Management Plan
TABLE OF CONTENTS
2. GENERAL
3 ORGANISATION
4.1Control of documents.
4.2 Incoming & outgoing correspondence.
4.3Material submittal form
4.4 Contractual documents.
4.5 Method statement & ITP
4.6Tracebilty (LIST OF FILE & FOLDER)
4.7 Interfaces with sub contractors and clients
4.8 Permanent (QUALTIY RECORDS)
4.9CONFIDNETIALITY OF DOCUMENTS
4.10Vendors and subcontractor.
4.11 Monitor and inspection
4.12 Handling storage and inspection
4.13 Completion and handing over
4.14 Operation and maintenance instruction
5.0 AUDITS
PURPOSE 1.2
The purpose of this writing guide is to define the structure and content for #1
Project Management and Quality Plans (PMQPs) to be used by INDSAO
INFRATECH PVT. LTD and their suppliers (internal or external) of
.software, equipment, services, studies or consultancy
The structure of this document must be used as the structure of the Project #3
Management Plan, except where indicated in section
:The benefits of an agreed PMQP are those resulting from the fact that #2
there is effective communication between contractor and their client of
,computer equipment, services, software, studies and consultancy
all business and management transactions are properly directed and
authorised between contractor and its client, within the scope of a
,contracted project
all changes to project plans, specifications, etc. are adequately controlled
,in a specified and agreed manner
both the contractor and its client have a clear understanding of project
objectives, of the progress towards attaining these objectives and any
,impediment to their attainment
there is clear agreement between the contractor and its client on the
,standards, procedures and methods employed to meet project objectives
PROJECT QUALITY PLAN Page 4
the PMQP is used by the INDSAO INFRATECH PVT. LTD and its
.CLIENT as a basis for agreement (rather than conflict)
Time-scales Type
Size Security/Safety
Project
Characteristics
External
Standards
Project Management
Plan
Best Practices
PMP Model
When the contract is agreed, the life of the PMQP will continue until the #1
.client has satisfactorily completed all of its obligations under the contract
All work undertaken must be reviewed against the appropriate sections of the #1
:following
IndSao-MS
PROJECT QUALITY PLAN Page 6
2. GENERAL
1. Client
2. Project Manager
3. Project Engineer
4. Documentation Record.
3 ORGANISATION
1. QUALITY MANAGER.
Please refer AAR CEE Quality Template.
2. QA / QC ENGINEER
Please refer AAR CEE Quality Template.
3. DOCUMENT CONTROLLER
3.1 Responsible for all incoming and outgoing correspondence, internal
matrix
distribution and filing per quality plan.
3.3 Responsible for keeping and numbering all transmittals forms as per
approved format.
3.4 Responsible for keeping all permanent / final documents till handing over
to clients.
3.5 Responsible for maintaining the document register according to approved
format.
This PMQP document, which will form part of the contract, describes
the processes for management of the relationships between an
INDSAO INFRATECH PVT. LTD.S and INDIA BULLS..
The sequence of the statement shall be Title page including revision history,
Index, Safety, References, Material, Method, Equipment etc., and also
attachment if any.
Inspection and Test Plan shall be prepared and submitted to client in the
format attached. The custodian of this document is QA / QC Engineer.
4.6 TRACEABILITY
All documents shall be filed in a systematic / functional way marking index,
contents of the file, project so as to trace the required document.
A master index shall be maintained by the Document controller.
1. MONITORING
All monitoring, inspection and testing shall be carried out as per our method
statement and Inspection and Test Plan. All inspections shall be carried out by
QC Engineer, (the job descriptions and responsibility as per Quality Manual).
All the third party inspection / test shall be carried out in accordance with the
specification for which necessary approvals shall be obtained.
2. SCHEDULE
All site inspections shall be carried out by giving a schedule of 1 day in
advance. An inspection request shall accompany along with the schedule that
shall be signed by QC engineer and clients representative.
Before Calling clients representative, our QC Engineer shall ensure that the
works executed is in accordance with our approved procedure and
specification, he shall sign the check list and check for necessary
attachments, after completing
all this he shall request the client representative for inspection. After getting
approval from client further activities shall commence.
3. QUALITY RECORDS
All quality records shall be submitted to client within 24hrs after completion
of the prescribed activity & after getting the approval from the client, the
documents shall be forwarded to document controller / QC Engineer for
filing.
All handling storage and ware housing shall be as per our Quality Template.
FINAL DOZZIER
a. Method statements
b. Inspection and Test Plan
c. Site Inspection Reports
d. Field Test Reports
e. Non Conformance Reports / Site Instruction
f. Corrective Action Reports
g. Raising / Clearing of Punch List
PROJECT QUALITY PLAN Page 11
All the documents shall be clubbed together in a package with soft copy.
5 AUDIT
As per AAR CEE Quality Template.
First audit
Second audit
Third audit