DAILY REPORT Project Names construction of brrdge between Thalunna - Ardy palana Project Code = yg} bate: [2022103103 | Staff and Labours Machineries No |Description Quantity [No | Description | Quantity | 01 | Project Engineer Ol 01 | Excavator 200 ol 02 _| Site Engineer =| 03 _| Work Supervisor = 04 Cleark = a 05 [Storekeeper or (04 | Tipper (cube) [06 | Operator ol 05 | Tractor with trailer [07 | Driver o1 06 | Water Rowser = 08 | Skilled Labour ©3 |_| 07 | Water pump( 2”) [09 7 Unskilled Labour on 08 [Water Pump(3") 10 Sub contract Labour = | 09 | Water pump [ 4 _| [11 7'Sub contract TO = [10 | Pocker vibrator | [12 Night watcher Lor Ti [Van = | (13 { 12 — [ Work plan & Description — No | Location Description of work (91 [Anda palana Ed. [2 TCexcavadted pt cofferdam _preperalioo Remong mud from excavated pd (93 | oven) Dewdtermg or Remmicd mad 15 ceded awed ( *$§ cube) 05 _Issues t. Lack of Labour Contractor's Representative Consultant Representative