Audit TPS18-2-23
Audit TPS18-2-23
Audit TPS18-2-23
SIG-1123-DP27 MINOR Mud Agitator repair leak in agitator n°5 MEC Chef mec -DLIGA MARWEN
SIG-1131-DP01 MAJOR air winch repair leaking oil MEC YAAKOUBI SAMI
SIG-1167-DP14 CRITICAL BOP control unit repair leak on bypass valve FOR KHALIFA HOUCINE
SIG-1169-DP16 CRITICAL BOP control unit repair leak on PRV FOR KHALIFA HOUCINE
Recalibrate gauges on
SIG-1165-DP12 MAJOR BOP control unit elec Amine darwaz
accumulator unit
SIG-1116-DP04 MINOR Carrier Replace cushion on strong bar MEC SAMI YAAKOUBI
SIG-1113-DP01 MINOR Carrier Place missing bolts in tires MEC SAMI YAAKOUBI
Provide up to date inspection
SIG-1071-DP09 MAJOR carrier MEC SAMI YAAKOUBI
records on carrier.
SIG-1132-DP11 MINOR carrier compressor replace bearings tightener sheave MEC SAMI YAAKOUBI
SIG-1152-DP06 MAJOR choke panel place choke panel on rig floor FOR Houcine
SIG-1155-DP09 MAJOR choke panel repair leak on choke panel FOR chef macanicien
SIG-1127-DP07 MINOR diesel tank replace diesel tank level MEC chef mecanique
Provide recent measurement
SIG-1068-DP06 MAJOR DLA MEC Dligua
checks on DLA.
SIG-1136-DP05 MAJOR Drawwork repair chain cover leak MEC DLIGA MARWEN
SIG-1134-DP03 MINOR Drawwork repair input shaft Seal leaking MEC DLIGA MARWEN
SIG-1135-DP04 MINOR Drawwork Place missing bolts side cover MEC DLIGA MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1133-DP02 MAJOR Engine Place missing shields exhausts MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1137-DP06 MINOR Engine Place missing clamp filter MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1138-DP07 MINOR Engine clean filter indicator MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1117-DP05 MAJOR Engine repair oil leak on carrier engine n°1 MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1110-DP20 MAJOR Engine Place missing nut on engine handle MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1119-DP23 MAJOR Engine Replace RPM gauge MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1104-DP14 MINOR Engine Place filter indicator pump n°1 MEC
MARWEN
Place missing bolts on filter support HMIDI ABDELHALIM+JELJLI
SIG-1121-DP25 MINOR Engine MEC
pump n°1 MARWEN
Repair broken radiator guard pump HMIDI ABDELHALIM+JELJLI
SIG-1112-DP22 MINOR Engine MEC
n°1 MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1080-DP01 MINOR Engine repair damaged guard on genset 1 MEC
MARWEN
HMIDI ABDELHALIM+JELJLI
SIG-1083-DP04 MAJOR Engine repair oil sump leak on genset n°2 MEC
MARWEN
SIG-1072-DP10 CRITICAL handling equipment inspection cat 4 et cat 3 FOR KHAMMARI NOUREDDINE
SIG-1148-DP06 MINOR mast & substructure Straighten handrails FOR KHALIFA HOUCINE
SIG-1129-DP09 MINOR mast & substructure repair oil leak on Levelling Cylinder MEC SAMI YAAKOUBI
SIG-1108-DP18 MINOR mud pump Place piston gaskets FOR chef chantier
SIG-1095-DP05 MAJOR mud pump n°1 place missing bolts on chain guard MEC DLIGA MARWEN
SIG-1096-DP06 MINOR mud pump n°1 place pressure gauge pump n°1 MEC DLIGA MARWEN
SIG-1073-DP11 MAJOR mud pump n°2 Cat IV inspection mud pump °2 MEC DLIGA MARWEN
SIG-1106-DP16 MINOR mud pump n°2 Replace gauges broken glasses ELEC Amine darwaz
SIG-1159-DP32 CRITICAL VACCUM DEGASSER Repair vacuum degasser FOR KHALIFA HOUCINE
Connect vacuum degasser vent to
SIG-1160-DP33 CRITICAL VACCUM DEGASSER FOR KHALIFA HOUCINE
mud gas separator
SIG-1180-DP38 MINOR WATER TANK repair leak on the transfer pump MEC DLIGA MARWEN
PLAN
DATE
DOCUMENTS DATE REAL
Observatio
PLAN D'ACTION Etat
n
Durée
DEBU
DEBU
FIN
(j)
Document
T
16/2/23
23/2/23
Will be fixed durin Rigmove Open 0%
2
Critical parts to be provided Open 0%
1
Cat IV inspection records
Closed
avalable to 31/3/2031
15/1/23
17/1/23
Air winch replaced by new
Closed 100%
2
one Multy purpose See Photo 1131
CTF install
Closed 100% alwas a
certfie BOP
25/2/23
28/2/23
Valid until 25/2/2023
Open 0%
1
will be calibrated before spud
13/2/23
10/3/23
25
Alarm system Upgrading On going 20% DA23000586
dernièrement
on a changé
la chaine et
sur site Closed 100% See Photo 1168
confectionné
des joints
d'etancheité
cushion
14/2/23
24/2/23
10
will be done before spud On going 20% available in
stock
bolts
14/2/23
21/2/23
will be placed befor spud On going 40% available in
7
stock
Open
leak repaired
repair leaking air on carrier on carrier
Closed 100%
driller side brake actuator driller side
brake No Photo
23/2/23
2/3/23
will be placed before spud On going 80%
7
DI23004204
1
sheave DRA4043 en activité
See Photo 1132
25/2/23
27/2/23
air hoses will be placer in
On going 50%
2
boxe
1
Will be fitted in tps well Open 0%
1 1
sur site Open 0%
25/2/23
26/2/23
Gauge will be replaced Closed 100%
1
DRA28
sur site Open 0%
DRA33
1
See Photo 1105
CTF colour
code is fully
implemented
in the Rig site
and the lifting
gear register
is
Perform lifting inspection and continuously
apply the colour code Open updated.
