Checklist - Internal Painting Work
Checklist - Internal Painting Work
Tower/Flat No : -
Vendor Sattva
SL Description Date Remarks
Y N Sign Y N Sign
PRIOR TO PAINTING
Are manufacturer’s specifications for
1
painting available for reference.
2 Availability of approved shade details.
Check whether inspection is carried out (MIR) for received
3
paint,putty,primer etc.,and approved.
Check for an available/received paint, putty, primer etc.,is
4
approved.
Check for an available/received paint,putty,primer etc., is
5 having sufficient validity period as per
manufacturer
Check for cleaning of wall & ceiling surface. Is it free from dead
6
mortar, dirt, dust, algae, grease etc.
Check for filling of pits or undulations in the concrete / plaster
7
surface.
Check for availability of floor covering arrangements done at
8
site before start painting work
Check for availability of skilled painters and sufficient painting
9
material in site for works
DURING PAINTING
Check for surface is smooth & uniform and edges & corners
6
are straight and crisp.
Name : - Name : -