/2/2017
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 1 OF 6
Task List
Ensure pressure relief devices are in suitable condition to protect pressurised devices from over or under pressure.
To access valves fitted to Digester Gas Compressors purging between the inlet and outlet valves will be required.
Spare tested Digester PSV's are kept in store. Retest spare and fit in place of installed unit. Test and Inspect
removed unit. Place remaining retested unit in store as a spare.
Bursting discs
Replace bursting discs 2 yearly
On-line external visual inspection (as per the requirements of AS3788 Section 4.7.3)
Where weather protection has failed, the device should be externally examined, and
assessed for continued service
Pressure relief devices with easing gear should be manually operated, unless there is
significant risk that this will—
(I) compromise plant integrity;
(ii) damage the device; or
(iii) create a hazard for personnel in the vicinity.
Doc ID: CHE345 - Mechanical - Test and Inspection - Pressure Relief Device Revision:3 - Active: 7/2/2017
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 2 OF 6
Task List
Where a pressure relief device is found to be not functioning correctly, it shall be repaired
and tested in accordance with AS3788
Scheduled Testing and Maintenance (as per the requirements of AS3788 Section 4.7.4)
Test safety relief valve to verify functionality in accordance with AS1271. If safety relief valve fails
testing, valve to be overhauled and re-tested in accordance with AS1271
Carry out all other inspections covered in the "On-line external visual inspection" (as per the
requirements of AS3788 Section 4.7.3), not covered by the "Scheduled Testing and Maintenance"
activity
Details of the valve testing shall be recorded on documentation, which meets the requirements of
AS1271 Appendix B, C & D
Where maintenance/overhauls are required details of the as-received valve condition, repairs and work
carried out on the valve shall be recorded on documentation, which meets the requirements of AS 3788
Appendix P
Doc ID: CHE345 - Mechanical - Test and Inspection - Pressure Relief Device Revision:3 - Active: 7/2/2017
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 3 OF 6
Reset
Condition
Manufacturer
Vent Stack
Calibrated
Score
Replaced
Description
Leakage
Isolation
Installed
Correct
Device
Model
Valve
Make
1-5
Plant No.
Serial Number
Plant No.
Serial Number
Plant No.
Serial Number
Plant No.
Serial Number
Plant No.
Serial Number
Plant No.
Serial Number
Plant No.
Serial Number
Plant No.
Serial Number
Doc ID: CHE345 - Mechanical - Test and Inspection - Pressure Relief Device Revision:3 - Active: 7/2/2017
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 4 OF 6
Equipment Schedule of Results
Work Order
Equipment Ref: MST No:
Equipment Description:
Authentication Of Results
The results recorded in the Schedule of Results verifies, subject to the specified level of maintenance or inspection and any limitations & observations listed below, the condition of the
equipment listed.
Limitations & Observations (Technician to detail limitations and items requiring attention. Condition Score 2,3,4,5):
Planned Corrective (For Office Use. Receiving Officer to record reference numbers and comments):
Doc ID: CHE345 - Mechanical - Test and Inspection - Pressure Relief Device Revision:3 - Active: 7/2/2017
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 5 OF 6
Condition Score
Condition Score
Very Good Condition.
1 It is stable, no additional work required.
Advise normal or extended maintenance interval.
Good Condition.
Only used where repair/replacement work is completed as per job instructions
2
Now it is stable and safe.
Doc ID: CHE345 - Mechanical - Test and Inspection - Pressure Relief Device Revision:3 - Active: 7/2/2017
Printed copies of this document should be verified for currency against the published electronic copy. PAGE 6 OF 6