BEAM SCHEDULE (M30 : Fe500) (LEVEL: 2nd Floor) USE OF THIS DRAWING FOR CONSTRUCTION SHALL
EXPLICITLY CONFIRM ACCEPTANCE OF FOLLOWING
SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR REINFORCEMENT REMARK SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR REINFORCEMENT REMARK CONDITIONS BY CONTRACTOR.
BEAM BEAM
THROUGH LEFT (U.N.O. 2-LEGGED) THROUGH LEFT (U.N.O. 2-LEGGED) 1. OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND SOUND
THROUGH MID SPAN RIGHT THROUGH MID SPAN RIGHT
NUMBERS NUMBERS STRUCTURAL DESIGN AS TRANSMITTED BY THIS DRAWING AND WE
B D LEFT MID SPAN RIGHT OUT (b1) or (b5) (b2) or (b6) (b3) or (b7) (b4) or (b8) B D LEFT MID SPAN RIGHT OUT (b1) or (b5) (b2) or (b6) (b3) or (b7) (b4) or (b8)
DIA Z1 Z2 Z3 DIA Z1 Z2 Z3 SHALL NOT REMAIN RESPONSIBLE FOR
a) SAFETY OF OLD STRUCTURE DURING DEMOLITION.
B1 2-T12 - B76 200 700 3-T12 - 2-T12 - - 2-T16 - 2-T16 2-T20 2-T16* T8 175 175 175 -
200 700 3-T12 - - - - - - - - T8 200 200 200 b) SAFETY OF ANY ADJOINING BUILDING / PERSONS STAYING IN
ADJOINING BUILDING / PERSONS & PROPERTIES ON ADJOINING ROADS.
B2 200 700 3-T12 - - - 2-T12 - - - - - T8 200 200 200 - B77 200 700 2-T12+1-T10 - - - 2-T16 - - - - - T8 100 100 100 - c) SAFETY OF CONSTRUCTION WORKER/ANY PERSONNEL AT WORK SITE
DURING CONSTRUCTION.
B3 2-T12 - B78 200 700 3-T12 - - - 3-T12 - - 2-T16 - - T8 175 175 175 - d) CORRECTNESS / SAFETY OF ANY TEMPORARY STRUCTURE,
200 550 3-T12 - - - - - - - - T8 200 200 200 SCAFFOLDING, SHUTTERING, CENTERING ERECTED @ SITE AND ANY
B4 - B79 200 700 3-T12 - 2-T12 - 2-T12 - - 2-T16 - - T8 175 175 175 - INJURY TO ANY PERSONNEL ARISING OUT OF THEIR ACCIDENTS.
200 700 3-T12 - - - 3-T12 - - - 2-T12 - T8 200 200 200 e) ACCIDENT OCCURRING DUE TO PREMATURE DE-SHUTTERING FAULTY /
SUBSTANDARD CONSTRUCTION MATERIAL OR WORKMANSHIP / FAULTY
B5 - B80 200 500 3-T12 - - - 2-T12 - - - - - T8 200 200 200 -
200 550 3-T12 - 2-T12 - 3-T12 - - - - - T8 200 200 200 CONSTRUCTION PROCEDURE.
f) ANY ACCIDENT OCCURRING DUE TO CONSTRUCTION OF ELEMENTS OF
B6 2-T20 T8 150 150 150 - B81 200 500 3-T12 - - - 2-T12 - - - - - T8 200 200 200 -
200 700/550 2-T16 - 2-T20 - - 2-T20 2-T16* 2-T16 2-T16* BUILDINGS NOT DESIGN BY US. MATERIAL OR WORKMANSHIP / FAULTY
CONSTRUCTION PROCEDURE.
B7 B82 200 700 3-T12 - - - 3-T12 - - - - - T8 200 200 200 - 2. SUPERVISION IF SPECIFICALLY ASKED FOR WILL BE PROVIDED TO THE
200 700 2-T16 - 2-T20 2-T20 2-T16 2-T16 - - - - T8 150 150 150 - EXTENT OF VERIFICATION OF REINFORCEMENT ON SITE BUT
B8 B83 200 500 3-T12 - - - 2-T12 - - - - - T8 200 200 200 - RESPONSIBILITY REGARDING CORRECT & SOUND CONSTRUCTIONSHALL
200 700 2-T16 - - - 2-T12 - - - - - T8 175 175 175 - SOLELY REST WITH CONTRACTOR/ BUILDER / OWNER.
