Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING

DIRECTORATE GENERAL OF HUMAN SETTLEMENTS


Konstruksi : Bagi B CT 5 CENTRAL JAVA REGION RESIDENTIAL INFRASTRUCTURE CENTER
Gajah Mungkur Selatan Street No.14 - 16 Semarang Telephone.024-8442050, Fax. 024-8312752

STA : Jalur P-221 +30 / STA 22+550


19 Alamat : Desa Begajah, Sukoharjo, Sukoharjo ..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM.jpeg

Koordinat : 7°42'14.58"S, 110"52'9.01"E


KEY MAP :

961
105 6 039 3
10 3 85

937
10

267
222+50
106 039

103
222

479

110044 0124
+50

106 28
10322
347

09838
103
0
106 5 717
10
384
P.222
105 717

10041 43 14
1 35
10

3483
P.2
2

105 4292
2

110043 1
926
103 235
23

103
10606 26

7
1

169
103
221+50

0
106 267

6
106 139
19

103

5
077
7
105 777
20

013
103
221
P. 221+50

104

104
+50
10614
567

105 225

355
JA

103

974
10506 17 5
TP.3

1 5 63
17
104 496 106 078
13

10
P.221

915 2
105 821

LA
10415
553

103
105 144
16
104 803
18

775
103
N

P.2
706
21

98
lly
Vo

4
IN

an

25
ang

106
Lap
220+50
106 050

05
SP
SA

0
98
22

06

10013 8 73
0+

1 4 9 55
6

10 03 7
EK

50

42170
L

1
+10

103
UR

10
6
PROJECT NAME :

SI
AN
5.
+

00
The Development of Regional

IN
+10
Water Supply System Wosusokas

DU
4.0

KC
+

0
LOCATION :

+10

OL
O
+10

3.0
Sukoharjo District, Central Java Province

TIM

+10
0
5.0
+

UR

3.0
0

+10
+10
PACKAGE :

5.0
4.0
Construction of Water Treatment Plant Wosusokas Regional

0
0
Water Supply System
PIPA STEEL Ø 1000 mm
DRAWING TITLE :

+
+10 Layout Existing Perlintasan Pipa

CONSULTANT :
4.0

+
0

+5 0 IMPLEMENTATION CONSULTANT ( IC )
+
2 2 1 REGIONAL WATER SUPPLY SYSTEM WOSUSOKAS
Perumahan Solo Baru Sektor 1 Jalan Cemara Raya No DB4
P Gedangan, Grogol, Kab. Sukoharjo, Jawa Tengah
+1
03.

DRAFTED :
+
00

CAD - OPERATOR : Edy Endro Purwono, ST.


PERM
+

UKI
WAR MAN CHECKED :
GA
JUNIOR STRUCTURE SPECIALIST : Ir. Abdul Rozak
+

JA
LA
VERIFIED :

N
IN
+

SP
SENIOR STRUCTURE SPECIALIST : Ir. Faturrachman

EK
SI
APPROVED :
+

IMPLEMENTATION CONSULTANT ( IC )
"REGIONAL WATER SUPPLY
SYSTEM WOSUSOKAS"
+

SALURAN IRIGASI
Ir. N. Sardjiono P, M.M.
+

Team Leader

APPROVED :
+

PT. TIRTA UTAMA (PERSERODA)


PROVINCE OF CENTRAL JAVA
+

Djoko Suprapto, S.E., M.M.


+

Executive Director

DRAWING NUMBER
REVISION
LAYOUT EXISTING PERLINTASAN PIPA 00 2.5
2.5 55 7.5
7.5 10m
10m
1:200
DWG CODE PAGE NUMBER
1:200
+

B
+

..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM (1).jpeg
+
MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING
DIRECTORATE GENERAL OF HUMAN SETTLEMENTS
CENTRAL JAVA REGION RESIDENTIAL INFRASTRUCTURE CENTER
Konstruksi : Bagi B CT 5 Gajah Mungkur Selatan Street No.14 - 16 Semarang Telephone.024-8442050, Fax. 024-8312752

+
STA : Jalur P-221 +30 / STA 22+550
Alamat : Desa Begajah, Sukoharjo, Sukoharjo ..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM.jpeg

+
Koordinat : 7°42'14.58"S, 110"52'9.01"E
KEY MAP :

819 1
102 5 267 9

96
10 6 03
10 3 853

937
10
222+50
106 039

103
222

479

110044 0124
+5

106 28
103
22347

09838
103
0
106 5 717
10
384
P.222
105 717

10041 4 14
1 35
10
+

34383
P.2
22

105 4292
10043 1
1

926
10323
235

103 065
10606 26

7
1

169
103
221+50
106 267

103
10619
139

077
7
105 777
20

103

013
221

104

104
+50
106 567
14

105 225

355
103
+
P. 221+50

974
10506 17 35
TP.3

1 56
JA
17
104 496 106 078
13

10
P.221

915 2
105 821

10415
553

103
105 144
16
104 803
18

775
103
LA

P.2
706
21

98
lly
N

Vo

42
an
ang

5
10
Lap

60
220+50
106 050

IN

50
98
+

22

06

1003 8 73
SP

0+

1 4 9 55
6

1 4 70
10 7
50

10

21
3
10
JA

10606
37
EK

1 5
10

73
PROJECT NAME :

+10

SI
AN

5.0
The Development of Regional

IN

0
Water Supply System Wosusokas

SA
SP

+10

LU
EK

4
.00

RA
SI
LOCATION :

