SAW-CUT GROOVE 8MM

WIDE TO BE FILLED WITH DOWEL TO MATCH


POLYURETHANE SEALANT SEE CONSTRUCTION NOTES
FOR MASONRY WALL REIN- CHB VERT. BARS
SLAB REINF. FORCEMENTS (TYPICAL) DOWEL TO MATCH
2Ø12 HOR. BAR 2Ø12 HOR. BAR CHB VERT. BARS
FLR. LVL.
20MM MIN. WHERE SLAB
CONC. COVER PEJ
Ø10 SPACED Ø10 SPACED DEPRESSION OCCURS
@150 O.C (TYP.) @150 O.C (TYP.) FIN. FLR. LVL.
CONSTRUCTION JOINT ALTERNATELY PLACED ALTERNATELY PLACED
(FOR 3M CMU WALL HEIGHT) (FOR 3M CMU WALL HEIGHT) DOWEL BARS TO MATCH
CHB VERT. BARS
RET. WALL/CHB WALL
N.G.L
COMPACTED GRAVEL SUBGRADE COMPACTED
WB-1 WB-2
POLYURETHANE SEALANT
CRITICAL SECTION BEDDING (TYP.) TO 95% OF MAXIMUM FIN. FLR. LVL.
(INTERIOR FACE OF
SUPPORT) VAPOR BARRIER
WHEN REQUIRED
DRY DENSITY @ OPTIMUM
MOISTURE CONTENT (MAX.
SLAB REINF. TYP. CHB STIFFENER BEAM
DEPTH OF COMPRESSED
FILL = (200mm PER LAYER).
FLR. LVL. DETAIL
WHERE: SLAB-ON-GRADE CONSTRUCTION 3-10MM Ø BOT. BARS 6-10MM Ø BARS (AS SHOWN)

Ldh = DEVELOPMENT LENGTH FOR 6-10MM Ø BARS (AS SHOWN)


STANDARD HOOK
H = EXTENSION
JOINT DETAIL 10MM Ø BOT. BARS @ 300 O.C.
10MM Ø BOT. BARS @ 300 O.C.
r = INSIDE RADIUS OF BEND 10MM Ø BOT. BARS
COMPACTED GRAVEL SUBGRADE COMPACTED
BEDDING (TYP.) TO 95% OF MAXIMUM @ 300 O.C.
*ONLY WHEN USED AS COMPRESSION MEMBER IN FOOTING, DRY DENSITY @ OPTIMUM
SPLICED WITH DOWELS OR WHEN LAP SPLICED
WITH SMALLER BAR.
VAPOR BARRIER
WHEN REQUIRED MOISTURE CONTENT (MAX.
DEPTH OF COMPRESSED
AT INTERIOR WALLS WITH
FILL = (200mm PER LAYER). AT EDGE / PERIMETER CHB WALL AT INTERIOR CHB WALLS SLAB ELEVATION DIFFERENCE
STANDARD HOOKS STIRRUPS AND TIE HOOKS
SLAB-ON-GRADE EXPANSION WALL FOOTING DETAILS (WHERE APPLICABLE)
JOINT DETAIL
PARAPET BEAM WITH
t (SLAB THICKNESS) BAR "C" BAR "A" BAR "C" BAR "B" BAR "A" 2-10 Ø HOR REINF,10 Ø
TIES @ 150 O.C.

t (SLAB THICKNESS)

A B C D E F BAR "B" TEMP. BARS CHB WALL

CHB REINF.
(SEE SCHEDULE)

TYPICAL CANTILEVER TYPICAL SLAB SECTION


NOTES:

SLAB SECTION 1. BAR "A" = TOP BARS @ FREE END TOP OF PARAPET WALL
2. BAR "B" = BOTTOM BARS
2C1 3. BAR "C" = TOP BARS @ FIXED END
PROVIDE 20MM CLEAR CONCRETE COVER 4MM THK. PL ANCHORED TO CONCRETE
SLAB W/ 2-10MM Ø EXPANSION BOLT
STUD OR WELDED TO BOT. OF STL. TRUSSES
3 2G2
BOTTOM OF CONCRETE SLAB/
BEAM OR STEEL TRUSS
2G1 BEAM/SLAB

2G1 L 64 x 64 x 4MM

S1 2G1 BRACE @ 1200 O.C.


