(Q sINOPEC
mS
saad ST A RRA A ML
BERRI INCREMENT PROCESSING FACILITIES PROJECT
MINUTES OF MEETING
MEETING AGENDA. | Weekly HSE Coordination Meeting
ATTACHMENT(s) _| Photos & Attendance
‘MEETING REF. No.
SIN-AAP-PKG#1-MOM-010
PREPAREDBY —_| Tushar D. Jogadia
‘MEETING DATE
25-05-2022
MEETING PLACE | SINOPEC Office Meeting Room 2
MEETINGTINE | 1600101500
NEXT MEETING
DATE
01-06-2022
SINOPEC ATTENDEES
SUBCONTRACTOR ATTENDESS |
NAME POSITION T
NAME
POSITION
‘WANG WEIWET HSE MANAGER
TUSHAR D JOGADIA | HSE ENGINEER
“ASGHAR ALT HSE SUPERVISOR
‘ARMED HASSAN ENVIRINMENT COORDINATOR
BASIM HASSAN EQUIPMENT INSPECTOR
TAIRUS BENTAMIN | HSE OFFICER
IMTIVATPATHAN | HSE OFFICER
SK ANISUR RAMAN | HSE OFFICER
‘AHMAD NESHAT HSE SUPERVISOR
UMAR EQUIPMENT INSPECTOR
SN. Action Required - Agreements
‘Action By
Open Date
Due Date
Status
General
To be informed thatthe weekly HSE Coordination
1 | Meeting will be conducted regularly on every
Thursday at 14:00 hours,
All
25-May-23
‘All the inspectors and supervisors must keep Mr.
2. | Wang, Mr. Yang and Mr. Tushar in CC for every B-
sail communication.
All
25-May-23
Tobe informed all HSE supervisors and inspectors
‘must prepare and submit their weekly HSE work
report to HSE Manager before every week Thursday
lunch,
HSE
supervisors &
Inspectors
25-May-23
o1-June-23
‘Whenever there isa LPD, PMT or intemal regular
4 | walkthrough, the area supervisor with inspectors
must be present.
HSE
Supervisors &
Inspectors
25-May-23
Equipment
Monthly Equipment Inspection and Report for
Brown, Flare, TCF, Camp to be submitted. The
5 | monthly inspection record includes equipment
‘monthly inspection checklist and observations
rectification record.
Basim
25-May-23
01-06-232 sinopec
PA HRA YS TE Hh AEE HB
BERRI INCREMENT PROCESSING FACILITIES PROJECT
MINUTES OF MEETING
Monthly Equipment Inspection Report for Green
Field to be submitted. The monthly inspection record
includes equipment monthly inspection checklist and
‘observations rectification record,
Umar
25-May-23,
01-06-23
Environment
Environment Monthly Inspection Report to be
prepared and submitted. The monthly inspection
record includes. all environmental related. monthly
inspection checklist and observations rectification
| record.
‘Ahmed Hassan
25-May-23.
01-06-23. |
eat Stress Program and Planning tobe prepared and
submitted,
‘Ahmed Hassan
25-May-23
O1-tune-23
~ Site Safety
Hand tools and power tools, PPE, Full Body Hamess,
Fire extinguishers, Lifting Gears etc. monthly
inspection must be implemented from this coming
Saturday by area HSE officers. Site HSE Supervisors
‘must arrange to complete the monthly inspection
thoroughly and collet all the inspection record from
cach area HSE officers to file in office. This record
includes monthly inspection checklist and
‘observations rectification record. And area monthly
inspection must be arranged by area HSE
Supervisors
HSE
Supervisor &
HSE Officers
25-May-23
O1-June-23
LSE supervisors will ensure that LPD, PMT, Saipem
Observations are followed up and closed within the
due date,
HSE
Supervisor
25-May-23
HSE Supervisors to make sure that the Safety
Officers are doing follow up to close the Sinopec
Observation on time.
HSE
Supervisor
25-May-23
Tis necessary and mandatory to maintained intemal
near misses and incident report Fach HSE
Supervisor must report and update his ate repor
regula
HSE
Supervisor
25-May-23
Helmet chin straps to be checked and strictly
followed for all work force involved in work at
height activity,
HSE
Supervisors &
HSE Officers
25-May-23
Information
Penalty System will be initiated for safety violations
from next month,
Info
25-May-23
‘To be informed that PMT will do the re-evaluation
forall Safety personnel and WPRs.
25-May-23cn (2 SINOPEC ent Bo
aad WFAA REN Ta ACTH
BERRI INCREMENT PROCESSING FACILITIES PROJECT
MINUTES OF MEETING
__ Prepared By Reviewed By Approved By
‘NAME ‘Tushar D. Jogadia ‘Wang Weiwei ____MaXin
DESIGNATION HSE Engineer HSE Manager Site Manager
27-May-2023,
DATE 27-May-7023
SIGNATURE | “ } ke
Parxion