N
+10

IN
Sukoharjo District, Central Java Province

3
+10

DU
.00

+10
5.0

K
+

CO

3.0
PACKAGE :

0
LO

+10
Construction of Water Treatment Plant Wosusokas Regional

4
TIM

.00
Water Supply System

U
PIPA STEEL Ø 1000 mm

R
DRAWING TITLE :

+10
5.0
+

0
Denah Situasi Perlintasan Pipa
+10

CONSULTANT :
4.0

+
0

IMPLEMENTATION CONSULTANT ( IC )
+50 REGIONAL WATER SUPPLY SYSTEM WOSUSOKAS
2 1 Perumahan Solo Baru Sektor 1 Jalan Cemara Raya No DB4

P2
+

Gedangan, Grogol, Kab. Sukoharjo, Jawa Tengah

DRAFTED :
+10

+
3.0
0

CAD - OPERATOR : Edy Endro Purwono, ST.


+

PERMUKIMAN CHECKED :

WARGA
JUNIOR STRUCTURE SPECIALIST : Ir. Abdul Rozak
+

JA
LA
VERIFIED :

N
IN
SENIOR STRUCTURE SPECIALIST : Ir. Faturrachman
+

SPE
KS
APPROVED :

I
+

IMPLEMENTATION CONSULTANT ( IC )
"REGIONAL WATER SUPPLY
SYSTEM WOSUSOKAS"
+

SALURAN IRIGASI Ir. N. Sardjiono P, M.M.


+

Team Leader

APPROVED :

PT. TIRTA UTAMA (PERSERODA)


+

PROVINCE OF CENTRAL JAVA


+

Djoko Suprapto, S.E., M.M.


Executive Director
+

DRAWING NUMBER
REVISION
DWG CODE PAGE NUMBER

B
+

DENAH SITUASI PERLINTASAN PIPA 0 2.5 5 7.5 10m


1:200
+

..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM (1).jpeg
MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING
B DIRECTORATE GENERAL OF HUMAN SETTLEMENTS
BBWS BORDER CENTRAL JAVA REGION RESIDENTIAL INFRASTRUCTURE CENTER
Gajah Mungkur Selatan Street No.14 - 16 Semarang Telephone.024-8442050, Fax. 024-8312752

..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM.jpeg

PIPA STEEL Ø 1000 mm

KEY MAP :

961
105 6 039 3
10 3 85

937
10

267
222+50
106 039

103
R

222

479
W UM

10044 0124
1 06
+50
RU

1
10322
347

09838
103
AR AH

028
M

106 5 717
10
AH

384
P.222
105 717

10041 4 14
G

1 35
10

34383
A

P.2
W

105 4292
2
AR

10043 1
1
JALAN INSPEKSI

JALAN INSPEKSI

926
103 235
23

103 065
10066 26

7
G

169
103 13
221+50
106 267

A
106 139

103
19

077
7
105 777
20

0
103
P. 221+50

221

104

104
+50
106 567
14

105 225

35
103

5
974
10506 17 5
TP.3

1 5 63
17
104 496 106 078
13

10
P.221

91 2
105 821

104 553
15

5
103
10516144

104 803
18

77
103

5
P.2
706
21

98
lly
Vo

42
ngan

5
Lapa

10
60
220+50
106 050

50
98
22

06

1003 8
0+

1 4
6

1 4 70
10 03
5

21
0
PROJECT NAME :

A A The Development of Regional


P 221+50 PINTU AIR Water Supply System Wosusokas

LOCATION :
SALURAN IRIGASI
Sukoharjo District, Central Java Province

PACKAGE :

Construction of Water Treatment Plant Wosusokas Regional

JALAN INSPEKSI

JALAN INSPEKSI
Water Supply System

SALURAN INDUK COLO TIMUR


AN

DRAWING TITLE :
IK
M
LA

Tampak Atas Perlintasan Pipa


KO

N
A
IK

CONSULTANT :
M
LA

IMPLEMENTATION CONSULTANT ( IC )
KO

REGIONAL WATER SUPPLY SYSTEM WOSUSOKAS


Perumahan Solo Baru Sektor 1 Jalan Cemara Raya No DB4
AN

Gedangan, Grogol, Kab. Sukoharjo, Jawa Tengah


IK
M

DRAFTED :
LA
KO

CAD - OPERATOR : Edy Endro Purwono, ST.

