Rev no.00 Dt 20.05.2019 EUROCOUSTIC PRODUCTS LTD.

Issue no.01 Dt 20.05.2019 DAMAN


PROCEDURE FOR BOND STRENGTH TO
Doc. No: LMP/5.5.2/04
CONCRETE AS PER IS 1786/2770

1. PURPOSE & SCOPE


The procedure is to evaluate the bond strength between the reinforcing bar & concrete cube.

2. RESPONSIBILITY & AUTHORITY


As mentioned in procedures below.

3. PROCEDURES.

Sr. Ref. /
Activity Responsibility Authority Record
No.

1. Prepare cube as per IS 1786,2770 Lab Assistant Lab Incharge

Place the cube on the table which


2. is mounted on the upper cross Lab Assistant Lab Incharge
head

Keep both the valve (Right & Left)


3. Lab Assistant Lab Incharge
in fully closed condition

Start the hydraulic motor, open the


right side valve slightly open such
4. Lab Assistant Lab Incharge
that lower beam is slowly moving
upward.
Lab Test Register
Now press tare load & reset elong (QA/QC/LAB-
5. key on the panel (This will Lab Assistant Lab Incharge 01/09)
compensate for deadweight)

Operate the gear motor and adjust


the up & down position of middle
6. Lab Assistant Lab Incharge
beam to suit the proper clamping of
teat piece.

Operate the jaw handle of middle


beam to clamp the lower portion of
7. specimen. Lock the jaw in the Lab Assistant Lab Incharge
position by operating the jaw lock
handle.

Sr. Ref. /
Activity Responsibility Authority
No. Record

Reviewed by Doc. Status Approved by

Lab. Incharge Unit Head


Page 1 of 2
Rev no.00 Dt 20.05.2019 EUROCOUSTIC PRODUCTS LTD.
Issue no.01 Dt 20.05.2019 DAMAN
PROCEDURE FOR BOND STRENGTH TO
Doc. No: LMP/5.5.2/04
CONCRETE AS PER IS 1786/2770

Turn the right control valve slowly


8. to open position till you get desired Lab Assistant Lab Incharge
loading rate.

Load Vs Extension graph which is


9. displayed on monitor will load at Lab Assistant Lab Incharge
slip of 0.025 & load at slip 0.25mm Lab Test Register
(QA/QC/LAB-
01/09)
After completion of the test, press
10. Lab Assistant Lab Incharge
the TEST key on panel.

Close the right valve and operate


11. left control valve to take down the Lab Assistant Lab Incharge
position.

4. REFERENCES:

1. Lab Management System Manual Section 5.5.2


2. Indian Standards IS 2770 /IS 1786

5. RECORDS:

1. Bond Strength to Concrete Lab Test Register


Test Report (QA/QC/LAB-01/09)

6 EQUIPMENT, CHEMICALS AND OTHER FACILITIES FOR TEST

Universal Testing Machine

7. LOCATION

Location for test Laboratory

Reviewed by Doc. Status Approved by

Lab. Incharge Unit Head


Page 2 of 2