Learning objectives:
Page | 2
4. Select the third wall in the project and
change the Phasing parameters as
follows to change the phase status to
New.
Page | 3
6. Observe how the wall graphics have
updated in the 3D view.
Page | 4
8. When working with linked Revit
models, the phases can be mapped.
Select a linked model and then click
Edit Type in the Properties palette. In
the Type Properties dialog, click Edit
next to Phase Mapping. Then map the
phases in the linked model to the
phases in the host model.
Page | 5