Checklist - Internal Painting Work
Checklist - Internal Painting Work
PAINTING
PROJECT: SATTVA DIVINITY TOWER/BUILDING: DATE:
FLOOR/LEVEL: FLAT/ROOM:
DURING PAINTING
1 Check for surface preparation works
like joints grinding etc., done.
Check for application of one coat coarse
2 putty of BIRLA PUTTY on
joints.
Check for application of one coat coarse
3 putty of BIRLA PUTTY on full
surface.
4 Check for edges and corners are finished
properly.
Check for application of one coat smooth
5 putty of BIRLA / ASIAN
PUTTY on full surface.
Check for surface is smooth & uniform and
6 edges & corners are straight and
crisp.
Check for proportion of paint mix with water
7 as per manufacturer’s
specifications.
8 Check for consistency of paint.
DATE:
Sattva
Y N Sign
nature:
CHECKLIST FOR INTERNAL PAINTING WORK
Project : - Sattva Divinity Project, Mysore Road Date : -
Tower/Flat No : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO PAINTING
Are manufacturer’s specifications for
1
painting available for reference.
2 Availability of approved shade details.
Check whether inspection is carried out (MIR) for received
3
paint,putty,primer etc.,and approved.
DURING PAINTING
Check for surface is smooth & uniform and edges & corners
6
are straight and crisp.
Name : - Name : -
Check list for Internal Door Shutter Painting Works
Project : - Sattva Divinity Project, Mysore Road Date : -
Tower/Flat No : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO PAINTING
Name : - Name : -
Check list for Pylon Cladding Works (Fundermax)
Project : - Sattva Divinity Project, Mysore Road Date : -
Location : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO INSTALLATION:-
Name : - Name : -