CHECKLIST FOR OBD IN BASEMENT CEILING & RC WALLS

PAINTING
PROJECT: SATTVA DIVINITY TOWER/BUILDING: DATE:
FLOOR/LEVEL: FLAT/ROOM:

Sl# Description Date Simplex Synergy


Y N Sign Y N Sign
PRIOR TO PAINTING
1 Are manufacturer’s specifications for
painting available for reference.
2 Availability of approved shade details.
Check whether inspection is carried out
3 (MIR) for received paint, putty,
primer etc., and approved.
4 Check for an available / received
paint, putty, primer etc., is approved.
Check for an available / received paint,
putty, primer etc., is having sufficient
5
validity period as per
manufacturer
Check for cleaning of wall & ceiling surface.
6 Is it free from dead mortar,
dirt, dust, algae, grease etc.
7 Check for filling of pits or undulations
in the concrete / plaster surface.
8 Check for suitability & safety of
scaffolding and platforms.
9 Check for Availability of sufficient
painting material in site.
Check for Availability of sufficient
10 skilled painters and painting gangs for work

DURING PAINTING
1 Check for surface preparation works
like joints grinding etc., done.
Check for application of one coat coarse
2 putty of BIRLA PUTTY on
joints.
Check for application of one coat coarse
3 putty of BIRLA PUTTY on full
surface.
4 Check for edges and corners are finished
properly.
Check for application of one coat smooth
5 putty of BIRLA / ASIAN
PUTTY on full surface.
Check for surface is smooth & uniform and
6 edges & corners are straight and
crisp.
Check for proportion of paint mix with water
7 as per manufacturer’s
specifications.
8 Check for consistency of paint.

9 Check for application of 1st coat OBD paint


of ASIAN PAINT on full surface.
Check for time interval between two coats
10 as per manufacturer’s
specifications.
11 Check for application of 2nd coat OBD paint
of ASIAN PAINT on full surface.
AFTER PAINTING
1 Check for application of paint. Is it
uniform?
Check for dismantling of scaffolding,
2 platforms etc. and removed from the
painted area.
3 Check for painted area cleaned and
removed all materials.
COMMENTS / CORRECTIVE ACTION PROPOSED:
Vendor Rep Signature: SYNERGY Civil / Services Rep Signature:
NAME: NAME:
Consultant Rep Signature (Not Mandatory): Client Rep Signature: NAME:
NAME:
RC WALLS

DATE:

Sattva
Y N Sign
nature:
CHECKLIST FOR INTERNAL PAINTING WORK
Project : - Sattva Divinity Project, Mysore Road Date : -

Tower/Flat No : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO PAINTING
Are manufacturer’s specifications for
1
painting available for reference.
2 Availability of approved shade details.
Check whether inspection is carried out (MIR) for received
3
paint,putty,primer etc.,and approved.

Check for an available/received paint, putty, primer etc.,is


4
approved.
Check for an available/received paint,putty,primer etc., is
5 having sufficient validity period as per
manufacturer
Check for cleaning of wall & ceiling surface. Is it free from
6
dead mortar, dirt, dust, algae, grease etc.

Check for filling of pits or undulations in the concrete /


7
plaster surface.
Check for availability of floor covering arrangements done at
8
site before start painting work
Check for availability of skilled painters and sufficient painting
9
material in site for works

10 Check and ensure the safety of scaffolding, platforms if any

DURING PAINTING

Check for surface preparation works


1
like joints grinding etc., done. (If required)
Check for application of one coat coarse putty at joints (if
2
any)
Check for application of one coat coarse putty of BIRLA
3
PUTTY on full surface.

4 Check for edges and corners are finished properly.

Check for application of one coat smooth putty of


5
BIRLA/ASIAN PUTTY on full surface.

Check for surface is smooth & uniform and edges & corners
6
are straight and crisp.

Check for proportion of paint mix with water as per


7
manufacturer’s specifications.(If any)
8 Check for consistency of paint.
Check for application of 1st coat of paint of ASIAN PAINTon
9
full surface.

Check for time interval between two coats as per


10
manufacturer’s specifications.

Check for application of 2nd coat of paint of ASIAN PAINT on


11
full surface.
AFTER PAINTING
1 Check for application of paint.Is it uniform?
2 Check for any visibile brush marks/stains/patches et.., found after
finishing.
3 Check the putty or paint stains cleaned from skirting and floor tiles.

