B PEKERJAAN ARSITEK

Uraian Satuan Volume Harga Satuan Jumlah Harga


No.
Rp Rp

VI. PEKERJAAN PINTU JENDELA


1 Kusen Pintu
- Pintu Jendela Type 1 (PJ1) Unit 1,00 5.665.600,00 5.665.600,00
- Pintu Jendela Type 2 (PJ2) Unit 1,00 7.037.800,00 7.037.800,00
- Pintu Type 3 (P3) Unit 7,00 4.040.800,00 28.285.600,00
2 Kusen Jendela
- Jendela Type 1 (J1) Unit 1,00 2.561.200,00 2.561.200,00
- Jendela Type 2 (J2) Unit 3,00 4.983.400,00 14.950.200,00
- Jendela Type 3 (J3) Unit 6,00 7.152.800,00 42.916.800,00
- Bouvent Type 1 (BV1) Unit 2,00 900.100,00 1.800.200,00

Jumlah : 103.217.400,00
VII. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding 1/2 Bata 1 : 3 M2 348,00 129.210,08 44.965.109,15

Pek.Plesteran
1 Pek. Plesteran Trasraam 1pc : 3ps tb : 15 mm M2 52,20 59.476,09 3.104.651,74
2 Pek. Plesteran 1pc : 6ps tb : 15 mm M2 696,00 55.779,21 38.822.328,07
3 Acian Beton M2 696,00 33.025,09 22.985.465,25
Jumlah : 109.877.554,21
VIII. PEKERJAAN LANTAI KERAMIK
1 Pas. Lantai Kramik Uk.60x60 cm ( Texture ) M2 119,00 342.950,85 40.811.151,15
2 Pas. Lantai Kramik Uk.30x30 cm ( Texture ) M2 6,00 138.254,33 829.525,95
Jumlah : 41.640.677,10
IX. PEKERJAAN
Pas. PLAFOND + Rangka Hollow +
Plafond Gypsumboard
1 Pengecatan (Terpasang) M2 125,00 149.000,00 18.625.000,00
2 Pas. Plafond Kalsiboard M2 125,00 149.000,00 18.625.000,00
Jumlah : 37.250.000,00
X. PEKERJAAN SANITAIR
1 Closed Jongkok (Sentor Otomatis) + asesoris ex. Toto Unit 1,00 4.665.366,75 4.665.367,75
2 Wastafel + asesoris Ex. Ina Unit 1,00 630.327,50 630.327,50
3 Kitchen Zinc Unit 1,00 309.320,00 309.320,00
Jumlah : 5.605.015,25
XI. PEKERJAAN PENGECATAN
1 Pengecatan
- Dinding dalam M2 348,00 22.897,77 7.968.422,22
- Dinding luar Cat Weathershield M2 48,00 63.275,03 3.037.201,20
Jumlah : 11.005.623,42

JUMLAH TOTAL PEKERJAAN 308.596.269,98