II PEKERJAAN TANAH,
PONDASI & STRUKTUR
1 Galian tanah, pondasi & Sloof 95 M3 40,000 3,800,000
2 Buang Tanah 1,500,000
3 Urugan tanah kembali 95 M3 30,000 2,850,000
4 Urugan tanah kembali (dari luar) 20 M3 50,000 1,000,000
5 Pondasi batu kali 20 M3 400,000 8,000,000
6 Pekejaan pondasi setempat 10 M3 1,800,000 18,000,000
7 Sloof beton 10 M3 3,000,000 30,000,000
8 Kolom beton struktur 10 M3 3,000,000 30,000,000
9 Tangga beton 1 M3 2,800,000 2,800,000
10 Meja dapur 1 M3 2,500,000 2,500,000
Sub Total 100,450,000
IV PEKERJAAN ATAP
1 Rangka Baja 70 M2 150,000 10,500,000
2 Atap Genteng keramik 60 M2 95,000 5,700,000
3 Nok Genteng Keramik 10 M2 80,000 800,000
4 Listplank ujung atap 10 M2 50,000 500,000
5 Atap carport&area service Solartuff 8 M2 180,000 1,440,000
Sub Total 18,940,000
No URAIAN PEKERJAAN SPESIFIKASI VOLUME SATUAN HARGA SATUAN JUMLAH (Rp)
V PEKERJAAN PLAFOND
1 Plafond Gypsum dan rangka Ex. Jayaboard 250 M2 75,000 18,750,000
2 List Plafond 280 M2 20,000 5,600,000
Sub Total 24,350,000
IX PEKERJAAN PLUMBING
1 Instalasi air bersih
- Pipa PVC 1 ½" AW Ex. Wavin 85 10,000 850,000
- Pipa PVC 1 ¾" AW Ex. Wavin 70 10,000 700,000
- Pipa PVC 1/2" AW Ex. Wavin 50 10,000 500,000
- Fitting 1 175,000 175,000
2 Instalasi Air Kotor 0
-Pipa PVC 4" D Ex. Wavin 20 25,000 500,000
-Pipa PVC 2" D Ex. Wavin 8 25,000 200,000
- Fitting 1 180,000 180,000
3 Instalasi Air Bekas 0
- Pipa PVC 3" D Ex. Wavin 80 25,000 2,000,000
- Pipa PVC 2" D Ex. Wavin 8 25,000 200,000
- Pipa PVC 1¼" D Ex. Wavin 7 20,000 140,000
- Fitting 2 367,500 735,000
No URAIAN PEKERJAAN SPESIFIKASI VOLUME SATUAN HARGA SATUAN JUMLAH (Rp)
4 Instalasi Air Hujan
-Pipa PVC 4" D Ex. Wavin 60 55,000 3,300,000
-Pipa PVC 2" D Ex. Wavin 8 25,000 200,000
- Roof dram Ex. Antasan 8 135,000 1,080,000
- Fitting 2 300,000 600,000
5 Bak Kontrol 5 85,000 425,000
6 Septic Tank 1 1,500,000 1,500,000
7 Rembesan air 2 1,300,000 2,600,000
Sub Total 15,885,000
Tertanda
( )
USAHA RUMAH TANGGA
Biaya Lain-lain
Biaya Transportasi : Rp 100.000,-
Biaya Tenaga Kerja : Rp 100.000,-
Biaya Lain-lain
Biaya Transportasi : Rp 150.000,-
Biaya Tenaga Kerja : Rp 300.000,-
Biaya Lain-lain
Biaya Transportasi : Rp 100.000,-
Biaya Tenaga Kerja : Rp 100.000,-
II PEKERJAAN FINISHING
DINDING DAN LANTAI
1 Pasang batubata dan ring 424.2 M2 400,000 169,680,000
2 Plesteran dan aci 1:5 300 M2 250,000 75,000,000
3 Plesteran & acian (tekstur) 350 M2 200,000 70,000,000
4 Pekerjaan waterproofing 0
- Toilet 50 M2 100,000 5,000,000
- Dak atap 150 M3 160,000 24,000,000
Sub Total 343,680,000
VI PEKERJAAN PENGECATAN
1 Cat dinding luar ICI Weathershield 500 M2 100,000 50,000,000
2 Cat dinding dalam Ex.ICI Catylac 500 M2 100,000 50,000,000
3 Cat plafond Ex.ICI Catylac 300 M2 100,000 30,000,000
Cat list plafond Ex.ICI Catylac 200 M1 100,000 20,000,000
4 Cat Plituran 0
- kusen pintu/jendela 100 M2 75,000 7,500,000
- daun pintu panel 30 M2 85,000 2,550,000
- daun jendela 20 M2 85,000 1,700,000
Sub Total 161,750,000