C1 C2 C3
BATH
7' X 4'
M.BED ROOM
W.C. 10'6" X 11'0"
4' X 4'
C4 2'-6"
STORE ROOM
3'3'' WIDE
UTILITY
NAMAJ ROOM
8'0" X 6'0" TOILET
7' X 3'6"
C7 C9
C8
C10
C11 C12
UP
5'
HALL
17'6" X 13'6"
PARKING
8'0" X 18'3"
C14 C15 C16
C13
4'
R O A D
W
E
GENERAL NOTES:
DESIGN AS G+1 R.C.C. FRAME STRUCTURE
1. STEEL Fe500 AND CONCRETE M20 SHALL BE USED FOR STRUCTURE.
2. CHANGE/REDUCTION IN COLUMN SHOULD BE AT BEAM/SLAB LEVEL.
COLUMN JUNCTION ONLY WITH 1 IN 6 SLOPE
3. APPROVED DESIGN MIX.
P.C.C -M10
FOUNDATION -M20
COLUMNS,BEAMS,SLAB -M20 UNLESS OTHERWISE SPECIFIED
4. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
5. DRAWING SHALL READ WITH REFERENCE TO ARCHITECTURAL AND SERVICES DRAWING.
6. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND IS RESPONSIBLE FOR
THE ACCURATE SETTING OUT.
7. LAP LENGTH IN REINFORCEMENT BARS SHALL BE 50 TIMES DIAMETER OF BAR IN BOTH
TENSION AND COMPRESSION.
8. CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS.
FOUNDATION -50MM TOP, 75 MM SIDES AND BOTTOM.
COLUMN -40MM ON ALL SIDES.
BEAMS -25MM ON ALL SIDES.
SLAB - 20MM
9.ASSUME SAFE BEARING CAPACITY OF SOIL 300 KN/M2, SUBJECTED TO CHANGE AS PER
SITE SOIL CONDITION.
10. SAFETY & CHECKING OF FORM WORK WILL BE RESPONSIBILITY OF CONTRACTOR &
ARCHITECT.
11. ANY CHANGE IN STRUCTURE AT SITE SHALL BE COME INTO KNOWLEDGE OF
STRUCTURAL CONSULTANT PRIOR TO CASTING OTHERWISE DESIGNER WILL NOT BE
RESPONSIBLE FOR SAFETY OF SUCH STRUCTURAL CHANGES.
12. CONTRACTOR & OWNER SHALL BE RESPONSIBLE FOR QUALITY & STRENGTH OF
CONCRETE.
13. 'STRUCTURAL ENGINEER'S' RESPONSIBILITY SHALL REMAIN LIMITED TO CORRECTNESS
OF STRUCTURAL DESIGN AND DRAWINGS. WE ARE NOT RESPONSIBLE FOR
a) DESIGN OF CENTERING, SHUTTERING, FRAMEWORK DURING CONSTRUCTION.
b) CONCRETE MIX DESIGN FOR VARIOUS CONCRETE GRADES.
c) SAFETY OF ANY ADJOINING EXISTING STRUCTURES / RETAINED SOIL MASS / NEAR
BY ROADS.
d) SAFETY OF WORKERS / EQUIPMENTS DURING CONSTRUCTION.
e) ACCIDENTS DUE TO PREMATURE DE-SHUTTERING.
f) FAULTY CONSTRUCTION METHODS / MATERIALS / WORKMANSHIP.
14. TECHNICAL ASSISTANCE SHALL BE PROVIDED FOR SLAB REINFORCEMENT CHECKING
IF REQUIRED, BUT RESPONSIBILITY OF EXECUTION SHALL REMAIN SOLELY WITH THE
CONTRACTOR.
PLOT BOUNDARY
C2C5,C8 16'-5" [4.99]
BUILDING LINE
C11 16'-2" [4.91]
C11,C12
C14,C16
C1,C2
C1 3'-11" [1.18]
C10
C15
C13
C3
C4
C5
C6
C8
C9
C7
C4 3'-8" [1.10]
C1 C2 C3
5" [0.11]
1600
1400
1400
8" [0.19]
9'-5" [2.86]
1600 1600
12'-2" [3.70]
12'-3" [3.73]
1400
1400
1600
20'-2" [6.13]
20'-3" [6.17]
20'-5" [6.21]
C4
1400
1600
C6
C5
31'-2" [9.49]
31'-5" [9.56]
1800 1300
1400
1400
1600
1600
C7 C9
C8
45'-5" [13.83]
45'-6" [13.87]
45'-8" [13.91]
46' [14.02]
1800 1300
50' [15.24]
1600
C10
C11
1600
C12
1800
1600
1400
1800
1400
1600
1600
1400
R O A D
2L RINGS FOR
6-12T
RINGS @ 175MM C/C
2-12T
2-12T
4L RINGS FOR
4-12T + 4-12T
SLOPE
1:6 MAX
100MM
COVER COVER
300MM 300MM 300MM
100MM
P.C.C P.C.C
SOILING
SOILING
FOR LOOSE
SOIL
SECTION A-A
SECTION B-B
LENGTH
LENGTH
STEEL IN X- DIRECTION
STEEL IN X- DIRECTION
ANCHOR BEAM
100MM
100MM WITH 3-12T AT
A A
TOP & BOTTOM,
100MM
100MM
STIRRUPS
B B
6MM@125MM C/C