1. The name of the substation must be Noted. All substations name has Noted
cleared. The contractor may be been revised as per Contract BOQ
instructed to use or write the substation Price Part
by one name-As the Substation has
been written by different names on
different pages, Like –Bachedichaur
Nagma, Distt. Kalikota on the Covering
Letter of Geo-technical report, Tilagufa
in the Geotechnical Report, Nagma SS,
Kalikot in Annex-A (site Map) and
Bachedichaur Kalikot in the Master
Plan. The same please be checked for
another substation too.
2. The test has been conducted by M/S Before Starting of ERT and Noted
Pashupati-Driling & Geo-technical Pvt. Geotechnical Investigation activities.
Limited, Please confirm whether the We informed to NEA and No
approval of the same has been taken by objection certification issued by NEA
NEA. If yes, please share. to us. Letter is hereby attached
4. The identified quarry sites description Identification of Quarry sites in not a Please provide a details of quarry
along with the map and coordinates part of Substation Geotechnical site along with the material to be
may kindly be provided. investigation. extracted viz a viz requirement of
material at site.
8. The graph clearly mentioning the The sample test is not applicable for Noted
Moisture Content (%) vs No. of Blows weathered rock.
should be plotted to get the Flow Index
value
9. The LL and PL values for some samples The sample test is not applicable for Noted
from Trial Pit are not-known. Kindly weathered rock.
clarify
10. Test results related to swell pressure The sample test is not applicable for Noted
and free swell index determination are weathered rock.
not provided
11. Chemical tests results for soil samples The sample test is not applicable for Noted. However, Kindly see
as per IS: 2720 are not provided. Kindly weathered rock. ANNEX-F (Laboratory Test Result
clarify Summary Sheet) of the submitted
report. Chemical Test Result has
been shown at 3m depth. We
understand rock has been
encountered after 1m depth as
per Annex-B (Bore Hole Log
datasheet) Kindly clarify.
12. Chemical tests pertaining to the The sample test is not applicable for Noted
presence of Nitrate in water samples weathered rock.
are not provided. Kindly Clarify
13. The contractor may be instructed to The sample test is not applicable for Noted
provide the chemical tests results weathered rock.
sample wise for better understanding of
the harmful substances present in soil
and water.
14. The type of sample (Disturbed or Bore hole sample is Undisturbed. Noted
Undisturbed) should be clearly written
in the result table
15. The test result range of aggregate Note a part of sub- station Noted
impact value, crushing value and Geotechnical, Material test may be
abrasion, value as per IS-2386 may done separately, if required as per
kindly be provided contract comment.
16. Kindly provide the photographs Site images are hereby attached. We have asked for the
performing Laboratory Testing as well. photographs of Laboratory
Testing. However, the
photographs received are of field
tests only. Kindly provide
B. Comments/observations on Earth
Resistivity Test report Applicable on
both the substations
5 It seems from the report that earth Earth resistivity test has been Noted.
resistivity has been measures in April measured in February 2023 and our
2022. The same may also be required in contract started from Nov. 2022. As
dry season during (Oct-Dec 2023) for per contract agreement, if there is a
designing the earth mat. requirement for measurement in dry
season, may be measured in dry
season.