MATERIALS SUBMITTAL LOG
Brand Submitted Date No. of days Submitted Date No. of days Submitted Date No. of days Submitted Date No. of days Approval
Supplier Name
S. No. Submittal Reference Number Description Revision Name Status Revision Status Revision Status Revision Remarks
Returned to Returned to Returned to Returned to
To SMC Completed To SMC Completed To SMC Completed To SMC Completed Code
Arcop Arcop Arcop Arcop
Pak Electron
1 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐026 Mv Switchgear / HT Panel by PEL 0 PEL 14/12/2022 30/12/2022 15 C 1 24/03/2023 11/04/2023 16 C 2 19/05/2023 C Under review
Limited
Network & firewall switches (Alcatel) by Curve Curve
2 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐025 0 Alcatel 14/12/2022 28/12/2022 25 C 1 31/01/2023 10/02/2023 9 C 2 24/02/2023 10/03/2023 12 C 3 29/03/2023 18/04/2023 17 B
Technologies Technologies
Clipsal
3 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐013 Wiring Accessories by Clipsal Schneider 1 Clipsal 16/12/2022 13/01/2023 24 C 2 08/02/2023 11/02/2023 4 C B
Schneider
5 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐007 Suspension Accessories by Fischer 1 Fischer M/s Ahmedally 24/12/2022 13/01/2023 18 C 06/03/2023 14/03/2023 7 C 3 06/04/2023 11/04/2023 4 B B
PVC conduit already
Jeddah Jeddah
6 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐005 PVC conduit & fitting by Jeddah polymer 1 26/12/2022 02/01/2023 7 D D approved submittal was
polymer polymer
returned
Universal
Public Address & Voice Evacuation System
7 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐007 0 TOA Overseas 29/12/2022 13/01/2023 14 D D
(Universal Overseas Agency Pvt Ltd)
Agency Pvt Ltd
Dry type Transformer (LEGRAND) By C‐XOR C‐XOR
8 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐028 0 LEGRAND 29/12/2022 20/01/2023 20 C 1 08/02/2023 27/02/2023 16 C 2 29/03/2023 17/04/2023 16 C C
Engineering Engineering
LT Switchgear / LV Panel (ACB ITALY) By
9 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐032 0 ABB ITALY Hussain & Co 04/01/2023 14/01/2023 10 C 1 05/05/2023 12/05/2023 6 C C
Hussain & Co
MV / HT Switchgear(ABB ITALY) by Hussain &
10 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐029 0 ABB ITALY Hussain & Co 04/01/2023 14/01/2023 10 D 1 08/03/2023 16/03/2023 7 C C
Co
Busbar Riser/Bus Tie Duct by Gersan (Hussain
12 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐030 0 Gersan Hussain & Co 04/01/2023 14/01/2023 10 D D
& Co)
Access Control System by PAXTON (Curve Curve
13 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐033 0 PAXTON 05/01/2023 23/01/2023 15 C 1 23/02/2023 10/03/2023 13 C 2 08/04/2023 19/04/2023 10 C C
Technologies) Technologies
Clipsal
15 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐016 IT Rack (ARKITE) by Clipsal Schneider Electric 2 ARKITE Schneider 05/01/2023 13/01/2023 7 C 3 23/05/2023 30/05/2023 7 B B
Electric
Clipsal
Audio Intercom system by COMELIT (Clipsal
16 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐034 0 COMELIT Schneider 10/01/2023 30/01/2023 17 C 1 17/03/2023 31/03/2023 13 C 2 15/04/2023 05/05/2023 12 C 3 16/05/2023 25/05/2023 7 B
Schneider Electric)
Electric
Hanging supports and accessories of cable tray
17 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐036 0 Al Fazal Al Fazal 12/01/2023 20/01/2023 7 B B
by Al Fazal
Dry type Transformer By TMC (Jubilee Jubilee
18 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐035 0 TMC 12/01/2023 21/01/2023 8 C 1 24/02/2023 07/03/2023 10 C C
corporation) corporation
JES
Prepaid energy meter KWHR meter by
19 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐024 1 INHEMETER Instrumentatio 12/01/2023 21/01/2023 8 C 2 15/05/2023 23/05/2023 7 D D
INHEMETER (JES Instrumentation & control
n & control
Fire resistant cable by Firecel Cavicel ( Secure Firecel
21 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐011 3 Secure vision 16/01/2023 30/01/2023 12 B B
vision) Cavicel
Structure Cabling & ICT System By Corning Busniness
22 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐012 2 Corning 19/01/2023 04/02/2023 14 C 3 22/02/2023 10/03/2023 14 C 4 03/04/2023 19/04/2023 14 B 5 23/05/2023 31/05/2023 7 B
(Busniness solution) solution
Unterrupted Power Supply(UPS) by SOCOMEC ( M/s Net‐line
