Daily Mainenance
Daily Mainenance
Daily Mainenance
Month :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
No Check Point Required Parametrs Cecking condition
1
Inner cleaning range: material tube
distributor valve and buffer tank ect.
Material tube distributor valve Suggest before everyday working, cleaning
via hot water which is 85°-90°. Before operation
and buffer tank
Finish everyday filling, cleaning according to
CIP cleaning program.
Evacuate medium in tubes.
2 Check whether bottle clamp (striking fork,
Bottle clamp Before operation
nozzle) are damaged.
3 Check whether medium conversion device
Conversion device and
and medium conversion valve are normal or Before operation
conversion valve
not.
4 If it is necessary, check filling valve and
Filling valve Before operation
readjust.
5 Check whether screw capping heads are
Screw capping heads Before operation
normal.
6
At the end of filling, spray the whole
machine by water, and eliminate all
Machines rubbishes, and dry all spares or dried by Before operation
compressed.
When cleaning, check wear and crack of
machines.
7 Finish product, cleaning inner and external
Machines parts by CIP, and better add oil at outside Before operation
lubricating point after cleaning.
8 All bearings (includeturn-over
Add oil to each lubricating point of bearing Before operation
supporting)
9 Air source treatment device oil
Daily maintenan needed,then add oil Before operation
mist
10 Top of screw capping machine
Check liquid level and when needed add oil Before operation
and screw capping head cam
Pet Blower Machine Daily Mainenance Check Sheet
Month :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
No Check Point Required Parametrs Cecking condition
1 Clean up the whole machine and conveyor
Whole machine (Sensor) and belt cleaning the machine and conveyor belt,
be extra careful with signal sensors, inductive Before operation
conveyor belt
switches, motors and bearings.
2 Photoelectric and reflecting plate and
detectors Carefully dry them with a soft,
clean cloth and check if they are
Sensor normal.Clean the grating faces of each Before operation
photoelectric sensor and mirror with clean
gauze to ensure that each photoelectric
sensor and mirror work properly.
8 Air cylinder Pressure gage 7kgf/c m• See if the pressure is about 7kgf/c m•. Before operation
9 Check the filter and lubricator for the
Filter and lubricator Smooth movement movement air. Before operation
10 Discharge the air and drain the water from
The air tank compressor Vale opening the air tanks. After operation
Pet Blower Machine Daily Mainenance Check Sheet
Month :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
No Check Point Required Parametrs Cecking condition
1
Transmission belt and chain Before operation
Whether the appearance is abraded or broken
2
The button switch works normally
The operation switch is firmly installed
Operation switch and indicator without looseness Before operation
The indicator works normally
The component signs of the operation switch
and indicator are complete
3 Pneumatic components like In action inspection, the manual mechanism
Before operation
solenoid valve, etc. works normally and is free of noise
4
Check the level of the oil ejector
Whether the filter drainage is normal
Air source treatment unit Whether the air pressure regulating device is Before operation
normal and the corresponding air pressure
contact works normally
5
Record and check the voltage and current
parameters of the main power supply
Electrical control cabinet Check whether the electrical components Before operation
inside the electrical control cabinet are burnt
and need to be replaced
6
7
8
9
10
11
Pet Blower Machine Daily Mainenance Check Sheet
Month :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
No Check Point Required Parametrs Cecking condition
1 Clean the sanitation of the Every day must clean the sanitation of the
equipment equipment, ensure that the equipment is Before operation
clean, no grease, no dirt, no water