Colour code
applied to
service
companies
equipment
depends on
the operator
procedure
Open 0%
Open 0%
#####
#####
gauge
Closed 100%
1
replaced See Photo 1127
To clarify the
Will be performed during the
required
inspection campaign before Open
measurement
spud
checks
Open DA23000505
#####
#####
repair chain cover leak Closed 100%
1
See Photo 1136
pièces de
rechange à
recommande
7/8/23
7/8/23
Will be fixed durin Rig move Open 0% r(fabrication DA23000505
3
PARAHUILE)
OU
DA23000505
#####
#####
Place missing bolts side
Closed 100%
1
cover See Photo 1135
Open Sfax
jours
04
Will be fixed before Rig spud Open 0% Sfax
Ensure proper bolting on
Closed 100%
cable endings
See Photo 1182
Will be fixed before Rig spud Open 0%
1
#####
Will be fixed before Rig spud Closed 100%
1
Will be replaced before Rig
On going 0% DRA833 DA23000288
1
spud
1
See Photo 1117
1
See Photo 1114
replacement missing nut Closed 100%
1
See Photo 1110
gauge
remplacement gauge niveau Closed 100%
1
replaced
See Photo 1119
#####
#####
assembly of indicator for
Open 0% DRA834
1
filter
guard
Closed 100%
repaired
1
replaced
gauges cleaned Closed 100% cloturé
See Photo 1099
PIECES
25/2/23
25/2/23
prelub pump to be placed On going 50% DISPONIBLE A
3
LA BASE
See Photo
guard repaired Closed 100% See Photo 1080
1080
calorifugage
place exhaust shield Closed 100% See Photo 1084
ok
25/2/23
25/2/23
cnd test to be completed
Open 0%
1
before rig spud
In the process of
On going 5%
1
manufacturing
Closed 100%
1
See Photo 1161
1
See Photo 1089
Closed 100% done See Photo 1090
TPS to specify
Valid until 23/2/2023. To be
25/2/23
17/3/23
the requested
20
performed during inspection Open 0%
handling
campaign before spud
equipment
1
See Photo 11858
25/2/23
28/2/23
Valid until 25/2/2023
Open 0%
4
will be calibrated before spud
Closed 100%
See Photo 1142
1/3/22
6/3/22
will be replaced before spud On going 50% DA22003753
5
during DTM Open 0%
1
purchase
5J
will be replaced prior spud Open 0%
material
jours
02
Valid until 22/2/2023 Open 0%
Pressure test and
will be done before spud On going 50%
1
Closed 100%
1
See Photo 1102
Fabrication
sur site Closed 100%
selon modèle
2 jours
sur site Closed 100% not major see photo1162
missing bolts
sur site Closed 100%
1
placed See Photo 1101
####
####
Closed 100%
1
guard placed See Photo 1095
11/2/23
11/2/23
place pressure gauge pump
Closed 100%
1
n°1
See Photo 1096
to Place missing bolts on missing bolts
Closed 100%
1
crosshead cover pump n°1 placed see photo 1097
17/2/23
17/2/23
To adress oil leak Closed 100% leak adressed
1
See Photo 1120
18/2/23
19/2/23
Closed 100% leak adressed
2
No Photo
The Mud pump #2 will be
##### #####
Parts
21
used as Backup Open 0%
available
Cat VI Can be done before
Place missing bolts on
Closed 100% bolts placed
1
chain guard pump n°2 See Photo 1109
1
See Photo 1106
Closed 100%
1
See Photo 1125
Open
Open
2
See Photo 1141
outer cover
outer cover to be replaced Closed 100%
1
repaired See Photo 1126
valid until 30 Mars 2023
Cat IV will be done before Open 0%
5
spud
valid until 30 mars 2023
Open 0%
3
will be done before spud
bearings clearances will be
controlled an recorded Open 0%
2
during rig move
Sfax
test
fontionnel a
vide :ok
,Reste test en
more clarification from TPS Open 0% charge
lorsque on
aura une
volume de
boue dans le
tanck n°1
besoin de
3"butterfly
valve pour
faire une in
let sur le vent
more clarification from TPS Open 0% DRA35
line + 10 m
flexible 3"
pour le
raccordemen
t
guards
Closed 100%
repaired
See Photo 1091
Repair during Rig Move Closed 100% floor repaired
5
See Photo 1091
Open 0% DT
1
8/2/23
8/2/23
Leak to be adressed Closed 100%
1
see photo01180
missing bolt
Closed 100%
replaced
Closed 100%
See Photo 1139
DATE REAL
FIN
Closed
Closed
On going
Open
Open; 35;
36%
Closed; 54;
56%
On going;
8; 8%