Hydraulic Calculation of Drain Aqueduct @CD21

Design of Aqueduct : CD21

Data of Canal Section :-


Discharge in Drain canal 121.400 m3/s
Full Supply Level 474.116 m
Bed Width of Drain Canal 37.00 m
Full Supply Depth 3.25 m
Drain Canal Bed Level 470.87 m
Side slope of canal 1 in 1.50
Canal Bed Slope 1 in 4018
Free Board 1.00 m

Design :-
2.0 Design of Canal waterway :-
Bed width of canal 37.00 m
Full Supply Depth 3.25 m
Free Board 1.00 m
Discharge in canal 121.400 m3/s

Let the normal canal width of 37m be flumed to 16.90 m


Providing a splay of 2:1 in contraction, the length of contraction transition =
Lin = ((Bc - Bf)/2)*2 (m) 20.1 m
Providing a splay of 3:1 in Expansion, the length of expansion transition =
Lout = ((Bc - Bf)/2)*3 (m) 30.2 m
Length of the flumed rectangular portion of the canal between abutments =
88.54 m
88.00 m
Span, m 4
Bay,Nr 4
Thickness,m 0.3
1 2 3 4
2:1

4.00

4.00
0.3m thick

4.00

16.90
0.3m thick 4.00 3:1

1 2 3 4
20 m 89 m 30 m

Page 2
Hydraulic Calculation of Drain Aqueduct @CD21

Design of Aqueduct : CD21

3.0 Calculation of Head loss and bed levels at different sections


At section 4 - 4 ( the canal section returns to its normal section)
Area (A) = (b+m*h)*h = 135.89 m2
V4 = Q/A = 0.893 m/s
Velocity head (h4) = (V /2*g ) =
4
2
0.041 m
R.L. of bed at 4 - 4 = 470.870 m
R.L. of water surface at 4 - 4 = 474.116 m
R.L. of T.E.L. at 4 -4 = 474.156 m

At section 3 - 3
Keeping the same depth of water3.25m throughout in the canal
Area (A) = (b-t*Nw)*d= 51.93 m2
V3 = Q/A = 2.338 m/s
Velocity head (h3) = (V /2*g ) =
3
2
0.279 m
Loss of head in expansion from 3 - 3 to 4 - 4
= 0.30*(V32 - V42)/(2*g) 0.071 m
R.L. of T.E.L. at 3 - 3 = 474.228 m
R.L. of water surface at 3 - 3 = 473.949 m
R.L. of bed at 3 - 3 = 470.703 m

At section 2 - 2
Area (A) of trough section = (b-n*0.30)*h = 51.93 m2
Wetted Perimeter (P) = (b+2*h) = 23.09 m
V2 = Q/A = 2.338 m/s
Velocity head (h2) = (V /2*g ) =
2
2
0.279 m
Loss of head from 3 - 3 to 2 - 2
Hydraulic mean depth R =(A/P) = 2.249 m
Velocity in Tough V = (1/n)*R2/3*S1/2
where h is rugosity coefficient whose value in concrete 0.016
Therefore, frictional slope ' S' = 0.000 m/m
or S' = 1 in 2106.03487
Loss of head in Trough = 0.042 m
R.L. of T.E.L. at 2 - 2 = 474.270 m
R.L. of water surface at 2 - 2 = 473.991 m
R.L. of bed at 2 - 2 = 470.746 m

At section 1 - 1
Loss of head in contraction from 1 - 1 to 2 - 2
= 0.20*(V22 - V12)/(2*g) 0.048 m
R.L. of T.E.L. at 1 -1 = 474.317 m
R.L. of water surface at 1 - 1 = 474.277 m
R.L. of bed at 1 - 1 = 471.031 m

Page 3
Hydraulic Calculation of Drain Aqueduct @CD21

Design of Aqueduct : CD21

0 6 96.3 104.3
1 2 3 4 1-4 2-3
Bed Level 471.031 470.746 470.703 470.870 0.161 0.042
F.S.L 474.277 473.991 473.949 474.116 0.161 0.042
Velocity 2.338 2.338 0.893

0.00047773965 465.159 88.00 11.000


470.11 11 470.740 0.031
22 470.735 4.976
33 470.730 4.971
44 470.725 4.966
55 470.719 4.960
66 470.714 4.955
77 470.709 0.000

4 Scour depth in the Main canal


The design scour depth below bed level is given below; = XR - D (m).
X= scour factor dependent on type of reach (by table ) 1.50
D= design depth of flow (m) 3.55
R= 1.35 x (q2/f)1/3 3.04
q= the maximum discharge per unit width (m2/s/m) 3.37
f= Lacey's silt factor (Generally " 1") 1.00
Discharge of RBMC (m /s) 3
144.55
Width of Canal 42.85
The design scour depth below bed level (m) 1.01

Page 4