Check for dismantling of scaffolding, platforms and removed


4 from the painted area. Ensure cleaning of painted area etc.

COMMENTS / CORRECTIVE ACTION PROPOSED:

Vendor Rep Signature: SATTVA Rep Signature:

Name : - Name : -
Check list for Internal Door Shutter Painting Works
Project : - Sattva Divinity Project, Mysore Road Date : -

Tower/Flat No : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO PAINTING

Are manufacturer’s specifications for


1
painting available for reference.
2 Check approved shade details is available?

Check whether inspection is carried out (MIR) for received


3
paint,putty,primer etc.,and approved.

Check for an available/received paint,putty,primer etc., is


4
having sufficient validity period as per manufacturer

Check for cleaning of shutter surface - Is it free from dead


5
mortar, dirt, dust, algae, grease etc.

Check for filling of knots/ undulations/dents in the shutter face /


6
frame surface.

Check for availability of floor covering mats and masking tape


7
wrapped in all hardware fixture before start painting work

Check for availability of skilled painters and sufficient painting


8
material in site for works
DURING PAINTING

Check for surface preparation works


1
like joints grinding etc., done. (If required)

2 Check for application of one coat wood primer on full surface.

3 Check for application of touch up wood putty at joints (if any)

4 Check the application of 1st coat wood putty on full surface.

5 Check for edges are finished properly.

6 Check the application of 2nd coat wood putty on full surface.

7 Check the application of 2nd coat wood primer on full surface.

Check for proportion of paint mix as per manufacturer’s


8
specifications. Asian Enamel - Matt finish
9 Check for consistency of paint.
Check the application of 1st coat Asian Enamel Paint on full
10
surface.
Check for time interval between two coats as per
11
manufacturer’s specifications.
Check the application of 2nd coat Asian Enamel Paint on full
12
surface.
AFTER PAINTING
1 Check for application of paint.Is it uniform?
Check for any visibile brush marks/stains/patches et.., found after
2 finishing.
Check the putty or paint stains cleaned from hardware fixture,
3 skirting and floor tiles

4 Check the cleaning of painted area is done


COMMENTS / CORRECTIVE ACTION PROPOSED:

Vendor Rep Signature: SATTVA Rep Signature:

Name : - Name : -
Check list for Pylon Cladding Works (Fundermax)
Project : - Sattva Divinity Project, Mysore Road Date : -

Location : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO INSTALLATION:-

1 Are approved shop drawing available or Released for execution.

2 Check the materials deployed for installation are approved.

Check whether inspection is carried out (MIR) for received


3
paint,putty,primer etc.,and approved.

Check for an available/received paint,putty,primer etc., is


4
having sufficient validity period as per manufacturer

Check for cleaning of shutter surface - Is it free from dead


5
mortar, dirt, dust, algae, grease etc.

Check for filling of knots/ undulations/dents in the shutter face /


6
frame surface.

Check for availability of floor covering mats and masking tape


7
wrapped in all hardware fixture before start painting work

Check for availability of skilled painters and sufficient painting


8
material in site for works
DURING PAINTING

Check for surface preparation works


1
like joints grinding etc., done. (If required)

2 Check for application of one coat wood primer on full surface.

3 Check for application of touch up wood putty at joints (if any)

4 Check the application of 1st coat wood putty on full surface.

5 Check for edges are finished properly.

6 Check the application of 2nd coat wood putty on full surface.

7 Check the application of 2nd coat wood primer on full surface.

Check for proportion of paint mix as per manufacturer’s


8
specifications. Asian Enamel - Matt finish
9 Check for consistency of paint.
Check the application of 1st coat Asian Enamel Paint on full
10
surface.
Check for time interval between two coats as per
11
manufacturer’s specifications.
Check the application of 2nd coat Asian Enamel Paint on full
12
surface.
AFTER PAINTING
1 Check for application of paint.Is it uniform?
Check for any visibile brush marks/stains/patches et.., found after
2 finishing.
Check the putty or paint stains cleaned from hardware fixture,
3 skirting and floor tiles

4 Check the cleaning of painted area is done


COMMENTS / CORRECTIVE ACTION PROPOSED:

Vendor Rep Signature: SATTVA Rep Signature:

Name : - Name : -