METHOD OF MEASUREMENT
TAKING OFF AND SQUARING
GENERAL
Rm 2.13
@ #R.Bar = 0.012
1.58 Kg/Rm B 0.012
67.31 0.024
259.12 Total (A + B)
Kg
Tims Meas Squaring Description SSR RATE AMOUNT
A ureme
ing NO Rs. Ps. Rs. Ps.
nts
6
5/19 1.26 119.70 All as per item No. 5 above, but 5mm dia and 10036 85.18 6290.54
Rm over upto and including 10mm dia in stirrups, Kg
@ spacers and binders
0.617 Stirrups-10mm dia
Length = 1.50
Kg/Rm
0.40
73.85 Kg
(-)0.05
(-)0.024
1.83
No. of stirrups
= 1.83 = 18.3 ~ 19
0.10
Length of one stirrup
= 4 x 0.35
(-)8cover (-)(8 x 0.04)
(+)2 x 9D (2 x 9 x 0.01)
1.26
TOTAL 81600.60