30'

C1 C2 C3
BATH
7' X 4'

M.BED ROOM
W.C. 10'6" X 11'0"
4' X 4'

C4 2'-6"

STORE ROOM
3'3'' WIDE
UTILITY

8'0" X 4'0" 3'-6"


C6
C5
TOILET
7' X 3'6"

NAMAJ ROOM
8'0" X 6'0" TOILET
7' X 3'6"

C7 C9
C8

KITCHEN M.BED ROOM


11'0" X 10'9" 10'6" X 11'0"

C10
C11 C12

UP

5'

HALL
17'6" X 13'6"

PARKING
8'0" X 18'3"
C14 C15 C16
C13
4'

R O A D
W

GROUND FLOOR PLAN S N

E
GENERAL NOTES:
DESIGN AS G+1 R.C.C. FRAME STRUCTURE
1. STEEL Fe500 AND CONCRETE M20 SHALL BE USED FOR STRUCTURE.
2. CHANGE/REDUCTION IN COLUMN SHOULD BE AT BEAM/SLAB LEVEL.
COLUMN JUNCTION ONLY WITH 1 IN 6 SLOPE
3. APPROVED DESIGN MIX.
P.C.C -M10
FOUNDATION -M20
COLUMNS,BEAMS,SLAB -M20 UNLESS OTHERWISE SPECIFIED
4. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
5. DRAWING SHALL READ WITH REFERENCE TO ARCHITECTURAL AND SERVICES DRAWING.
6. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND IS RESPONSIBLE FOR
THE ACCURATE SETTING OUT.
7. LAP LENGTH IN REINFORCEMENT BARS SHALL BE 50 TIMES DIAMETER OF BAR IN BOTH
TENSION AND COMPRESSION.
8. CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS.
FOUNDATION -50MM TOP, 75 MM SIDES AND BOTTOM.
COLUMN -40MM ON ALL SIDES.
BEAMS -25MM ON ALL SIDES.
SLAB - 20MM
9.ASSUME SAFE BEARING CAPACITY OF SOIL 300 KN/M2, SUBJECTED TO CHANGE AS PER
SITE SOIL CONDITION.
10. SAFETY & CHECKING OF FORM WORK WILL BE RESPONSIBILITY OF CONTRACTOR &
ARCHITECT.
11. ANY CHANGE IN STRUCTURE AT SITE SHALL BE COME INTO KNOWLEDGE OF
STRUCTURAL CONSULTANT PRIOR TO CASTING OTHERWISE DESIGNER WILL NOT BE
RESPONSIBLE FOR SAFETY OF SUCH STRUCTURAL CHANGES.
12. CONTRACTOR & OWNER SHALL BE RESPONSIBLE FOR QUALITY & STRENGTH OF
CONCRETE.
13. 'STRUCTURAL ENGINEER'S' RESPONSIBILITY SHALL REMAIN LIMITED TO CORRECTNESS
OF STRUCTURAL DESIGN AND DRAWINGS. WE ARE NOT RESPONSIBLE FOR
a) DESIGN OF CENTERING, SHUTTERING, FRAMEWORK DURING CONSTRUCTION.
b) CONCRETE MIX DESIGN FOR VARIOUS CONCRETE GRADES.
c) SAFETY OF ANY ADJOINING EXISTING STRUCTURES / RETAINED SOIL MASS / NEAR
BY ROADS.
d) SAFETY OF WORKERS / EQUIPMENTS DURING CONSTRUCTION.
e) ACCIDENTS DUE TO PREMATURE DE-SHUTTERING.
f) FAULTY CONSTRUCTION METHODS / MATERIALS / WORKMANSHIP.
14. TECHNICAL ASSISTANCE SHALL BE PROVIDED FOR SLAB REINFORCEMENT CHECKING
IF REQUIRED, BUT RESPONSIBILITY OF EXECUTION SHALL REMAIN SOLELY WITH THE
CONTRACTOR.

SHEET GENERAL NOTES DATE 20-04-2021


PLOT BOUNDARY 30' [9.14]

BUILDING LINE 27'-6" [8.38]

C3,C6,C9,C12,C16 27'-2" [8.27]

C15 19'-10" [6.03]

PLOT BOUNDARY
C2C5,C8 16'-5" [4.99]

BUILDING LINE
C11 16'-2" [4.91]

C14 8'-11" [2.71]

C11,C12

C14,C16
C1,C2
C1 3'-11" [1.18]

C10

C15

C13
C3

C4

C5

C6

C8

C9

C7
C4 3'-8" [1.10]

C1 C2 C3

5" [0.11]
1600
1400

1400

8" [0.19]

9'-5" [2.86]
1600 1600

12'-2" [3.70]

12'-3" [3.73]
1400
1400
1600

20'-2" [6.13]

20'-3" [6.17]
20'-5" [6.21]
C4

1400
1600

C6
C5

31'-2" [9.49]

31'-5" [9.56]
1800 1300

1400
1400
1600

1600

C7 C9
C8

45'-5" [13.83]

45'-6" [13.87]

45'-8" [13.91]

46' [14.02]
1800 1300

50' [15.24]
1600

C10
C11
1600

C12
1800
1600

1400
1800

1400

C14 C15 C16


C13
1600

1600
1600

1400

1400 1600 1400

R O A D

SHEET CENTER LINE PLAN DATE 20-04-2021


SCHEDULE FOR COLUMN
SIZE
RINGS
COLUMN NO STEEL
B D
NEAR END REST OF COLUMN
C6,C9,C13 230 (9'') 300 (15") 6 - 12T 2L 6MM DIA @125MMC 2L 6MM DIA @175MMC
C1,C2,C3,C4,C7,C12,C14,,C15, 230 (9'') 380 (15") 2L 6MM DIA @125MMC 2L 6MM DIA @175MMC
6 - 12T
C16
C5,C8,C10,C11 230 (9'') 380 (15") 8 - 12T 4L 6MM DIA @125MMC 4L 6MM DIA @175MMC
SCHEDULE FOR FOOTING
SIZE P.C.C. SIZE DEPTH STEEL
FOOTING FOR
TYPE OF FOOTING
COLUMN NO. L B L B D d
X-DIREXTION Y-DIRECTION
mm mm mm mm mm mm
CONCENTRIC C6,C9 1200 1100 1400 1300 300 300 8 MM T @ 150 MM (6") C/C 8 MM T @ 150 MM (6") C/C
CONCENTRIC C4,C12,C14,C15,C16 1400 1200 1600 1400 380 380 8 MM T @ 125 MM (5") C/C 8 MM T @ 150 MM (6") C/C
ECCENTRIC C1,C2,C3,C7,C13 1400 1200 1600 1400 380 150 8 MM T @ 125 MM (5") C/C 8 MM T @ 150 MM (6") C/C
CONCENTRIC C5,C8,C11 1600 1400 1800 1600 380 380 8 MM T @ 100 MM (4") C/C 8 MM T @ 100 MM (4") C/C
ECCENTRIC C10 1600 1400 1800 1600 450 300 8 MM T @ 100 MM (4") C/C 8 MM T @ 125 MM (5") C/C
SHEET COLUMN & FOOTING SCHEDULE DATE 20-04-2021
2-12T
2-12T
FLOOR BEAM

RINGS @ 100MM C/C

2L RINGS FOR
6-12T
RINGS @ 175MM C/C

2-12T
2-12T

4L RINGS FOR
4-12T + 4-12T

RINGS @ 100MM C/C PLINTH BEAM PLINTH LEVEL SECTION OF COLUMNS


ø

SLOPE
1:6 MAX

RINGS @ 175MM C/C

SPLICE RINGS @ 175MM C/C


WITH
OFFSET
CRANKED BAR MAIN STEEL
GL MAIN STEEL GL GL GL

RINGS @ 100MM C/C RINGS @ 100MM C/C


STARTER BARS
STARTER BARS

100MM

COVER COVER
300MM 300MM 300MM
100MM

P.C.C P.C.C

SOILING
SOILING
FOR LOOSE
SOIL

SECTION A-A
SECTION B-B
LENGTH

LENGTH

STEEL IN X- DIRECTION

STEEL IN X- DIRECTION
ANCHOR BEAM
100MM
100MM WITH 3-12T AT
A A
TOP & BOTTOM,
100MM
100MM
STIRRUPS
B B
6MM@125MM C/C

REINFORCEMENT DETAILING FOR


COLUMN AND CONCENTRIC FOOTING
REINFORCEMENT DETAILING FOR
COLUMN AND ECCENTRIC FOOTING

SHEET COLUMN & FOOTING DETAILS DATE 20-04-2021