Form No.

OSJV-FM-SCT-0005
PRE-EXCAVATION CHECKLIST
Rev. 0

Reference Drawing no:

Project:

Date: Day: Day Shift / Night Shift

Excavation Sequence No. : Top Heading / Bench / Invert Location:

Shaft: Mix of Concrete : Dry / Wet

Items to check: √ or N/A Remarks:

Dry Shotcrete available

Wet Shotcrete available

Accelerator available

Wire mesh available

Lattice girders available

Alignment check

Oxygen level checked

Probe drilling completed

Visual inspection of SCL

Min. shotcrete strength of 6Mpa


achieved (In-situ test - Hilti Gun)

Nozzleman available
Comments by QSS RE/RTO:

Prepared by: Subcon Checked by: OSJV Checked by: QSS


Tunnel Engineer / Supervisor Tunnel Engineer / Supervisor RE/RTO

Name / Signature / Date Name / Signature / Date Name / Signature / Date