MiR WCB 2W2L14H (1.5kN) Drg.V1
MiR WCB 2W2L14H (1.5kN) Drg.V1
MiR WCB 2W2L14H (1.5kN) Drg.V1
Overall Scaffold 3D View with Dimension
Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe‐boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
Project: Erection of Scaffold @ Inclined Conveyor Outside Building, Woodchip Boiler
Subject: Tubular Scaffold(2W*2L*14H) with Lifting Points(SWL=150kgf)
File Name: MiR_WCB_2W2L14H(1.5kN)_Drg.V1
Scaffold Plan View with Dimension
Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe‐boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
Project: Erection of Scaffold @ Inclined Conveyor Outside Building, Woodchip Boiler
Subject: Tubular Scaffold(2W*2L*14H) with Lifting Points(SWL=150kgf)
File Name: MiR_WCB_2W2L14H(1.5kN)_Drg.V1
Scaffold Side View with Dimension
Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe‐boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
Project: Erection of Scaffold @ Inclined Conveyor Outside Building, Woodchip Boiler
Subject: Tubular Scaffold(2W*2L*14H) with Lifting Points (SWL=150kgf)
File Name: MiR_WCB_2W2L14H(1.5kN)_Drg.V1
Bundle with Lifting Points
Scaffold Front View with Dimension
Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe‐boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading