TEST REPORT - Bushing Serial Number: 19C4011: Power Trading T Et D A1907024sc 08.07.2019 40473/010 Drawing: 41415803Z

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TEST REPORT - Bushing Serial Number: 19C4011

Bushing Type COT 1550-2500 L500


Project 40473/010 Drawing: 41415803Z
Customer POWER TRADING T ET D
Customer order A1907024sc 08.07.2019
Rated highest voltage for equipment (Um) 550 kV

Dry power-frequency voltage withstand 750 kV

Rated frequency 50/60 Hz

Rated current 2500 A

Test as to IEC 60137-2017


-
Lower part / Upper part OIL/AIR
Atm. conditions 977 mbar 24 °C 31 % rel. humidity
Routine Test
Tightness test Satisfactory
Measure of capacitance, tan d and partial discharges before withstand tests
U (kV) U (kV) C1 (pF) tan d (%) q (pC) t (s) tan d (%) limits q (pC) limits
- 10 488 0,44 - - 0,70 -
0,5xUm/V3 159 488 0,44 - - 0,70 -
1,05xUm/V3 333 488 0,44 2 - 0,70 5
1,5xUm/V3 476 488 0,44 2 - - 10
1,73xUm/V3 550 488 0,44 3 - - 10
Lightning impulse voltage withstand tests (negative polarity)
N° Choc Wave Uref (kV) U (kV) t1 (µs) t2 (µs) t1(µs) limits t2(µs) limits
n° 1 50 % 814 819 1,25 46,12 1,2 (+/- 30%) 50 (+/- 20%)
n° 2 100% 1628 1628 1,28 46,62 1,2 (+/- 30%) 50 (+/- 20%)
n° 3 100% 1628 1627 1,28 46,67 1,2 (+/- 30%) 50 (+/- 20%)
n° 4 100% 1628 1628 1,28 46,64 1,2 (+/- 30%) 50 (+/- 20%)
n° 5 100% 1628 1629 1,29 46,61 1,2 (+/- 30%) 50 (+/- 20%)
n° 6 100% 1628 1628 1,28 46,65 1,2 (+/- 30%) 50 (+/- 20%)
Measure of capacitance, tand and partial discharges after withstand tests
U (kV) U (kV) C1 (pF) tan d (%) q (pC) t (s) tan d (%) limits q (pC) limits
U Test 750 - - Passed 60 - -
1,73xUm/V3 550 488 0,44 2 - - 10
1,5xUm/V3 476 - - 2 - - 10
1,05xUm/V3 333 488 0,44 2 - 0,70 5

Flange insulated Flange earthed


Test tap
U (kV) C2 (pF) tan d (%) Withstand t (s) tan d (%)
limits
2 - - Passed 60 -
1 1134 0,87 - - 5
Voltage tap
U (kV) C2 (pF) tan d (%) Withstand t (s) tan d (%)
limits
20 - - 60 -
1 - - 5

Measured: Zekeriya Aktas Approved: Luc Starck


Date: 07.11.2019 Date: 08.11.2019

Equipment conform to the standard

You might also like