CHECKED :

B
JUNIOR STRUCTURE SPECIALIST : Ir. Abdul Rozak
1000 460 300 450 200 330 1180 330 270 500
VERIFIED :

TAMPAK ATAS PERLINTASAN PIPA 0 2.5 5 7.5 10m


1:200 SENIOR STRUCTURE SPECIALIST : Ir. Faturrachman

APPROVED :
SALURAN IRIGASI JALAN INSPEKSI
PINTU AIR JALAN INSPEKSI IMPLEMENTATION CONSULTANT ( IC )
BBWS BORDER "REGIONAL WATER SUPPLY
SYSTEM WOSUSOKAS"
SALURAN INDUK COLO TIMUR

250 150 80 MAN

140 140 Ir. N. Sardjiono P, M.M.


300
Team Leader

APPROVED :
130
200
PT. TIRTA UTAMA (PERSERODA)
PROVINCE OF CENTRAL JAVA
100 PIPA STEEL Ø 1000 mm

P 221+50
Djoko Suprapto, S.E., M.M.
Executive Director

DRAWING NUMBER
REVISION
DWG CODE PAGE NUMBER
1000 460 300 450 200 330 1180 330 270 500
B
POTONGAN A- A 0 2.5 5 7.5 10m
1:200
..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM (1).jpeg
MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING
DIRECTORATE GENERAL OF HUMAN SETTLEMENTS
CENTRAL JAVA REGION RESIDENTIAL INFRASTRUCTURE CENTER
Gajah Mungkur Selatan Street No.14 - 16 Semarang Telephone.024-8442050, Fax. 024-8312752
URUGAN TANAH DIPADATKAN TIAP 20cm
JALAN INSPEKSI
SALURAN IRIGASI
..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM.jpeg

URUGAN TANAH DIPADATKAN TIAP 20cm


C D

250 KEY MAP :

P.2

045
102
23

819 1
102 5 267

96
10 6 039 3
10 3 85

937
10
222+50
106 039

103
222

479

110044 0124
+50
80

106 28
103 347
22

09838
103
0
106 5 717
10
384
P.222
105 717

10041 4 14
1 35
10

34383
P.2
22

105 4292
10043 1
1

926
103 235
23

103 065
10606 26

7
140

169
150

103
221+50
106 267

LAUNCH PIT RECEPTION PIT


106 139

103
19

P. 221+50

077
7
10520777

103

013
221

104

104
+
14567
106

105 225

355
50

103

974
10506 17 5
TP.3

1 5 63
17
104 496 106 078
13

10
30
P.221

915 2
105 821

104 553
15

103
10516
144

104 803
18

775
103
P.2
706
100

21

98
lly
Vo

42
an
ang

5
10
Lap

60
220+50
106 050

50
130

98
22

10103
66
0+

1
200

50
PROJECT NAME :

JACKING DIRECTION The Development of Regional


Water Supply System Wosusokas
PIPA STEEL Ø 1000 mm
LOCATION :

Sukoharjo District, Central Java Province

700 200 260 200 PACKAGE :

TANAH EXISTING Construction of Water Treatment Plant Wosusokas Regional


HORIZONTAL BORING = 6.60 m Water Supply System

DRAWING TITLE :

Potongan dan Detail Perlintasan Pipa


0 2.5 5 7.5 10m
POTONGAN B - B 1:200
CONSULTANT :

IMPLEMENTATION CONSULTANT ( IC )
REGIONAL WATER SUPPLY SYSTEM WOSUSOKAS
Perumahan Solo Baru Sektor 1 Jalan Cemara Raya No DB4
Gedangan, Grogol, Kab. Sukoharjo, Jawa Tengah

DRAFTED :
SALURAN IRIGASI
URUGAN TANAH DIPADATKAN TIAP 20cm CAD - OPERATOR : Edy Endro Purwono, ST.
140 150
CHECKED :

JUNIOR STRUCTURE SPECIALIST : Ir. Abdul Rozak

30
VERIFIED :

SENIOR STRUCTURE SPECIALIST : Ir. Faturrachman


PIPA STEEL Ø 1000 mm 100
APPROVED :

IMPLEMENTATION CONSULTANT ( IC )
TANAH EXISTING "REGIONAL WATER SUPPLY
200 SYSTEM WOSUSOKAS"

25 100 25
100
Ir. N. Sardjiono P, M.M.
Team Leader

APPROVED :

PT. TIRTA UTAMA (PERSERODA)


PROVINCE OF CENTRAL JAVA
PIPA STEEL Ø 1000 mm 100

TANAH EXISTING

DETAIL D 0 0.5 1 2m
1:50 Djoko Suprapto, S.E., M.M.
Executive Director

DRAWING NUMBER
REVISION
DWG CODE PAGE NUMBER

DETAIL C 0 0.5 1 2m
1:50 B
..\..\..\..\..\TECHNICAL RECOMENDATION DRAWING FOR BBWS\2. GAMBAR LOKASI:PETA SITUASI\WhatsApp Image 2022-07-26 at 11.16.28 AM (1).jpeg

You might also like