This document provides a current routing report for item 035-GG313-10DF, which is an electrical assembly for a 3 1/8 gamma gun. The report lists an assembly operation that takes 16 hours to complete and has 40 hours in queue. It also lists 8 required materials for the assembly, including various printed circuit boards, chassis components, screws, and solder lugs.
This document provides a current routing report for item 035-GG313-10DF, which is an electrical assembly for a 3 1/8 gamma gun. The report lists an assembly operation that takes 16 hours to complete and has 40 hours in queue. It also lists 8 required materials for the assembly, including various printed circuit boards, chassis components, screws, and solder lugs.
This document provides a current routing report for item 035-GG313-10DF, which is an electrical assembly for a 3 1/8 gamma gun. The report lists an assembly operation that takes 16 hours to complete and has 40 hours in queue. It also lists 8 required materials for the assembly, including various printed circuit boards, chassis components, screws, and solder lugs.
Oper WC Description Move Hours Queue Hours Setup Hours Lbr Hours/Pc Mch Hours/Pc Fixed Sched Hours Offset Hours Ctrl Point 10 ASSEM PCB ASSEMBLY 16.00 40.00 0.00 3.44828000 3.44828000 Yes B Type Item Revision Ref Effective Date Obsolete Date BOM Seq Quantity U/M Per Alt Group Alt Group Rank Material 003-00000-DFC Inventory PCB DUAL FIRE CIRCUIT REV C 1.00000 EA Unit 1 0
Material 003-00000-GGES Inventory
PCB GAMMA GUN SCINTILLATION 1.00000 EA Unit 2 0
Material 003-00000-LVHV E Inventory
PCB UNIVERSAL HVPS LV INPUT 30-60V 1.00000 EA Unit 3 0
Material 035-GG275-0006 Inventory
CHASSIS 2.75 GAMMA GUN 1.00000 EA Unit 4 0
Material 035-GG313-0023 Inventory
HEADER UPPER ELEC. CHASSIS 1.00000 EA Unit 5 0
L_TCFW PROBE TECHNOLOGY SERVICES Page 1 of 2
Alan.Williamson Item Current Routing Report 2/11/2014 4:06:36 PM