Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LOA (Letter of Authorization) Form

Date : 17 -04 2023


Sales Order No. : 662/EDGE/SO/03/2023

This LOA is provided to PT Ekadrata Data Gemilang on behalf of PT Jala Lintas Media

PT Jala Lintas Media hereby authorizes PT Ekagrata Data Gemilang (“EDGE”) to perform the Cross Connect /
Direct Connect service(s) detailed below. This authority is limited to the provisioning of the initial installation,
reconfiguration, or subsequent removal of such services for 30 days since the date of this LOA.

Cross Connect / Direct Connect details:

Service Type : Cross Connect FO


Quantity : 1 unit(s)

Requestor Company / PT. Ekagrata Data Gemilang – Must be signed by the Primary Point of Contact (PPOC)
Rack ID (Demarcation position)
FO Connector Type
PPOC Name
PPOC Mobile No.
PPOC Job Title
PPOC Email Address
PPOC Signature

Destination Company / PT Jala Lintas Media Must be signed by the Primary Point of Contact (PPOC)
Rack ID (Demarcation position) EG1-3-RCK-022-001
FO Connector Type LC
PPOC Name Fandi Krismanto
PPOC Job Title GM Enggineering
PPOC Mobile No. +62 8118602328
PPOC Email Address fandi@jlm.net.id
PPOC Signature

Important Notes:

1. Facility address: Jl. Kuningan Barat Raya No.59, Mampang Prapatan, South Jakarta 12710
2. Delivery process for Cross Connect:
● Requires 5 business days upon the acknowledgement of the complete documents (Sales Order and
LOA) and the valid information provided in the documents received by EDGE
● EDGE has the rights to reject invalid document and require customer to revise the LOA
3. Delivery process for Direct Connect:
● Installation process will be performed by Customer under EDGE’s supervision
● Cable material and any additional equipment will be provided by Customer

LOA for Interconnection Services © Edge 2022

You might also like