B8A T8 175 175 175 B84 200 700 3-T12 - - - 2-T16 - - - 2-T12 - T8 100 100 100 CANTILEVER
200 700 3-T12 - - - 2-T20 - - - 2-T12 - -
NOTE-1
B9 B85 200 700 3-T12 2-T12 - - - 2-T16 2-T12* 2-T16 2-T20 2-T16* T8 175 175 175 - FORMS SHALL NOT BE RELEASED UNTIL THE CONCRETE HAS ACHIEVED
200 700 3-T12 - - - 2-T12 - - - - - T8 175 175 175 - STRENGTH OF AT LEAST TWICE THE STRESS TO WHICH THE CONCRETE
B10 2-T20 - B86 200 700 3-T12 - - 2-T12 - 2-T20 2-T16* 2-T16 2-T20 2-T16* T10 125 150 125 - MAY BE SUBJECTED AT THE TIME OF REMOVAL OF FORMWORK. THE
200 700 3-T12 - 2-T12 2-T12 2-T16 - - 2-T20 - T8 175 175 175 STRENGTH REFERRED TO SHALL BE THAT OF CONCRETE USING THE
B11 CANTILEVER B87 200 700 3-T12 - - - 2-T16 2-T12 - - - - T8 100 100 100 CANTILEVER
SAME CEMENT & AGGREGATES & ADMIXTURE, IF ANY, WITH THE SAME
200 700 3-T12 - - - 2-T16 2-T20 - - - - T8 100 100 100 PROPORTIONS & CURED UNDER CONDITIONS OF TEMPERATURE &
MOISTURE SIMILAR TO THOSE EXISTING ON THE WORK.
B12 3-T12 2-T12 - B88 200 700 3-T12 - - - 2-T12 - - - - - T8 200 200 200 -
200 700 - - - - - - - - T8 200 200 200 NOTE-2
B13 - B89 200 700 3-T12 - - - 3-T12 - - - - - T8 200 200 200 - WHILE THE ABOVE CRITERIA MENTIONED IN NOTE-1 OF STRENGTH
200 700 3-T12 - 2-T12 - 2-T12 - - - - - T8 200 200 200 SHALL BE THE GUIDING FACTOR FOR REMOVAL OF FORMWORK, IN
B14 2-T16 - B90 200 700 3-T12 - - - 2-T12 - - - - - T8 200 200 200 - NORMAL CIRCUMSTANCES WHERE AMBIENT TEMPERATURE DOES NOT
200 700 3-T12 - - - - - 2-T20 2-T20 - T8 150 150 150 FALL BELOW 15°C AND WHERE ORDINARY PORTLAND CEMENT IS USED
AND ADEQUATE CURING IS DONE, FOLLOWING STRIKING PERIOD MAY BE
B15 200 700 3-T12 - - - 2-T16 2-T20 - - - CANTILEVER B91 200 500 3-T12 - - - 2-T12 - - - - - T8 200 200 200 -
- T8 100 100 100 FOLLOWED (EVEN FOR CONCRETE HAVING A FLY ASH CONTENT OF UP
TO 30%.
