WTP WI Stick Diagram R4
WTP WI Stick Diagram R4
WTP WI Stick Diagram R4
Rev: 0
FL3B PROJECT Internal
Pipe Sleeper Land Side Start Finish Pipe Sleeper River Side Start Finish
QTY - Pile 900 NOS QTY - Bore Pile D500 16 NOS
WTP & WI
15/Apr/2021 04/May/2021
15/Apr/2021 14/Jul/2021 Bore Piling General Start Finish
Piling 7/Jun/21 20/Jun/21
7/Apr/21 07/Jul/21 30/Apr/2021 15/Jul/2021 NTP - 10/Dec/20
Pipe Sleeper
30/Apr/2021 06/01/2022 15/Nov/21 15/Dec/21 15/04/2021 30/Jul/2021
Pipe Sleeper Piling
4/Jun/21 30/Dec/21 ETA at Site 30/Apr/21 7/Apr/21 27/jul/21
ETA at Site 30/Apr/21 Piping Fabrication & 01/Jun/2021 14/Aug/21 30/Apr/2021 09/Feb/2022
Civil Work
Piping Fabrication & 01/Jun/2021 07/03/2022 Installation 18 /Feb/22 19/Mar/22 4/Jun/21 16/Mar/22
Installation 24/May/21 29/Mar/22 29/Sep/2021 10/Mar/2022
Equipment - Mechanical
15/Sep/21 26/Mar/22
01/06/2021 30/Mar/2022
Piping Fabrication & Installation
24/Jun/21 30/Mar/22
25/11/2021
EIA Work 25/Apr/22
19/Nov/21
27/10/2021 20/04/2021
HVAC
19/Nov/21 20/Apr/22
14/Jan/2022 13/Apr/2022 UHRSCC 1 & 2 Start
Insulation Work EL./ Grid. +94.000
20/Jan/21 19/Apr/22
11/04/2022 09/Jun /2022 QTY - Pile 242 NOS
Check Out
24/Feb/22 20/May/22 15/Apr/2021
11/05/2022 09/07/2022 Piling
Comissioning 26/May/21
21/May/22 9/Jul/22 01/06/2021
Start Up 10/Jun/22 10/Jul/22 Civil Work
30/Jun/21
Main equipment at site Start Finish
ETA at Site
Shipment 1 (Anchor bolts,
embedded plates,Auto 08/07/2021 01/Dec/2021
Backwash 8/Sep/21 Mechanical Start
27/Dec/21
Strainner,Agitator, Media) 19/9/2021
Piping Installation
20/Jan/22
Shipment 2 (Dosing
Pump,Centifugal 07/08/2021 FP (Filter Pak) Start
pump,Tanks,Valves,Piping,I 23/Sep/21 EL./ Grid. +97.120
nstrument) QTY - Pile 144 NOS
06/09/2021 26/May/2021
Shipment 3 (Filter Pack) Piling
25/Oct/21 7/Jul/21
06/09/2021 14/06/2021
Shipment 4 (UHRSCC) Civil Work
9/Nov/21 19/Jul/21
Pipe Rack (ISBL) Start Finish Cascade Aerator Start Finish IFC
Spread Footing EL./ Grid. +95.546
Civil Work 15/Sep/21 14/Dec/21 QTY - Pile 12 NOS
24/05/2021 26/May/2021
Module Assembly Piling 25/May/21
8/Jun/21 10/Jun/21
Module Erection
01/Jun/2021 15/Sep/2021
Piping Erection Civil Work 31/May/21
16/Jun/21 28/Sep/21
E&I Installation ETA at Site
Mechanical Start
Polymer Dosing Tank 1-2 Start Finish IFC Lime Dosing Tank 1-2 Start Finish IFC
EL./ Grid. A-B/7-9 EL./ Grid. A-B/9-11
QTY 2 NOS QTY 2 NOS
10/Oct/2021 10/Jan/2022 10/Oct/2021 10/Jan/2022
30/Jul/21 30/Jul/21
Eq. Foundation 5/Aug/21 5/Nov/21
Eq. Foundation 5/Aug/21 5/Nov/21
01/07/2021
01/07/2021
ETA at Site 25/Oct/21
11/Jan/2022 17/Feb/2022
ETA at Site 25/Oct/21
11/Jan/2022 17/Feb/2022
Mechanical Start 6/Nov/22 13/Dec/21
Mechanical Start 6/Nov/22 13/Dec/21
Piping Installation
Piping Installation