Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

FLOOR PLAN

NOT TO SCALE

31.50

3 3 3 3 3 3 3 3 3 3 1.5
2.67

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND
2.66

2
8

WORKING AREA
2.67

FLOOR PLAN
NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
1
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7
1.75
1.75
0.50

2.4
1.9

0.4
0.4

3 0.85 1 3 2.67 2.66 2.67

8
8

FRONT ELEVATION REAR ELEVATION


NOT TO SCALE
NOT TO SCALE
1.75

1.75
0.5
2.4

1.9
0.4
0.4

SIDE ELEVATION
NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
2
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7
0.25m x 0.25m x 1m
Concrete Foundation
1.75

w/ 10mm Diam. RSB 2"Dia. G.I. Pipe


5 @ 150mm O.C. Schedule 40 (Post)
welded on G.I. pipe

0.4
N.G.L.

0.2
1
1.5 1.5 1 1 1.5 1.5

0.3
0.1
TRUSS 1
NOT TO SCALE
FOUNDATION DETAILS
NOT TO SCALE

0.45

0.45

0.25
1.75

0.25

2 2 2 2
COLUMN DETAILS
NOT TO SCALE

FRAME 1
NOT TO SCALE
0.55

0.4
0.7
N.G.L.

0.2
0.1
1 1

TRUSS 2 WALL FOOTING DETAILS


NOT TO SCALE NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
3
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7
31.5

3 3 3 3 3 3 3 3 3 3 1.5

2.67

TRUSS 2

TRUSS 2
FRAME 1

FRAME 1

FRAME 1

FRAME 1

FRAME 1
TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1
2.66
2.67

ROOF FRAMING PLAN


NOT TO SCALE

31.5

3 3 3 3 3 3 3 3 3 3 1.5
HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND

HYDROPONICS STAND
WORKING
8

AREA

DRAINAGE LINE

AUTOMATED HYDROPONICS SYSTEM LAYOUT


NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
4
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7
0.35
0.15

0.25

0.25
0.25

0.25
0.25

0.25
1.55

1.55
0.25

0.25
0.25

0.25
0.3

0.3
1.45 1.45 1.45 1.45
0.8
1
6

HYDROPONIC STAND DETAILS


NOT TO SCALE
0.25

0.25
0.20m x 0.20m x 0.6m
Concrete Foundation w/
0.25

0.25
4-10mm Diam. Vertical RSB, 1 21"x 1 21"x 14"
5 STIRRUPS O.C. welded on G.I.
pipe
Angle Bar
0.25

0.25
1.55

1.55

0.2 0.25 0.15


N.G.L.
0.25

0.25

0.6
0.25

0.25
0.3

0.3

0.8 0.8
1 1

HYDROPONICS STAND
INLET DETAILS OUTLET DETAILS FOUNDATION DETAILS
NOT TO SCALE NOT TO SCALE NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
5
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7
31.5

3 3 3 3 3 3 3 3 3 3 1.5

1
LED TUBE LIGHT
LED TUBE LIGHT LED TUBE LIGHT

8
LED TUBE LIGHT LED TUBE LIGHT LED TUBE LIGHT

LED TUBE LIGHT LED TUBE LIGHT


LED TUBE LIGHT 2

POWER LAYOUT
NOT TO SCALE

31.5

3 3 3 3 3 3 3 3 3 3 1.5

S3
LED TUBE LIGHT LED TUBE LIGHT LED TUBE LIGHT
8

LED TUBE LIGHT LED TUBE LIGHT LED TUBE LIGHT

LED TUBE LIGHT LED TUBE LIGHT LED TUBE LIGHT

SWITCH LAYOUT
NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
6
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7
31.5

3 3 3 3 3 3 3 3 3 3 1.5

8 VENTILATION LAYOUT
NOT TO SCALE

TO POWER 0.297
SUPPLY
2 - 25mm ^2 THHN

KWH
KW-HR METER
REPUBLIC OF THE PHILIPPINES
100 AT , 2 POLE DA-RFO DEPARTMENT OF AGRICULTURE HVCDP
III
LOGO REGIONAL FIELD OFFICE III LOGO
CITY OF SAN FERNANDO, PAMPANGA

01 02

03 04 PROJECT TITLE:
05 06
PROJECT FUND:
07 08
RECIPIENT:
PROJECT LOCATION: NOTE: TO BE INSTALLED
sing e ine diagra SECTOR: HIGH VALUE CROPS DEVELOPMENT
UPFRONT
PROGRAM

0.42
9 480 1.57
4 800 3.48
CRISPULO G. BAUTISTA JR.
1HP PUMP 932 4.05 REGIONAL EXECUTIVE DIRECTOR
1.5 HP PUMP 1398 6.05
AUTOMATION SYSTEM 800 3.48
AIR CURTAIN 150 0.70
H.E. FERDINAND R. MARCOS JR.
VENTILATION FANS 800 3.48 PRESIDENT, REPUBLIC OF THE PHILIPPINES
SPARE
29.30 A

29.30 x 1.25 = 36.625A


USE 50A FOR MAIN SERVICE ENTRANCE

LOAD SCHEDULE PERMANENT MARKER DETAILS


NOT TO SCALE NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


INSTALLATION OF APPROVAL:
S .M. GREENHOUSE
ITH HYDROPONICS ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
7
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS ENGR. ELMER F. TUBIG DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
7

You might also like