Employer: Engineer: Engineer’s Assistant: Contractor:

Document Type: Inspection & Test Plan Title: ITP for Fire Protection System
COMMENT RESPONSE SHEET
Doc Ref no: CPC02-AJJV-ITP-FIR-13-0001 Rev: 2 Date: 22-04-2014
No Comment Contractors Response Affected Pages

Civil Defense inspection & approval to be included. Complied 10 of 11


1
The required inspection & testing frequency is always 100% from
The required inspection & testing frequency to be provided. contractor side in line with the ITP. All
2
The provisions for stage wise inspection by the Engineer are
3 the minimum and it may be decided to increase Hold Points/ Noted None
Witness Points.
4 All
Contractor to carry out 100% examination of all activities. Complied as the contractor is ‘HOLD POINT’ in all activities.

Form No : AJJV-CRS-F-01 Page 1 of 1