2G2
DRILLED DOWEL BARS W/
EPOXY TO MATCH VERTICAL
S1 REINFORCEMENT

S1 S1 TOP OF CHB WALL


2G2

2G2

2G2
WT 6 X 13 x 4" LG. W/
2B2 2B2 100 LG. FOR 1-16 MM Ø

2G2
2 - 10MM Ø X 150 LG.
ANCHOR BOLTS BOLT.

CHB WALL REINF. BOND BEAM REINFORCED CEILING LINE


(SEE SCHEDULE) WITH 2-Ø10 H.B. AND Ø10
@300 O.C STIRRUPS
S1 2B1 2B1 2B1 LINTEL BLOCK REINF. W/

2G2
INTERIOR CHB WALL
2G2

2 - 12MM Ø CONT. H.B


AND 10MM Ø @ 300 STIRRUPS

2B3 S1 S1 S1 INTERIOR WALL SUPPORT AT BOTTOM CHB VERT. REINF.


(SEE SCHEDULE
FOR REINF.)

2B3 S2
OF SLAB/BEAM WALL TOP SUPPORT IN AREAS
2 W/ DROPPED CEILINGS
2G1 2G1 2G1 2G1 2G2
FOOTING BARS FOOTING BARS
(Y - DIRECTION) (Y - DIRECTION)
S2

2C1
S1 S1 S1 S1 2B1
TIE BEAM
(SEE SCHEDULE)
2G2

2G2

2G2

2G2

2G2
FOOTING BARS
(X - DIRECTION) FOOTING BARS
(X - DIRECTION)
2B1 2B1 2B1 2B1

S2 PLAN
FOOTING 1 FOOTING 2
S1 S1 S1 S1

2B1
VERTICAL COLUMN BARS
(SEE SCHEDULE) 10MM Ø LATERAL TIES
SPACED @ 1@50, 10@100,
MAIN TOP BARS 5@150, REST @ 200MM O.C.
TIE BEAM
1 (SEE SCHEDULE) NATURAL GRADE LINE

2G2 2G1 2G1 2G1 2C1 TOP BARS

A
BOTTOM BARS
SECTION A - A
(SECTION OF TIE BEAM)
FOOTING BARS
(X- DIRECTION)
MAIN BOTTOM BARS A

100mm THK GRAVEL BASE 100mm THK GRAVEL BASE


FOOTING BARS
SECOND FLOOR FRAMING PLAN (Y- DIRECTION)

SCALE: 1/75 METERS SECTION


TYPICAL TIE BEAM TO FOOTING DETAILS
PROJECT TITLE/ LOCATION: SHEET CONTENT: PREPARED BY: DESIGNED BY: CHECKED & REVIEWED BY: APPROVAL RECOMMENDED BY: APPROVED BY: SHEET NUMBER:
SECOND FLOOR FRAMING PLAN, STANDARD
HOOKS, SLAB-ON-GRADE CONSTRUCTION JOINT
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS
AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES -
DETAIL,STIRRUPS AND TIE HOOKS, SLAB ON
GRADE EXPANSION JOINT, TYP CHB STIFFENER
BEAM DETAIL, AT EDGE / PERIMETER CHB WALL,
S07 S11
CEBU 6th DISTRICT ENGINEERING OFFICE REHABILITATION OF MULTI-PURPOSE BUILDING WALL FOTING DETAIL, TYPICAL CANTILEVER
A.C. CORTES AVENUE, MANDAUE CITY
(BARANGAY HALL) , BARANGAY TAYUD,
CONSOLACION, CEBU
SLAB SECTION, TYPICAL SLAB SECTION, TOP
OF PARAPET WALL, INTERIOR WALL SUPPORT AT
BOTTOM OF SLAB/BEAM. WALL TOP SUPPORT IN
AREAS W/ DROPPED CEILINGS, TYP. TIE BEAM TO
RAYMUND JAY C. ALFORQUE HELEN C. BASALLO ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng. 34 83
FOOTING DETAILS DRAFTSMAN ENGINEER II CHIEF_PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: 2020

20HN0102

You might also like