Download as pdf
Download as pdf
You are on page 1of 6
Wzicr eP Thai Oil Clean Fuel Project sausune eeu Petrofac @ Sa <> seine Vesture f| REQUEST FOR INSPECTION rele Sut ast aa Pei, Spm Singapore Pe and SuungEaeering thle, |PROJECT No: JI2044 [Discipline : Mechanical a [RFINo 2044. PTR-TRCCOZMS-03030_ boc ke Unis WHS Are rte aration, TRCSHOP I bsteotinspection. jrmectinepection MPNumber | ren | Fae] ae : ‘ohio lon.00 Am EERE | Tw |W w TRVDES No. TRVOLODAS rspecion Aalvig/ Desc: olay rapacton of Coan. - T-11351 Drip Ring ECS 95 (Underside) [Inspection Item TagNumber :1-11351 zt brawingaRevNo; RY1S811-11900KS0TL 10034 Revo I CHECKED READY FORNRECTION Suites by aan anon ar Corin Te ‘aja. Vind. Catac mbt 27 wea 3005366 Sigmtre ed Baten Taya Taya [aap FOR QUALITY CONTROL DEPARTNUSE ONLY | ected and Che by Saconrador ae Ganiacarae omeeaOr ected By Checked 761 Receved ecced By Name ‘Sakda K. ‘Sakda K. Pornchai P. Anon ContactWobite No ba.0f89785, oss Tag7e5 ——s Srre Ducking sa mtr aoe fora am 70 EO INSPECTION RESULTS cule ‘ACCEPTABLE ZT PARTIALLY AcCEPTABLE:PAY Rr onbioLD o ‘caNCELLED G CI REJECTED (Ry oO (NOT READY FORINSPECTION@N® [) REASON FORCANCELLATIONNOT READY FORINSPECTIONREJECTION Tempe Teoementtacied Seapaichametenaa er Reon Sweat Trine Tete Tieton Teapot wae Open Tapa OTE RE inal earicae Taian resin a ig otterCommentsRemark habia Tnspectedby SubcontractorQ€ | UNV Construction Ticensor QG OwnerPwCQC Teme lap omncnon S| a Siratare fat TPs wy RFICloredon Pinay =i aD TNS caD OETA ee ‘Totattacof macs, C? Compete No.of TRACS Signed off,“ TRACS Signed off on. fem 9 Wainoapeiate E 23 NAY 2022 @ Vase ay Quality Document Petrofac Sl eat st, | Cont. Doc No. 2044-00000-PI-092003 Client Doc No. R1118111-00000-PI-ITP-00001 DOCUMENT TITLE: INSPECTION & TEST PLAN FOR PAINTING AND COATING OF METAL SURFACES. Page 14 of 15 Rev. 0D. | Inspection Cades: |: Information 1H: Hold ‘W: Witness R: Review ‘SW: Spot Witness E: Execution | Invention Points | tom Control Activit Action to be vorified enetce! ‘Acceptance Responsible Verttying ‘TOP! | a Document Criteria Party Document | se | yyy | pwc ~ Ratert1-00000- |» RVTTBIT7-O0000- Grspc-ooont |" CLSPC-0000% | a Vey porto each subsequent | * R1¥1877"-cb000- | + R1181T1-00000. | SC QC inspector | 19.2. | Touch Up repaire ‘i PI-QcP-00002 PL-OCP-00002 | / UJV Painting imRvot02xx | Wo) sw sw | ar = R1116010-TOss- | #R1116010-TOSS- | supervisor | s300 feoot DEP 0.480031 | «DEP 3048.00.31 2: Repair of damage are prarto appication of subsequent coat + 116111-00000- | #R1198117-00000. | b.Corcioantetem amebod |" S\Srcomar» | eLene set | an = 111811100000. | + R1118411-00000- | 66 Q¢ inspector | c. Compatibility of the applied PI-QCP-00002 PI-QCP-00002 19.3 | Damaged Coatings. ‘coating to existing coating = R1116010-Toss- | * R1116010-TOSs- oe Painting ITR-V-0102X w sw ‘sw supporedty manutecurers | 48.001 sooo nensor | ‘confirmation in writing or as = DEP 30.48,00.31 | * DEP 30.48.0031 | recommended by Manufacture. | 6: Check DFT I ~rt16117-00000- |» R1418417-00000- Stsro-oooot |" cL-sPe-0o00% snr coating tee of * R111811-00000- | Ris 1811 1-00000- ana | oy Insocten of Check the entre coating ist PL-acp-20002 PLacp-oo002 | SC/ UV aC mmev-o1034 | (UHI) | Coatings iscontinuites = Rit6ot0-TOSS. | Inspector | =| a ‘oot | + 0ep 30480031 | + DEP 30.48.0031 Sa ITRNoV-0103A-S HOLIDAY TEST INSPECTION REPORT , S Petrofac @ 53 ame suze Thao sat vtes! | Sear 5 : Project No:R1118111 Record No: T- 1151-000) /4 Tag No: T- 1961 PlantUnit: wo3- C |Sub-System No: $00-MS-DTL- 100A Isomotrillino Surface to be Tested: IntemallExteral m0: item Inspected: reoweting ee Underground ie Glass Flate Lining (Tick as applicable) Aboveground : Oo yes No ] Welds Included | Holiday instrument Si.No Section Seceeud aaetbate Accepted Reject Remarks T [Dab Ping Conderside WIE WIA | Te 20833 HEC = = Company Signature: GYKeplicable C1 Not Arpcabie Record Acceptance Sub Contractor uv. ac TOPIPMC Name 2Gkdo b. Ternokou a a i, oo Date to [may [ay et ano = Page Tart Tet TP No: PECOUTP TTS at DISCONTINUITY (Pinhole) TESTING REPORT fee ASTM D 5162 Test Method B & AS 3994.1 Method 1 Date: 10-May-2022 [|Report Not | HVI/TAC/CFP/O01/2022 Project Name: Clean Fuel Project ‘Owner ‘Thal Oil Public Company Limited atts Contractor: Petrofac, Saipem and Samsung J.V. ‘Sub-contractor: TRC Site/Work Location: TRC shop, Rayong Drawing/Specification No. | Ri118111-11300-MS-DTL-10034-Rev.0 DC High Voltage: For Coatings Applied > 500 Microns (asTM p 5162-B) (AS 3894. ‘Average Coating a Voltage Number of Date of Test as Volume Solid % vane Due [10-May-2022 500 micron 82% 2kv o ae uk Pee 7 ] Coating Passed? ves No | Jotun CA Note, z This test is performed on Underside Drip Ring of T-11301 and T-11351 (ECS95) Name Top/PMC Signature Print Name Mr.Amnard Fug-in ARUN S. Date romay202 | to/ May /2) | kt-tmoy -e,| 23MM me DISCONTINUITY (Pinhole) TESTING REPORT ASTM D 5162 Test Method B & AS 3994.1 Method 1 Photo reference Equipment: cicometer 236 D.C Holiday Detector Serial no.: 1c20877 Result: voltage set 2000VDC or 2.0 kv. Test on Underside Drip Ring 7-11301 and T-11351 Test on Underside Drip Ring T-11301 and T-11351

You might also like