AWANGES Bima
aeaosir
Net — 12, Jalan USI 21/7, 47680 Subang Jaya, Selangor Darl Ehsan
‘Tel; 603-8023 3708, Fax 603-8023 3086 Email: absb@awangsa cosy
Our Ref : ABSB/KH-P3/SKM/1211/08
Date : 16 October 2008
SINCLAIR KNIGHT MERZ SDN BHD
Suite E-15-01 & E-15-02
15™ Floor Block E
Plaza Mont Kiara
50480 Kuala Lumpur
ATT _FE ENG LAI
Dear Sirs
CADANGAN PEMBANGUNAN 228 UNIT KONDOMINIUM YANG MENGANDUNGI 3
BLOK KONDOMINIUM 9 TINGKAT (54 UNIT) & 3 BLOK KONDOMINIUM 20 TINGKAT
DAN KEMUDAHAN PENDUDUK DI ATAS LOT PT6594, JALAN 19/70A DI ATAS TAMAN
‘SRI HARTAMAS, MUKIM KUALA LUMPUR, DAERAH KUALA LUMPUR.
CONCRETE REPAIR METHOD FOR.EL
Referring to the abi ne Nc
statement for electrical
=
ours faithfully;
AWANGSA BINA SDN BHD.
‘Sinclair Knight Merz Sdn Bhd -Mr. Ir Chong Thin Hoot
SA Architects Sdn Bhd “MrAlox Lyo i
‘Meinhardt (M) Sdn Bhd “Ms.Cheryl Chal :
-Mr.ktun See Keet |
Awangsa Bina Sdn Bhd HQ Mr. Tan Chuan Han
TSHRAMIn; SUMMIT POWER ENGINEERING SDN BAD.
No.37-1, Jalan 5/36 Bukit Sri Bintang, Kepong 52100 Kuala Lumpur
Tel: 03-6273 4350 Fax: 03-6276 7897
METHOD STATEMENT
REPAIRING OF DEFECTIVE CONCRETE USING PATCH REPAIR METHOD
APPLICATION INSTRUCTIONS.
Clean surface and remove all dust and unsound material. Flood the grouting
zone with clean water for several hours. Immediately before grouting, blow out
remaining water, including that trapped in pockets or bolt holes. Formwork should
be leakproof.
Mixing
Use a slow speed heavy duty drill (400 — 500rpm) fitted with a hight shear mixing
head. Water must be accurately added as follows.
Trowellabel consistency
3.4— 366 Litres per 25 kg bag
Flowable consistency
4.0-45 Litres per 25 kg bag
Slowly add water, mixing continuously. After all the powder is added, continue
mixing for 3-5 minutes
Placing
Ensure enough material can be mixed to enable continuous pouring without
interruption until completion. Pour from one side only.CEMENT GROUT PHOTO