Professional Documents
Culture Documents
Soln CD LT Pov L4 11010 1
Soln CD LT Pov L4 11010 1
PROTECTED CORRIDOR 1
-LCP
PROTECTED CORRIDOR 1
AD (PANTRY) L4-031 LIGHTING CONTROL PANEL
L4-026
L4-036
L4-052 CHILLER KITCHEN LIGHTING / PROGRAMMABLE SOCKET -LPS
ACCU WATER TANK
FL+ 30.30 m FIRE EXIT STAIR 11B
HS JANITOR'S DN DIMMED GPO -DLS
CLOSET
L4-025
L4-022
L4-029
ACCU DIMMER SENSOR -DS
PL-PO-01 PL-PO-02 PL-PO-03 PL-PO-04 L4-011 BEVERAGE -SW
L4-051
SUPPORT/
SWITCH
AD PWD TOILET L4-028
FIRE EXIT STAIR 8 L4-013
ACCU DISPENSE COLD KITCHEN
MALE TOILET (FOH) L4-037
BAR
TO / FROM L3M FIRE EXIT STAIR 11A
ACCU
SPD DN
L4-008 L4-012
ACCU L4-030
CASINO MAIN OFFICE & JANITOR'S CLOSET
AD UP PROTECTED CORRIDOR 2
CASINO SERVICES
FL+ 30.30 m L4-017a L4-017 HS UP DN
EE ROOM ELV ROOM 28 FL+ 30.30 m FPOV DRAWINGS BASED ON THE FOLLOWING
REFER TO BOH ID PLANS FOR THE FINAL LAYOUT HABITUS DRAWINGS:
VOID
L4-020
T&B
FL+ 30.30 m
L4-038 SOLN-CD-LA-IDC-L4-19000
DN FIRE EXIT STAIR 12A ISSUED TO FPOV ON 15/05/21
HL-VIP-03 HL-VIP-02 HL-VIP-01 L4-018
HS L4-019
ACCU GREEN
VIP SUITE
ROOM
ACCU SKYLIGHT
VOID
SLOPE
L4-015
ACCU
HL-LZ 01 HL-LZ 02 HL-LZ 03
PAHU-AHU-1 PRE-FUNCTION DN
VOID
L4-039
FL+ 30.30 m
FIRE EXIT STAIR 12B
L4-056
EMERGENCY ACCESS VOID UP
CORRIDOR
L4-050
HS HL-LZ 06 HL-HZ 05 HL-LZ 04 ELV ROOM 29 HRU HRU HRU
L4-041
VOID BALLROOM
L4-049 FL+ 30.30 m
L4-048
EE ROOM 1
CBS ROOM 1 HRU
PROTECTED CORRIDOR 3
L4-047
OPEN BELOW
STORAGE CHW L4-001
ROOM SL/FL-05
SL-PL-03 SL-PL-04 MEP VOID
L4-040
FL+ 30.30 m
SL-TO-04
L4-046 VOID
SERVICE LOBBY 1 FL+ 30.30 m
FL+ 30.30 m
PAHU-AHU-1 HRU
HS
L4-045
DN VOID
FIRE EXIT STAIR 1
UP SPD
SD SD
UP L4-042 UP
PROTECTED CORRIDOR 4
STAIR OUTLINE ABOVE STAIR OUTLINE ABOVE
HS FL+ 30.30 m
UP LANDSCAPE DECK
FL+ 29.97 m
ARCHITECTURAL CONSULTANT INTERIOR DESIGN CONSULTANT QUANTITY SURVEYOR LIGHTING CONSULTANT PROJECT OWNER SOLAIRE
SOLAIRE NORTH, QUEZON CITY
LIGHTING DESIGN