KUNAL CONSTRUCTION JSW/SHE/2023/04/PCC/01

PROJECT : JSW STEEL COATED PRODUCT LIMITED


KALMESHWAR REV.
CHECKLIST FOR CUTTER MACHINE
NAME OF LOCATION : FREQUENCY : MINIMUM ONCE IN A WEEK
NAME OF CONTRACTOR / EMPLOYEE : INSPECTION BY NAME :
DATE OF REGISTRATION : EQUIPMENT SERIAL NO. :
DATE OF INSPECTION :

1 2

3
11
5 8

Sr No. POINT OF INSPECTION YES NO N/A

1 Circular Saw Body should be physically should and in


good condition.
2 Switches should be free from damage and properly
insulated.
3 Fixed guard of machine should be in good condition .
(Loose,dispaced, correded not allowed)
Auto adjustable guard should be in working
4
condition.

Circular saw wheel should free from


5 defect,crack,deterioration and rotaring capacity
should be market over it.

6 Cable condition (Any cut , wear etc) and presence of


wire top plug.
7
Circular saw should be double insulated or grounded.
8 Must use designated key for changing wheel.

Circular saw should be operated by expeirince and


9
competent person.

10 Operator should be provided with and using proper


personal protective euipment.

11 Circular saw wheel in use should be suitble for the


sterial being cut.
Accepteble
Overall Observation : (YES/NO) Is not accepteble - equipment
removed from site (Date)

Checked By Date Signature


Contractor's Supervisor :
JSW Representive :
JSW/SHE/2023/04/PCC/01

MINIMUM ONCE IN A WEEK

10

OBSERVATION DETAILS
Corrective / preventive action taken on
date

Signature