Joint Detail Slab-On-Grade Construction: A B C D E F
Joint Detail Slab-On-Grade Construction: A B C D E F
t (SLAB THICKNESS)
CHB REINF.
(SEE SCHEDULE)
SLAB SECTION 1. BAR "A" = TOP BARS @ FREE END TOP OF PARAPET WALL
2. BAR "B" = BOTTOM BARS
2C1 3. BAR "C" = TOP BARS @ FIXED END
PROVIDE 20MM CLEAR CONCRETE COVER 4MM THK. PL ANCHORED TO CONCRETE
SLAB W/ 2-10MM Ø EXPANSION BOLT
STUD OR WELDED TO BOT. OF STL. TRUSSES
3 2G2
BOTTOM OF CONCRETE SLAB/
BEAM OR STEEL TRUSS
2G1 BEAM/SLAB
2G1 L 64 x 64 x 4MM
2G2
2G2
WT 6 X 13 x 4" LG. W/
2B2 2B2 100 LG. FOR 1-16 MM Ø
2G2
2 - 10MM Ø X 150 LG.
ANCHOR BOLTS BOLT.
2G2
INTERIOR CHB WALL
2G2
2B3 S2
OF SLAB/BEAM WALL TOP SUPPORT IN AREAS
2 W/ DROPPED CEILINGS
2G1 2G1 2G1 2G1 2G2
FOOTING BARS FOOTING BARS
(Y - DIRECTION) (Y - DIRECTION)
S2
2C1
S1 S1 S1 S1 2B1
TIE BEAM
(SEE SCHEDULE)
2G2
2G2
2G2
2G2
2G2
FOOTING BARS
(X - DIRECTION) FOOTING BARS
(X - DIRECTION)
2B1 2B1 2B1 2B1
S2 PLAN
FOOTING 1 FOOTING 2
S1 S1 S1 S1
2B1
VERTICAL COLUMN BARS
(SEE SCHEDULE) 10MM Ø LATERAL TIES
SPACED @ 1@50, 10@100,
MAIN TOP BARS 5@150, REST @ 200MM O.C.
TIE BEAM
1 (SEE SCHEDULE) NATURAL GRADE LINE
A
BOTTOM BARS
SECTION A - A
(SECTION OF TIE BEAM)
FOOTING BARS
(X- DIRECTION)
MAIN BOTTOM BARS A