DAILY REPORT
ProjectName:- construction of bridge helween -
Thalonng ~ Andupalang
ProjectCode = py Date
Staff and Labours Machineries _
No | Description Quantity] [No [Description
Site Engineer
| Work Supervisor
Ceark
Store Keepe
Tipper (cube }
[Operator
halter (6
07 _| Driver
08 _| Skilled Labour
7_| Water pump (2
|=
09 _| Unskilled Labour
08 | Water Pump (
70 _| Sub contract Labour =
[09 | water pamp CF)
~ | uantity |
Ti_|Sabcontract TO _ = [10 _| - |
72] Night watcher ou it - |
aa 7 12 |
Work plan & Description _ ee
No | Location ‘Description of work }
Oi |ansepotana end | Dewalemng r ___|
[oz |(Excavoled pd | vemoving mad from excavgld pt —
03 | area) zemoyec matewel 95 coded. ausog from thes
for] C4 cube) es i
[os _
: Ee: Consultant Representative
Contractor's Representative