Professional Documents
Culture Documents
Adobe Scan 23 May 2023
Adobe Scan 23 May 2023
(6o) (60 )
196206.00 11931.00 42524.00 250661.00
faofaoio fao) 2023-24 3rerter
/faofaoo
/2023-24
( H N)
2
3
5
M.S channel, 100x50x2240 mm (Top-channel)
Base angle TTTTT
2
1
909.00
1956.00|
823.00|
909.00
3912.00
823.00
MS channel, 100x50x2028 mm(Dropper) 7376.00
Earthing Complete 8 922.00 0
11 KV Pin Insulator with pins 21 219,00 0 4599,00
1 74298.00 74298.00
Transformer 11/0.4,25 KVA. 0 2928.00
10 DiscInsulator with fitting 12 244.00
5 2230.00l 11150.00
11 Stay Complete with Concreting 960.00
12 LTShackle Insulator 16 60.00
2 526.00 1052.00
13 M.S Channel, T-off
Total 196205.69
anter a f r
far f ER
Vtnge
f e rag
ufen
() ufoyfh
2700 56
wf fdfte (ed) te f h e
10
wd tu/A re io fofer
11
1103100
11931,.00
42524,00
S4455.00
afeneh a f r
henge
REPORT
2)00S6
The Estimate amounting to Rs. 259943.00 only has been framed to cover
the to installation of one Nos. 25 KVA Transformer & Proper voltage supply to
Vill-Yadavpur, Block-Chhanbey, Distt-Mirzapur. under Business Plan during the
year 2022-23.
The rates provided in the estimate are as per current RESSPO schedule. The
work will be carried out under the supervision of SDO-I1, EDSD-I1, EDD-I1,
Mirzapur.
SDO
No 119758.00) 1197580o
25 KVATE
No 102138.0o 10213800
211KV Linc 1
48160.00 48160 00
LTLine No
270056.00 270056.00
Total
SDo
Block Disst
Neagr Sasiess Paa the year 2822-23
Paecuiars Quantity Unit
Z2|2|22
3 4
Rabe
5
Amoumt
6
2 2517.00 S03400
2 85.00 170 00
28521.00 28521
LS hanne 1 0 N m (Tes-channe
Sase angie 2 1958 00 391200
Cans wth s &bots o vancus sze To
22|2|2|2|2|2|242 12600 1260 00
Sane 1 0 b 8 o e r S23 00 82300
Eattig mgie 2 184400
9Dange Soand 2 160.00 32000
3 21900 657 00
Tansime th 25 KWA 74298 00 7429800
244.00 1484 00
13 Say Campilete ith Canceting 2 2230 00 4480.00
Toal Cst of Nateiails 95436.21
Total 119757 91
Total 77339,46
1 Job 5413.70
() Cartage Charges
() Erection Charges 1 Job 6187 16
(i) Concreting of pole 6 No 942.00 5652 00
Total 17252.92
Total 102138.27
No
124.00
60.00 960.00)
Kg 106.00 424.00
7 Nut Bolt for Shackle tnsulator
No 1 2230.00) 2230.00
8 |Stay Complete
Loop Guard Complete 3 Phese No 8 89.00 712 00
35361.02
Total
Job 2475.27
(0 Cartage Charges 2828.88
1 Job
) Erection Charges 3768.00
4 No 942.00
() Concreting of pole
9072.15|
Total
18GST for work
1632.99
46066.16
1381.98
3% Contingency Charges on Rs.
47448.15
711.72
1.5% T&P Charges on Rs.
48159.87
Total 48159.87