The document is a work plan from S.E.C (East African) Co. Ltd. for an outdoor freight elevator project at a KEDS factory in Tanzania. It outlines 13 activities for the project including site mobilization, excavation, steel bending and fixing, foundation concreting, and retaining wall construction. It provides the planned and actual start and duration dates for each activity as well as the percentage complete. The project is currently 60% complete for steel fixing of the base and 40% complete for steel bending and fixing of the wall.
The document is a work plan from S.E.C (East African) Co. Ltd. for an outdoor freight elevator project at a KEDS factory in Tanzania. It outlines 13 activities for the project including site mobilization, excavation, steel bending and fixing, foundation concreting, and retaining wall construction. It provides the planned and actual start and duration dates for each activity as well as the percentage complete. The project is currently 60% complete for steel fixing of the base and 40% complete for steel bending and fixing of the wall.
The document is a work plan from S.E.C (East African) Co. Ltd. for an outdoor freight elevator project at a KEDS factory in Tanzania. It outlines 13 activities for the project including site mobilization, excavation, steel bending and fixing, foundation concreting, and retaining wall construction. It provides the planned and actual start and duration dates for each activity as well as the percentage complete. The project is currently 60% complete for steel fixing of the base and 40% complete for steel bending and fixing of the wall.
P.O. Box 8454, Plot No. 15/1 Tanesco Strt., Msasani, Dar es +255-719-581484 / +255-713-324415 Salaam, Tanzania engineeringdep.tz@mitsuelevator.com md@mitsuelvator.com / master@mitsuelevator.com +255 22-2664901 / +255 22-2664900
PROPOSED EPC SERVICE FOR OUTDOOR FREIGHT ELEVATOR IN KEDS FACTORY
WORK PLAN ACTIVITY PLAN ACTUAL ACTUAL PERCENTAGE START START DURATION COMPLETE 1. Site 12-December 12 2 100% mobilization 2022 2. Site clearing 14 14 2 100% 3. Site setting 16 16 1 100% out 4. Excavation of 17 17 8 100% foundation 5. Compaction 27 27 2 100% and blinding 50mm concrete 6. Preparation of 29 29 5 100% materials and deliver to site 7. Steel bending 4-January 11 7 100% for base 2023 8. Steel fixing 5 14 9 60% for base 9. Steel bending 6 4 2 40% and fixing for wall 10. Foundation 8 18 1 0% concreting 11. Steel fixing 9 19 1 0% for wall 12. Fixing of 10 20 2 0% form work for wall 13. Retaining 11 22 1 0% wall concreting