B16 2-T12 T8 200 200 200 - B92 200 500 2-T16 2-T12 - - 2-T16 2-T12 - - 2-T12 - T8 150 150 150 -
200 500 3-T12 - - - - - - 2-T12 - TYPE OF FORMWORK/ PART OF STRUCTURE:
B17 200 700 - - - - - - - - T8 200 200 200 - B93 200 700 3-T12 - - - 2-T16 2-T12 - - - - T8 200 200 200 - 1. WALLS, COLUMNS AND VERTICAL SIDES OF BEAMS : 48 HOURS
3-T12 3-T12 2. SLABS (PROPS LEFT UNDER) : 3 DAYS (PROPS TO BE REFIXED
B18 T8 200 200 200 - B94 200 700 3-T12 - - - 2-T12 - - - - - T8 200 200 200 - IMMEDIATELY AFTER REMOVAL OF FORMWORK)
200 700 3-T12 - - - 2-T12 - - - 1-T12 -
3. BEAM SOFFITS (PROPS LEFT UNDER) : 7 DAYS (PROPS TO BE REFIXED
B19 200 700 - 2-T16 - 3-T12 - - - - T8 175 175 175 - B95 200 700 3-T12 - - - 2-T12 - - - - - T8 200 200 200 -
2-T16 - IMMEDIATELY AFTER REMOVAL OF FORMWORK)
4. REMOVAL OF PROPS UNDER SLABS
B20 3-T12 3-T12 175 175 175 - B96 200 700 3-T12 - - - 3-T12 - - - - - T8 200 200 200 -
200 700 - - - 2-T12 - - - - T8 a) SPANNING UP TO 4.5M : 7 DAYS
B21 200 700 - - - 2-T16 - - - 2-T12 - T10 200 200 200 - B97 200 700 3-T12 - - - 3-T12 - - - - - T8 200 200 200 - b) SPANNING OVER 4.5M : 14 DAYS
3-T12 5. REMOVAL OF PROPS UNDER BEAMS
B22 200 700 2-T20 - - 2-T12 2-T20 2-T12 - - - - T10 125 125 125 - B3X 200 550 2-T16 - - - 2-T12 - - - - - T8 200 200 200 - a) SPANNING UP TO 6M : 14 DAYS
b) SPANNING OVER 6M : 21 DAYS
B23 200 700 3-T12 - - - 2-T16 - - - 2-T12 - T8 150 150 150 - B6X 200 700 2-T16 - - - 2-T12 - - - - - T8 200 200 200 -
B24 NOTES :
200 700 3-T12 - - - 2-T16 2=T12 - - - - T10 100 100 100 -
B25 200 500 3-T12 - - - 3-T12 = - - - - T8 100 100 100 -
B26 200 700 2-T25 2-T10 - - 2-T25 - - - 2-T10 - T10 125 125 125 -
B27 200 700 2-T12+2-T10 - - - 2-T16 - - - - - T8 100 100 100 CANTILEVER
B28 200 500 3-T12 - - - 3-T12 - - - 2-T12 - T8 200 200 200 -
B29 200 700 3-T12 - - - 3-T12 2-T12 - - - - T8 200 200 200 -
B30 200 700 3-T12 - - - 2-T16 - - - 2-T20 - T8 200 200 200 CANTILEVER
B31 200 700 3-T12 - 3-T12 - 2-T16 2-T20 - - - - T8 175 175 175 -
B32 200 700 3-T12 - 2-T12 - 2-T12 1-T12 - - - - T8 175 175 175 - SECOND FLOOR SLAB SCHEDULE ( M25 FE-500) LOADING CONSIDERATIONS:
B33 200 700 3-T12 - - - 2-T12 - - - - - T8 175 175 175 - SLABS TYPE THICK. BOTTOM REINFORCEMENT REMARKS
MKD. (mm) SHORT BARS LONG BARS
B34 200 700 3-T12 - - - 2-T16 - - 2-T20 2-T20 - T8 175 175 175 -
B35 200 700 3-T12 - - - 2-T16 2-T20 - - - - T8 100 100 100 CANTILEVER
B36 200 700 3-T12 - - - 3-T12 - - - - - T8 100 100 100 -
B37A 200 700 3-T12 - - - 2-T16 - - - - - T8 100 100 100 CANTILEVER DRY BALCONY SUNK
B37 200 700 3-T12 - - - 2-T16 - - - - - T8 175 175 175 - DRY BALCONY SUNK
B70 200 700 3-T12 - - - 2-T16 - - - - - T8 100 100 100 CANTILEVER +12.00
THIRD
DRG. TITLE : RC DETAILS FOR SLAB & BEAMS AT SECOND
B71 + .00 FLOOR LEVEL
200 700 2-T25 - - 2-T12 2-T25 2-T12 - - - - T10 100 100 100 - SECOND
+6.00 FIRST
B72 200 700 3-T12 - 3-T12 - - 2-T25 2-T20* 2-T16 2-T25 - T10 200 200 200 -
DRG. NO. 02 /03
B73 200 700 3-T12 - - - 2-T16 - - - - - T8 100 100 100 CANTILEVER
+0.000 PARKING
SMA-2851-2F-01 R0
B74 200 700 3-T12 - - - 2-T12 - - - - - T8 200 200 200 - FOUNDATION
B75 200 700 3-T12 2-T12 - - - 2-T20 - 2-T16 2-T20 - T8 175 175 175 -
KEY SECTION