23 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐020 1 SOCOMEC 25/01/2023 04/02/2023 9 C 2 25/05/2023 01/06/2023 6 C C
M/s Net‐line pvt ltd ) pvt ltd
CURVE
24 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐037 CCTV syatem by AXIS (CURVE Technologies) 0 AXIS 27/01/2023 10/02/2023 12 C C
Technologies
CLIPSAL
Floor outlet box by (DAVIS) CLIPSAL Schenider
25 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐018 0 DAVIS Schenider 30/01/2023 07/02/2023 7 C 2 10/03/2023 30/03/2023 17 B B
electric
electric
WIFI Access point by ( Alcatel ) CURVE CURVE
26 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐039 0 Alcatel 30/01/2023 07/02/2023 7 C 1 20/03/2023 03/04/2023 12 B B
Technologies Technologies
Energy
Diesel engine Driven Generator sets by (
28 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐038 0 Mitsubishi solutions pvt 31/01/2023 13/02/2023 11 C C
mitsubishi) Energy solutions pvt ltd
ltd
CLIPSAL
Motion sensor & Occupancy sensor by ( RIVA)
29 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐040 0 RIVA Schenider 03/02/2023 13/02/2023 9 C 1 19/04/2023 05/05/2023 8 C 2 16/05/2023 24/05/2023 7 B B
CLIPSAL Schenider electric
electric
Building Management System (BMS) By IMS
30 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐028 0 Schenider IMS Electric 22/02/2023 06/03/2023 10 C C
Electric
Annex‐ B‐8 ‐ 1 of 2
S. MEHBOOB & COMPANY E:\2102 The View Emmar\Material Submittal Electrical Comments Sheet\
2102‐View Electrical Materials submittals Log Sheet updated 30‐05‐2023
SITE SUPERVISION FORMS
EMAAR THE VIEW, CRESCENT BAY, DHA, KARACHI
EMAAR THE VIEW PROJECT
Approved
Approved as Noted
Revise & re submit
Rejected
MATERIALS SUBMITTAL LOG
Brand Submitted Date No. of days Submitted Date No. of days Submitted Date No. of days Submitted Date No. of days Approval
Supplier Name
S. No. Submittal Reference Number Description Revision Name Status Revision Status Revision Status Revision Remarks
Returned to Returned to Returned to Returned to
To SMC Completed To SMC Completed To SMC Completed To SMC Completed Code
Arcop Arcop Arcop Arcop
CLIPSAL
31 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐013 Wiring Accessories by Clipsal Schneider 3 Clipsal Schenider 27/02/2023 09/03/2023 10 C 4 20/03/2023 24/03/2023 4 B B
electric
Welder's
Diesel Generator Fuel tank by Welder's Welder's
32 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐043 0 Internation 03/03/2023 14/03/2023 10 C 1 05/04/2023 20/04/2023 13 B B
International International
al
MPRO
33 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐004 Back boxes ( 3"x3" & 3"x 6" ) by MPRO 1 MPRO Mechanical 10/03/2023 30/03/2023 17 C B
Industries
CLIPSAL
Structure Cabling & ICT System By Clipsal by
34 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐044 0 Clipsal Schenider 24/03/2023 04/04/2023 9 C C
Schneider
electric
Diesel engine Driven Generator sets by (Kohlar) GREAVES
35 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐045 0 Kohlar 05/04/2023 13/04/2023 8 C 1 17/05/2023 26/05/2023 8 C C Under review
GREAVES Pakistan pvt ltd Pakistan pvt ltd
Busbar Riser/Bus Tie Duct by EAE (Libra Libra
36 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐046 0 EAE 08/04/2023 17/04/2023 8 C 1 11/05/2023 17/05/2023 5 C C
Engineering) Engineering
Earthing & lighting protection system by Britlite
37 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐0010 2 Furse 10/04/2023 26/04/2023 10 C 3 08/05/2023 17/05/2023 8 C 4 25/05/2023 C Under review
(Furse) Britlite Engineering co. Engineering co.
Unterrupted Power Supply(UPS) by (Eaton) GREAVES
38 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐047 0 Eaton 10/04/2023 19/04/2023 9 C 1 11/05/2023 15/05/2023 3 C C
GREAVES Pakistan pvt ltd Pakistan pvt ltd
CLIPSAL
39 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐014 RJ45 1 & 2 Gang faceplates by Clipsal Schneider 1 Clipsal Schenider 19/04/2023 06/05/2023 9 C C
electric
1 core 300 sqmm HT cable (11KV) by Fast
40 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐015 0 Fast cables Fast cables 26/04/2023 09/05/2023 10 B B
cables
ST Engneering
41 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐015 Light fixtures by NVC lighting 0 NVC 24/05/2023 29/05/2023 4 C C
solutions
GREAVES
42 EKL‐RP04‐MCW‐PCL‐ELE‐MS‐050 Elevator by OTIS 0 OTIS 25/05/2023 Under review
Pakistan pvt ltd
1 Total 42
2 Approved 18
3 Rejected 22
4 Under Review 6