Professional Documents
Culture Documents
WORK PLAN Cost Estimate
WORK PLAN Cost Estimate
WORK PLAN Cost Estimate
1. Inception
report 1. Created
inception report
2. Research 2. Submitted
Proposal Research
Proposals/
3. Data collection Inception
instruments Report.
2. Drafted the
4. Validated Data research
Collection instrument.
FIRST
Instruments Researcher,
3. Validated the April, 2018-
research BERF
August, 2018 Validator
instrument
4. Prepared
and procured
research
materials. 24,000.00
5. Created
survey and
interview
schedule
6. Prepared
liquidation
report.
1. Final Report
3. Printed September-
December,
LAST
hardbound
manuscripts Researchers 6,000.00 BERF
2018
4. Exhibited
research output
through poster
and oral
presentation
5. Submitted
second tranche
liquidation
report.
6. Prepared liquidation
report Internet prepaid card 5 500 2500
Meals
10,000
Subtotal 24,000
1. Final Report 1. Finalized research Assorted School 20 pcs 30 600
output supplies
expenses
Subtotal 6,000
GRAND
TOTAL
P 30,000.00